CN218264871U - Protector is used in engineering construction - Google Patents

Protector is used in engineering construction Download PDF

Info

Publication number
CN218264871U
CN218264871U CN202222690181.8U CN202222690181U CN218264871U CN 218264871 U CN218264871 U CN 218264871U CN 202222690181 U CN202222690181 U CN 202222690181U CN 218264871 U CN218264871 U CN 218264871U
Authority
CN
China
Prior art keywords
fixedly connected
connecting piece
engineering construction
plate
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222690181.8U
Other languages
Chinese (zh)
Inventor
张加平
吴亚尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengxin Electromechanical Equipment Installation Co ltd
Original Assignee
Jiangsu Hengxin Electromechanical Equipment Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hengxin Electromechanical Equipment Installation Co ltd filed Critical Jiangsu Hengxin Electromechanical Equipment Installation Co ltd
Priority to CN202222690181.8U priority Critical patent/CN218264871U/en
Application granted granted Critical
Publication of CN218264871U publication Critical patent/CN218264871U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a protector is used in engineering construction, comprising a base plate, the top fixedly connected with guard plate of bottom plate, and four connecting pieces of one side outer wall fixedly connected with of guard plate, four the connecting piece all is connected with the mounting through the axostylus axostyle, and the fixed orifices has all been seted up at the top of four mountings, four the fixed orifices has all been seted up at the top of connecting piece, and the fixed orifices of seting up on corresponding connecting piece and the mounting all communicates with each other with the fixed orifices. The utility model discloses a set up the dead lever upstairs in the construction, the mounting passes through the axostylus axostyle and is connected with the connecting piece, and the inner wall of mounting and connecting piece contacts with the outer wall of dead lever simultaneously, increases the stability of hanging flower basket when carrying out high altitude construction from this, improves the security when constructing, and the fixed pin is fixed it through the communicating fixed mouthful of seting up on mounting and connecting piece, guarantees can not loosen with the dead lever when the operation, convenient to detach simultaneously.

Description

Protector is used in engineering construction
Technical Field
The utility model relates to an engineering construction technical field especially relates to a protector is used in engineering construction.
Background
Along with the development of scientific technology, the fields of construction and the like are rapidly improved, and in the construction site of a construction site, in order to prevent irrelevant personnel from entering a dangerous construction site, a protective device is often arranged near the construction site or beside some dangerous construction equipment, a hanging basket is generally required during high-altitude operation, is a construction machine for high-altitude operation of construction engineering, acts on curtain wall installation and outer wall cleaning, and has the characteristics of capability of replacing a traditional scaffold, labor intensity reduction, work efficiency improvement and repeated use.
The existing protective device for engineering construction has the following defects: the existing hanging basket is easy to shake when the hanging basket is used due to the influence of high-altitude wind power when high-altitude operation is carried out, so that threats are caused to constructors, construction articles drop easily, and potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the protector is used in engineering construction that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a protector is used in engineering construction, includes the bottom plate, the top fixedly connected with guard plate of bottom plate, and four connecting pieces of one side outer wall fixedly connected with of guard plate, four the connecting piece all is connected with the mounting through the axostylus axostyle, and the fixed mouthful has all been seted up at the top of four mountings, four the fixed orifices has all been seted up at the top of connecting piece, and the fixed orifices and the fixed mouthful of seting up on corresponding connecting piece and the mounting all communicate with each other, and are corresponding the equal sliding connection of inner wall of fixed orifices and fixed mouthful has the fixed pin.
Preferably, two lifting blocks are fixedly connected to the outer walls of the two sides of the protection plate, rotating rods are connected to the inner walls of the four lifting blocks through bearings, and lifting wheels are fixedly connected to the outer walls of the four rotating rods.
Preferably, the top of the bottom plate is fixedly connected with four supporting rods, the top of the four supporting rods is fixedly connected with the same top plate, and the tops of the top plates are fixedly connected with a plurality of buffer springs at equal intervals.
Preferably, the same damping plate is fixedly connected to the top of the buffer spring, a buffer pad is fixedly connected to the top of the damping plate, and the top of the buffer pad is an inclined plane.
Preferably, one side outer wall fixedly connected with installing frame of guard plate, a plurality of installing ports have been seted up to the top equidistance of installing frame, and the inner wall sliding connection of installing port has the protective rod.
Preferably, the outer wall fixedly connected with fixture block of both sides of fender rod, and two spacing frames of the top fixedly connected with of installing frame, two spacing frames are located the both sides of fender rod respectively.
Preferably, two equal sliding connection of inner wall of spacing frame has the stopper, and is in the stopper with one side and spacing frame relative one side outer wall fixedly connected with two tension springs.
The utility model has the advantages that:
1. through being provided with the connecting piece, the mounting, fixed mouthful and fixed pin, this protector is used for the hanging flower basket operation for the engineering construction, set up the dead lever upstairs in the construction, the mounting passes through the axostylus axostyle and is connected with the connecting piece, the inner wall of mounting and connecting piece contacts with the outer wall of dead lever simultaneously, increase the stability of hanging flower basket when carrying out high altitude construction from this, improve the security during construction, and the fixed pin is fixed it through the communicating fixed mouthful of seting up on mounting and connecting piece, guarantee can not loosen with the dead lever when the operation, convenient to detach simultaneously.
2. Through being provided with roof, buffer spring, shock attenuation board and cushion, this protector for engineering construction is used for the hanging flower basket operation, and something drops when can avoiding the construction through the roof and causes the injury to the personnel, can play the cushioning effect when dropping through being provided with buffer spring, shock attenuation board and cushion, reduces the influence to the hanging flower basket, further increases stability.
3. Through being provided with protective rod, fixture block, tension spring, stopper and spacing frame, this protector for engineering construction is used for the hanging flower basket operation, can increase the security when constructing through raising the protective rod, carries on spacingly through stopper and spacing frame to the fixture block when using for the protective rod can be fixed, can just withdraw and fix through tension spring simultaneously.
Drawings
Fig. 1 is a schematic structural view of a protective device for engineering construction according to the present invention;
fig. 2 is a structural side view of the protection device for engineering construction provided by the utility model;
fig. 3 is a schematic view of a combined structure of a top plate and a shock absorbing plate of the protective device for engineering construction according to the present invention;
fig. 4 is a schematic view of a combination structure of a fixing member and a fixing pin of the protective device for engineering construction according to the present invention;
fig. 5 is the utility model provides a protection device for engineering construction's enlarged structure schematic diagram of part a in fig. 1.
In the figure: 1. a protection plate; 2. a lifting block; 3. a support bar; 4. a top plate; 5. a cushion pad; 6. a guard bar; 7. installing a frame; 8. a fixing member; 9. a lifting wheel; 10. a damper plate; 11. a buffer spring; 12. a fixed port; 13. a fixing pin; 14. a connecting member; 15. a tension spring; 16. a limiting block; 17. a limiting frame; 18. a clamping block; 19. a base plate.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the figures, which are based on the orientations and positional relationships shown in the figures, and are used for convenience in describing the patent and for simplicity in description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and therefore should not be construed as limiting the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Referring to fig. 1-5, a protector is used in engineering construction, including bottom plate 19, the top fixedly connected with guard plate 1 of bottom plate 19, and one side outer wall fixedly connected with four connecting pieces 14 of guard plate 1, four connecting pieces 14 all are connected with mounting 8 through the axostylus axostyle, and fixed mouthful 12 has all been seted up at the top of four mounting 8, the fixed orifices has all been seted up at the top of four connecting pieces 14, and the fixed orifices that set up on corresponding connecting piece 14 and the mounting 8 all communicate with each other with fixed mouthful 12, the equal sliding connection of corresponding fixed orifices and the inner wall of fixed mouthful 12 has fixed pin 13, through setting up the dead lever on the construction building, mounting 8 is connected with connecting piece 14 through the axostylus axostyle, the inner wall of while mounting 8 and connecting piece 14 contacts with the outer wall of dead lever, increase the stability of hanging flower basket when carrying out high altitude construction from this, improve the security during construction, and fixed pin 13 fixes it through the communicating fixed mouthful 12 of setting up on mounting 8 and connecting piece 14, guarantee can not loosen with the dead lever when the operation, be convenient to dismantle simultaneously.
The utility model discloses, two elevating blocks 2 of the equal fixedly connected with of both sides outer wall of guard plate 1, four elevating blocks 2's inner wall all are connected with the bull stick through the bearing, and the equal fixedly connected with of outer wall of four bull sticks lift wheel 9, thereby be convenient for go up and down to the hanging flower basket through the lift wheel 9 that sets up.
The utility model discloses, four bracing pieces 3 of bottom plate 19's top fixedly connected with, the same roof 4 of top fixedly connected with of four bracing pieces 3, and a plurality of buffer spring 11 of top equidistance fixedly connected with of roof 4, article drop when can avoiding being under construction through roof 4 and cause the injury to personnel, and buffer spring 11 can play the cushioning effect when the east west drops simultaneously.
The utility model discloses, the same shock attenuation board 10 of the same shock attenuation board of top fixedly connected with of buffer spring 11, the top fixedly connected with blotter 5 of shock attenuation board 10, and the top of blotter 5 is the inclined plane, can play the cushioning effect when dropping through being provided with buffer spring 11, shock attenuation board 10 and cushion 5, reduces the influence to the hanging flower basket, further increases stability.
The utility model discloses, one side outer wall fixedly connected with installing frame 7 of guard plate 1, a plurality of installing ports have been seted up to the top equidistance of installing frame 7, and the inner wall sliding connection of installing port has fender rod 6, can increase the security when constructing through raising fender rod 6.
The utility model discloses, the both sides outer wall fixedly connected with fixture block 18 of protection rod 6, and two spacing frames 17 of the top fixedly connected with of installing frame 7, two spacing frames 17 are located the both sides of protection rod 6 respectively, and spacing frame 17 is convenient for install stopper 16.
The utility model discloses, the equal sliding connection of inner wall of two spacing frames 17 has stopper 16, and is in stopper 16 with one side with two tension spring 15 of the relative one side outer wall fixedly connected with of spacing frame 17, carries on spacingly to fixture block 18 through stopper 16 and spacing frame 17 during the use for guard bar 6 can be fixed, simultaneously can just with withdraw and fix through tension spring 15.
The working principle is as follows: this protector for engineering construction is when being used for the hanging flower basket operation, set up the dead lever on the construction building, rise through lifting wheel 9, fixing 8 passes through the axostylus axostyle and is connected with connecting piece 14 simultaneously, and the inner wall of fixing 8 and connecting piece 14 contacts with the outer wall of dead lever, increase the stability of hanging flower basket when carrying out high altitude construction from this, and fix fixing 8 and connecting piece 14 through fixed pin 13, guarantee can not loosen with the dead lever when the operation, the security when accomplishing fixed same moment with the protection lever 6 rise in order to increase the construction, carry out spacingly through stopper 16 to fixture block 18 when using, make protection lever 6 can be fixed, simultaneously can just with withdrawing and fixing through tension spring 15, can avoid when carrying out high altitude construction that something drops to cause the injury to the personnel through roof 4 when carrying out high altitude construction, and through buffer spring 11, shock attenuation board 10 and buffer pad 5 can play the cushioning effect when east west drops, reduce the influence to the hanging flower basket, further increase stability, descend through lifting wheel 9 after accomplishing the construction.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a protector is used in engineering construction, includes bottom plate (19), its characterized in that, top fixedly connected with guard plate (1) of bottom plate (19), and four connecting piece (14) of one side outer wall fixedly connected with of guard plate (1), four connecting piece (14) all are connected with mounting (8) through the axostylus axostyle, and fixed mouthful (12), four have all been seted up at the top of four mounting (8) the fixed orifices has all been seted up at the top of connecting piece (14), and the fixed orifices of seting up on corresponding connecting piece (14) and mounting (8) all communicates with each other with fixed mouthful (12), and is corresponding the equal sliding connection of inner wall of fixed orifices and fixed mouthful (12) has fixed pin (13).
2. The protection device for engineering construction according to claim 1, wherein two lifting blocks (2) are fixedly connected to the outer walls of two sides of the protection plate (1), rotating rods are connected to the inner walls of the four lifting blocks (2) through bearings, and lifting wheels (9) are fixedly connected to the outer walls of the four rotating rods.
3. The protection device for engineering construction according to claim 1, wherein four support rods (3) are fixedly connected to the top of the bottom plate (19), the same top plate (4) is fixedly connected to the tops of the four support rods (3), and a plurality of buffer springs (11) are fixedly connected to the tops of the top plate (4) at equal intervals.
4. The protection device for engineering construction according to claim 3, wherein the same damping plate (10) is fixedly connected to the top of the damping spring (11), the cushion pad (5) is fixedly connected to the top of the damping plate (10), and the top of the cushion pad (5) is inclined.
5. The protection device for engineering construction according to claim 1, wherein an installation frame (7) is fixedly connected to the outer wall of one side of the protection plate (1), a plurality of installation openings are formed in the top of the installation frame (7) at equal intervals, and protection rods (6) are slidably connected to the inner wall of the installation openings.
6. The protection device for engineering construction according to claim 5, wherein the outer walls of the two sides of the protection rod (6) are fixedly connected with the fixture blocks (18), the top of the mounting frame (7) is fixedly connected with two limiting frames (17), and the two limiting frames (17) are respectively located on the two sides of the protection rod (6).
7. The protection device for engineering construction according to claim 6, wherein the inner walls of the two limit frames (17) are connected with limit blocks (16) in a sliding manner, and the outer walls of the limit blocks (16) on the same side and the outer walls of the opposite sides of the limit frames (17) are fixedly connected with two tension springs (15).
CN202222690181.8U 2022-10-13 2022-10-13 Protector is used in engineering construction Active CN218264871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222690181.8U CN218264871U (en) 2022-10-13 2022-10-13 Protector is used in engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222690181.8U CN218264871U (en) 2022-10-13 2022-10-13 Protector is used in engineering construction

Publications (1)

Publication Number Publication Date
CN218264871U true CN218264871U (en) 2023-01-10

Family

ID=84750364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222690181.8U Active CN218264871U (en) 2022-10-13 2022-10-13 Protector is used in engineering construction

Country Status (1)

Country Link
CN (1) CN218264871U (en)

Similar Documents

Publication Publication Date Title
CN218264871U (en) Protector is used in engineering construction
CN213062879U (en) Hanging basket for steel arch construction
CN209975993U (en) Suspension cage
CN210795684U (en) Novel movable lifting platform
CN204788911U (en) Multi -functional safety belt testing arrangement
CN110947117A (en) Portable safety belt locking device
CN211847056U (en) Mast type aerial work platform
CN210086058U (en) Matching type operating platform
CN210369986U (en) Building safety protection equipment
CN216196506U (en) Construction hanging basket for construction
CN219604827U (en) Building hanging basket with protection function
CN220666882U (en) Protection device for building engineering
CN216552939U (en) Supporting platform with protection function for construction
CN208120617U (en) A kind of tower crane lifting stock buffering falling proof device
CN220766240U (en) Protection overhead hoist of mining machinery conveyer
CN213802505U (en) Mounting rack for installation of scaffold-free elevator
CN212129874U (en) High-safety hanging basket
CN217500988U (en) High-safety hanging basket for constructional engineering
CN210239081U (en) Safe scaffold for building construction
CN213837858U (en) Assembly type lifting frame with protection function for building construction
CN211114708U (en) Scaffold
CN219411718U (en) Operation frame for safety protection of high-altitude operation
CN214498343U (en) Hanging type hanging basket
CN211783111U (en) Protection safety shed for mine blasting
CN209618612U (en) A kind of fixed device of building construction hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant