CN218270926U - Auxiliary device for assembling and disassembling wafer type turbine flowmeter - Google Patents
Auxiliary device for assembling and disassembling wafer type turbine flowmeter Download PDFInfo
- Publication number
- CN218270926U CN218270926U CN202222046830.0U CN202222046830U CN218270926U CN 218270926 U CN218270926 U CN 218270926U CN 202222046830 U CN202222046830 U CN 202222046830U CN 218270926 U CN218270926 U CN 218270926U
- Authority
- CN
- China
- Prior art keywords
- fixing
- flowmeter
- pipeline
- mounting flange
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims abstract description 14
- 238000007789 sealing Methods 0.000 claims description 11
- 238000000034 method Methods 0.000 abstract description 7
- 230000000149 penetrating effect Effects 0.000 description 4
- 238000005259 measurement Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 2
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000000137 annealing Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 229910001873 dinitrogen Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Measuring Volume Flow (AREA)
Abstract
The utility model provides an auxiliary device that butt clamp formula turbine flowmeter installation was dismantled, the pipeline comprises a pipeline, be provided with the flowmeter on the pipeline, the flowmeter both ends are connected through first mounting flange with the pipeline, the fixed second mounting flange that is equipped with on the pipeline in first mounting flange outside, can dismantle between two second mounting flanges and be equipped with second clamping screw, can dismantle between two first mounting flanges and be equipped with first clamping screw, first clamping screw and second clamping screw are two at least, second clamping flange diameter ratio is long than first mounting flange diameter, first clamping screw and second clamping screw all are equipped with fixation nut, still be equipped with sealed the pad between flowmeter and the first mounting flange. The utility model discloses set up mounting flange in pipeline both sides, through the fixed method of twin-screw, accurate nature when having improved the installation, required labour still less, fail safe nature and work efficiency are higher.
Description
Technical Field
The utility model relates to an automatic change measuring instrument installation and dismantle field, specifically be an auxiliary device that wafer formula turbine flowmeter installation was dismantled.
Background
The annealing furnace needs smaller flow in the processes of temperature rise and heat preservation, the wafer-type turbine flowmeter is usually selected for measuring the flow, belongs to a speed-type flowmeter, is required to be horizontally arranged on a pipeline, has the characteristics of accurate measurement and simple maintenance, and is short in maintenance period, high in mounting and dismounting frequency and required to be periodically checked and cleaned. Usually need use the crowbar to rectify the pipeline when flowmeter installation is dismantled, make the screw hole align to this carries out flowmeter's installation and dismantlement work, does not have reliable strong point below the horizontal pipeline simultaneously, and the operation personnel often regards as the strong point with the help of non-bearing object, from this exposes following problem: the required labor is large, no proper method and device are provided, the normative is poor, the operation risk is uncontrollable, and the labor production efficiency is low.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a to the above-mentioned problem condition, aim at overcomes prior art's is not enough, the auxiliary device of wafer-like turbine flowmeter installation dismantlement of design to when realizing wafer-like turbine flowmeter installation dismantlement, improve fail safe nature, accurate nature and work efficiency's purpose.
In order to achieve the above purpose, the technical scheme of the utility model is as follows: the utility model provides an auxiliary device that wafer formula turbine flowmeter installation was dismantled, includes the pipeline, the pipeline on be provided with the flowmeter, flowmeter both ends and pipeline pass through first mounting flange and be connected, first mounting flange outside pipeline on the fixed second mounting flange that is equipped with, two the second mounting flange between can dismantle and be equipped with second clamping screw, two first mounting flange between can dismantle and be equipped with first clamping screw.
As a further description of the above solution, the number of the first fixing screw and the second fixing screw is at least two.
As a further description of the above solution, the second fixing flange diameter is longer than the first fixing flange diameter.
As a further description of the above solution, the first fixing screw and the second fixing screw are both provided with fixing nuts.
As a further description of the above solution, a sealing gasket is further disposed between the flowmeter and the first fixing flange.
The utility model has the advantages that:
1. second fixing flanges are welded on two sides of the pipeline, and the coaxiality and the measurement accuracy of the pipeline can be ensured by using a method of fixing through second fixing screws; a first fixing flange is welded at the middle broken part of the pipeline, and the flowmeter can be supported by using a method of fixing through a first fixing screw rod;
2. the first fixing screw and the second fixing screw are at least two, the operation is simple, light, safe and reliable, and the diameter of the second fixing flange is larger than that of the first fixing flange, so that the installation of the flowmeter is not influenced, and the deviation of a flow timing pipeline during replacement can be prevented;
3. the fixing nut is used for limiting and fixing the fixing screw rod, so that the fixing screw rod is firmer and more reliable, the sealing performance between the flowmeter and the pipeline can be better by using the sealing gasket, and leakage is prevented.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a structural sectional view of the present invention.
The labels in the figure are: 1. a flow meter; 2. a first fixed flange; 3. a pipeline; 4. fixing the bolt; 5. fixing a nut; 6. a gasket; 7. a first fixing screw; 8. a second fixing screw; 9. a second mounting flange.
Detailed Description
To make the objects, technical solutions and advantages of the present invention clearer, the following description will clearly and completely describe the technical solutions with reference to the drawings and embodiments of the present invention, but the scope of the present invention is not limited to the following description.
The utility model provides an auxiliary device that butt clamp formula turbine flowmeter installation was dismantled, including pipeline 3, middle fracture department is provided with flowmeter 1 on the pipeline 3, flowmeter 1 both ends are connected through first mounting flange 2 with pipeline 3, and fix through fixing bolt 4 and fixation nut 5, fixed second mounting flange 9 that is equipped with on the 2 outside pipelines 3 of first mounting flange, can dismantle between two second mounting flanges 9 and be equipped with second clamping screw 8, through the method that uses second clamping screw 8 to fix, can ensure the axiality of pipeline 3 and measuring accuracy, can dismantle between two first mounting flanges 2 and be equipped with first clamping screw 7, through the method that uses first clamping screw 7 to fix, can play the supporting role to flowmeter 1. First clamping screw 7 and second clamping screw 8 are two at least, easy operation is light, safety and reliability, 9 diameters of second clamping flange are longer than 2 diameters of first clamping flange, thus can not influence the installation of flowmeter 1, still can prevent pipeline 3 from taking place the skew when changing flowmeter 1, first clamping screw 7 and second clamping screw 8 all are equipped with fixation nut 5, use fixation nut 5 to carry out spacing fixed to fixation screw, can be more firm reliable, still be equipped with sealed 6 between flowmeter 1 and the first clamping flange 2, can make the leakproofness between flowmeter 1 and the pipeline 3 better, thereby prevent to leak.
When the flowmeter 1 is disassembled: firstly, two second fixing screws 8 are respectively inserted from the outer side of a second fixing flange 9 on one side of the pipeline 3 at vertically symmetrical positions, penetrate through the inner side of the second fixing flange 9 on the other side and penetrate out of the inner side of the second fixing flange 9 on the other side, fixing nuts 5 are respectively screwed to the positions where the second fixing screws 8 penetrate in and penetrate out, the fixing nuts 5 at the positions where the second fixing screws 8 penetrate out are respectively fastened by using a wrench, the coaxiality and the measurement accuracy of the pipeline 3 can be ensured by fixing the two second fixing screws 8, and the pipeline 3 can be prevented from shifting; then, the fixing bolts 4 and the fixing nuts 5 connected with the flowmeter 1 and the first fixing flange 2 are unscrewed by a spanner, the unscrewing length on the two sides is 25mm, then the fixing bolts 4 and the fixing nuts 5 on the left side and the right side are dismantled, then two first fixing screws 7 are respectively inserted from the outer side of the first fixing flange 2 on one side of the pipeline 3 and penetrate out from the inner side of the first fixing flange 2 on the other side at positions which are symmetrical up and down, the fixing nuts 5 are respectively screwed to the penetrating and penetrating positions, the fixing nuts 5 at the penetrating and penetrating positions of the first fixing screws 7 are respectively fastened by the spanner, and the two first fixing screws 7 play a role in supporting and assisting in fixing the flowmeter 1; finally, the remaining fixing bolts 4 and fixing nuts 5 connecting the flowmeter 1 and the first fixing flange 2 are removed, and the flowmeter 1 can be taken out in the horizontal direction.
When the flowmeter 1 is installed: at first, the integrity of the sealing gasket 6 is checked, if abnormal conditions exist, the sealing gasket should be immediately replaced, so as not to affect the sealing performance, the positions of the first fixing screw rod 7 and the second fixing screw rod 8 are kept unchanged when the flowmeter 1 is disassembled, the flow direction of a medium in the pipeline 3 is adjusted according to the size when the flowmeter 1 is disassembled, the flowmeter 1 is horizontally placed between the first fixing flanges 2 at the middle fracture of the pipeline 3, and the first fixing screw rod 7 plays a limiting role below the flowmeter 1, so the flowmeter 1 is firmly blocked and cannot fall. The fixing nuts 5 on two sides of the first fixing screw 7 are unscrewed by using a spanner, the unscrewing length of the two sides is 25mm, the flowmeter 1 is firstly pushed to the first fixing flange 2 on one side and placed into the sealing gasket 6, then the flowmeter 1 is pushed to the first fixing flange 2 on the other side and placed into the sealing gasket 6, the placing position of the sealing gasket 6 is confirmed to be consistent with the mounting position of the flowmeter 1, and leakage is prevented. The fixing bolt 4 and the fixing nut 5 which are connected with the flowmeter 1 and the first fixing flange 2 penetrate, meanwhile, the fixing nuts 5 on two sides of the first fixing screw 7 are unscrewed slowly by a wrench, the fixing nut 5 which is connected with the flowmeter 1 and the first fixing flange 2 is tightened by a wrench synchronously, the sealing gasket 6 is enabled to be attached to the first fixing flange 2 tightly, then the fixing nut 5 on the first fixing screw 7 is unscrewed, the first fixing screw 7 is taken down, the fixing bolt 4 and the fixing nut 5 which are connected with the flowmeter 1 and the first fixing flange 2 are fastened by the wrench, at the moment, the gap is adjusted at any time according to the flowmeter 1 until the flowmeter 1 is completely attached tightly, the phenomenon of uneven stress is prevented, and finally, the fixing nut 5 which is connected with the second fixing screw 8 and the second fixing flange 9 is unscrewed by the wrench and the second fixing screw 8 is taken down. Nitrogen gas was introduced and the washing powder water was used for leakage, and it was confirmed that there was no leakage at the installation site of the flowmeter 1.
The foregoing is illustrative of the present invention and is not to be construed as limiting thereof, and any modifications, equivalent alterations and improvements made within the spirit and principles of the invention are intended to be included within the scope of the invention.
Claims (5)
1. The utility model provides an auxiliary device that wafer-type turbine flowmeter installation was dismantled which characterized in that: including pipeline (3), pipeline (3) on be provided with flowmeter (1), flowmeter (1) both ends be connected through first mounting flange (2) with pipeline (3), first mounting flange (2) outside pipeline (3) on fixed second mounting flange (9) that are equipped with, two second mounting flange (9) between can dismantle and be equipped with second clamping screw (8), two first mounting flange (2) between can dismantle and be equipped with first clamping screw (7).
2. The auxiliary device for assembling and disassembling a wafer-type turbine flowmeter according to claim 1, wherein: the number of the first fixing screw rods (7) and the number of the second fixing screw rods (8) are at least two.
3. The auxiliary device for assembling and disassembling a wafer-type turbine flowmeter according to claim 1, wherein: the diameter of the second fixing flange (9) is larger than that of the first fixing flange (2).
4. The auxiliary device for assembling and disassembling a wafer-type turbine flowmeter according to claim 1, wherein: and the first fixing screw rod (7) and the second fixing screw rod (8) are both provided with fixing nuts (5).
5. The auxiliary device for assembling and disassembling a wafer-type turbine flowmeter according to claim 1, wherein: a sealing gasket (6) is arranged between the flowmeter (1) and the first fixing flange (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222046830.0U CN218270926U (en) | 2022-08-04 | 2022-08-04 | Auxiliary device for assembling and disassembling wafer type turbine flowmeter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222046830.0U CN218270926U (en) | 2022-08-04 | 2022-08-04 | Auxiliary device for assembling and disassembling wafer type turbine flowmeter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218270926U true CN218270926U (en) | 2023-01-10 |
Family
ID=84765146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222046830.0U Expired - Fee Related CN218270926U (en) | 2022-08-04 | 2022-08-04 | Auxiliary device for assembling and disassembling wafer type turbine flowmeter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218270926U (en) |
-
2022
- 2022-08-04 CN CN202222046830.0U patent/CN218270926U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218270926U (en) | Auxiliary device for assembling and disassembling wafer type turbine flowmeter | |
CN112901289B (en) | Blade vibration monitoring device at top of low-pressure final-stage moving blade of steam turbine | |
CN220206751U (en) | Conical orifice plate flowmeter | |
CN106225524B (en) | Single tube sheet heat exchanger | |
CN104354141B (en) | Large-scale pipeline and valve adpting flange installation servicing unit and using method thereof | |
CN214697964U (en) | Blade vibration monitoring device at top of low-pressure last-stage moving blade of steam turbine | |
CN112730604B (en) | Pulsed eddy current sensor device for corrosion monitoring of metal pipeline | |
CN206399589U (en) | A kind of downhole electronic pressure bomb caliberating device | |
CN215111157U (en) | Multifunctional flange and sealing gasket mounting and positioning tool | |
CN112228169B (en) | Split surface assembling method for high-pressure outer cylinder of nuclear turbine | |
CN204171980U (en) | Large-scale pipeline and valve adpting flange installation servicing unit | |
CN204535626U (en) | Portable electric precipitation pole span measurement mechanism | |
CN211638859U (en) | Pipe orifice alignment auxiliary device for adjacent pipelines | |
CN103192331A (en) | Adjustable locating assembly of marine engine partition plate or mechanical component | |
CN209369291U (en) | A kind of chemical industry equipment internal overhaul gridded platform device | |
CN219954578U (en) | Transformer oiling flange | |
CN214668771U (en) | Fixing device of pulse eddy current sensor for monitoring corrosion of metal pipeline | |
CN219345791U (en) | Deformation-preventing long-life butt welding flange | |
CN216899748U (en) | Precooler for chemical high-temperature water vapor sampling | |
CN216408053U (en) | Internal sealing flange convenient to fix | |
CN217530688U (en) | Large-diameter pipeline flange winding gasket mounting tool | |
CN217536056U (en) | Auxiliary device for quickly installing blast furnace tuyere small sleeve | |
CN213874766U (en) | Tap water supply pressure detection device | |
CN221665429U (en) | Pipeline supporting seat with shockproof function | |
CN219222099U (en) | Pressure real-time monitoring device convenient to dismouting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230110 |