CN218291624U - Pier stud construction handling frame - Google Patents

Pier stud construction handling frame Download PDF

Info

Publication number
CN218291624U
CN218291624U CN202222672640.XU CN202222672640U CN218291624U CN 218291624 U CN218291624 U CN 218291624U CN 202222672640 U CN202222672640 U CN 202222672640U CN 218291624 U CN218291624 U CN 218291624U
Authority
CN
China
Prior art keywords
pier stud
supporting leg
groove
handling frame
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222672640.XU
Other languages
Chinese (zh)
Inventor
程张
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Road & Bridge Engineering Giant Construction Group Co ltd
Original Assignee
Chongqing Road & Bridge Engineering Giant Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Road & Bridge Engineering Giant Construction Group Co ltd filed Critical Chongqing Road & Bridge Engineering Giant Construction Group Co ltd
Priority to CN202222672640.XU priority Critical patent/CN218291624U/en
Application granted granted Critical
Publication of CN218291624U publication Critical patent/CN218291624U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pier stud construction handling frame, including supporting leg, mount table and dismantlement board, the outside of supporting leg is run through and is installed threaded connection section of thick bamboo, the inside of threaded connection section of thick bamboo is run through and is installed the threaded rod, the screens fixed plate is installed to the one end of threaded rod, bolt cover is passed through in the outside of supporting leg has the adapter sleeve, and the mount table is installed through the adapter sleeve to the inboard of supporting leg, the pier stud draw-in groove has been seted up at the top of mount table, the dismantlement board is installed to the inboard of pier stud draw-in groove, movable support plate is installed through the movable rod in the bottom of dismantlement board. The utility model discloses in when needs are under construction annular cylinder, dismantle the board, with the outside of pier stud draw-in groove pier stud to make this messenger constructor when the mount table is under construction to the pier stud, can the furthest increase the construction area of pier stud, make constructor convenient more quick to the construction of pier stud.

Description

Pier stud construction handling frame
Technical Field
The utility model relates to an handling frame technical field specifically is a pier stud construction handling frame.
Background
The pier stud is the pier stud of bridge for support the bridge, general pier stud volume is great, very trouble when being under construction need use the handling frame to help constructor, makes constructor simple and convenient more when being under construction.
The existing pier stud construction operation frame has the defects that:
1. the patent document CN211647224U discloses a construction operating frame, "belonging to the technical field of building construction equipment, and comprising a fixed frame, a workbench, a limiting device and a first driving device, wherein the bottom of the fixed frame is provided with a roller, the workbench is arranged on the fixed frame and is in sliding connection with the fixed frame, and one or more workbenches are arranged on the workbench in the vertical direction of the fixed frame; the limiting device is arranged on the fixed frame, connected with the workbench and used for limiting the height of the workbench; the first driving device is arranged on the fixed frame, is connected with the workbench and is used for controlling the workbench to move up and down. The utility model discloses the position of the convenient removal mount of gyro wheel that the construction handling frame set up conveniently realizes the operation personnel in the operation of co-altitude not to and satisfy a plurality of operation personnel at the co-operation of co-altitude not, stop device can prevent the abrupt drop of workstation moreover, guarantees operation personnel's safety. "with the utility model discloses compare, this construction handling frame forms through mount, workstation isotructure concatenation, when using, does not set up corresponding pier stud groove to be not convenient for use when being under construction pier stud or other loop configuration.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pier stud construction handling frame to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an operating frame for pier construction comprises a supporting leg, an installation platform and a dismounting plate, wherein a threaded connection cylinder is installed on the outer side of the supporting leg in a penetrating mode, a threaded rod is installed inside the threaded connection cylinder in a penetrating mode, a clamping fixing plate is installed at one end of the threaded rod, a connecting sleeve is sleeved on the outer side of the supporting leg through a bolt, the installation platform is installed on the inner side of the supporting leg through the connecting sleeve, and a pier clamping groove is formed in the top of the installation platform;
the inboard of pier stud draw-in groove is installed and is dismantled the board, the movable supporting plate is installed through the movable rod in the bottom of dismantling the board.
Preferably, a connecting rod is installed at one side of the supporting leg.
Preferably, the other end of the threaded rod is provided with a rotating disc.
Preferably, the protection network is installed at the top of mount table, and first slipmat is located the inboard of protection network, and the mounting groove has been seted up at the top of mount table, and the mounting groove is connected with the pier stud draw-in groove.
Preferably, the second non-slip mat is installed at the top of the dismounting plate, the fixing rod is installed on the outer side of the dismounting plate and corresponds to the mounting groove, the first bolt penetrates through the top of the fixing rod, and the first bolt penetrates through the bottom of the mounting groove.
Preferably, a second bolt is installed at the bottom of the movable support plate in a penetrating mode, and one end of the second bolt penetrates through the bottom of the dismounting plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a pier stud draw-in groove has been seted up at the top of mount table, and the pier stud draw-in groove makes this handling frame conveniently be under construction to other annular cylinder such as pier stud, when needs are under construction to annular cylinder, dismantles the board, with the outside of pier stud draw-in groove pier stud to make this messenger constructor when the mount table is under construction to the pier stud, can the furthest increase the construction area of pier stud, make constructor convenient more quick to the construction of pier stud.
2. The utility model discloses a run through in the outside of supporting leg and install threaded connection section of thick bamboo, the threaded rod is installed in the inside through of threaded connection section of thick bamboo, and the rolling disc is installed to the one end of threaded rod, and the screens fixed plate is installed to the other end of threaded rod, places when the support frame and accomplishes the back, can pass through rotatory threaded rod, makes the screens fixed plate remove, makes the screens fixed plate contact with the outside of pier stud to it is more stable when carrying out the use to make this support frame for pier stud construction.
Drawings
Fig. 1 is a perspective view of the present invention;
fig. 2 is a schematic structural view of the retaining plate of the present invention;
FIG. 3 is a schematic view of the structure of the mounting table of the present invention;
FIG. 4 is a schematic diagram of a detachable plate structure of the present invention;
fig. 5 is a schematic diagram of the structure of the movable supporting plate of the present invention.
In the figure: 1. supporting legs; 101. a connecting rod; 102. a threaded connection barrel; 2. a threaded rod; 201. rotating the disc; 202. a clamping fixing plate; 3. an installation table; 301. connecting sleeves; 302. a protective net; 303. a first non-slip mat; 304. mounting grooves; 305. pier stud neck; 4. disassembling the plate; 401. a second non-slip mat; 402. a fixing rod; 403. a first bolt; 5. a movable support plate; 501. and a second bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides an embodiment of: an operating frame for pier column construction;
the anti-skid device comprises a supporting leg 1, a threaded rod 2 and an installation platform 3, wherein a threaded connecting cylinder 102 is installed on the outer side of the supporting leg 1 in a penetrating manner, a connecting rod 101 is installed on one side of the supporting leg 1, the threaded rod 2 is installed inside the threaded connecting cylinder 102 in a penetrating manner, a clamping fixing plate 202 is installed at one end of the threaded rod 2, a rotating disc 201 is installed at the other end of the threaded rod 2, a connecting sleeve 301 is sleeved on the outer side of the supporting leg 1 through a bolt, the installation platform 3 is installed on the inner side of the supporting leg 1 through the connecting sleeve 301, a pier stud clamping groove 305 is formed in the top of the installation platform 3, a protective net 302 is installed on the top of the installation platform 3, a first anti-skid pad 303 is installed on the top of the installation platform 3, the first anti-skid pad 303 is located on the inner side of the protective net 302, an installation groove 304 is formed in the top of the installation platform 3, the installation groove 304 is connected with the pier stud clamping groove 305, the supporting leg 1 provides a position for installing the threaded connecting cylinder 102, and is also used for supporting the installation platform 3, meanwhile, the height of the installation platform 3 is increased, the threaded connection cylinder 102 enables the threaded rod 2 to be installed, after the operation frame is installed and placed, a constructor rotates the rotary disc 201 to enable the threaded rod 2 to rotate, so that the rotary disc 201 at one end is driven to rotate, the rotary disc 201 is in contact with a pier stud, the operation frame is placed more stably, the installation platform 3 provides a position for a user to operate, meanwhile, a pier stud clamping groove 305 is provided, the installation platform 3 is installed on the supporting leg 1 through the connecting sleeve 301, the protective net 302 can play a protective role and prevent articles on the installation platform 3 from falling off, the first anti-skid pad 303 enables the constructor to operate on the installation platform 3 more stably, the installing groove 304 provides a space for fixing the fixed rod 402, and the pier stud clamping groove 305 enables the operation frame to be used conveniently outside the pier stud, the staff of being convenient for is under construction to the pier stud.
Referring to fig. 4 and 5, the present invention provides an embodiment: an operating frame for pier column construction;
including dismantling board 4 and movable support plate 5, dismantling board 4 is installed to pier stud draw-in groove 305's inboard, second slipmat 401 is installed at dismantling board 4's top, dead lever 402 is installed in dismantling board 4's the outside, and dead lever 402 is corresponding with mounting groove 304, the top of dead lever 402 is run through and is installed first bolt 403, and first bolt 403 runs through the bottom of mounting groove 304, movable support plate 5 is installed through the movable rod in dismantling board 4's bottom, second bolt 501 is run through and is installed to movable support plate 5's bottom, and the bottom of dismantling board 4 is run through to the one end of second bolt 501, dismantling board 4 makes pier stud draw-in groove 305 expose through dismantling, whether will dismantle board 4 dismantlement through constructor's different demands, dismantle board 4 and install in mounting groove 304 through dead lever 402, then utilize first bolt 403 to fix dead lever 402, second slipmat 401 also plays skid-proof effect, movable support plate 5 is used for supporting dismantling board 4's bottom, make dismantling board 4 more firm when the installation is used, backup pad 5 is fixed through second bolt 501 movably.
The working principle is as follows: before using pier stud construction handling frame, should examine earlier whether this pier stud construction handling frame has the problem that influences the use, at first install the position that needs use with pier stud construction handling frame, will dismantle 4 dismantlements of board, make pier stud draw-in groove 305 be located the outside of pier stud and be in, rotatory threaded rod 2 makes screens fixed plate 202 remove, contacts with the outside of pier stud to make the more stable that this handling frame settled, the staff carries out construction operation to the pier stud on mount table 3.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not to be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a pier stud construction handling frame, includes supporting leg (1), mount table (3) and dismantlement board (4), its characterized in that: the outer side of the supporting leg (1) is provided with a threaded connection cylinder (102) in a penetrating mode, a threaded rod (2) is arranged in the threaded connection cylinder (102) in a penetrating mode, one end of the threaded rod (2) is provided with a clamping fixing plate (202), the outer side of the supporting leg (1) is sleeved with a connecting sleeve (301) through a bolt, the inner side of the supporting leg (1) is provided with an installation platform (3) through the connecting sleeve (301), and the top of the installation platform (3) is provided with a pier stud clamping groove (305);
dismantlement board (4) are installed to the inboard of pier stud draw-in groove (305), movable support plate (5) are installed through the movable rod in the bottom of dismantling board (4).
2. The pier stud construction handling frame of claim 1, characterized in that: and a connecting rod (101) is installed on one side of the supporting leg (1).
3. The pier stud construction handling frame of claim 1, characterized in that: and the other end of the threaded rod (2) is provided with a rotating disc (201).
4. The pier stud construction handling frame of claim 1, characterized in that: protection network (302) are installed at the top of mount table (3), and first slipmat (303) are located the inboard of protection network (302), and mounting groove (304) have been seted up at the top of mount table (3), and mounting groove (304) are connected with pier stud draw-in groove (305).
5. The pier stud construction handling frame of claim 1, characterized in that: the second anti-skid pad (401) is installed at the top of the detaching plate (4), the fixing rod (402) is installed on the outer side of the detaching plate (4), the fixing rod (402) corresponds to the installing groove (304), the first bolt (403) penetrates through the top of the fixing rod (402), and the first bolt (403) penetrates through the bottom of the installing groove (304).
6. The pier stud construction handling frame of claim 1, wherein: and a second bolt (501) is installed at the bottom of the movable supporting plate (5) in a penetrating manner, and one end of the second bolt (501) penetrates through the bottom of the dismounting plate (4).
CN202222672640.XU 2022-10-11 2022-10-11 Pier stud construction handling frame Active CN218291624U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222672640.XU CN218291624U (en) 2022-10-11 2022-10-11 Pier stud construction handling frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222672640.XU CN218291624U (en) 2022-10-11 2022-10-11 Pier stud construction handling frame

Publications (1)

Publication Number Publication Date
CN218291624U true CN218291624U (en) 2023-01-13

Family

ID=84807219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222672640.XU Active CN218291624U (en) 2022-10-11 2022-10-11 Pier stud construction handling frame

Country Status (1)

Country Link
CN (1) CN218291624U (en)

Similar Documents

Publication Publication Date Title
CN218291624U (en) Pier stud construction handling frame
CN213278378U (en) Strain test communication equipment for suspension fatigue strength test
CN211981338U (en) Maintenance platform for safety operation of isolating switch
CN211478238U (en) Portable air quality detection equipment
CN213147894U (en) Building engineering environment monitoring device with comprehensive monitoring capability
CN218918402U (en) Poster display device
CN217988197U (en) Safety belt hanging rod for mounting and dismounting K-type drilling derrick
CN217400268U (en) Civil engineering construction support
CN216512726U (en) Computer network debugging device
CN219889180U (en) Fire control monitoring device convenient to installation
CN212675686U (en) Aerial fog concentration alarm convenient to installation and dismantlement
CN213479664U (en) Portable projecting apparatus strutting arrangement is used in middle-position english teaching
CN219775363U (en) Multi-channel thermal imaging device for public places
CN216121538U (en) Electric power overhaul equipment
CN213743217U (en) Dedicated ladder of distribution fortune dimension
CN217948854U (en) Quick detach formula warning device for construction
CN220957540U (en) Monitoring rod convenient for monitoring probe maintenance work
CN217928004U (en) Portable electromechanical device mounting bracket
CN215907379U (en) Connecting piece for scaffold cross rod
CN219220275U (en) Portable simple climbing frame
CN220391259U (en) Subway signal prompting device
CN213712390U (en) Movable check out test set for environmental monitoring
CN117559292B (en) Maintenance auxiliary device for maintenance of extra-high voltage cable
CN216277096U (en) Support frame with reinforced structure for construction
CN215626609U (en) Upper frame maintenance hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant