CN218263375U - Road marking clearing device for road construction - Google Patents

Road marking clearing device for road construction Download PDF

Info

Publication number
CN218263375U
CN218263375U CN202221258622.0U CN202221258622U CN218263375U CN 218263375 U CN218263375 U CN 218263375U CN 202221258622 U CN202221258622 U CN 202221258622U CN 218263375 U CN218263375 U CN 218263375U
Authority
CN
China
Prior art keywords
road
arc
construction
shower nozzle
shaped plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221258622.0U
Other languages
Chinese (zh)
Inventor
苌安军
乔乐妹
李莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Junlan Construction Engineering Group Co ltd
Original Assignee
Anhui Junlan Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Junlan Construction Engineering Group Co ltd filed Critical Anhui Junlan Construction Engineering Group Co ltd
Priority to CN202221258622.0U priority Critical patent/CN218263375U/en
Application granted granted Critical
Publication of CN218263375U publication Critical patent/CN218263375U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model relates to a road construction equipment technical field especially relates to a road marking clearing device is used in road construction, including front end construction case and rear end pressure unit, rear end pressure unit's bottom is provided with moving vehicle frame to rear end pressure unit's delivery port intercommunication has the raceway, the one end intercommunication that rear end pressure unit was kept away from to the raceway has the water-locator, water-locator fixed mounting is in the inside of front end construction case to the inside bottom fixedly connected with shower nozzle mounting bracket of front end construction incasement portion, the inboard fixedly connected with pressure boost shower nozzle of shower nozzle mounting bracket, the water inlet end of pressure boost shower nozzle communicates with the delivery port end of water-locator. The utility model discloses an increase the setting exportable high-pressure waterline of unit and pressure boost shower nozzle, high-speed impact marking, through the friction with wash and carry out high-pressure washing to the road marking and clear away, compare the tradition and polish and clear away the mode, have dustless, the noise is low, the clearing speed is high and clear away the advantage that the clean degree is high.

Description

Road marking clearing device for road construction
Technical Field
The utility model relates to a road construction equipment technical field especially relates to a road marking clearing device is used in road construction.
Background
With the increase of urban traffic flow, traffic management departments increase vehicle passing lanes by optimizing intersection canalization configuration and other modes under the condition that the width of a road surface is not changed, so that vehicles are effectively shunted, and a good effect is obtained.
Among the prior art, road marking clearing device on the market generally adopts the mode of polishing, has the defect of operation noise and dust pollution, and the workman need push away tedious whole unit equipment and impel the use, uses not nimble enough, consequently, provides a road marking clearing device for road construction in order to solve above-mentioned not enough.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a road marking clearing device is used in road construction.
In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a road marking clearing device for road construction, includes front end construction case and rear end booster unit, the bottom of rear end booster unit is provided with the removal frame to the delivery port intercommunication of rear end booster unit has the raceway, the one end intercommunication that rear end booster unit was kept away from to the raceway has the water-locator, water-locator fixed mounting is in the inside of front end construction case to the inside bottom fixedly connected with shower nozzle mounting bracket of front end construction case, the inboard fixedly connected with pressure boost shower nozzle of shower nozzle mounting bracket to the water inlet end of pressure boost shower nozzle communicates with the delivery port end of water-locator mutually, one side of front end construction bottom of the case portion is provided with the operation wheel to the fixed surface of front end construction case is connected with the operation support, the end of operation support is provided with the operation auxiliary wheel, the surface of raceway is provided with protection device.
Preferably, one side of the bottom of the front end construction box, which is far away from the operation wheels, is fixedly connected with a spray head protection cover, and one side of the outer side of the front end construction box, which is far away from the operation wheels, is provided with a carrying wheel.
Preferably, a folding handrail is arranged at the top of the operation support, and a control panel is arranged at the top of the folding handrail.
Preferably, the protection device comprises a first arc-shaped plate and a second arc-shaped plate, wherein C-shaped grooves are formed in the outer sides of the first arc-shaped plate and the second arc-shaped plate, and balls are arranged inside the C-shaped grooves.
Preferably, the two ends of the first arc-shaped plate and the second arc-shaped plate are both provided with connecting portions, and the inner sides of the first arc-shaped plate and the second arc-shaped plate are both provided with anti-slip pads.
Preferably, a water inlet of the rear end booster set is communicated with a short connecting pipe.
The utility model discloses possess following beneficial effect at least:
1. by arranging the additional unit and the pressurizing nozzle, the additional unit is used for outputting high-pressure water flow, the water flow is sprayed out of a high-pressure waterline through the pressurizing nozzle, the waterline impacts at a high speed of about 15 meters per second, and the pavement marking line is cleaned by high-pressure washing through friction and washing, so that compared with the traditional polishing and cleaning mode, the polishing and cleaning device has the advantages of no dust, low noise, high cleaning speed and high cleaning and tidying degree;
2. through the separated design of the front-end construction box and the rear-end booster set, only the front-end construction box with light weight needs to be pushed for operation during construction, the rear-end booster set can be arranged at a water source, the physical consumption of the operation is less, and the operation is more flexible and convenient;
3. through set up on the raceway and embrace protection device, can drag the in-process at the pipeline and carry out the abrasionproof protection to the pipeline, avoid pipeline and ground friction damaged, reduce pipeline and ground frictional force simultaneously, make things convenient for equipment construction to drag the line pipeline.
Drawings
In order to more clearly illustrate the technical solution of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the description below are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a front view of the structure of the present invention;
FIG. 2 is a schematic view of the front-end construction box structure of the present invention;
FIG. 3 is a schematic view of the structure of the protection device of the present invention;
fig. 4 is a cross-sectional view of the structure of the protection device of the present invention.
In the figure: 1. a front end construction box; 2. a rear-end booster set; 3. moving the frame; 4. a water delivery pipe; 5. a water distributor; 6. a nozzle mounting frame; 7. a pressurized spray head; 8. a working wheel; 9. an operation bracket; 10. an operation auxiliary wheel; 11. a nozzle protection cover; 12. a carrying wheel; 13. folding the hand-held rack; 14. a control panel; 15. a first arc-shaped plate; 16. a second arc-shaped plate; 17. c-shaped grooves; 18. a ball bearing; 19. a connecting portion; 20. a non-slip mat; 21. a nipple.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-4, a road marking removing device for road construction comprises a front-end construction box 1 and a rear-end booster set 2, wherein a movable frame 3 is arranged at the bottom of the rear-end booster set 2, a water delivery pipe 4 is communicated with a water delivery pipe 4, one end of the water delivery pipe 4, which is far away from the rear-end booster set 2, is communicated with a water distributor 5, the water distributor 5 is fixedly installed inside the front-end construction box 1, a nozzle mounting frame 6 is fixedly connected to the bottom inside the front-end construction box 1, a boosting nozzle 7 is fixedly connected to the inner side of the nozzle mounting frame 6, a water inlet end of the boosting nozzle 7 is communicated with a water outlet end of the water distributor 5, an operation wheel 8 is arranged on one side of the bottom of the front-end construction box 1, an operation support 9 is fixedly connected to the surface of the front-end construction box 1, an operation auxiliary wheel 10 is arranged at the tail end of the operation support 9, a protection device is arranged on the surface of the water delivery pipe 4, and the whole gravity center of the front-end construction box 1 is positioned on the right side of the operation wheel 8 in an operation state.
The scheme has the following working processes:
during the use, with the takeover 21 switch-on water source, front end construction case 1 moves to clearing away the marking construction place, it makes front end construction case 1 be in the operation angle to push down operation support 9, provide the support for front end construction case 1 by operation auxiliary wheel 10 and operation wheel 8, make pressure boost shower nozzle 7 aim at the marking, it goes ahead to control front end construction case 1 through folding hand frame 13, carry behind rear end pressure boost unit 2 with the water source pressure boost, spray high-pressure waterline at a high speed of 15 meters per second left and right sides through pressure boost shower nozzle 7, carry out the impact friction to the marking, reach the purpose of getting rid of the marking.
Furthermore, a sprayer protection cover 11 is fixedly connected to one side of the bottom of the front-end construction box 1, which is far away from the operation wheels 8, and a carrying wheel 12 is arranged on one side of the outer side of the front-end construction box 1, which is far away from the operation wheels 8, the sprayer protection cover 11 prevents the pressurizing sprayer 7 from contacting with the ground, the front-end construction box 1 is in a horizontal state during carrying, and the carrying wheel 12 and the operation wheels 8 are used for integrally supporting the front-end construction box.
Further, a folding handrail 13 is arranged at the top of the operation bracket 9, and a control panel 14 is arranged at the top of the folding handrail 13, so that the front-end construction box 1 is controlled to move forward by the folding handrail 13.
Further, the protection device comprises a first arc-shaped plate 15 and a second arc-shaped plate 16, wherein C-shaped grooves 17 are formed in the outer sides of the first arc-shaped plate 15 and the second arc-shaped plate 16, balls 18 are arranged in the C-shaped grooves 17, the balls 18 are limited in the grooves by the C-shaped grooves 17 and cannot be separated from the grooves, and the balls 18 can roll in the C-shaped grooves 17 in any direction.
Further, the both ends of first arc 15 and second arc 16 all are provided with connecting portion 19 to the inboard of first arc 15 and second arc 16 all is provided with slipmat 20, and first arc 15 and second arc 16 carry out fixed connection through connecting portion 19, and slipmat 20 strengthens the fixed effect of being connected between protection device and the raceway 4, avoids packing plant along pipeline surface slip.
Furthermore, a water inlet of the rear-end booster unit 2 is communicated with a short connecting pipe 21, and the short connecting pipe 21 is communicated with a water source.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that all the embodiments and descriptions are provided in the present invention, and that various changes and modifications can be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a road marking clearing device for road construction, includes front end construction case (1) and rear end pressure unit (2), its characterized in that, the bottom of rear end pressure unit (2) is provided with travelling carriage (3) to the delivery port intercommunication of rear end pressure unit (2) has raceway (4), the one end intercommunication that rear end pressure unit (2) were kept away from in raceway (4) has water-locator (5), water-locator (5) fixed mounting is in the inside of front end construction case (1) to the bottom fixedly connected with shower nozzle mounting bracket (6) of front end construction case (1) inside, the inboard fixedly connected with pressure boost shower nozzle (7) of shower nozzle mounting bracket (6) to the water inlet end of pressure boost shower nozzle (7) communicates with the delivery port end of front end construction case (5), one side of front end construction case (1) bottom is provided with operation wheel (8) to the fixed surface of front end construction case (1) is connected with operation support (9), the end of operation support (9) is provided with operation auxiliary wheel (10), the surface protection device of raceway (4) is provided with water-distributing device.
2. The road marking removing device for road construction according to claim 1, wherein a nozzle protecting cover (11) is fixedly connected to one side of the bottom of the front end construction box (1) far away from the working wheel (8), and a carrying wheel (12) is arranged on one side of the outer side of the front end construction box (1) far away from the working wheel (8).
3. The road marking removing device for road construction according to claim 1, wherein a folding handrail (13) is provided on the top of the working bracket (9), and a control panel (14) is provided on the top of the folding handrail (13).
4. The road marking removing device for road construction according to claim 1, wherein the protecting device comprises a first arc-shaped plate (15) and a second arc-shaped plate (16), the outer sides of the first arc-shaped plate (15) and the second arc-shaped plate (16) are provided with C-shaped grooves (17), and balls (18) are arranged inside the C-shaped grooves (17).
5. The road marking removing device for road construction according to claim 4, wherein the first arc-shaped plate (15) and the second arc-shaped plate (16) are provided with connecting portions (19) at both ends thereof, and non-slip mats (20) are provided on inner sides of the first arc-shaped plate (15) and the second arc-shaped plate (16).
6. The road marking removing device for road construction according to claim 1, wherein the water inlet of the rear end booster set (2) is communicated with a short connecting pipe (21).
CN202221258622.0U 2022-05-24 2022-05-24 Road marking clearing device for road construction Active CN218263375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221258622.0U CN218263375U (en) 2022-05-24 2022-05-24 Road marking clearing device for road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221258622.0U CN218263375U (en) 2022-05-24 2022-05-24 Road marking clearing device for road construction

Publications (1)

Publication Number Publication Date
CN218263375U true CN218263375U (en) 2023-01-10

Family

ID=84755456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221258622.0U Active CN218263375U (en) 2022-05-24 2022-05-24 Road marking clearing device for road construction

Country Status (1)

Country Link
CN (1) CN218263375U (en)

Similar Documents

Publication Publication Date Title
CN205816007U (en) A kind of Multifunctional road guard fence auto spray painting device
CN107034816B (en) Road protective fence cleaning vehicle
CN218263375U (en) Road marking clearing device for road construction
CN211252532U (en) High-speed train cleaning machine
CN219214960U (en) Vehicle cleaning device
CN2832906Y (en) Multifunctional cleaning vehicle for road balustrade
CN210766561U (en) Road and bridge guardrail cleaning vehicle set
JPH11269835A (en) Hydraulic type sand-dusts recovery device, and hydraulic type sand-dusts sweep-out device, and hydraulic type road scavenger with these device
CN110184982B (en) Road silt cleaning device
CN205530080U (en) Traffic marking washs car
JPH11152720A (en) Washing car for road mark
CN210561926U (en) Highway marking cleaning machine
CN212714752U (en) High-low pressure water way separation system of motor sweeper
CN209059063U (en) A kind of clean and environmental protection electric dust cart
CN214492832U (en) Cleaning device for unmanned automobile
CN214363213U (en) High-pressure cleaning secondary side suction device for sweeper
CN216994251U (en) Construction building site machineshop car belt cleaning device
CN211596335U (en) Hand propelled road striping machine
CN213448296U (en) Liftable formula press down dirt watering lorry
CN207582396U (en) A kind of water sprinkling path device
CN214993446U (en) Road cleaning trolley easy to operate
CN220246787U (en) High-efficient safe electronic cleaning equipment
CN106111394A (en) A kind of Multifunctional road guard fence auto spray painting device
CN214194303U (en) Highway guardrail sprays belt cleaning device
CN213943570U (en) Coating spraying device for highway maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant