CN218233338U - Water conservancy construction water-blocking wall - Google Patents

Water conservancy construction water-blocking wall Download PDF

Info

Publication number
CN218233338U
CN218233338U CN202221942073.9U CN202221942073U CN218233338U CN 218233338 U CN218233338 U CN 218233338U CN 202221942073 U CN202221942073 U CN 202221942073U CN 218233338 U CN218233338 U CN 218233338U
Authority
CN
China
Prior art keywords
water
wall
interception
wall body
conservancy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221942073.9U
Other languages
Chinese (zh)
Inventor
朱泽良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Changjiang Hydropower Engineering Group Co ltd
Original Assignee
Hunan Changjiang Hydropower Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Changjiang Hydropower Engineering Group Co ltd filed Critical Hunan Changjiang Hydropower Engineering Group Co ltd
Priority to CN202221942073.9U priority Critical patent/CN218233338U/en
Application granted granted Critical
Publication of CN218233338U publication Critical patent/CN218233338U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the technical field of hydraulic engineering, in particular to a water conservancy construction water-blocking wall, which comprises a wall body, wherein a water diversion groove is formed in the surface of the wall body, a plurality of water inlets are formed in the outer wall of the wall body, one side of the wall body, which is far away from the water inlets, is fixedly connected with a drainage end, a valve is installed on the drainage end, and a plurality of supporting walls are fixedly connected with the inner wall of the water diversion groove; can discharge rivers when the water level is higher through opening the valve, during the drainage, can intercept the solid rubbish in the rivers through the interception net, avoid rubbish to block up the drainage end, and rivers promote the interception board and open, make rivers flow fast, and the back is accomplished in the drainage, and the interception board is perpendicular to form with the interception net and collects the space, and then collects the rubbish of interception, makes things convenient for personnel to concentrate the rubbish of collecting and handles.

Description

Water conservancy construction water-blocking wall
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a water conservancy construction wall that blocks water.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purpose of removing harm and benefiting, also called water engineering, water is a valuable resource essential for human production and life, but the naturally existing state of the water does not completely meet the needs of human beings, and water flow can be controlled only by building the hydraulic engineering to prevent flood disasters and adjust and distribute water quantity to meet the needs of people for life and production on water resources.
In the construction process of hydraulic engineering, rivers need to be blocked through the water-blocking wall often, come to construct river course, ditch etc..
The existing water retaining wall is limited in height, when water flow is turbulent and large in water quantity, the situation that water flows over the water retaining wall often occurs, quick drainage is difficult, water cannot be drained in time, certain potential safety hazards are caused, generally more garbage and floating waste materials are mixed in the water flow, so that drainage pipelines are blocked by the garbage when the water retaining wall drains water, and the garbage is inconvenient to clean; therefore, a water conservancy construction water-blocking wall is proposed to the above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
In order to compensate the not enough of prior art, solved current breakwater because highly limited, when rivers are comparatively torrent and the water yield is great, the condition of the water conservancy overflow department breakwater often can appear, and the emergency drainage is comparatively difficult, not only can not in time discharge water, has also caused certain potential safety hazard simultaneously, is generally being mingled with more rubbish and showy waste material among the rivers, and this often can make the breakwater when the drainage, and drainage pipe is by the problem of rubbish jam, the utility model provides a water conservancy construction hinders the waterwall.
The utility model provides a technical scheme that its technical problem adopted is: a water conservancy construction wall that blocks water, which comprises a wall body, the diversion channel has been seted up on the surface of wall body, a plurality of water inlets have been seted up to the outer wall of wall body, one side fixedly connected with drainage end that the water inlet was kept away from to the wall body, and the drainage is served and is installed the valve, a plurality of support walls of inner wall fixedly connected with of diversion channel, the impact force that receives through support wall dispersion wall body, the internally mounted of diversion channel has two interception subassemblies, and two interception subassembly symmetric distribution are in the both sides of drainage end, the inside of diversion channel corresponds water inlet department and installs the buffering subassembly, can increase water storage space through the diversion channel, rivers pass through the inside that the water inlet got into the diversion channel to can discharge rivers when the water level is higher through opening the valve.
Preferably, the interception subassembly includes the intercepting net, intercepting net fixed mounting is in the inner wall department of diversion channel, during the drainage, can intercept the solid waste in the rivers through the intercepting net, avoids rubbish jam drainage end.
Preferably, the interception subassembly still includes interception board and stopper, interception board rotates the inner wall department of installing at the diversion flume, stopper fixed mounting is in the inner wall department of diversion flume, restricts interception board unidirectional rotation through the stopper, and during the drainage, rivers promote interception board and open, make rivers flow fast, and the back is accomplished in the drainage, interception board is perpendicular to form with the interception net and collects the space, and then collects the rubbish of interception, makes things convenient for personnel to concentrate the rubbish of collecting and handles.
Preferably, the interception subassembly still includes the clearance piece, the top fixedly connected with handle of clearance piece, and the handle runs through the wall body and extends to the outside, and the valve is perhaps closed after the drainage is accomplished, makes the rubbish that the clearance piece drove the interception rise through pulling up the handle, makes things convenient for personnel's safety efficient clearance rubbish.
Preferably, the clearance piece includes two slip rooms, two the inside sliding connection of slip room has the slide, two the relative one side of slide is rotated and is connected with rotatory collection room, and the clearance dish moves upward and drives rivers and flow and can drive rubbish and drop, and when the clearance piece moved upward, rotatory collection room downwardly rotating formed the V-arrangement, and then stored rubbish, reduced rubbish and moved the volume that drops of rubbish from the clearance piece top because of rivers.
Preferably, the buffering subassembly includes the erection column, erection column fixed mounting is in the inner wall department of diversion flume, the outside sliding connection of erection column has the interception dish, the surface cover of erection column is equipped with supporting spring, and the water inlet is plugged up to the elastic force that the interception dish passes through supporting spring, can reduce the volume that mud and rubbish got into the diversion flume, and during the drainage, through the impact force of interception dish absorption flow through water inlet department rivers, the reduction is to the destruction of wall body.
The utility model discloses an useful part lies in:
1. the utility model discloses an open the valve and can discharge rivers when the water level is higher, during the drainage, can intercept the solid waste in the rivers through the interceptor net, avoid rubbish to block up the drainage end, and rivers promote the interception board and open, make rivers flow fast, and the back is accomplished in the drainage, and the interception board is perpendicular to form with the interceptor net and collect the space, and then collects the rubbish of interception, makes things convenient for personnel to concentrate the rubbish of collecting and handles.
2. The utility model discloses perhaps close the valve after the drainage is accomplished, make the rubbish that the clearance piece drove the interception rise through the pull-up handle, make things convenient for personnel's safety efficient to clear up rubbish, when the clearance piece shifts up, rotatory collection room downwardly rotating forms the V-arrangement, and then stores rubbish, reduces rubbish and drives the volume of dropping of rubbish from clearance piece top because of rivers flow.
3. The utility model discloses a water inlet is plugged up to the elastic force that the interception dish passes through supporting spring, can reduce the volume that mud and rubbish got into the diversion channel, during the drainage, absorbs the impact force of the rivers of water inlet department of flowing through the interception dish, reduces the destruction to the wall body.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a side view of the present invention in fig. 1;
FIG. 3 is a cross-sectional view of the wall of the present invention;
FIG. 4 is a schematic view of the cleaning sheet of the present invention;
fig. 5 is a schematic structural view of the buffer assembly of the present invention.
In the figure: 1. a wall body; 2. a water diversion groove; 3. a water inlet; 4. a drainage end; 5. a support wall; 6. an interception component; 61. an intercepting net; 62. a interception plate; 63. a limiting block; 64. cleaning the tablets; 65. a handle; 641. a sliding chamber; 642. a slide plate; 643. rotating the collection chamber; 7. a buffer assembly; 71. mounting a column; 72. a catch tray; 73. a support spring; 74. a flow port.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Example one
Please refer to fig. 1-5, a water conservancy construction water-blocking wall, includes wall body 1, diversion channel 2 has been seted up on the surface of wall body 1, a plurality of water inlets 3 have been seted up to the outer wall of wall body 1, one side fixedly connected with drainage end 4 that water inlet 3 was kept away from to wall body 1, and install the valve on the drainage end 4, a plurality of support walls 5 of inner wall fixedly connected with of diversion channel 2, the internally mounted of diversion channel 2 has two interception subassemblies 6, and two interception subassemblies 6 symmetric distribution are in the both sides of drainage end 4, the inside of diversion channel 2 corresponds water inlet 3 department and installs buffering subassembly 7, can increase the water storage space through diversion channel 2, and rivers pass through water inlet 3 and get into the inside of diversion channel 2 to can discharge rivers when the water level is higher through opening the valve.
The intercepting component 6 comprises an intercepting net 61, the intercepting net 61 is fixedly installed on the inner wall of the water diversion groove 2, and during drainage, solid garbage in water flow can be intercepted through the intercepting net 61, so that the garbage is prevented from blocking the drainage end 4.
Interception subassembly 6 still includes interception board 62 and stopper 63, interception board 62 rotates the inner wall department of installing at diversion trench 2, stopper 63 fixed mounting is in diversion trench 2's inner wall department, restricts interception board 62 unidirectional rotation through stopper 63, and during the drainage, rivers promote interception board 62 and open, make rivers flow fast, and the back is accomplished in the drainage, interception board 62 is perpendicular to form with interception net 61 and collects the space, and then collects the rubbish of interception, makes things convenient for personnel to concentrate the rubbish of collecting and handles.
Interception subassembly 6 still includes cleaning sheet 64, cleaning sheet 64's top fixedly connected with handle 65, and handle 65 runs through wall body 1 and extends to the outside, and the drainage is accomplished the back or is closed the valve, and the rubbish that makes cleaning sheet 64 drive the interception rises through pull-up handle 65, makes things convenient for personnel's safety efficient clearance rubbish.
The cleaning sheet 64 comprises two sliding chambers 641, sliding plates 642 are slidably connected inside the two sliding chambers 641, a rotary collecting chamber 643 is rotatably connected to one opposite side of each sliding plate 642, the cleaning disc moves upwards to drive water flow to drive garbage to fall, and when the cleaning sheet 64 moves upwards, the rotary collecting chamber 643 rotates downwards to form a V shape to store the garbage, so that the falling amount of the garbage above the cleaning sheet 64, which is driven by the water flow, is reduced.
Buffer unit 7 includes erection column 71, erection column 71 fixed mounting is in the inner wall department of diversion channel 2, the outside sliding connection of erection column 71 has interception dish 72, the surface cover of erection column 71 is equipped with supporting spring 73, and interception dish 72 blocks up water inlet 3 through supporting spring 73's elastic force, can reduce the volume that mud and rubbish got into diversion channel 2, and during the drainage, the impact force of the rivers of water inlet 3 department of flowing through is absorbed through interception dish 72, reduces the destruction to wall body 1.
Example two
Referring to fig. 5, in the first comparative example, as another embodiment of the present invention, a flow opening 74 is formed on a surface of the intercepting plate 72, and the flow opening 74 facilitates the flow of water.
According to the working principle, a water storage space can be increased through the diversion channel 2, water flow enters the diversion channel 2 through the water inlet 3 and can be discharged when the water level is high by opening a valve, solid garbage in the water flow can be intercepted through the intercepting net 61 during water discharge, the garbage is prevented from blocking the water discharge end 4, the intercepting plate 62 is pushed to open by the water flow, the water flow flows rapidly, after the water discharge is completed, the intercepting plate 62 vertically forms a collecting space with the intercepting net 61, the intercepted garbage is further collected, and the collected garbage can be conveniently and intensively treated by personnel;
after the water is drained or the valve is closed, the cleaning sheet 64 drives the intercepted garbage to rise through the pull-up handle 65, so that the garbage can be cleaned safely and efficiently by personnel, when the cleaning sheet 64 moves upwards, the rotary collecting chamber 643 rotates downwards to form a V shape, the garbage is stored, and the falling amount of the garbage above the cleaning sheet 64, which is driven by the flowing of water flow, is reduced;
the interception disc 72 simply blocks the water inlet 3 through the elastic force of the supporting spring 73, the amount of mud and garbage entering the water diversion groove 2 can be reduced when water is not drained, and the impact force of water flow flowing through the water inlet 3 is absorbed through the interception disc 72 when water is drained, so that the damage to the wall body 1 is reduced.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed.

Claims (6)

1. The utility model provides a water conservancy construction water-blocking wall, includes wall body (1), its characterized in that: diversion channel (2) have been seted up on the surface of wall body (1), a plurality of water inlets (3) have been seted up to the outer wall of wall body (1), one side fixedly connected with drainage end (4) of water inlet (3) are kept away from in wall body (1), and install the valve on drainage end (4), a plurality of support walls (5) of inner wall fixedly connected with of diversion channel (2), the internally mounted of diversion channel (2) has two interception subassemblies (6), and two interception subassemblies (6) symmetric distribution are in the both sides of drainage end (4), the inside of diversion channel (2) corresponds water inlet (3) department and installs buffering subassembly (7).
2. The water conservancy construction water-blocking wall of claim 1, characterized in that: the intercepting component (6) comprises an intercepting net (61), and the intercepting net (61) is fixedly installed on the inner wall of the flume (2).
3. The water conservancy construction water-blocking wall of claim 1, characterized in that: the intercepting component (6) further comprises an intercepting plate (62) and a limiting block (63), the intercepting plate (62) is rotatably installed on the inner wall of the water diversion groove (2), and the limiting block (63) is fixedly installed on the inner wall of the water diversion groove (2).
4. The water conservancy construction water-blocking wall of claim 1, characterized in that: the intercepting component (6) further comprises a cleaning sheet (64), the top of the cleaning sheet (64) is fixedly connected with a handle (65), and the handle (65) penetrates through the wall body (1) and extends to the outside.
5. A water conservancy construction waterwall according to claim 4, wherein: the cleaning sheet (64) comprises two sliding chambers (641), sliding plates (642) are connected inside the two sliding chambers (641) in a sliding mode, and rotating collecting chambers (643) are connected to opposite sides of the two sliding plates (642) in a rotating mode.
6. The water conservancy construction water-blocking wall of claim 1, characterized in that: buffer unit (7) include erection column (71), erection column (71) fixed mounting is in the inner wall department of diversion flume (2), the outside sliding connection of erection column (71) has interception dish (72), the surface cover of erection column (71) is equipped with supporting spring (73).
CN202221942073.9U 2022-07-26 2022-07-26 Water conservancy construction water-blocking wall Active CN218233338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221942073.9U CN218233338U (en) 2022-07-26 2022-07-26 Water conservancy construction water-blocking wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221942073.9U CN218233338U (en) 2022-07-26 2022-07-26 Water conservancy construction water-blocking wall

Publications (1)

Publication Number Publication Date
CN218233338U true CN218233338U (en) 2023-01-06

Family

ID=84678921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221942073.9U Active CN218233338U (en) 2022-07-26 2022-07-26 Water conservancy construction water-blocking wall

Country Status (1)

Country Link
CN (1) CN218233338U (en)

Similar Documents

Publication Publication Date Title
CN209179132U (en) A kind of municipal administration storm-water system
WO2019103627A1 (en) A storm water drain system and components thereof and methods of use
CN213159622U (en) Full-closed spiral type material-liquid separation device
CN218233338U (en) Water conservancy construction water-blocking wall
CN214033960U (en) Construction rainfall drainage structures
CN212925972U (en) Ecological water conservancy irrigation canals and ditches convenient to clearance debris
CN211368627U (en) Waterproof drainage device of hydraulic engineering construction
CN216041365U (en) Be applied to anti sluicing decompression structure that floats of basement
CN213508779U (en) A safe reposition of redundant personnel cuts dirty device for on municipal pipe network
CN112813922B (en) Active-passive debris flow water-stone separation-energy dissipation disaster reduction device
CN114182804A (en) Multifunctional intelligent flow dividing well
RU2703201C1 (en) Surface runoff inlet
CN115262491A (en) Gate with water passing channel
CN207331779U (en) A kind of basement drain anti-floating system
CN213174094U (en) Ecological garden sponge city drainage device
CN211691119U (en) House building drainage structures
CN218952124U (en) Dirt blocking grille for hydraulic engineering
CN220834267U (en) Periodic flushing type sand sedimentation tank structure
CN219671403U (en) Drainage device for hydraulic engineering construction
CN216976211U (en) Water conservancy pipeline for water conservancy project
CN217923890U (en) Multi-functional pond of going out of compact
CN217500497U (en) Intercepting well
CN221276968U (en) Roof curtain wall with drainage groove
CN217298847U (en) Water conservancy construction river course cleaning device
CN219653624U (en) Drainage equipment capable of preventing backflow of water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant