CN218289909U - Cable winding device for plant hydropower installation - Google Patents

Cable winding device for plant hydropower installation Download PDF

Info

Publication number
CN218289909U
CN218289909U CN202221965501.XU CN202221965501U CN218289909U CN 218289909 U CN218289909 U CN 218289909U CN 202221965501 U CN202221965501 U CN 202221965501U CN 218289909 U CN218289909 U CN 218289909U
Authority
CN
China
Prior art keywords
fixed
cable
winding device
plant
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221965501.XU
Other languages
Chinese (zh)
Inventor
李曼曼
李丹
李春敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Guotong Lingyu Construction Group Co ltd
Original Assignee
Hubei Guotong Lingyu Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Guotong Lingyu Construction Group Co ltd filed Critical Hubei Guotong Lingyu Construction Group Co ltd
Priority to CN202221965501.XU priority Critical patent/CN218289909U/en
Application granted granted Critical
Publication of CN218289909U publication Critical patent/CN218289909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The utility model provides a be used for factory building water and electricity installation cable coiling mechanism, including the coiling mechanism body, the coiling mechanism body includes the base, the top welding of base has the backup pad, first power unit is installed to one side of backup pad, install the take-up pulley on the first power unit, one side of take-up pulley is fixed with the limiting disc, it has the fixed slot to open in the backup pad, the internally mounted of fixed slot has the slider, install supporting mechanism between the bottom of slider and the fixed slot, install spacing cylinder on the slider. This a be used for factory building water and electricity installation cable coiling mechanism, along with the diameter of cable on the take-up pulley constantly increases, extrudees spacing cylinder through the bottom of coil, and spacing cylinder passes through the supporting mechanism downstream, and the holding power that produces through supporting mechanism effectively supports spacing cylinder to provide the helping hand for spacing cylinder to the extrusion of cable and use.

Description

Cable winding device for plant hydropower installation
Technical Field
The utility model relates to a cable rolling equipment field specifically is a be used for factory building water and electricity installation cable coiling mechanism.
Background
In the middle of the last water and electricity installation of factory building, need cooperate take-up to accomplish rolling work to unnecessary electric wire, the in-process cable of rolling stops the unable spacing fixed of take-up pulley after, thereby it is not hard up to easily make the cable production on the take-up pulley, current take-up device needs to change the direction and the position of winding displacement equipment in the face of the cable of equidirectional not, if during unable quick adjustment, the position causes the mode of dragging to the circuit easily, thereby cause the damage, in addition, current take-up pulley carries out the rolling through the winding to the cable, it is spacing to extrude the cable unable timely after the rolling, thereby easily cause the not hard up production winding of cable, it is inconvenient to use.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a be used for factory building water and electricity installation cable take-up to solve the problem that proposes in the above-mentioned background art, the utility model discloses novel structure, during the use, spacing cylinder produces extrusion spacing power for receiving the cable on the line cylinder, thereby avoids the cable to appear not hard up winding that causes after the line is received to the take-up pulley.
In order to achieve the above purpose, the present invention is realized by the following technical solution: the utility model provides a be used for factory building water and electricity installation cable coiling mechanism, includes the coiling mechanism body, the coiling mechanism body includes the base, the top welding of base has the backup pad, first power unit is installed to one side of backup pad, install the take-up pulley on the first power unit, one side of take-up pulley is fixed with the spacing dish, it has the fixed slot to open in the backup pad, the internally mounted of fixed slot has the slider, install supporting mechanism between the bottom of slider and the fixed slot.
Furthermore, a fixed box is fixed on the base, a second power mechanism is installed at one end of the fixed box, a slot is formed in the top of the fixed box, and a flat cable assembly is installed inside the slot.
Furthermore, an output shaft is installed on the second power mechanism, a reciprocating screw rod is installed on the output shaft, the reciprocating screw rod is installed inside the fixed box, and the wire arranging assembly comprises a screw rod sleeve.
Furthermore, a movable seat is installed at the top of the screw rod sleeve, a fixed hole is formed in the bottom of the movable seat, a fixed column is fixed at the top of the screw rod sleeve, and the fixed column is installed inside the fixed hole.
Furthermore, a reset mechanism is installed between the fixing column and the fixing hole, and two ends of the reset mechanism are respectively fixed on the fixing column and the fixing hole.
Furthermore, a fixed frame is fixed at the top of the movable seat, a fixed pipe is installed on the fixed frame, and two sides of the fixed pipe are installed on the fixed frame through torsion spring shafts.
Furthermore, arc-shaped grooves are formed in the inner walls of the two ends of the fixing pipe, and balls are mounted inside the arc-shaped grooves.
Furthermore, a limiting roller is mounted on the sliding block and matched with the take-up pulley, limiting blocks are fixed to two sides of the sliding block, a sliding groove is formed in the fixing groove, and the limiting blocks are mounted in the sliding groove.
The utility model has the advantages that: the utility model relates to a cable winding device for hydropower installation of a factory building, which comprises a base; a support plate; a first power mechanism; a take-up pulley; a limiting disc; fixing grooves; a limiting roller; a fixed box; a second power mechanism; grooving; a wire arranging assembly; a slider; a limiting block; a support mechanism; an output shaft; a reciprocating screw rod; a screw rod sleeve; a movable seat; fixing a column; a fixing hole; a reset mechanism; a fixed mount; fixing the tube; a torsion spring shaft; and (4) a ball.
1. This be used for factory building water and electricity installation cable coiling mechanism, during the use, spacing cylinder produces extrusion limiting force for receiving the cable on the line cylinder to avoid the cable to appear not hard up winding that causes after the line is received to the take-up pulley.
2. This a be used for factory building water and electricity installation cable coiling mechanism, along with the diameter of cable on the take-up pulley constantly increases, extrudees spacing cylinder through the bottom of coil, and spacing cylinder passes through the supporting mechanism downstream, and the holding power that produces through supporting mechanism effectively supports spacing cylinder to provide the helping hand for spacing cylinder to the extrusion of cable and use.
3. This a be used for factory building water and electricity installation cable coiling mechanism, the winding displacement subassembly is sheathe in at the lead screw and is rotated the adjustment, drives the timely playback of sliding seat through canceling release mechanical system, and fixed pipe direction and inclination's change from top to bottom when using can cooperate the adjustment to the cable of equidirectional not, and the contact point of inside ball reduction and cable to reduce the damage that the friction caused the cable.
Drawings
FIG. 1 is a schematic structural view of a cable winding device for plant hydropower installation of the utility model;
FIG. 2 is a schematic structural view of a slider of the cable winding device for plant hydropower installation of the utility model;
FIG. 3 is a schematic structural view of a reciprocating screw rod of the cable winding device for plant hydropower installation of the utility model;
FIG. 4 is a schematic view of a right-side sectional structure of a limiting disc of the cable winding device for hydropower installation of a plant of the present invention;
in the figure: 1. a base; 2. a support plate; 3. a first power mechanism; 4. a take-up pulley; 5. a limiting disc; 6. a fixing groove; 7. a limiting roller; 8. a fixed box; 9. a second power mechanism; 10. Slotting; 11. a wire arranging assembly; 12. a slider; 13. a limiting block; 14. a support mechanism; 15. An output shaft; 16. a reciprocating screw rod; 17. a screw rod sleeve; 18. a movable seat; 19. fixing a column; 20. A fixing hole; 21. a reset mechanism; 22. a fixed mount; 23. a fixed tube; 24. a torsion spring shaft; 25. and (4) a ball.
Detailed Description
In order to make the utility model realize, the technical means, the creation characteristics, the achievement purpose and the efficacy are easy to understand and understand, the utility model is further explained by combining the specific implementation mode.
Referring to fig. 1 to 4, the present invention provides a technical solution: the utility model provides a be used for factory building water and electricity installation cable coiling mechanism, includes the coiling mechanism body, the coiling mechanism body includes base 1, the top welding of base 1 has backup pad 2, first power unit 3 is installed to one side of backup pad 2, install take-up pulley 4 on the first power unit 3, one side of take-up pulley 4 is fixed with spacing dish 5, it has fixed slot 6 to open in backup pad 2, the internally mounted of fixed slot 6 has slider 12, install supporting mechanism 14 between slider 12's bottom and the fixed slot 6, be fixed with fixed box 8 on the base 1, second power unit 9 is installed to fixed box 8's one end, open at fixed box 8's top has fluting 10, the internally mounted of fluting 10 has winding displacement subassembly 11, and first power unit 3 and second power unit 9 are the motor, and the motor is convenient for take-up pulley 4 and the transmission of reciprocal lead screw 16 to use, and when using, the one end of spacing cylinder 7 cooperatees with the inner wall of spacing dish 5 to avoid producing the clearance and make the cable get into and cause wearing and tearing, thereby protect the winding of cable.
In this embodiment, the output shaft 15 is installed on the second power mechanism 9, the reciprocating screw 16 is installed on the output shaft 15, the reciprocating screw 16 is installed inside the fixed box 8, the wire arranging assembly 11 includes a screw sleeve 17, a movable seat 18 is installed at the top of the screw sleeve 17, a fixed hole 20 is formed in the bottom of the movable seat 18, a fixed column 19 is fixed at the top of the screw sleeve 17, the fixed column 19 is installed inside the fixed hole 20, a reset mechanism 21 is installed between the fixed column 19 and the fixed hole 20, the reset mechanism 21 is a torsion spring, so that the movable seat 18 can be quickly returned after rotating in the later period, two ends of the reset mechanism 21 are respectively fixed on the fixed column 19 and the fixed hole 20, the cables in different directions can be adjusted in a matched manner due to the change of the direction and the vertical inclination angle of the fixed tube 23, and contact points between the balls 25 inside and the cables can be reduced, thereby reducing damage to the cables due to friction.
This embodiment, the top of sliding seat 18 is fixed with mount 22, install fixed pipe 23 on the mount 22, the both sides of fixed pipe 23 are passed through torsion spring axle 24 and are installed on mount 22, it has the arc wall to open on the both ends inner wall of fixed pipe 23, the internally mounted of arc wall has ball 25, install spacing cylinder 7 on the slider 12, spacing cylinder 7 cooperatees with take-up pulley 4, the both sides of slider 12 are fixed with stopper 13, the inside of fixed slot 6 is opened there is the spout, stopper 13 is installed in the inside of spout, and when using, spacing cylinder 7 passes through supporting mechanism 14 and moves down, and the holding power that produces through supporting mechanism 14 effectively supports spacing cylinder 7 to provide the helping hand for the extrusion of spacing cylinder 7 to the cable and use.
The device provides required electric energy for electric appliances inside the device through an external power supply, when the device is used, one end of a cable firstly penetrates through a fixed pipe 23 to enter a take-up pulley 4 and is wound to be limited, a first power mechanism 3 is started to drive the take-up pulley 4 to rotate after limiting is completed, the take-up pulley 4 winds the cable to be used, the diameter of the wound cable is continuously increased, the cable extrudes a bottom limiting roller 7, the limiting roller 7 drives a sliding block 12 to move downwards inside a fixed groove 6 after being extruded, a supporting mechanism 14 is extruded when moving downwards, the supporting mechanism 14 generates upward supporting force to support the limiting roller 7, the limiting roller 7 supports the cable to be limited through the supporting force, the influence caused by looseness between the cables is avoided, the second power mechanism 9 drives a reciprocating screw rod 16 to rotate when the cable is wound, the reciprocating screw rod sleeve 17 is driven by the reciprocating screw rod 16 to reciprocate, the fixed pipe 23 can change the direction through a torsion spring shaft 24 of the cable according to the condition that the cable in different directions passes through a fixed column 19 and a reset mechanism 21 to complete adjustment of the direction, the fixed line, the damage caused by large contact angle of the fixed pipe 23, and the fixed pipe and the damage to the cable after the limited roller 7 is reduced, and the damage of the cable is better contact area caused by pulling force of the fixed pipe when the fixed pipe and the limited roller 7, and the contact area of the cable is reduced by the three points of the limited roller 25.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (8)

1. The utility model provides a be used for factory building water and electricity installation cable coiling mechanism, includes the coiling mechanism body, its characterized in that: the winding device comprises a base (1), a supporting plate (2) is welded at the top of the base (1), a first power mechanism (3) is installed on one side of the supporting plate (2), a take-up pulley (4) is installed on the first power mechanism (3), a limiting disc (5) is fixed on one side of the take-up pulley (4), a fixing groove (6) is formed in the supporting plate (2), a sliding block (12) is installed inside the fixing groove (6), and a supporting mechanism (14) is installed between the bottom of the sliding block (12) and the fixing groove (6).
2. The cable winding device for plant hydropower installation, which is characterized in that: the wire arranging machine is characterized in that a fixed box (8) is fixed on the base (1), a second power mechanism (9) is installed at one end of the fixed box (8), a groove (10) is formed in the top of the fixed box (8), and a wire arranging assembly (11) is installed inside the groove (10).
3. The cable winding device for plant hydropower installation, disclosed by claim 2, is characterized in that: an output shaft (15) is installed on the second power mechanism (9), a reciprocating screw rod (16) is installed on the output shaft (15), the reciprocating screw rod (16) is installed inside the fixed box (8), and the wire arranging assembly (11) comprises a screw rod sleeve (17).
4. The cable winding device for plant hydropower installation, which is characterized in that: the novel screw rod fixing device is characterized in that a movable seat (18) is installed at the top of the screw rod sleeve (17), a fixing hole (20) is formed in the bottom of the movable seat (18), a fixing column (19) is fixed at the top of the screw rod sleeve (17), and the fixing column (19) is installed inside the fixing hole (20).
5. The cable winding device for plant hydropower installation, which is characterized in that: a reset mechanism (21) is installed between the fixed column (19) and the fixed hole (20), and two ends of the reset mechanism (21) are respectively fixed on the fixed column (19) and the fixed hole (20).
6. The cable winding device for plant hydropower installation, which is characterized in that: the top of sliding seat (18) is fixed with mount (22), install fixed pipe (23) on mount (22), the both sides of fixed pipe (23) are installed on mount (22) through torsion spring axle (24).
7. The cable winding device for plant hydropower installation, which is characterized in that: arc-shaped grooves are formed in the inner walls of the two ends of the fixing pipe (23), and balls (25) are mounted inside the arc-shaped grooves.
8. The cable winding device for plant hydropower installation, which is characterized in that: install spacing cylinder (7) on slider (12), spacing cylinder (7) cooperate with take-up pulley (4), the both sides of slider (12) are fixed with stopper (13), the inside of fixed slot (6) is opened there is the spout, the inside at the spout is installed in stopper (13).
CN202221965501.XU 2022-07-28 2022-07-28 Cable winding device for plant hydropower installation Active CN218289909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221965501.XU CN218289909U (en) 2022-07-28 2022-07-28 Cable winding device for plant hydropower installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221965501.XU CN218289909U (en) 2022-07-28 2022-07-28 Cable winding device for plant hydropower installation

Publications (1)

Publication Number Publication Date
CN218289909U true CN218289909U (en) 2023-01-13

Family

ID=84791669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221965501.XU Active CN218289909U (en) 2022-07-28 2022-07-28 Cable winding device for plant hydropower installation

Country Status (1)

Country Link
CN (1) CN218289909U (en)

Similar Documents

Publication Publication Date Title
CN202594543U (en) Automatic wire arrangement cable drum for mobile engineering machinery
CN214059507U (en) Quick coiling device of cable
CN218289909U (en) Cable winding device for plant hydropower installation
CN112573295A (en) Anti-coil-falling winding mechanism for communication optical cable processing production
CN116470438A (en) Wire embedding device for engineering and method thereof
CN216072509U (en) Cable coiling device for electric power engineering construction
CN116002451A (en) Electric power engineering circuit pay-off
CN216095647U (en) Novel stainless steel wire transfer mechanism
CN213834086U (en) Automatic take-up device for electric power engineering
CN210260676U (en) Winding device for cable production
CN218560578U (en) Galvanized winding device
CN214660176U (en) Subway shield constructs construction with pipeline extension fixture that starts
CN218809574U (en) Steel wire rope winding equipment
CN218386449U (en) Electric power construction draw gear
CN115339960A (en) Cable recovery unit for power engineering
CN219156126U (en) Automatic electric equipment coiling device of pressure
CN219730184U (en) Wire winding and unwinding device
CN214899834U (en) Cable laying frame convenient to transfer in district tunnel
CN210635511U (en) Communication cable pay-off
CN219585531U (en) Cable looping machine
CN220596698U (en) Automatic wire arrangement device for electric power installation
CN221420222U (en) Wire and cable winding device
CN220011677U (en) Cable winding device for power engineering
CN221885873U (en) Fixing equipment for construction of broadcast and television engineering cable
CN220886477U (en) Stabilizing device for winding up cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant