CN218292255U CN202222512882.2U CN202222512882U CN218292255U CN 218292255 U CN218292255 U CN 218292255U CN 202222512882 U CN202222512882 U CN 202222512882U CN 218292255 U CN218292255 U CN 218292255U
Authority
CN
China
Prior art keywords
fixedly connected
cover frame
steel
overlap joint
limiting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222512882.2U
Other languages
Chinese (zh)
Inventor
周弘力
程海燕
胡明文
赵顺祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huaren Road And Bridge Engineering Co ltd
Original Assignee
Anhui Huaren Road And Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huaren Road And Bridge Engineering Co ltd filed Critical Anhui Huaren Road And Bridge Engineering Co ltd
Priority to CN202222512882.2U priority Critical patent/CN218292255U/en
Application granted granted Critical
Publication of CN218292255U publication Critical patent/CN218292255U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application discloses assembled steel construction building, including PMKD, the first steel pillar of one side fixedly connected with at PMKD top, the top fixedly connected with installation cover frame on first steel pillar surface, the first overlap joint cover frame of the equal fixedly connected with in both sides on installation cover frame surface, the middle part fixedly connected with socket joint section of thick bamboo of first overlap joint cover frame one side. This application is through first steel pillar, the installation cover frame, first overlap joint cover frame, cup joint a section of thick bamboo, the connecting rod, the hand strap, the limiting plate, compression spring, the inserted bar, the setting of connection steelframe and spliced eye, the hand strap moves the connecting rod and stimulates backward, the limiting plate drives the inserted bar and contracts back to the inside of cup jointing a section of thick bamboo, will connect the steelframe again and place the inside of first overlap joint cover frame, compression spring resets the limiting plate, make the limiting plate drive the inserted bar insert inside the spliced eye, make the connection steelframe be convenient for fixed, thereby reached the effect of being convenient for the staff to the quick installation dismantlement of the top steelframe of steel construction building.

Description

Assembled steel construction building
Technical Field
The application relates to the technical field of steel structure buildings, in particular to an assembly type steel structure building.
Background
The steel structure building is a novel building system, breaks through the industry boundary line between the house and land industry, the building industry and the metallurgical industry, is integrated into a new industry system, and the existing steel structure building needs to be assembled and disassembled when in use and can be used for multiple times.
Disclosed an assembled steel construction building in patent document CN209975709U, including "base and steel sheet, the base upside is equipped with the slide, the dwang lower extreme passes through the second pivot to be connected with the slide upper end rotation, the base upper end is excavated there is T type spout, bottom end is excavated there are a plurality of draw-in grooves in the T type spout, slide lower extreme fixedly connected with T type slider, T type slider and T type spout phase-match, it has corresponding screw hole to excavate on slide and the T type slider, the slide upper end is connected with the location section of thick bamboo, the inboard fixture block that is equipped with of location section of thick bamboo, the inboard compression spring that is equipped with of location section of thick bamboo, threaded connection has the spacing ring on the fixture block, with setting up the mode into threaded connection between fixture block and the slide, stabilize fixed fixture block, can avoid the unexpected problem that breaks away from the draw-in groove of fixture block accident that exists after compression spring's elasticity performance worsens, and compression spring and fixture block all can change alone, avoid whole change, and save material. "above-mentioned technical scheme is when using, and is comparatively fixed to the mounting means of steel construction mostly, and the assembly effect that leads to the steel construction building is relatively poor, makes its use of dismantling difficult after long-time the use, therefore the staff need improve the fixed mode of device, makes its convenient to detach installation.
SUMMERY OF THE UTILITY MODEL
The application aims to provide an assembly type steel structure building so as to solve the problem that the assembly type steel structure building is difficult to disassemble and use repeatedly in the background technology.
In order to achieve the purpose, the application provides the following technical scheme that the assembly type steel structure building comprises a fixed bottom plate, wherein a first steel pillar is fixedly connected to one side of the top of the fixed bottom plate, and a mounting bracket is inserted into the other side of the top of the fixed bottom plate;
the utility model discloses a steel prop, including first steel pillar, installation cover frame, tail end fixedly connected with hand-strap board, front end fixedly connected with limiting plate, one side of limiting plate is connected with compression spring, and compression spring's trailing end connection in the inner wall of cup jointing a section of thick bamboo, the middle part fixedly connected with inserted bar of limiting plate opposite side, one side overlap joint of first overlap joint cover frame inner wall has the connection steelframe, the spliced eye has been seted up at the middle part of connecting steelframe one side, and cup joints in the surface of inserted bar in one side of spliced eye inner wall to the top fixedly connected with installation cover frame on first steel pillar surface, the first overlap joint cover frame of the equal fixedly connected with in both sides on installation cover frame surface, the middle part fixedly connected with of first overlap joint cover frame one side cup joints a section of thick bamboo.
The compression spring generates certain thrust to the limiting plate, the limiting plate drives the insertion rod to retract into the sleeve joint barrel, and the limiting plate drives the insertion rod to be inserted into the insertion hole, so that the connection steel frame is convenient to fix.
Preferably, the bottom of the surface of the mounting bracket is provided with a limiting hole, one side of the inner wall of the limiting hole is inserted with a limiting insertion rod, and one side of the surface of the limiting insertion rod is inserted in the inner wall of the fixed bottom plate.
The limiting insertion rod is inserted into the two opposite mounting supports simultaneously.
Preferably, one side fixedly connected with second steel pillar at PMKD top, the fixed cover frame of top fixedly connected with on second steel pillar surface, the equal fixedly connected with second overlap joint cover frame in both sides on fixed cover frame surface.
Preferably, the middle part of the bottom of the second overlap sleeve frame is fixedly connected with an inclined bracket, and the middle part of the top of the second overlap sleeve frame is overlapped on the surface of the connecting steel frame.
Preferably, the middle part of the top of the fixed bottom plate is fixedly connected with a connecting base plate, and one side of the top of the connecting base plate is fixedly connected with an anti-skidding sleeve.
Preferably, the middle part of one side of the fixed bottom plate is fixedly connected with an arc-shaped circular plate, three sides of the fixed bottom plate are provided with connecting holes, and the connecting holes are sleeved on the surface of the limiting insertion rod.
Compared with the prior art, the beneficial effects of this application are as follows:
1. this application is through first steel pillar, the installation cover frame, first overlap joint cover frame, cup joint a section of thick bamboo, the connecting rod, the hand strap, the limiting plate, compression spring, the inserted bar, the setting of link bar and spliced eye, the hand strap moves the connecting rod and stimulates backward, the limiting plate drives the inserted bar and contracts the inside of cup jointing a section of thick bamboo, will connect the inside that the steelframe was placed first overlap joint cover frame again, compression spring resets the limiting plate, make the limiting plate drive the inserted bar insert inside the spliced eye, make the link bar be convenient for fixed, thereby reached the effect that the staff of being convenient for dismantled the quick installation of the top steelframe of steel construction building, and the staff of being convenient for operates.
2. This application is through the setting of installing support and spacing inserted bar, and the grafting region of PMKD and installing support inserts spacing inserted bar for spacing inserted bar is pegged graft the installation simultaneously to two relative installing supports, and is convenient for dismantle it, and is the grafting of height dislocation in PMKD's inside, provides support to the holistic fastness of PMKD, thereby has reached the effect to installing support rapid Assembly.
Drawings
Fig. 1 is a perspective view of a split structure of the present application;
FIG. 2 is a perspective view of the structure of the present application;
FIG. 3 is a schematic view of a first steel strut structure of the present application;
fig. 4 is a schematic structural view of the limiting inserted link of the present application.
In the figure: 1. fixing a bottom plate; 2. a first steel strut; 3. mounting a bracket; 101. a second steel strut; 102. a second lap joint sleeve frame; 103. connecting the base plate; 104. an arc-shaped circular plate; 201. installing a sleeve frame; 202. a first lap joint sleeve frame; 203. sleeving a sleeve; 204. a connecting rod; 205. a hand-pulled plate; 206. a limiting plate; 207. a compression spring; 208. a plug rod; 209. connecting a steel frame; 2010. inserting holes; 301. a limiting inserted rod.
Detailed Description
Referring to fig. 1 to 4, an assembled steel structure building;
including PMKD 1, the first steel pillar 2 of one side fixedly connected with at 1 top of PMKD, the opposite side at 1 top of PMKD is pegged graft and is had installing support 3, the top fixedly connected with installation cover frame 201 on the surface of first steel pillar 2, the first overlap joint cover frame 202 of the equal fixedly connected with in both sides on installation cover frame 201 surface, the middle part fixedly connected with socket 203 of first overlap joint cover frame 202 one side, the middle part of socket 203 one side is pegged graft and is had connecting rod 204, the tail end fixedly connected with hand-pulling plate 205 of connecting rod 204, the front end fixedly connected with limiting plate 206 of connecting rod 204, one side of limiting plate 206 is connected with compression spring 207, and compression spring 207's trailing end connection is in the inner wall of socket 203, the middle part fixedly connected with peg graft pole 208 of limiting plate 206 opposite side, one side overlap joint of first overlap joint cover frame 202 inner wall has the connection steelframe 209, the spliced eye 2010 has been seted up at the middle part of connecting steelframe 209 one side, and one side of peg graft in the surface of peg pole 208.
One side fixedly connected with second steel pillar 101 at 1 top of PMKD, the top fixedly connected with fixed suit frame on second steel pillar 101 surface, the equal fixedly connected with second overlap joint suit frame 102 in both sides on fixed suit frame surface, the middle part fixedly connected with tilt bracket of second overlap joint suit frame 102 bottom, and the middle part overlap joint at second overlap joint suit frame 102 top in the surface of connecting steelframe 209, the middle part fixedly connected with at 1 top of PMKD connects backing plate 103, connect one side fixedly connected with antiskid cover at backing plate 103 top, the middle part fixedly connected with arc plectane 104 of 1 one side of PMKD, the connecting hole has all been seted up to three sides of PMKD 1, and the inside of connecting hole cup joints in the surface of spacing inserted bar 301.
When in use, a worker needs to rapidly install and detach the top connecting steel frame 209 of the device, because the first overlapping sleeve frame 202 is arranged on the surface of the first steel strut 2 through the installing sleeve frame 201, the sleeve cylinder 203 is arranged on one side of the first overlapping sleeve frame 202, the connecting rod 204 is inserted in the sleeve cylinder 203, the tail end of the connecting rod 204 is provided with the hand-pulling plate 205, the worker pulls the hand-pulling plate 205, the hand-pulling plate 205 drives the connecting rod 204 to be pulled backwards, the front end of the connecting rod 204 is provided with the limiting plate 206, one side of the limiting plate 206 and the interior of the sleeve cylinder 203 are connected with the compression spring 207, so that the compression spring 207 generates a certain thrust to the limiting plate 206, the inserting rod 208 is arranged on the other side of the limiting plate 206, and the limiting plate 206 drives the inserting rod 208 to retract into the sleeve cylinder 203, the staff will connect steelframe 209 to place the inside of first overlap joint cover frame 202 again, and the spliced eye 2010 has been seted up in one side of connecting steelframe 209, make the staff to let out hand-operated panel 205, then inside compression spring 207 is with limiting plate 206 playback, make limiting plate 206 drive peg rod 208 insert inside the spliced eye 2010, make connecting steelframe 209 be convenient for fixed, first steel pillar 2 forms a set of support with second overlap joint cover frame 102 with first overlap joint cover frame 202 on second steel pillar 101 surface, make it place connecting steelframe 209 overlap joint, and be provided with four similar supports in the device altogether, and all be provided with the overlap joint cover frame in every top both sides, make its four connection steelframe 209 of installation top of being convenient for, and make things convenient for the staff to dismantle it.
Spacing hole has been seted up to the bottom on installing support 3 surface, and one side on spacing downthehole wall is pegged graft and is had spacing inserted bar 301, and one side on spacing inserted bar 301 surface is pegged graft in PMKD 1's inner wall, installs two installing supports 3 at three first steel pillars of group 2 and second steel pillar 101 middle parts.
During the use, after steel structure support's large-scale steel pipe is fixed, need be at the small-size steel pipe of its inside installation, because of pegging graft at PMKD 1's top has six installing support 3, and installing support 3 highly be less than and connect steelframe 209, and insert spacing inserted bar 301 at PMKD 1 and installing support 3's grafting region, make spacing inserted bar 301 to relative two installing support 3 installation of pegging graft simultaneously, and be convenient for dismantle it, and be the grafting of height dislocation in PMKD 1's inside, provide support to the holistic fastness of PMKD 1.
Working principle, the staff stimulates hand-pulled plate 205, hand-pulled plate 205 drives connecting rod 204 and stimulates backward, there is compression spring 207 at one side of limiting plate 206 and the internal connection of a socket 203, make compression spring 207 produce certain thrust to limiting plate 206, and install peg 208 at the opposite side of limiting plate 206, make limiting plate 206 drive peg 208 retract the inside of a socket 203, the staff releases hand-pulled plate 205, then inside compression spring 207 returns limiting plate 206, make limiting plate 206 drive peg 208 insert inside the spliced eye 2010, because of pegging graft at the top of PMKD 1 has six installing support 3, and installing support 3 highly be less than and connect steelframe 209, installation is pegged graft simultaneously to two relative installing support 3 to spacing peg 301, and be height dislocation grafting in the inside of PMKD 1.
It will be evident to those skilled in the art that the present application is not limited to the details of the foregoing illustrative embodiments, and that the present application may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. An assembled steel construction building, includes PMKD (1), its characterized in that: a first steel pillar (2) is fixedly connected to one side of the top of the fixed bottom plate (1), and a mounting bracket (3) is inserted into the other side of the top of the fixed bottom plate (1);
the utility model discloses a steel support for the building of steel structure, including first steel pillar (2), the top fixedly connected with installation cover frame (201) on first steel pillar (2) surface, the equal first overlap joint cover frame (202) of both sides fixedly connected with on installation cover frame (201) surface, the middle part fixedly connected with socket tube (203) of first overlap joint cover frame (202) one side, the middle part of socket tube (203) one side is pegged graft and is had connecting rod (204), tail end fixedly connected with hand-pulling plate (205) of connecting rod (204), the front end fixedly connected with limiting plate (206) of connecting rod (204), one side of limiting plate (206) is connected with compression spring (207), and the tail end of compression spring (207) is connected in the inner wall of socket tube (203), the middle part fixedly connected with peg graft pole (208) of limiting plate (206) opposite side, one side overlap joint of first overlap joint cover frame (202) inner wall has connection steelframe (209), peg graft hole (2010) have been seted up at the middle part of connecting steelframe (209) one side, and peg hole (2010) one side of inner wall cup joints in the surface of peg graft pole (208).
2. An assembled steel structural building according to claim 1, wherein: the bottom on the surface of the mounting support (3) is provided with a limiting hole, one side of the inner wall of the limiting hole is inserted with a limiting insertion rod (301), and one side of the surface of the limiting insertion rod (301) is inserted in the inner wall of the fixed bottom plate (1).
3. An assembled steel structural building according to claim 1, wherein: one side fixedly connected with second steel pillar (101) at PMKD (1) top, the fixed cover frame of top fixedly connected with on second steel pillar (101) surface, the equal fixedly connected with second overlap cover frame (102) in both sides on fixed cover frame surface.
4. An assembled steel structure building according to claim 3, wherein: the middle part of the bottom of the second lap-joint sleeve frame (102) is fixedly connected with an inclined bracket, and the middle part of the top of the second lap-joint sleeve frame (102) is lapped on the surface of the connecting steel frame (209).
5. An assembled steel structural building according to claim 1, wherein: the middle part of the top of the fixed base plate (1) is fixedly connected with a connecting base plate (103), and one side of the top of the connecting base plate (103) is fixedly connected with an anti-skidding sleeve.
6. An assembled steel structural building according to claim 1, wherein: the middle part of one side of the fixed bottom plate (1) is fixedly connected with an arc circular plate (104), three sides of the fixed bottom plate (1) are provided with connecting holes, and the inside of each connecting hole is sleeved on the surface of the limiting insertion rod (301).
CN202222512882.2U 2022-09-22 2022-09-22 Assembled steel construction building Active CN218292255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222512882.2U CN218292255U (en) 2022-09-22 2022-09-22 Assembled steel construction building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222512882.2U CN218292255U (en) 2022-09-22 2022-09-22 Assembled steel construction building

Publications (1)

Publication Number Publication Date
CN218292255U true CN218292255U (en) 2023-01-13

Family

ID=84815094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222512882.2U Active CN218292255U (en) 2022-09-22 2022-09-22 Assembled steel construction building

Country Status (1)

Country Link
CN (1) CN218292255U (en)

Similar Documents

Publication Publication Date Title
CN110130540B (en) Assembled building connecting component
CN110331786B (en) Steel structure connecting piece
CN218292255U (en) Assembled steel construction building
CN109322428B (en) Window wall system unit type curtain wall and installation method thereof
CN215630887U (en) Panel adjusting seat for special-shaped curtain wall and special-shaped curtain wall
CN111945883A (en) Can realize quick tight fixed light steel building connection structure of clamp
CN206844423U (en) Glass curtain wall attachment structure positioner optimizes structure
CN214461285U (en) Waterproof board convenient to dismouting
KR101849272B1 (en) Frame structure for exhibition booth and construction method of exhibition booth using the frame structure
CN210896390U (en) LED screen stage structure with three-dimensional display effect
CN211037470U (en) Space-saving curtain wall
CN210662029U (en) Liquid crystal display screen splicing rack
CN217949333U (en) Detachable building structure of prefabricated house
CN214119463U (en) LED display screen adjustable angle ground beam
CN219888913U (en) Positioning bracket for water supply and drainage pipeline
CN219864467U (en) Construction fence
CN213820124U (en) High-efficient concatenation formula rib
CN218405966U (en) Mounting structure of glass curtain wall
CN218004274U (en) Detachable class tent model teaching aid
CN214329441U (en) Partition wall node gap construction structure
CN219623026U (en) Three-way pipe for pet marching bed
CN215629915U (en) Spiral ground pile for mounting photovoltaic bracket
CN218933537U (en) Curtain wall combined by multi-specification unit curtain walls
CN213809220U (en) Ventilating duct support
CN211923313U (en) Outdoor heat preservation decorative wallboard mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant