CN218233468U - A fixed auxiliary device for building pile among engineering building - Google Patents

A fixed auxiliary device for building pile among engineering building Download PDF

Info

Publication number
CN218233468U
CN218233468U CN202221864976.XU CN202221864976U CN218233468U CN 218233468 U CN218233468 U CN 218233468U CN 202221864976 U CN202221864976 U CN 202221864976U CN 218233468 U CN218233468 U CN 218233468U
Authority
CN
China
Prior art keywords
spout
installation piece
draw runner
building
auxiliary device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221864976.XU
Other languages
Chinese (zh)
Inventor
刘蔚伦
叶小扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Ruitai Construction Engineering Co ltd
Original Assignee
Huizhou Ruitai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Ruitai Construction Engineering Co ltd filed Critical Huizhou Ruitai Construction Engineering Co ltd
Priority to CN202221864976.XU priority Critical patent/CN218233468U/en
Application granted granted Critical
Publication of CN218233468U publication Critical patent/CN218233468U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a construction equipment technical field discloses a fixed auxiliary device for building pile among engineering building, install the piece including two symmetries settings ground, be connected with the roof on two installation pieces jointly, the opening has been seted up on the roof, all be equipped with the fixture of the fixed building pile body of centre gripping in two installation pieces, fixture includes the draw runner, first spout has been seted up in the installation piece, draw runner slidable mounting is in first spout, draw runner one end is equipped with curved fixed block, the fixed block is located the installation piece outside, still be equipped with actuating mechanism in the installation piece, actuating mechanism is used for driving the draw runner and removes. The purpose is as follows: through setting up installation piece, roof, first spout, fixed block, draw runner and actuating mechanism, drive draw runner and fixed block through actuating mechanism and remove to can fix the building pile of different thickness degrees, and then solved the staff when the use the limitation great, can not satisfy the problem of operation needs.

Description

A fixed auxiliary device for building pile among engineering building
Technical Field
The utility model belongs to the technical field of the architectural equipment, concretely relates to a fixed auxiliary device that is arranged in building pile of engineering building.
Background
The construction engineering is various technical works such as planning, investigation, design and construction, completion and the like for newly building, reconstructing or expanding a house building and an auxiliary structure facility, and installation engineering of completed engineering entities and matched lines, pipelines and equipment, wherein in the engineering construction, the building pile is usually driven into a foundation by using the friction force between a stratum and the building pile, and then the construction pile is matched with a pile cap to form a pile foundation, so that the subsequent construction is facilitated;
but current building pile fixing device has some defects, can not satisfy the fixed demand of different thickness degree building piles to make the staff when using the restriction great, can not satisfy the user demand, consequently, need provide a fixed auxiliary device that is arranged in building pile among the engineering building.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an aim at: aim at providing a fixed auxiliary device for building pile among engineering building, through setting up installation piece, roof, first spout, fixed block, draw runner and actuating mechanism, drive draw runner and fixed block through actuating mechanism and remove to can fix the building pile of different thickness degrees, and then solved the staff and limited great when using, can not satisfy the problem that the use needs.
In order to realize the technical purpose, the utility model discloses a technical scheme as follows:
the utility model provides a fixed auxiliary device for building pile among engineering building, installs the piece including two symmetries set up ground, two be connected with the roof jointly on the installation piece, seted up the opening on the roof, two all be equipped with the fixture of the fixed building pile body of centre gripping in the installation piece, fixture includes the draw runner, first spout has been seted up in the installation piece, draw runner slidable mounting is in first spout, draw runner one end is equipped with curved fixed block, the fixed block is located the installation piece outside, still be equipped with actuating mechanism in the installation piece, actuating mechanism is used for driving the draw runner and removes.
Further inject, actuating mechanism includes the threaded rod, the second spout has been seted up in the installation piece, second spout and first spout intercommunication, the threaded rod is located the second spout, and rotates with the installation piece inner wall and be connected, the threaded rod is worn out installation piece one side and is equipped with the turning handle, the cover is equipped with the sliding block on the threaded rod, the sliding block is located the second spout, and slides with second spout lateral wall and contradict, sliding block one end and draw runner fixed connection. Such structural design through setting up threaded rod, second spout, sliding block and turning handle, through rotating the turning handle to drive the threaded rod and rotate, drive the sliding block then and remove, make the sliding block drive the draw runner and remove, and then play the effect that promotes the fixed block.
Further inject, the fixed block both sides all are equipped with the connecting block, two one side that the connecting block is relative all is connected with the tight pulley through the bolt rotation.
Further inject, the installation piece bottom is equipped with the supporting seat, the through-hole has been seted up on the supporting seat, threaded connection has the post of inserting on the through-hole. Such structural design through setting up the supporting seat, can play better stabilizing effect when the device uses, and the rethread sets up the through-hole and inserts the post, and the post is inserted in the rotation earlier to make and insert the relative supporting seat downstream of post, then insert in the ground, and then further strengthened the stability when the device uses.
Further inject, two the installation piece outside all is equipped with the arc handle. Such structural design through setting up the arc handle, makes things convenient for the staff to hand the device and removes.
Adopt above-mentioned technical scheme's utility model, have following advantage:
1. the utility model discloses a set up installation piece, roof, first spout, fixed block, draw runner and actuating mechanism, drive draw runner and fixed block through actuating mechanism and remove to can fix the building pile of different thickness degrees, and then solved the staff and had the restriction great when using, can not satisfy the problem that the use needs.
2. The utility model discloses a set up threaded rod, second spout, sliding block and turning handle, through rotating the turning handle to drive the threaded rod and rotate, drive the sliding block then and remove, make the sliding block drive the draw runner and remove, and then play the effect that promotes the fixed block.
3. The utility model discloses a set up the supporting seat, can play better stabilizing effect when the device uses, the rethread sets up the through-hole and inserts the post, and the post is inserted in the rotation earlier to make and insert the relative supporting seat downstream of post, insert ground then, and then further strengthened the stability when the device uses.
4. The utility model discloses a set up the arc handle, make things convenient for the handheld device of staff to remove.
Drawings
The present invention can be further illustrated by the non-limiting examples given in the accompanying drawings;
fig. 1 is a schematic structural view of the fixing auxiliary device for a building pile in an engineering building of the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is a schematic structural view of a clamping mechanism and a driving mechanism in the auxiliary fixing device for a building pile in an engineering building of the present invention;
the main component symbols are as follows:
a mounting block 1, a top plate 2,
A slide bar 31, a first chute 32, a fixed block 33,
A threaded rod 41, a second chute 42, a rotating handle 43, a sliding block 44,
A connecting block 51, a fixed wheel 52,
A support seat 61, a through hole 62, an inserting column 63,
An arc-shaped handle 71.
Detailed Description
The present invention will be described in detail with reference to the drawings and specific embodiments, and it should be noted that in the drawings or the description, similar or identical parts are provided with the same reference numerals, and the implementation manner not shown or described in the drawings is known to those of ordinary skill in the art. In addition, directional terms such as "upper", "lower", "top", "bottom", "left", "right", "front", "back", etc. mentioned in the embodiments are only directions referring to the drawings, and are not intended to limit the scope of the present invention.
As shown in fig. 1 to fig. 3, the utility model discloses a fixed auxiliary device for building pile in engineering building, including two symmetrically arranged ground installation blocks 1, two 1 tops of installation blocks are connected with roof 2 jointly, roof 2 middle part has seted up the opening, all be equipped with the fixture of centre gripping fixed building pile body in two installation blocks 1, the fixture includes draw runner 31, first spout 32 has been seted up in installation block 1, draw runner 31 is slidably mounted in first spout 32, draw runner 31 one end fixedly connected with curved fixed block 33, fixed block 33 is located the installation block 1 outside, still be equipped with actuating mechanism in installation block 1, actuating mechanism is used for driving draw runner 31 to move;
actuating mechanism includes threaded rod 41, seted up second spout 42 in the installation piece 1, second spout 42 and first spout 32 intercommunication, threaded rod 41 is located second spout 42, and rotate with 1 inner wall of installation piece and be connected, threaded rod 41 wears out installation piece 1 one side and is equipped with turning handle 43, threaded rod 41 has cup jointed sliding block 44 in the outside through the screw thread, sliding block 44 is located second spout 42, and contradicts with second spout 42 lateral wall slip, sliding block 44 one end and draw runner 31 fixed connection. Through the arrangement of the threaded rod 41, the second sliding chute 42, the sliding block 44 and the rotating handle 43, the rotating handle 43 is rotated to drive the threaded rod 41 to rotate, and then the sliding block 44 is driven to move, so that the sliding block 44 drives the sliding strip 31 to move, and the effect of pushing the fixing block 33 is achieved;
the front side and the rear side of the fixed block 33 are both fixedly connected with connecting blocks 51, and one opposite sides of the two connecting blocks 51 are both rotatably connected with fixed wheels 52 through bolts;
supporting seat 61 is installed to installation piece 1 bottom, has seted up through-hole 62 on the supporting seat 61, and threaded connection has the inserted column 63 on the through-hole 62. Through the arrangement of the supporting seat 61, a good stabilizing effect can be achieved when the device is used, and then through the arrangement of the through hole 62 and the inserting column 63, the inserting column 63 is firstly rotated, so that the inserting column 63 moves downwards relative to the supporting seat 61 and then is inserted into the ground, and further the stability of the device in use is further enhanced;
the outer sides of the two mounting blocks 1 are respectively provided with an arc-shaped handle 71. By arranging the arc-shaped handle 71, the device is convenient for workers to hold the device for moving.
The utility model discloses a use method as follows:
in the embodiment, when the device is used, a worker firstly places the device at a specified position through the supporting seat 61, and then rotates the inserting column 63, so that the inserting column 63 moves downwards relative to the supporting seat 61 and then is inserted into the ground, and the stability of the device in use is further enhanced;
later pass the building pile opening, rotate turning handle 43 again to drive threaded rod 41 and rotate, drive sliding block 44 then and remove, make sliding block 44 drive the draw runner 31 and remove, rethread draw runner 31 drives fixed block 33, and then make two fixed block 33 relative movement, fix the centre gripping to the building pile, make things convenient for the staff to pile.
It is right above the utility model provides a pair of a fixed auxiliary device for building pile among engineering construction has carried out detailed introduction. The description of the specific embodiments is only intended to facilitate an understanding of the method of the invention and its core concept. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the scope of the appended claims.

Claims (5)

1. The utility model provides a fixed auxiliary device for building pile among engineering building, includes two block (1) of symmetrical ground installation, its characterized in that: two be connected with roof (2) jointly on installation piece (1), the opening has been seted up on roof (2), two all be equipped with the fixture of the fixed building pile body of centre gripping in installation piece (1), fixture includes draw runner (31), first spout (32) have been seted up in installation piece (1), draw runner (31) slidable mounting is in first spout (32), draw runner (31) one end is equipped with curved fixed block (33), fixed block (33) are located installation piece (1) outside, still be equipped with actuating mechanism in installation piece (1), actuating mechanism is used for driving draw runner (31) and removes.
2. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: actuating mechanism includes threaded rod (41), second spout (42) have been seted up in installation piece (1), second spout (42) and first spout (32) intercommunication, threaded rod (41) are located second spout (42), and rotate with installation piece (1) inner wall and be connected, threaded rod (41) are worn out installation piece (1) one side and are equipped with turning handle (43), the cover is equipped with sliding block (44) on threaded rod (41), sliding block (44) are located second spout (42), and slide with second spout (42) lateral wall and contradict, sliding block (44) one end and draw runner (31) fixed connection.
3. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: both sides of the fixing block (33) are provided with connecting blocks (51), and one side, opposite to the connecting blocks (51), is rotatably connected with a fixing wheel (52) through a bolt.
4. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: the mounting block (1) bottom is equipped with supporting seat (61), through-hole (62) have been seted up on supporting seat (61), threaded connection has inserted post (63) on through-hole (62).
5. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: the outer sides of the two mounting blocks (1) are provided with arc-shaped handles (71).
CN202221864976.XU 2022-07-19 2022-07-19 A fixed auxiliary device for building pile among engineering building Expired - Fee Related CN218233468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221864976.XU CN218233468U (en) 2022-07-19 2022-07-19 A fixed auxiliary device for building pile among engineering building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221864976.XU CN218233468U (en) 2022-07-19 2022-07-19 A fixed auxiliary device for building pile among engineering building

Publications (1)

Publication Number Publication Date
CN218233468U true CN218233468U (en) 2023-01-06

Family

ID=84675115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221864976.XU Expired - Fee Related CN218233468U (en) 2022-07-19 2022-07-19 A fixed auxiliary device for building pile among engineering building

Country Status (1)

Country Link
CN (1) CN218233468U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115839084A (en) * 2023-02-16 2023-03-24 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Pile driving device for foundation construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115839084A (en) * 2023-02-16 2023-03-24 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Pile driving device for foundation construction

Similar Documents

Publication Publication Date Title
CN218233468U (en) A fixed auxiliary device for building pile among engineering building
CN215803326U (en) Assembled wall body installation auxiliary assembly
CN110797804B (en) Cable pipe port multidirectional pulley auxiliary tool
CN208425812U (en) A kind of city planning model displaying device of simulate sunrise sunset
CN211341869U (en) Railing is prevented to building engineering instrument formula stair
CN211900485U (en) Auxiliary support for roadway wall anchor cable drilling machine
CN213269065U (en) A building bearing diagonal structure for construction
CN212425365U (en) Tunnel engineering excavation construction rack
CN114718174A (en) Plastic pipe well integrated device with fixing structure
CN206023034U (en) A kind of collection bunch side of returning device
CN207211762U (en) A kind of concrete bush hammer that can quickly handle vertical plane for construction
CN207078167U (en) A kind of liftable transfer car(buggy)
CN206591980U (en) A kind of detachable buffer
CN215443228U (en) Horizontal protection steel pipe fixture
CN216342234U (en) Island coal pillar inclined shaft exploitation supporting structure
CN214737034U (en) Novel concrete pillow
CN206541246U (en) A kind of logistics management computer
CN221278671U (en) Pipeline bracket for building construction
CN111038620B (en) Turntable type bicycle three-dimensional parking frame
CN221002807U (en) Coal mine excavating supporting structure
CN218120955U (en) Power transmission line operation detection device capable of being stably used
CN215329914U (en) Building deep foundation pit supporting type row pile supporting structure
CN214997693U (en) Auxiliary support for grouting of shield tunneling machine
CN218964572U (en) Walking type driven turnover displacement tool
CN211081042U (en) Ground pump pipe fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230106