CN218233468U - A fixed auxiliary device for building pile among engineering building - Google Patents
A fixed auxiliary device for building pile among engineering building Download PDFInfo
- Publication number
- CN218233468U CN218233468U CN202221864976.XU CN202221864976U CN218233468U CN 218233468 U CN218233468 U CN 218233468U CN 202221864976 U CN202221864976 U CN 202221864976U CN 218233468 U CN218233468 U CN 218233468U
- Authority
- CN
- China
- Prior art keywords
- spout
- installation piece
- draw runner
- building
- auxiliary device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims abstract description 38
- 238000010276 construction Methods 0.000 claims abstract description 15
- 238000013461 design Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000000087 stabilizing effect Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a construction equipment technical field discloses a fixed auxiliary device for building pile among engineering building, install the piece including two symmetries settings ground, be connected with the roof on two installation pieces jointly, the opening has been seted up on the roof, all be equipped with the fixture of the fixed building pile body of centre gripping in two installation pieces, fixture includes the draw runner, first spout has been seted up in the installation piece, draw runner slidable mounting is in first spout, draw runner one end is equipped with curved fixed block, the fixed block is located the installation piece outside, still be equipped with actuating mechanism in the installation piece, actuating mechanism is used for driving the draw runner and removes. The purpose is as follows: through setting up installation piece, roof, first spout, fixed block, draw runner and actuating mechanism, drive draw runner and fixed block through actuating mechanism and remove to can fix the building pile of different thickness degrees, and then solved the staff when the use the limitation great, can not satisfy the problem of operation needs.
Description
Technical Field
The utility model belongs to the technical field of the architectural equipment, concretely relates to a fixed auxiliary device that is arranged in building pile of engineering building.
Background
The construction engineering is various technical works such as planning, investigation, design and construction, completion and the like for newly building, reconstructing or expanding a house building and an auxiliary structure facility, and installation engineering of completed engineering entities and matched lines, pipelines and equipment, wherein in the engineering construction, the building pile is usually driven into a foundation by using the friction force between a stratum and the building pile, and then the construction pile is matched with a pile cap to form a pile foundation, so that the subsequent construction is facilitated;
but current building pile fixing device has some defects, can not satisfy the fixed demand of different thickness degree building piles to make the staff when using the restriction great, can not satisfy the user demand, consequently, need provide a fixed auxiliary device that is arranged in building pile among the engineering building.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an aim at: aim at providing a fixed auxiliary device for building pile among engineering building, through setting up installation piece, roof, first spout, fixed block, draw runner and actuating mechanism, drive draw runner and fixed block through actuating mechanism and remove to can fix the building pile of different thickness degrees, and then solved the staff and limited great when using, can not satisfy the problem that the use needs.
In order to realize the technical purpose, the utility model discloses a technical scheme as follows:
the utility model provides a fixed auxiliary device for building pile among engineering building, installs the piece including two symmetries set up ground, two be connected with the roof jointly on the installation piece, seted up the opening on the roof, two all be equipped with the fixture of the fixed building pile body of centre gripping in the installation piece, fixture includes the draw runner, first spout has been seted up in the installation piece, draw runner slidable mounting is in first spout, draw runner one end is equipped with curved fixed block, the fixed block is located the installation piece outside, still be equipped with actuating mechanism in the installation piece, actuating mechanism is used for driving the draw runner and removes.
Further inject, actuating mechanism includes the threaded rod, the second spout has been seted up in the installation piece, second spout and first spout intercommunication, the threaded rod is located the second spout, and rotates with the installation piece inner wall and be connected, the threaded rod is worn out installation piece one side and is equipped with the turning handle, the cover is equipped with the sliding block on the threaded rod, the sliding block is located the second spout, and slides with second spout lateral wall and contradict, sliding block one end and draw runner fixed connection. Such structural design through setting up threaded rod, second spout, sliding block and turning handle, through rotating the turning handle to drive the threaded rod and rotate, drive the sliding block then and remove, make the sliding block drive the draw runner and remove, and then play the effect that promotes the fixed block.
Further inject, the fixed block both sides all are equipped with the connecting block, two one side that the connecting block is relative all is connected with the tight pulley through the bolt rotation.
Further inject, the installation piece bottom is equipped with the supporting seat, the through-hole has been seted up on the supporting seat, threaded connection has the post of inserting on the through-hole. Such structural design through setting up the supporting seat, can play better stabilizing effect when the device uses, and the rethread sets up the through-hole and inserts the post, and the post is inserted in the rotation earlier to make and insert the relative supporting seat downstream of post, then insert in the ground, and then further strengthened the stability when the device uses.
Further inject, two the installation piece outside all is equipped with the arc handle. Such structural design through setting up the arc handle, makes things convenient for the staff to hand the device and removes.
Adopt above-mentioned technical scheme's utility model, have following advantage:
1. the utility model discloses a set up installation piece, roof, first spout, fixed block, draw runner and actuating mechanism, drive draw runner and fixed block through actuating mechanism and remove to can fix the building pile of different thickness degrees, and then solved the staff and had the restriction great when using, can not satisfy the problem that the use needs.
2. The utility model discloses a set up threaded rod, second spout, sliding block and turning handle, through rotating the turning handle to drive the threaded rod and rotate, drive the sliding block then and remove, make the sliding block drive the draw runner and remove, and then play the effect that promotes the fixed block.
3. The utility model discloses a set up the supporting seat, can play better stabilizing effect when the device uses, the rethread sets up the through-hole and inserts the post, and the post is inserted in the rotation earlier to make and insert the relative supporting seat downstream of post, insert ground then, and then further strengthened the stability when the device uses.
4. The utility model discloses a set up the arc handle, make things convenient for the handheld device of staff to remove.
Drawings
The present invention can be further illustrated by the non-limiting examples given in the accompanying drawings;
fig. 1 is a schematic structural view of the fixing auxiliary device for a building pile in an engineering building of the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is a schematic structural view of a clamping mechanism and a driving mechanism in the auxiliary fixing device for a building pile in an engineering building of the present invention;
the main component symbols are as follows:
a mounting block 1, a top plate 2,
A slide bar 31, a first chute 32, a fixed block 33,
A threaded rod 41, a second chute 42, a rotating handle 43, a sliding block 44,
A connecting block 51, a fixed wheel 52,
A support seat 61, a through hole 62, an inserting column 63,
An arc-shaped handle 71.
Detailed Description
The present invention will be described in detail with reference to the drawings and specific embodiments, and it should be noted that in the drawings or the description, similar or identical parts are provided with the same reference numerals, and the implementation manner not shown or described in the drawings is known to those of ordinary skill in the art. In addition, directional terms such as "upper", "lower", "top", "bottom", "left", "right", "front", "back", etc. mentioned in the embodiments are only directions referring to the drawings, and are not intended to limit the scope of the present invention.
As shown in fig. 1 to fig. 3, the utility model discloses a fixed auxiliary device for building pile in engineering building, including two symmetrically arranged ground installation blocks 1, two 1 tops of installation blocks are connected with roof 2 jointly, roof 2 middle part has seted up the opening, all be equipped with the fixture of centre gripping fixed building pile body in two installation blocks 1, the fixture includes draw runner 31, first spout 32 has been seted up in installation block 1, draw runner 31 is slidably mounted in first spout 32, draw runner 31 one end fixedly connected with curved fixed block 33, fixed block 33 is located the installation block 1 outside, still be equipped with actuating mechanism in installation block 1, actuating mechanism is used for driving draw runner 31 to move;
actuating mechanism includes threaded rod 41, seted up second spout 42 in the installation piece 1, second spout 42 and first spout 32 intercommunication, threaded rod 41 is located second spout 42, and rotate with 1 inner wall of installation piece and be connected, threaded rod 41 wears out installation piece 1 one side and is equipped with turning handle 43, threaded rod 41 has cup jointed sliding block 44 in the outside through the screw thread, sliding block 44 is located second spout 42, and contradicts with second spout 42 lateral wall slip, sliding block 44 one end and draw runner 31 fixed connection. Through the arrangement of the threaded rod 41, the second sliding chute 42, the sliding block 44 and the rotating handle 43, the rotating handle 43 is rotated to drive the threaded rod 41 to rotate, and then the sliding block 44 is driven to move, so that the sliding block 44 drives the sliding strip 31 to move, and the effect of pushing the fixing block 33 is achieved;
the front side and the rear side of the fixed block 33 are both fixedly connected with connecting blocks 51, and one opposite sides of the two connecting blocks 51 are both rotatably connected with fixed wheels 52 through bolts;
supporting seat 61 is installed to installation piece 1 bottom, has seted up through-hole 62 on the supporting seat 61, and threaded connection has the inserted column 63 on the through-hole 62. Through the arrangement of the supporting seat 61, a good stabilizing effect can be achieved when the device is used, and then through the arrangement of the through hole 62 and the inserting column 63, the inserting column 63 is firstly rotated, so that the inserting column 63 moves downwards relative to the supporting seat 61 and then is inserted into the ground, and further the stability of the device in use is further enhanced;
the outer sides of the two mounting blocks 1 are respectively provided with an arc-shaped handle 71. By arranging the arc-shaped handle 71, the device is convenient for workers to hold the device for moving.
The utility model discloses a use method as follows:
in the embodiment, when the device is used, a worker firstly places the device at a specified position through the supporting seat 61, and then rotates the inserting column 63, so that the inserting column 63 moves downwards relative to the supporting seat 61 and then is inserted into the ground, and the stability of the device in use is further enhanced;
later pass the building pile opening, rotate turning handle 43 again to drive threaded rod 41 and rotate, drive sliding block 44 then and remove, make sliding block 44 drive the draw runner 31 and remove, rethread draw runner 31 drives fixed block 33, and then make two fixed block 33 relative movement, fix the centre gripping to the building pile, make things convenient for the staff to pile.
It is right above the utility model provides a pair of a fixed auxiliary device for building pile among engineering construction has carried out detailed introduction. The description of the specific embodiments is only intended to facilitate an understanding of the method of the invention and its core concept. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the scope of the appended claims.
Claims (5)
1. The utility model provides a fixed auxiliary device for building pile among engineering building, includes two block (1) of symmetrical ground installation, its characterized in that: two be connected with roof (2) jointly on installation piece (1), the opening has been seted up on roof (2), two all be equipped with the fixture of the fixed building pile body of centre gripping in installation piece (1), fixture includes draw runner (31), first spout (32) have been seted up in installation piece (1), draw runner (31) slidable mounting is in first spout (32), draw runner (31) one end is equipped with curved fixed block (33), fixed block (33) are located installation piece (1) outside, still be equipped with actuating mechanism in installation piece (1), actuating mechanism is used for driving draw runner (31) and removes.
2. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: actuating mechanism includes threaded rod (41), second spout (42) have been seted up in installation piece (1), second spout (42) and first spout (32) intercommunication, threaded rod (41) are located second spout (42), and rotate with installation piece (1) inner wall and be connected, threaded rod (41) are worn out installation piece (1) one side and are equipped with turning handle (43), the cover is equipped with sliding block (44) on threaded rod (41), sliding block (44) are located second spout (42), and slide with second spout (42) lateral wall and contradict, sliding block (44) one end and draw runner (31) fixed connection.
3. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: both sides of the fixing block (33) are provided with connecting blocks (51), and one side, opposite to the connecting blocks (51), is rotatably connected with a fixing wheel (52) through a bolt.
4. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: the mounting block (1) bottom is equipped with supporting seat (61), through-hole (62) have been seted up on supporting seat (61), threaded connection has inserted post (63) on through-hole (62).
5. A fixing auxiliary device for a construction pile in an engineering construction according to claim 1, wherein: the outer sides of the two mounting blocks (1) are provided with arc-shaped handles (71).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221864976.XU CN218233468U (en) | 2022-07-19 | 2022-07-19 | A fixed auxiliary device for building pile among engineering building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221864976.XU CN218233468U (en) | 2022-07-19 | 2022-07-19 | A fixed auxiliary device for building pile among engineering building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218233468U true CN218233468U (en) | 2023-01-06 |
Family
ID=84675115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221864976.XU Expired - Fee Related CN218233468U (en) | 2022-07-19 | 2022-07-19 | A fixed auxiliary device for building pile among engineering building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218233468U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115839084A (en) * | 2023-02-16 | 2023-03-24 | 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) | Pile driving device for foundation construction |
-
2022
- 2022-07-19 CN CN202221864976.XU patent/CN218233468U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115839084A (en) * | 2023-02-16 | 2023-03-24 | 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) | Pile driving device for foundation construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218233468U (en) | A fixed auxiliary device for building pile among engineering building | |
CN215803326U (en) | Assembled wall body installation auxiliary assembly | |
CN110797804B (en) | Cable pipe port multidirectional pulley auxiliary tool | |
CN208425812U (en) | A kind of city planning model displaying device of simulate sunrise sunset | |
CN211341869U (en) | Railing is prevented to building engineering instrument formula stair | |
CN211900485U (en) | Auxiliary support for roadway wall anchor cable drilling machine | |
CN213269065U (en) | A building bearing diagonal structure for construction | |
CN212425365U (en) | Tunnel engineering excavation construction rack | |
CN114718174A (en) | Plastic pipe well integrated device with fixing structure | |
CN206023034U (en) | A kind of collection bunch side of returning device | |
CN207211762U (en) | A kind of concrete bush hammer that can quickly handle vertical plane for construction | |
CN207078167U (en) | A kind of liftable transfer car(buggy) | |
CN206591980U (en) | A kind of detachable buffer | |
CN215443228U (en) | Horizontal protection steel pipe fixture | |
CN216342234U (en) | Island coal pillar inclined shaft exploitation supporting structure | |
CN214737034U (en) | Novel concrete pillow | |
CN206541246U (en) | A kind of logistics management computer | |
CN221278671U (en) | Pipeline bracket for building construction | |
CN111038620B (en) | Turntable type bicycle three-dimensional parking frame | |
CN221002807U (en) | Coal mine excavating supporting structure | |
CN218120955U (en) | Power transmission line operation detection device capable of being stably used | |
CN215329914U (en) | Building deep foundation pit supporting type row pile supporting structure | |
CN214997693U (en) | Auxiliary support for grouting of shield tunneling machine | |
CN218964572U (en) | Walking type driven turnover displacement tool | |
CN211081042U (en) | Ground pump pipe fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230106 |