CN218234257U - Manual operation platform is installed to portable instrument formula ALC board - Google Patents

Manual operation platform is installed to portable instrument formula ALC board Download PDF

Info

Publication number
CN218234257U
CN218234257U CN202222393429.4U CN202222393429U CN218234257U CN 218234257 U CN218234257 U CN 218234257U CN 202222393429 U CN202222393429 U CN 202222393429U CN 218234257 U CN218234257 U CN 218234257U
Authority
CN
China
Prior art keywords
fixedly connected
wall
alc board
frame main
splint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222393429.4U
Other languages
Chinese (zh)
Inventor
刘仲阳
王效鹏
牛国权
侯卓
张星星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Installation Group Co Ltd
Original Assignee
Shanxi Installation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Installation Group Co Ltd filed Critical Shanxi Installation Group Co Ltd
Priority to CN202222393429.4U priority Critical patent/CN218234257U/en
Application granted granted Critical
Publication of CN218234257U publication Critical patent/CN218234257U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application discloses people operation platform in installation of portable instrument formula ALC board, relate to ALC board installation auxiliary assembly technical field, including the handling frame main part, the top fixedly connected with operation platform of handling frame main part, operation platform's top fixedly connected with protection frame, the draw-in groove has been seted up to the inner wall of protection frame, the handling frame main part drives inner wall fixed mounting and has the hoist engine, the output fixedly connected with hoist cable of hoist engine, one side fixedly connected with axostylus axostyle of handling frame main part, the outer wall of axostylus axostyle rotates and is connected with the assembly pulley, the one end fixedly connected with backup pad of hoist cable, the outer wall fixedly connected with mount pad of backup pad, the top fixed mounting of mount pad has small-size electric putter, small-size electric putter's output fixedly connected with splint, the activity joint has the ALC board between backup pad and the splint. This application need not constantly to set up the scaffold frame, does benefit to and reduces the construction degree of difficulty, has reduced artifical input, has reduced the high altitude construction degree of difficulty, has improved efficiency of construction and ALC board installation effectiveness.

Description

Manual operation platform is installed to portable instrument formula ALC board
Technical Field
The application relates to ALC board installation auxiliary assembly technical field especially relates to a people operation platform on portable instrument formula ALC board installation.
Background
ALC is short for autoclaved lightweight concrete, and is one of high-performance autoclaved aerated concrete. The ALC board is a porous concrete forming board which is formed by curing fly ash, cement, lime and the like serving as main raw materials through high-pressure steam. The ALC board can be used as a wall material and a roof board, and is a novel building material with excellent performance.
ALC board has now been widely used as building indoor partition wall structure, and it has advantages such as light in weight, keep warm good, strong, green, the installation of high ALC wallboard in the construction process needs professional framer to set up a large amount of fixed operation scaffolds along with the wall body construction direction, needs many people to cooperate in the ALC wallboard installation process just can accomplish the high altitude construction processes such as transport, take one's place, erect, installation fixed of wallboard material.
At realizing this application in-process, the inventor discovers that there is following problem in this technique at least, and current ALC board adopts the artifical mounting means of building the scaffold of tradition, and there is certain potential safety hazard in the stability that its operation scaffold was set up and the high altitude construction in the mounting process, and the scaffold need follow the mounted position and constantly set up, has increased certain construction degree of difficulty, has reduced efficiency of construction and ALC board installation effectiveness.
SUMMERY OF THE UTILITY MODEL
In order to improve the above-mentioned problem that the ALC board installation efficiency is low, the application provides a movable tool type ALC board installation upper operating platform.
The application provides people's operation platform in installation of portable instrument formula ALC board adopts following technical scheme:
a manual operation platform for installing a movable tool type ALC board comprises an operation frame main body, wherein the top of the operation frame main body is fixedly connected with the operation platform, the top of the operation platform is fixedly connected with a protection frame, the inner wall of the protection frame is provided with a clamping groove, the operation frame main body drives the inner wall to be fixedly provided with a winch, the output end of the winch is fixedly connected with a sling, one side of the operation frame main body is fixedly connected with a shaft lever, the outer wall of the shaft lever is rotatably connected with a pulley block, and one end of the sling is fixedly connected with a support plate;
the outer wall fixedly connected with mount pad of backup pad, the top fixed mounting of mount pad has small-size electric putter, small-size electric putter's output fixedly connected with splint, the activity joint has the ALC board between backup pad and the splint, the protection frame is located the inner wall activity joint of draw-in groove has the dead lever, the sleeve has been cup jointed in the outer wall activity of dead lever, telescopic inner wall fixed mounting has the spring, telescopic outer wall fixedly connected with bearing, the outer wall fixedly connected with roller of bearing.
Based on above-mentioned technical scheme, place the ALC board in the backup pad, drive splint through small-size electric putter and remove to one side of backup pad, be convenient for carry out the centre gripping to the ALC board and fix, it receive and releases at the outer wall of assembly pulley to drive the hoist cable, thereby it rises to drive the backup pad, be convenient for with ALC board rebound, make things convenient for the staff to install, need not constantly to set up the scaffold frame, do benefit to and reduce the construction degree of difficulty, the artifical input has been reduced, the high altitude construction degree of difficulty has been reduced, the efficiency of construction and ALC board installation is improved.
Optionally, the bottom of the handling frame main body is fixedly provided with universal wheels, and the longitudinal section of the handling frame main body is of a trapezoidal structure.
Based on above-mentioned technical scheme, conveniently remove the handling frame main part through the universal wheel, be convenient for follow the mounted position and remove the use.
Optionally, the longitudinal section of the supporting plate is of an L-shaped structure, the inner wall of the supporting plate is fixedly connected with a gasket, and one side of the supporting plate is provided with a movable groove.
Based on above-mentioned technical scheme, carry out centre gripping and fixed to the ALC board through backup pad and splint, conveniently drive the ALC board and carry out the lifting.
Optionally, the output end of the small electric push rod penetrates through the inner wall of the movable groove and extends to one side of the clamping plate, and the longitudinal section of the clamping plate is of an L-shaped structure.
Based on above-mentioned technical scheme, be convenient for adjust the application distance of splint, conveniently adjust the use according to the thickness of ALC board, improved the flexibility of device.
Optionally, the inner wall of the clamping plate is fixedly connected with an anti-abrasion pad, and the anti-abrasion pad is a rubber anti-abrasion pad.
Based on above-mentioned technical scheme, be convenient for strengthen the splint to the stability of ALC board centre gripping, played abrasionproof antiskid effect.
Optionally, the two sides of the clamping plate are fixedly connected with buckles, the outer wall of the sling is fixedly connected with a reinforcing rope, and one end of the reinforcing rope is connected with the clamping plate through the buckles.
Based on above-mentioned technical scheme, be convenient for connect splint and hoist cable through the reinforcing rope, do benefit to the stability that reinforcing splint and backup pad lifted when rising.
Optionally, one end of the fixing rod penetrates through the inner wall of the sleeve and extends to one end of the spring, and the fixing rod is symmetrically arranged about a vertical center line of the sleeve.
Based on above-mentioned technical scheme, be convenient for adjust dead lever and telescopic combination use length, conveniently take out the dead lever from the draw-in groove, convenient to detach and installation.
In summary, the present application includes at least one of the following advantages:
1. this application drives splint through small-size electric putter and removes and hold fixedly to the ALC board clamp to one side of backup pad, drive the hoist cable through the hoist and receive and release at the outer wall of assembly pulley, thereby drive backup pad and ALC board rebound, make things convenient for the staff to install, the handling frame main part can follow the mounted position through the universal wheel and remove the use, need not constantly to set up the scaffold frame, do benefit to and reduce the construction degree of difficulty, the artifical input has been reduced, the high altitude construction degree of difficulty has been reduced, the efficiency of construction and ALC board installation efficiency have been improved.
2. This application is convenient for carry out centre gripping and fixing to the ALC board through backup pad, small-size electric putter and the splint that set up, and the convenient centre gripping distance of adjusting backup pad and splint according to the ALC plate thickness does benefit to the application scope who enlarges the device, has improved the flexibility of device, and the stability of reinforcing splint to the ALC board centre gripping is convenient for through gasket and abrasionproof pad simultaneously, has played the effect of abrasionproof antiskid.
3. This application is convenient for adjust dead lever and telescopic combination use length through the dead lever that sets up, sleeve and spring, and the convenience carries out the block with dead lever and draw-in groove and is connected, is convenient for dismantle and the installation the roller, is convenient for take and place the ALC board through the roller simultaneously, and the structure is nimble laborsaving, has brought the facility for the staff.
Drawings
FIG. 1 is a schematic front view of the present application in its entirety;
FIG. 2 is a schematic front cross-sectional view of the present application as a whole;
FIG. 3 is a schematic view of the connection structure of the support plate and the clamping plate according to the present application;
FIG. 4 is a schematic view of a drum of the present application in a top-down configuration.
Description of the reference numerals:
1. an operation frame main body; 2. a universal wheel; 3. an operating platform; 4. a protective frame; 5. a card slot; 6. a hoist; 7. a sling; 8. a shaft lever; 9. a pulley block; 10. a support plate; 1001. a gasket; 1002. a movable groove; 11. a mounting base; 12. a small electric push rod; 13. a splint; 1301. an anti-wear pad; 14. an ALC board; 15. buckling; 16. reinforcing the rope; 17. fixing the rod; 18. a sleeve; 19. a spring; 20. a bearing; 21. a roller.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
Please refer to fig. 1 and 2 of the attached drawings of the specification, the utility model provides a people's operation platform is installed to portable instrument formula ALC board, including handling frame main part 1, the bottom fixed mounting of handling frame main part 1 has universal wheel 2, and the longitudinal section of handling frame main part 1 is the trapezium structure, conveniently moves handling frame main part 1 through universal wheel 2, is convenient for follow the mounted position and move the use. Operation platform 3 of top fixedly connected with of handling frame main part 1, operation platform 3's top fixedly connected with protection frame 4, protection frame 4 is convenient for strengthen the safeguard measure to operation platform 3 upper end constructor, strengthens high altitude construction's security, and draw-in groove 5 has been seted up to the inner wall of protection frame 4.
Referring to the attached drawings of the specification, fig. 1 and 2 show that the operation frame body 1 drives the inner wall to be fixedly provided with a winch 6, the output end of the winch 6 is fixedly connected with a sling 7, one side of the operation frame body 1 is fixedly connected with a shaft lever 8, the outer wall of the shaft lever 8 is rotatably connected with a pulley block 9, and one end of the sling 7 is fixedly connected with a support plate 10. The outer wall fixedly connected with mount pad 11 of backup pad 10, the top fixed mounting of mount pad 11 has small-size electric putter 12, and the output fixedly connected with splint 13 of small-size electric putter 12.
Referring to the attached drawings in the specification and fig. 3, an anti-abrasion pad 1301 is fixedly connected to the inner wall of the clamping plate 13, an ALC plate 14 is movably clamped between the supporting plate 10 and the clamping plate 13, and the anti-abrasion pad 1301 is made of rubber, so that the stability of clamping the ALC plate 14 by the clamping plate 13 is enhanced, and the anti-abrasion and anti-skid effects are achieved.
Move to one side of backup pad 10 and to ALC board 14 centre gripping fixed through small-size electric putter 12 drive splint 13, drive hoist engine 6 through hoist engine 7 hoist rope 7 and receive and release at the outer wall of assembly pulley 9, thereby drive backup pad 10 and ALC board 14 rebound, make things convenient for the staff to install, handling frame main part 1 can follow the mounted position through universal wheel 2 and move the use, need not constantly to set up the scaffold frame, do benefit to and reduce the construction degree of difficulty, the artifical input has been reduced, the high altitude construction degree of difficulty has been reduced, the efficiency of construction and ALC board 14 installation is improved.
Referring to the attached drawing fig. 3, the output end of the small electric push rod 12 penetrates through the inner wall of the movable slot 1002 and extends to one side of the clamping plate 13, and the longitudinal section of the clamping plate 13 is in an L-shaped structure, so that the use distance of the clamping plate 13 can be conveniently adjusted, the use can be conveniently adjusted according to the thickness of the ALC plate 14, and the flexibility of the device is improved.
Referring to fig. 2 and 3 of the drawings in the specification, a longitudinal section of the supporting plate 10 is an L-shaped structure, a gasket 1001 is fixedly connected to an inner wall of the supporting plate 10, a movable groove 1002 is formed in one side of the supporting plate 10, and the ALC plate 14 is clamped and fixed by the supporting plate 10 and the clamping plate 13, so that the ALC plate 14 is conveniently driven to be lifted.
Referring to the attached drawings of the specification, fig. 1 and 2, both sides of the clamping plate 13 are fixedly connected with buckles 15, the outer wall of the sling 7 is fixedly connected with a reinforcing rope 16, one end of the reinforcing rope 16 is connected with the clamping plate 13 through the buckles 15, the clamping plate 13 and the sling 7 are conveniently connected through the reinforcing rope 16, and the stability of the clamping plate 13 and the supporting plate 10 during lifting is improved.
Referring to the attached drawings of the specification, fig. 1 and 4 show that the inner wall of the clamping groove 5 of the protection frame 4 is movably clamped with a fixing rod 17, the outer wall of the fixing rod 17 is movably sleeved with a sleeve 18, a spring 19 is fixedly mounted on the inner wall of the sleeve 18, one end of the fixing rod 17 penetrates through the inner wall of the sleeve 18 and extends to one end of the spring 19, the fixing rod 17 is symmetrically arranged about the vertical center line of the sleeve 18, the combined use length of the fixing rod 17 and the sleeve 18 can be conveniently adjusted, the fixing rod 17 can be conveniently taken out of the clamping groove 5, and the detachment and installation are convenient. The outer wall of the sleeve 18 is fixedly connected with a bearing 20, and the outer wall of the bearing 20 is fixedly connected with a roller 21.
The working principle is as follows:
at first with handling frame main part 1 through universal wheel 2 removal to ALC board 14 construction installation position, the constructor of upper end stands on operation platform 3, through the measure of protection of 4 reinforcing to operation platform 3 upper end constructor of protection frame, the security of reinforcing high altitude construction, lower extreme staff places ALC board 14 on backup pad 10, it moves and fixes to ALC board 14 centre gripping to one side of backup pad 10 to drive splint 13 through small-size electric putter 12, the convenient centre gripping distance of backup pad 10 and splint 13 of thickness regulation according to ALC board 14, be convenient for strengthen the stability of splint 13 to ALC board 14 centre gripping through gasket 1001 and abrasionproof pad 1301 simultaneously, the effect of abrasionproof antiskid has been played.
Hoist 6 is started, utilize hoist cable 7 and assembly pulley 9 to drive backup pad 10 and carry out the lifting, thereby drive ALC board 14 and promote to take one's place, simultaneously through reinforcing rope 16 be convenient for connecting splint 13 and hoist cable 7, do benefit to the stability when reinforcing splint 13 and backup pad 10 lift, promote ALC board 14 to the upper end, upper end constructor takes ALC board 14 off backup pad 10, be convenient for remove ALC board 14 to operation platform 3 with the help of roller 21 leverage, the structure is nimble laborsaving, make things convenient for constructor to install and use, promote the both ends of dead lever 17 to sleeve 18 is interior, and extrude spring 19, do benefit to and shorten dead lever 17 and sleeve 18's combined length, conveniently take roller 21 off from draw-in groove 5, convenient to dismantle and install, operation frame main part 1 can follow the mounted position through universal wheel 2 and move the use, need not to set up the scaffold frame constantly, do benefit to reduce the construction degree of difficulty, the artifical input has been reduced, high altitude construction has been reduced, efficiency and ALC board 14 installation effectiveness have been improved.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. The utility model provides a people operation platform on installation of portable instrument formula ALC board, includes handling frame main part (1), its characterized in that: the top of the operating frame main body (1) is fixedly connected with an operating platform (3), the top of the operating platform (3) is fixedly connected with a protective frame (4), the inner wall of the protective frame (4) is provided with a clamping groove (5), the operating frame main body (1) drives the inner wall to be fixedly provided with a winch (6), the output end of the winch (6) is fixedly connected with a sling (7), one side of the operating frame main body (1) is fixedly connected with a shaft lever (8), the outer wall of the shaft lever (8) is rotatably connected with a pulley block (9), and one end of the sling (7) is fixedly connected with a supporting plate (10);
the outer wall fixedly connected with mount pad (11) of backup pad (10), the top fixed mounting of mount pad (11) has small-size electric putter (12), output fixedly connected with splint (13) of small-size electric putter (12), the activity joint has ALC board (14) between backup pad (10) and splint (13), protection frame (4) are located the inner wall activity joint of draw-in groove (5) has dead lever (17), sleeve (18) have been cup jointed in the outer wall activity of dead lever (17), the inner wall fixed mounting of sleeve (18) has spring (19), the outer wall fixedly connected with bearing (20) of sleeve (18), the outer wall fixedly connected with roller (21) of bearing (20).
2. A movable tool-style ALC board mount-to-human-operated platform as claimed in claim 1, wherein: the bottom fixed mounting of handling frame main part (1) has universal wheel (2), the longitudinal section of handling frame main part (1) is the trapezium structure.
3. A movable tool-style ALC board mount-to-human-operated platform as claimed in claim 1, wherein: the longitudinal section of the support plate (10) is of an L-shaped structure, a gasket (1001) is fixedly connected to the inner wall of the support plate (10), and a movable groove (1002) is formed in one side of the support plate (10).
4. A movable tool-style ALC board mount upper human operating platform of claim 3, wherein: the output end of the small electric push rod (12) penetrates through the inner wall of the movable groove (1002) and extends to one side of the clamping plate (13), and the longitudinal section of the clamping plate (13) is of an L-shaped structure.
5. A movable tool-style ALC board mount-to-human-operated platform as claimed in claim 1, wherein: the inner wall fixedly connected with abrasionproof pad (1301) of splint (13), abrasionproof pad (1301) adopt rubber abrasionproof pad.
6. A movable tool-style ALC board mount-to-human-operated platform as claimed in claim 1, wherein: the all fixedly connected with latch closure (15) in both sides of splint (13), the outer wall fixedly connected with reinforcing rope (16) of hoist cable (7), the one end of reinforcing rope (16) is through latch closure (15) and splint (13) interconnect.
7. A movable tool-style ALC board mount-to-human-operated platform as claimed in claim 1, wherein: one end of the fixing rod (17) penetrates through the inner wall of the sleeve (18) and extends to one end of the spring (19), and the fixing rod (17) is symmetrically arranged relative to the vertical center line of the sleeve (18).
CN202222393429.4U 2022-09-06 2022-09-06 Manual operation platform is installed to portable instrument formula ALC board Active CN218234257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222393429.4U CN218234257U (en) 2022-09-06 2022-09-06 Manual operation platform is installed to portable instrument formula ALC board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222393429.4U CN218234257U (en) 2022-09-06 2022-09-06 Manual operation platform is installed to portable instrument formula ALC board

Publications (1)

Publication Number Publication Date
CN218234257U true CN218234257U (en) 2023-01-06

Family

ID=84663450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222393429.4U Active CN218234257U (en) 2022-09-06 2022-09-06 Manual operation platform is installed to portable instrument formula ALC board

Country Status (1)

Country Link
CN (1) CN218234257U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116397864A (en) * 2023-06-07 2023-07-07 山西省安装集团股份有限公司 Scaffold device for open caisson construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116397864A (en) * 2023-06-07 2023-07-07 山西省安装集团股份有限公司 Scaffold device for open caisson construction
CN116397864B (en) * 2023-06-07 2023-08-18 山西省安装集团股份有限公司 Scaffold device for open caisson construction

Similar Documents

Publication Publication Date Title
CN108952184B (en) Assembled building decoration stone material wood-based plate curtain mounting bracket
CN218234257U (en) Manual operation platform is installed to portable instrument formula ALC board
CN211545757U (en) Auxiliary assembly is used in switch board installation
CN112623922A (en) Template overhead hoist is used in hydraulic engineering construction
CN210976535U (en) Building external climbing type building construction operation platform
CN216272789U (en) Auxiliary lifting device for solar photovoltaic panel
CN210150629U (en) Multipurpose crane for disassembling and assembling street lamp
CN213738149U (en) Building board hoisting device for green building assembly
CN215717379U (en) Device suitable for green building of integration assembled
CN113735012B (en) A installation device that is arranged in factory building construction high altitude structure
CN112919304B (en) Hoisting sling and hoisting method for prefabricated part
CN210944732U (en) Elevating gear for brickwork building
CN101407305A (en) Mobile crane
CN216613852U (en) Tool for mounting high and ultrahigh ALC (autoclaved lightweight concrete) wallboard
CN220201243U (en) ALC board installation auxiliary machine
CN220412757U (en) Hoisting support convenient to installation is assisted to science and technology factory building ALC wallboard
CN218201891U (en) High altitude glass curtain wall erection equipment
CN214359908U (en) Building hoisting accessory for real estate
CN220502460U (en) Retractable PC composite floor lifting tool
CN215291754U (en) Auxiliary holding pole with top pulley
CN216004812U (en) Auxiliary moving device for vacuum water absorption pad
CN217437626U (en) ALC wallboard handling erection equipment for engineering
CN216516737U (en) Mobilizable fossil fragments installation device that cornices
CN220317191U (en) Jig frame standard knot dismounting device
CN219217505U (en) Portable apron hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant