CN218267775U - An anti-seepage device for water supply and drainage pipes in construction engineering - Google Patents

An anti-seepage device for water supply and drainage pipes in construction engineering Download PDF

Info

Publication number
CN218267775U
CN218267775U CN202222472661.7U CN202222472661U CN218267775U CN 218267775 U CN218267775 U CN 218267775U CN 202222472661 U CN202222472661 U CN 202222472661U CN 218267775 U CN218267775 U CN 218267775U
Authority
CN
China
Prior art keywords
surrounding ring
screw
sealing cylinder
pipeline
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222472661.7U
Other languages
Chinese (zh)
Inventor
刘新坡
刁望君
司金山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222472661.7U priority Critical patent/CN218267775U/en
Application granted granted Critical
Publication of CN218267775U publication Critical patent/CN218267775U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a building engineering plumbing pipe anti-seepage device relates to drain pipe prevention of seepage technical field. The utility model discloses a first pipeline, second pipeline, the sealed section of thick bamboo of first sealed section of thick bamboo and second, the perforation has all been seted up with the sealed section of thick bamboo of second to the sealed section of thick bamboo of first sealed section of thick bamboo, first pipeline, second pipeline one end all are provided with the flange joint board, the connecting hole has all been seted up on a flange joint board surface, first sealed section of thick bamboo one end is provided with first surrounding ring, the sealed section of thick bamboo one end of second is provided with second surrounding ring, first surrounding ring, second surrounding ring and flange joint board directly all are provided with silicone seal gasket. The utility model discloses a set up a first sealed section of thick bamboo and the sealed section of thick bamboo of second, cancel the direct flange joint's that adopts mode of plectane, block the gap of flange joint board department sealed through inside silicone seal gasket, avoid whole connection structure wholly to expose by corrosion and oxidation in the air, but increase of service life when having increased the leakproofness.

Description

一种建筑工程给排水管防渗装置An anti-seepage device for water supply and drainage pipes in construction engineering

技术领域technical field

本实用新型属于排水管防渗技术领域,特别是涉及一种建筑工程给排水管防渗装置。The utility model belongs to the technical field of anti-seepage of drainage pipes, in particular to an anti-seepage device for water supply and drainage pipes in construction engineering.

背景技术Background technique

在建筑工程需要在地下埋设给排水用的管道,现代建筑中给排水管的设计安装是十分重要的,一般利用热熔装置或螺纹连接的方法实现两组给排水管与给排水管之间的连接,在利用热熔装置对两组给排水管进行连接时,常常由于热熔连接处未能完全密封造成渗漏,两组给排水管利用螺纹连接时,给排水管连接头处通过缠绕有密封防水胶带进行螺纹连接,有时此种密封连接效果并不能完全形成密封,时常有水从连接处渗出,为解决上述问题现设计一种建筑工程给排水管防渗装置能有效的解决传统的给排水管道连接方式不够紧密,容易发生渗水的问题。In construction projects, it is necessary to bury underground pipes for water supply and drainage. The design and installation of water supply and drainage pipes in modern buildings is very important. Generally, hot-melt devices or threaded connections are used to realize the connection between two sets of water supply and drainage pipes and water supply and drainage pipes. Connection. When using a hot-melt device to connect two sets of water supply and drainage pipes, leakage is often caused by the failure of the hot-melt connection to be completely sealed. The sealing and waterproof tape is used for threaded connection. Sometimes the sealing effect of this kind of sealing connection cannot completely form a seal, and water often seeps out from the connection. The water supply and drainage pipes are not connected tightly enough, which is prone to water seepage.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑工程给排水管防渗装置解决上述问题现设计一种建筑工程给排水管防渗装置能有效的解决传统的给排水管道连接方式不够紧密,容易发生渗水的问题:The purpose of this utility model is to provide an anti-seepage device for water supply and drainage pipes in construction projects to solve the above problems. Now we design a kind of anti-seepage device for water supply and drainage pipes in construction projects, which can effectively solve the problem that the traditional connection mode of water supply and drainage pipes is not tight enough, and water seepage is prone to occur. question:

本实用新型为一种建筑工程给排水管防渗装置,包括第一管道、第二管道、第一密封筒和第二密封筒,所述第一密封筒与第二密封筒内部均开设有穿孔,所述第一管道、第二管道分别位于第一密封筒与第二密封筒内部的穿孔内;The utility model relates to an anti-seepage device for water supply and drainage pipes in construction engineering, which comprises a first pipe, a second pipe, a first sealing cylinder and a second sealing cylinder, and the inside of the first sealing cylinder and the second sealing cylinder are both provided with perforations , the first pipeline and the second pipeline are respectively located in the perforations inside the first sealing cylinder and the second sealing cylinder;

所述第一管道、第二管道一端均设置有法兰连接板,所述法兰连接板一表面均开设有连接孔,所述第一密封筒一端设置有第一包围环,所述第二密封筒一端设置有第二包围环,所述第一包围环和第二包围环均位于法兰连接板的周侧面,所述第一包围环、第二包围环与法兰连接板直接均设置有硅酮密封垫片,所述硅酮密封垫片与法兰连接板相接触,通过设置带有第一包围环和第二包围环的第一密封筒与第二密封筒,并将两个排水管道的法兰连接板覆盖,取消圆板的直接采用法兰连接的方式,通过第一包围环和第二包围环将两端的法兰连接板进行包裹,内部的硅酮密封垫片将法兰连接板处的缝隙进行阻挡密封,并使用第一包围环和第二包围环上的第一螺孔与第一螺钉将其固定连接,避免整个连接结构整体暴露在空气中被锈蚀和氧化,增加了密封性的同时可延长使用寿命。One end of the first pipe and the second pipe is provided with a flange connection plate, and a connection hole is opened on one surface of the flange connection plate, a first surrounding ring is provided at one end of the first sealing cylinder, and a first surrounding ring is provided at one end of the second pipe. One end of the sealing cylinder is provided with a second surrounding ring, the first surrounding ring and the second surrounding ring are located on the peripheral side of the flange connecting plate, and the first surrounding ring, the second surrounding ring and the flange connecting plate are directly arranged There is a silicone sealing gasket, the silicone sealing gasket is in contact with the flange connection plate, by setting the first sealing cylinder and the second sealing cylinder with the first surrounding ring and the second surrounding ring, and the two The flange connection plate of the drainage pipe is covered, and the flange connection method is directly used to cancel the circular plate. The flange connection plates at both ends are wrapped by the first surrounding ring and the second surrounding ring, and the internal silicone gasket seals the flange connection. The gap at the flange connection plate is blocked and sealed, and the first screw hole and the first screw on the first surrounding ring and the second surrounding ring are used to fix them, so as to avoid the entire connecting structure being exposed to the air and being corroded and oxidized. Increased sealing can prolong service life at the same time.

进一步地,所述第一密封筒与第二密封筒内部一表面安装有强力弹簧,所述强力弹簧一端固定连接有顶块,所述顶块一端与法兰连接板挤压配合,通过设置强力弹簧和顶块对法兰连接板进行挤压,进一步增加了两端的密封性。Further, a powerful spring is installed on the inner surface of the first sealing cylinder and the second sealing cylinder, and one end of the powerful spring is fixedly connected with a jacking block, and one end of the jacking block is squeezed and fitted with the flange connection plate, and by setting a strong The spring and the top block compress the flange connection plate, further increasing the sealing at both ends.

进一步地,所述第一包围环和第二包围环一表面均开设有若干第一螺孔,所述第一螺孔与法兰连接板上的预设螺孔相适应,所述第一螺孔内部设置有第一螺钉,所述第一螺钉周侧面设置有第一螺母,所述第一螺钉与第一螺母、第一螺孔均螺纹配合。Further, a number of first screw holes are opened on the surface of the first surrounding ring and the second surrounding ring, and the first screw holes are adapted to the preset screw holes on the flange connection plate, and the first screw holes A first screw is arranged inside the hole, and a first nut is arranged on the peripheral side of the first screw, and the first screw is threadedly engaged with the first nut and the first screw hole.

进一步地,所述第一包围环周侧面固定连接有第二外延板,所述第二包围环周侧面固定连接有第一外延板,所述第一外延板与第二外延板的位置和数量相适应。Further, the side surface of the first surrounding ring is fixedly connected with a second extension plate, and the side surface of the second surrounding ring is fixedly connected with a first extension plate, the position and quantity of the first extension plate and the second extension plate adapt.

进一步地,所述第一外延板和第二外延板一表面均开设有第二螺孔,所述第二螺孔内部设置有第二螺钉,所述第二螺钉周侧面设置有第二螺母,所述第二螺钉与第二螺母、第二螺孔均螺纹配合。Further, a second screw hole is opened on one surface of the first extension plate and the second extension plate, a second screw is arranged inside the second screw hole, and a second nut is arranged on the side of the second screw, The second screw is threadedly engaged with the second nut and the second screw hole.

进一步地,所述第一包围环周侧面固定安装有铰链底座,所述铰链底座内部设置有转轴,所述转轴周侧面设置有转动架,所述转动架一表面开设有轴孔,所述转轴穿过轴孔,所述转动架通过轴孔与转轴转动配合。Further, a hinge base is fixedly installed on the side of the first surrounding ring, a rotating shaft is arranged inside the hinge base, a turret is arranged on the side of the rotating shaft, a shaft hole is opened on one surface of the turret, and the rotating shaft Through the shaft hole, the turret is rotatably engaged with the rotating shaft through the shaft hole.

进一步地,所述第二包围环一表面设置有插槽,所述插槽内部设置插板,所述插板与插槽滑动配合,所述插板一端固定连接有限位挂钩,所述转动架一端设置有横杆,所述限位挂钩与横杆相挂接。Further, a slot is provided on one surface of the second surrounding ring, and a board is provided inside the slot, and the board is slidably matched with the slot, and one end of the board is fixedly connected to a limit hook, and the turret One end is provided with a cross bar, and the limit hook is connected with the cross bar.

本实用新型具有以下有益效果:The utility model has the following beneficial effects:

1、本实用新型通过设置带有第一包围环和第二包围环的第一密封筒与第二密封筒,并将两个排水管道的法兰连接板覆盖,取消圆板的直接采用法兰连接的方式,通过第一包围环和第二包围环将两端的法兰连接板进行包裹,内部的硅酮密封垫片将法兰连接板处的缝隙进行阻挡密封,并使用第一包围环和第二包围环上的第一螺孔与第一螺钉将其固定连接,避免整个连接结构整体暴露在空气中被锈蚀和氧化,增加了密封性的同时可延长使用寿命。1. In this utility model, the first sealing cylinder and the second sealing cylinder with the first surrounding ring and the second surrounding ring are arranged, and the flange connection plates of the two drainage pipes are covered, and the circular plate is canceled and the flange is directly used. The way of connection is to wrap the flange connecting plates at both ends through the first surrounding ring and the second surrounding ring, and the inner silicone sealing gasket will block and seal the gap at the flange connecting plate, and use the first surrounding ring and The first screw hole on the second surrounding ring is fixedly connected with the first screw, which prevents the entire connecting structure from being exposed to the air to be corroded and oxidized, increases the sealing performance and prolongs the service life.

当然,实施本实用新型的任一产品并不一定需要同时达到以上的所有优点。Certainly, implementing any product of the present utility model does not necessarily need to achieve all the above advantages simultaneously.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following will briefly introduce the accompanying drawings required for the description of the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained based on these drawings without creative effort.

图1为本实用新型右视立体结构示意图;Fig. 1 is the utility model right-view three-dimensional structure schematic diagram;

图2为本实用新型左视立体结构示意图;Fig. 2 is a schematic diagram of a left-view stereoscopic structure of the utility model;

图3为本实用新型前视图;Fig. 3 is a front view of the utility model;

图4为本实用新型第一密封筒内部结构示意图;Fig. 4 is a schematic diagram of the internal structure of the first sealing cylinder of the present invention;

图5为本实用新型转动架局部结构放大示意图。Fig. 5 is an enlarged schematic diagram of the partial structure of the turret of the present invention.

附图中,各标号所代表的部件列表如下:1、第一管道;2、第一螺钉;3、第一外延板;4、第二外延板;5、第二螺母;6、第二螺钉;7、第二管道;8、穿孔;9、第一螺孔;10、第一包围环;11、第二包围环;12、第一密封筒;13、第二密封筒;14、第一螺母;15、顶块;16、硅酮密封垫片;17、连接孔;18、强力弹簧;19、法兰连接板;20、插槽;21、转动架;22、铰链底座;23、轴孔;24、转轴;25、横杆;26、限位挂钩;27、插板。In the drawings, the list of parts represented by each label is as follows: 1. The first pipe; 2. The first screw; 3. The first extension plate; 4. The second extension plate; 5. The second nut; 6. The second screw ; 7, the second pipeline; 8, perforation; 9, the first screw hole; 10, the first surrounding ring; 11, the second surrounding ring; 12, the first sealing cylinder; 13, the second sealing cylinder; 14, the first Nut; 15. Top block; 16. Silicone sealing gasket; 17. Connecting hole; 18. Strong spring; 19. Flange connection plate; 20. Slot; 21. Turret; 22. Hinge base; 23. Shaft Hole; 24, rotating shaft; 25, cross bar; 26, limit hook; 27, plate.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model.

在本实用新型的描述中,需要理解的是,术语“上”、“中”、“外”、“内”、“下”等指示方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的组件或元件必须具有特定的方位,以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present utility model, it should be understood that the terms "upper", "middle", "outer", "inner", "lower", etc. indicating orientation or positional relationship are only for the convenience of describing the present utility model and simplifying the Describes, but does not indicate or imply that the components or elements referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the present invention.

请参阅图1-图5所示,本实用新型为一种建筑工程给排水管防渗装置,包括第一管道1、第二管道7、第一密封筒12和第二密封筒13,第一密封筒12与第二密封筒13内部均开设有穿孔8,第一管道1、第二管道7分别位于第一密封筒12与第二密封筒13内部的穿孔8内;Please refer to Figures 1-5, the utility model is an anti-seepage device for water supply and drainage pipes in construction engineering, including a first pipeline 1, a second pipeline 7, a first sealing cylinder 12 and a second sealing cylinder 13, the first Both the sealing cylinder 12 and the second sealing cylinder 13 are provided with perforations 8 inside, and the first pipeline 1 and the second pipeline 7 are respectively located in the perforations 8 inside the first sealing cylinder 12 and the second sealing cylinder 13;

第一管道1、第二管道7一端均设置有法兰连接板19,法兰连接板19一表面均开设有连接孔17,第一密封筒12一端设置有第一包围环10,第二密封筒13一端设置有第二包围环11,第一包围环10和第二包围环11均位于法兰连接板19的周侧面,第一包围环10、第二包围环11与法兰连接板19直接均设置有硅酮密封垫片16,硅酮密封垫片16与法兰连接板19相接触,通过设置带有第一包围环10和第二包围环11的第一密封筒12与第二密封筒13,并将两个排水管道的法兰连接板19覆盖,取消圆板的直接采用法兰连接的方式,通过第一包围环10和第二包围环11将两端的法兰连接板19进行包裹,内部的硅酮密封垫片16将法兰连接板19处的缝隙进行阻挡密封,并使用第一包围环10和第二包围环11上的第一螺孔9与第一螺钉2将其固定连接,避免整个连接结构整体暴露在空气中被锈蚀和氧化,增加了密封性的同时可延长使用寿命。One end of the first pipe 1 and the second pipe 7 are provided with a flange connection plate 19, and one surface of the flange connection plate 19 is provided with a connection hole 17, and one end of the first sealing cylinder 12 is provided with a first surrounding ring 10, and the second sealing One end of the envelope 13 is provided with a second surrounding ring 11, the first surrounding ring 10 and the second surrounding ring 11 are located on the peripheral side of the flange connecting plate 19, the first surrounding ring 10, the second surrounding ring 11 and the flange connecting plate 19 Silicone sealing gaskets 16 are directly provided, and the silicone sealing gaskets 16 are in contact with the flange connecting plate 19. By setting the first sealing cylinder 12 with the first surrounding ring 10 and the second surrounding ring 11 and the second Seal the cylinder 13, and cover the flange connection plates 19 of the two drainage pipes, cancel the direct flange connection of the circular plate, and connect the flange connection plates 19 at both ends through the first surrounding ring 10 and the second surrounding ring 11 For wrapping, the inner silicone sealing gasket 16 blocks and seals the gap at the flange connecting plate 19, and uses the first screw holes 9 and the first screws 2 on the first surrounding ring 10 and the second surrounding ring 11 to seal the Its fixed connection prevents the entire connection structure from being exposed to the air to be rusted and oxidized, which increases the sealing performance and prolongs the service life.

第一密封筒12与第二密封筒13内部一表面安装有强力弹簧18,强力弹簧18一端固定连接有顶块15,顶块15一端与法兰连接板19挤压配合,通过设置强力弹簧18和顶块15对法兰连接板19进行挤压,进一步增加了两端的密封性。A powerful spring 18 is installed on the inner surface of the first sealing cylinder 12 and the second sealing cylinder 13, and one end of the powerful spring 18 is fixedly connected with a top block 15, and one end of the top block 15 is squeezed and fitted with the flange connecting plate 19. By setting the strong spring 18 The flange connection plate 19 is extruded with the top block 15, which further increases the sealing performance at both ends.

第一包围环10和第二包围环11一表面均开设有若干第一螺孔9,第一螺孔9与法兰连接板19上的预设螺孔相适应,第一螺孔9内部设置有第一螺钉2,第一螺钉2周侧面设置有第一螺母14,第一螺钉2与第一螺母14、第一螺孔9均螺纹配合。A surface of the first surrounding ring 10 and the second surrounding ring 11 is provided with a plurality of first screw holes 9, the first screw holes 9 are compatible with the preset screw holes on the flange connecting plate 19, and the first screw holes 9 are internally arranged There is a first screw 2, the side of the first screw 2 is provided with a first nut 14, and the first screw 2 is threadedly matched with the first nut 14 and the first screw hole 9.

第一包围环10周侧面固定连接有第二外延板4,第二包围环11周侧面固定连接有第一外延板3,第一外延板3与第二外延板4的位置和数量相适应。The side surface of the first surrounding ring 10 is fixedly connected with the second epitaxial plate 4 , and the side surface of the second surrounding ring 11 is fixedly connected with the first epitaxial plate 3 , the position and quantity of the first epitaxial plate 3 and the second epitaxial plate 4 are adapted.

第一外延板3和第二外延板4一表面均开设有第二螺孔,第二螺孔内部设置有第二螺钉6,第二螺钉6周侧面设置有第二螺母5,第二螺钉6与第二螺母5、第二螺孔均螺纹配合。A surface of the first extension plate 3 and the second extension plate 4 is provided with a second screw hole, the inside of the second screw hole is provided with a second screw 6, the side of the second screw 6 is provided with a second nut 5, and the second screw 6 It is threadedly matched with the second nut 5 and the second screw hole.

第一包围环10周侧面固定安装有铰链底座22,铰链底座22内部设置有转轴24,转轴24周侧面设置有转动架21,转动架21一表面开设有轴孔23,转轴24穿过轴孔23,转动架21通过轴孔23与转轴24转动配合。A hinge base 22 is fixedly installed on the side of the first surrounding ring 10, and a rotating shaft 24 is arranged inside the hinge base 22, and a turret 21 is arranged on the side of the rotating shaft 24, and a shaft hole 23 is provided on a surface of the turret 21, and the rotating shaft 24 passes through the shaft hole 23. The turret 21 is rotatably engaged with the rotating shaft 24 through the shaft hole 23.

第二包围环11一表面设置有插槽20,插槽20内部设置插板27,插板27与插槽20滑动配合,插板27一端固定连接有限位挂钩26,转动架21一端设置有横杆25,限位挂钩26与横杆25相挂接。One surface of the second surrounding ring 11 is provided with a slot 20, the inside of the slot 20 is provided with a board 27, the board 27 is slidably matched with the slot 20, one end of the board 27 is fixedly connected to the limit hook 26, and one end of the turret 21 is provided with a horizontal Bar 25, limit hook 26 is articulated with cross bar 25.

实施例一:Embodiment one:

本实施例的一个具体应用为:本装置在第一管道1与第二管道7连接处加设带有第一包围环10和第二包围环11的第一密封筒12与第二密封筒13,将两个排水管道的法兰连接板19覆盖,取消圆板的直接采用法兰连接的方式,通过第一包围环10和第二包围环11将两端的法兰连接板19进行包裹,内部的硅酮密封垫片16将法兰连接板19处的缝隙进行阻挡密封,并使用第一包围环10和第二包围环11上的第一螺孔9与第一螺钉2将其固定连接,避免整个连接结构整体暴露在空气中被锈蚀和氧化,增加了密封性的同时可延长使用寿命。A specific application of this embodiment is: the device adds a first sealing cylinder 12 and a second sealing cylinder 13 with a first surrounding ring 10 and a second surrounding ring 11 at the junction of the first pipeline 1 and the second pipeline 7 , cover the flange connection plates 19 of the two drainage pipes, cancel the round plate and directly adopt the flange connection method, wrap the flange connection plates 19 at both ends through the first surrounding ring 10 and the second surrounding ring 11, and the inner The silicone sealing gasket 16 blocks and seals the gap at the flange connecting plate 19, and uses the first screw hole 9 on the first surrounding ring 10 and the second surrounding ring 11 and the first screw 2 to fix them, Avoiding the entire connection structure being exposed to the air to be rusted and oxidized, increasing the sealing performance and prolonging the service life.

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, descriptions referring to the terms "one embodiment", "example", "specific example" and the like mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in the description of the present invention. In at least one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上公开的本实用新型优选实施例只是用于帮助阐述本实用新型。优选实施例并没有详尽叙述所有的细节,也不限制该实用新型仅为的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本实用新型的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本实用新型。本实用新型仅受权利要求书及其全部范围和等效物的限制。The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not exhaust all details nor limit the invention to specific implementations. Obviously, many modifications and variations can be made based on the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principle and practical application of the utility model, so that those skilled in the art can well understand and utilize the utility model. The invention is to be limited only by the claims and their full scope and equivalents.

Claims (7)

1.一种建筑工程给排水管防渗装置,包括第一管道(1)、第二管道(7)、第一密封筒(12)和第二密封筒(13),其特征在于,所述第一密封筒(12)与第二密封筒(13)内部均开设有穿孔(8),所述第一管道(1)、第二管道(7)分别位于第一密封筒(12)与第二密封筒(13)内部的穿孔(8)内;1. A building engineering water supply and drainage pipe anti-seepage device, comprising a first pipeline (1), a second pipeline (7), a first sealing cylinder (12) and a second sealing cylinder (13), it is characterized in that the The inside of the first sealing cylinder (12) and the second sealing cylinder (13) are provided with perforations (8), and the first pipeline (1) and the second pipeline (7) are located in the first sealing cylinder (12) and the second pipeline respectively. In the perforation (8) inside the second sealing cylinder (13); 所述第一管道(1)、第二管道(7)一端均设置有法兰连接板(19),所述法兰连接板(19)一表面均开设有连接孔(17),所述第一密封筒(12)一端设置有第一包围环(10),所述第二密封筒(13)一端设置有第二包围环(11),所述第一包围环(10)和第二包围环(11)均位于法兰连接板(19)的周侧面,所述第一包围环(10)、第二包围环(11)与法兰连接板(19)直接均设置有硅酮密封垫片(16),所述硅酮密封垫片(16)与法兰连接板(19)相接触。One end of the first pipeline (1) and the second pipeline (7) is provided with a flange connection plate (19), and a surface of the flange connection plate (19) is provided with a connection hole (17). One end of a sealing cylinder (12) is provided with a first surrounding ring (10), one end of the second sealing cylinder (13) is provided with a second surrounding ring (11), and the first surrounding ring (10) and the second surrounding ring The rings (11) are all located on the peripheral side of the flange connecting plate (19), and the first surrounding ring (10), the second surrounding ring (11) and the flange connecting plate (19) are directly provided with silicone gaskets sheet (16), the silicone sealing gasket (16) is in contact with the flange connecting plate (19). 2.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述第一密封筒(12)与第二密封筒(13)内部一表面安装有强力弹簧(18),所述强力弹簧(18)一端固定连接有顶块(15),所述顶块(15)一端与法兰连接板(19)挤压配合。2. The anti-seepage device for water supply and drainage pipes in construction engineering according to claim 1, characterized in that: a powerful spring (18) is installed on a surface inside the first sealing cylinder (12) and the second sealing cylinder (13) ), one end of the strong spring (18) is fixedly connected with a top block (15), and one end of the top block (15) is extruded with the flange connecting plate (19). 3.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述第一包围环(10)和第二包围环(11)一表面均开设有若干第一螺孔(9),所述第一螺孔(9)与法兰连接板(19)上的预设螺孔相适应,所述第一螺孔(9)内部设置有第一螺钉(2),所述第一螺钉(2)周侧面设置有第一螺母(14),所述第一螺钉(2)与第一螺母(14)、第一螺孔(9)均螺纹配合。3. The anti-seepage device for water supply and drainage pipes in construction projects according to claim 1, characterized in that: a surface of the first surrounding ring (10) and the second surrounding ring (11) is provided with a plurality of first screw holes. hole (9), the first screw hole (9) is adapted to the preset screw hole on the flange connecting plate (19), the first screw hole (9) is provided with a first screw (2), A first nut (14) is provided on the peripheral side of the first screw (2), and the first screw (2) is threadedly engaged with the first nut (14) and the first screw hole (9). 4.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于:所述第一包围环(10)周侧面固定连接有第二外延板(4),所述第二包围环(11)周侧面固定连接有第一外延板(3),所述第一外延板(3)与第二外延板(4)的位置和数量相适应。4. The anti-seepage device for water supply and drainage pipes in construction projects according to claim 1, characterized in that: the side of the first surrounding ring (10) is fixedly connected with a second extension plate (4), and the second A first extension plate (3) is fixedly connected to the peripheral side of the surrounding ring (11), and the position and quantity of the first extension plate (3) and the second extension plate (4) are adapted. 5.根据权利要求4所述的一种建筑工程给排水管防渗装置,其特征在于,所述第一外延板(3)和第二外延板(4)一表面均开设有第二螺孔,所述第二螺孔内部设置有第二螺钉(6),所述第二螺钉(6)周侧面设置有第二螺母(5),所述第二螺钉(6)与第二螺母(5)、第二螺孔均螺纹配合。5. The anti-seepage device for water supply and drainage pipes in construction engineering according to claim 4, characterized in that, a surface of the first extension plate (3) and the second extension plate (4) is provided with a second screw hole , the inside of the second screw hole is provided with a second screw (6), the peripheral side of the second screw (6) is provided with a second nut (5), and the second screw (6) and the second nut (5) ), the second screw holes are threaded. 6.根据权利要求1所述的一种建筑工程给排水管防渗装置,其特征在于,所述第一包围环(10)周侧面固定安装有铰链底座(22),所述铰链底座(22)内部设置有转轴(24),所述转轴(24)周侧面设置有转动架(21),所述转动架(21)一表面开设有轴孔(23),所述转轴(24)穿过轴孔(23),所述转动架(21)通过轴孔(23)与转轴(24)转动配合。6. The anti-seepage device for water supply and drainage pipes in construction engineering according to claim 1, characterized in that a hinge base (22) is fixedly installed on the side of the first surrounding ring (10), and the hinge base (22) ) is provided with a rotating shaft (24) inside, and a turret (21) is provided on the side of the rotating shaft (24), and a surface of the rotating frame (21) is provided with a shaft hole (23), and the rotating shaft (24) passes through A shaft hole (23), the turret (21) is rotatably engaged with the rotating shaft (24) through the shaft hole (23). 7.根据权利要求6所述的一种建筑工程给排水管防渗装置,其特征在于,所述第二包围环(11)一表面设置有插槽(20),所述插槽(20)内部设置插板(27),所述插板(27)与插槽(20)滑动配合,所述插板(27)一端固定连接有限位挂钩(26),所述转动架(21)一端设置有横杆(25),所述限位挂钩(26)与横杆(25)相挂接。7. The anti-seepage device for water supply and drainage pipes of construction engineering according to claim 6, characterized in that, a surface of the second surrounding ring (11) is provided with a slot (20), and the slot (20) A board (27) is arranged inside, and the board (27) is slidingly matched with the slot (20). One end of the board (27) is fixedly connected to a limit hook (26), and one end of the turret (21) is set Cross bar (25) is arranged, and described position-limiting hook (26) is articulated with cross bar (25).
CN202222472661.7U 2022-09-19 2022-09-19 An anti-seepage device for water supply and drainage pipes in construction engineering Active CN218267775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222472661.7U CN218267775U (en) 2022-09-19 2022-09-19 An anti-seepage device for water supply and drainage pipes in construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222472661.7U CN218267775U (en) 2022-09-19 2022-09-19 An anti-seepage device for water supply and drainage pipes in construction engineering

Publications (1)

Publication Number Publication Date
CN218267775U true CN218267775U (en) 2023-01-10

Family

ID=84715112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222472661.7U Active CN218267775U (en) 2022-09-19 2022-09-19 An anti-seepage device for water supply and drainage pipes in construction engineering

Country Status (1)

Country Link
CN (1) CN218267775U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116906695A (en) * 2023-08-14 2023-10-20 铜陵有色股份安庆月山矿业有限公司 Seepage-proof structure of underground mine drainage pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116906695A (en) * 2023-08-14 2023-10-20 铜陵有色股份安庆月山矿业有限公司 Seepage-proof structure of underground mine drainage pipeline
CN116906695B (en) * 2023-08-14 2025-10-21 铜陵有色股份安庆月山矿业有限公司 An anti-seepage structure for underground mine drainage pipes

Similar Documents

Publication Publication Date Title
CN218267775U (en) An anti-seepage device for water supply and drainage pipes in construction engineering
CN212319069U (en) Double containment structure clamp formula flange
CN218152334U (en) Water-swelling sealant for water supply and drainage pipeline
CN217762498U (en) Municipal administration water supply and drainage pipeline connection structure
CN216590413U (en) Vacuum negative pressure flange
CN205173851U (en) Rapid rush -repair device for high pressure resistance pipeline
CN212839906U (en) A pipeline connection structure for municipal drainage engineering
CN210106701U (en) An easy-to-install sleeve valve structure
CN202165737U (en) Connecting structure for plastic inspection well and smooth wall tube
CN209654848U (en) Household water pipe adhesive bandage
CN209587119U (en) A kind of negative-pressure vacuum sealing ring
CN209781932U (en) New anti-leakage duct
CN218895100U (en) Pipeline connecting device for hydraulic engineering
CN223805489U (en) A rotary sealing gate
CN212319068U (en) Mounting flange convenient to it is waterproof
CN218587779U (en) Buried heating pipe for greenhouse
CN212745414U (en) Anti-leakage structure device for municipal water supply and drainage pipe
CN207661137U (en) Levels waterproof sealing structure
CN218176015U (en) Drain pipe antiseep device
CN223838225U (en) A spliced pipeline structure
CN223677214U (en) Waterproof decorative sleeve pipe of back hole clamp formula
CN221995476U (en) Dampproofing casing of gateway
CN217556839U (en) Steel dam gate main shaft and breast wall stagnant water structure
CN213397239U (en) Highly sealed water meter convenient to fixed mounting
CN217603529U (en) Basement outer wall antiseep embedded sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant