CN218221196U - Waste incineration slag factory uses sewage circulation settlement processing apparatus - Google Patents

Waste incineration slag factory uses sewage circulation settlement processing apparatus Download PDF

Info

Publication number
CN218221196U
CN218221196U CN202221787205.5U CN202221787205U CN218221196U CN 218221196 U CN218221196 U CN 218221196U CN 202221787205 U CN202221787205 U CN 202221787205U CN 218221196 U CN218221196 U CN 218221196U
Authority
CN
China
Prior art keywords
gate
sedimentation tank
baffle
foundation
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221787205.5U
Other languages
Chinese (zh)
Inventor
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Youcheng Environmental Protection Industry Co ltd
Original Assignee
Guangdong Youcheng Environmental Protection Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Youcheng Environmental Protection Industry Co ltd filed Critical Guangdong Youcheng Environmental Protection Industry Co ltd
Priority to CN202221787205.5U priority Critical patent/CN218221196U/en
Application granted granted Critical
Publication of CN218221196U publication Critical patent/CN218221196U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a waste incinerator slag plant sewage circulating sedimentation treatment device, which comprises a foundation and a control unit; foundation construction: the right end of the main sedimentation tank is provided with a sand basin, the front end of the sand basin is movably inserted with a gate, an overflow port on the right side wall of the sand basin is provided with a blocking net, an overflow port on the right side surface of the sand basin is provided with a flow guide pipe, the middle part of the foundation is provided with an auxiliary sedimentation tank and a main sedimentation tank, the auxiliary sedimentation tank is positioned on the front side of the main sedimentation tank, the middle part of the auxiliary sedimentation tank is provided with an auxiliary sludge pump through a first support frame, and the left end of the main sedimentation tank is provided with a main sludge pump through a second support frame; a control unit: the lower end of the control unit is fixedly connected with the upper surface of the gate; wherein: still include the control switch group, the control switch group sets up in the left end of ground, and this sewage cycle subsides processing apparatus can carry out a lot of and deposit and filter, and the treatment effect is good to the sediment can be collected in unison and handle, and the mechanical desilting of being convenient for, and it is convenient to use the maintenance.

Description

Waste incineration slag factory uses sewage circulation settlement treatment device
Technical Field
The utility model relates to a sewage treatment technical field specifically is waste incinerator slag factory uses sewage cycle settlement processing apparatus.
Background
Sewage treatment refers to the purification process of treating sewage and then achieving a certain water body or the requirement of being reused, people's life and various industrial productions in cities can produce a large amount of sewage, if the sewage is not treated and directly discharged, the environment can be seriously caused, and the waste of water resources can be caused at the same time, and then some production enterprises can treat the sewage by using a sewage sedimentation treatment device, so that the solid matters in the sewage can be precipitated, then the precipitated water body can be reused, and the production cost of the enterprises is reduced.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide waste incinerator slag factory with sewage cycle settlement processing apparatus, can carry out a lot of sediment and filter, the treatment effect is good to the precipitate can be unified to collect and handle, and the mechanical desilting of being convenient for uses and maintains the convenience, can effectively solve the problem in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the waste incineration slag plant sewage circulating sedimentation treatment device comprises a foundation and a control unit;
foundation construction: a grit chamber is arranged at the right end of the device, a gate is movably inserted at the front end of the grit chamber, a blocking net is arranged at an overflow port on the right side wall of the grit chamber, a flow guide pipe is arranged at an overflow port on the right side surface of the grit chamber, an auxiliary sedimentation tank and a main sedimentation tank are arranged in the middle of a foundation, the auxiliary sedimentation tank is positioned on the front side of the main sedimentation tank, an auxiliary sludge pump is arranged in the middle of the auxiliary sedimentation tank through a first support frame, and a main sludge pump is arranged at the left end of the main sedimentation tank through a second support frame;
a control unit: the lower end of the control unit is fixedly connected with the upper surface of the gate;
wherein: still include the control switch group, the control switch group sets up in the left end of ground, and the equal electricity of input of vice silt pump and main silt pump is connected the output of control switch group, and external power source is connected to the input electricity of control switch group, can carry out a lot of to the water and deposit and filter, and two sludge pumps can deposit sediment at the bottom of the pool back the pumping sediment and deposit and filter once more in advancing the sedimentation tank simultaneously, and then the treatment effect is good, and the reuse rate of water is high to make things convenient for the unified collection of sediment to handle, the mechanical desilting of being convenient for, it is convenient to use to maintain.
Further, the control unit includes gate portal, supporting seat, worm wheel, lead screw, worm and synchronizing shaft, the gate portal sets up in the upper surface of grit chamber, and the upper surface symmetry of gate portal is equipped with the supporting seat, and the inside of supporting seat all is connected with the worm wheel through the bearing rotation, and the equal threaded connection in screw hole at worm wheel center has the lead screw, and the lower extreme of lead screw all is connected with the last fixed surface of gate, and the rear end of supporting seat all rotates through the bearing and is connected with the worm, and the worm is connected with the worm wheel meshing respectively, is equipped with the synchronizing shaft between two worms, the promotion of convenient control gate.
Furthermore, the control unit further comprises a gate motor, the gate motor is arranged on the left side of the upper surface of the gate portal, an output shaft of the gate motor is fixedly connected with the worm at the left end, and an input end of the gate motor is electrically connected with an output end of the control switch group, so that power is provided for lifting the gate.
Furthermore, a water hole at the lower end of the gate is provided with a gate filter screen, so that the filtering of sewage during discharge is facilitated.
Further, still include the baffle unit, the baffle unit includes baffle, baffle motor, belt pulley one, speed reducer and belt pulley two, the baffle rotates to be connected in the inside of ground, the baffle motor passes through the support frame and sets up in the left end of ground, be equipped with belt pulley one on the output shaft of baffle motor, the speed reducer sets up in the left end of ground upper surface, be equipped with belt pulley two on the input shaft of speed reducer, belt pulley two and belt pulley one pass through belt transmission and connect, the output shaft of speed reducer and the axis body fixed connection of baffle right-hand member, the output of the input electricity connection control switch group of baffle motor, make things convenient for the discharge of sewage and the passing through of forklift.
Furthermore, the bottom of the grit chamber is provided with a water retaining boss, so that sediments are prevented from being accumulated on a gate opening.
Furthermore, the right-hand member of ground is equipped with reserve pond, makes things convenient for the emergent of sewage to deposit.
Compared with the prior art, the beneficial effects of the utility model are that: this sewage cycle settlement processing apparatus has following benefit:
1. industrial waste water, sewage is got into sand basin back aquatic impurity by the action of gravity and slowly sinks to sand basin bottom through the pipeline, water because of discharging into the sand basin is the ration and discharges, water when the sand basin reaches the water of setting for capacity after unnecessary water will flow into main sedimentation tank and vice sedimentation tank through the honeycomb duct from the gap outflow, the block can intercept the floater during outflow, be equipped with the otter board on the diapire of honeycomb duct simultaneously, can carry out further filtration to rivers, water in the vice sedimentation tank can get into inside the main sedimentation tank through the breach of rear end after deposiing, can carry out many times to the water and deposit and filter, and then the treatment effect is good, the reuse rate of water is high.
2. A certain amount of impurities can be accumulated at the bottom of the main sedimentation tank after long-time filtering use, at the moment, the main sludge pump is started through the control switch group to suck the mixture of the impurities and the water at the bottom back to the sand sedimentation tank so as to promote the water body to further precipitate, a certain amount of impurities can be accumulated at the bottom of the auxiliary sedimentation tank after long-time filtering use, at the moment, the mixture of the impurities and the water at the bottom back is sucked to the inside of the sand sedimentation tank by starting the auxiliary sludge pump, repeated precipitation is further carried out, the two sludge pumps can suck the precipitates deposited at the bottom of the tank back to the sedimentation tank for secondary precipitation and filtration, the sewage treatment effect is improved, and the uniform collection treatment of the precipitates is facilitated.
3. When the sediment in the grit chamber reaches the set maximum storage capacity, the baffle motor operates, an output shaft of the baffle motor drives a belt pulley to rotate, the belt pulley drives an input shaft of a speed reducer to rotate through a belt and a belt pulley, an output shaft of the speed reducer drives the baffle to rotate, then the baffle opens a flow channel at the front end of a foundation, then the gate motor operates, an output shaft of the gate motor drives a left worm to rotate, the left worm drives a right worm to rotate through a synchronizing shaft, the worm drives a worm wheel to rotate, a threaded hole in the worm wheel drives a lead screw to drive a gate to move upwards, the gate drives the gate filter screen to move out of a slot at the bottom, then the water in the grit chamber passes through the gate filter screen and flows out of the water, then the water flows into an auxiliary settling chamber through the flow channel of the foundation, the auxiliary settling chamber settles the impurities in the water, after the water in the grit chamber is drained, the gate is opened to facilitate the passing of a forklift, then the baffle is reset and closed to facilitate the passing of the forklift, then a working forklift is opened into the grit chamber to scoop the debris deposited at the bottom, large-scale mechanical equipment can enter the large-scale mechanical equipment to be conveniently loaded, and the large scale mechanical equipment to be conveniently maintained, and the high in a high-easy-to be conveniently used for silt-cleaning facility.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of the present invention;
FIG. 3 is a schematic view of the cross-sectional structure of the foundation of the present invention;
FIG. 4 is an enlarged schematic view of the structure at B of the present invention;
fig. 5 is a schematic cross-sectional view of the right side of the present invention.
In the figure: the system comprises a foundation 1, a sand basin 2, a gate 3, a control unit 4, a gate portal 41, a support seat 42, a worm wheel 43, a lead screw 44, a worm 45, a synchronous shaft 46, a gate motor 47, a blocking net 5, a guide pipe 6, a settling pond 7, a main settling pond 8, a baffle plate unit 9, a baffle plate 91, a baffle plate motor 92, a belt pulley 93I, a speed reducer 94, a belt pulley II 95, a standby pond 10, a control switch group 11, a sludge pump 12, a sludge pump 13, a filter screen of the gate 14 and a water retaining boss 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present embodiment provides a technical solution: the waste incineration slag factory sewage circulating sedimentation treatment device comprises a foundation 1 and a control unit 4;
foundation 1: the right end of the device is provided with a grit chamber 2, a foundation 1 provides a foundation for other structures, the front end of the grit chamber 2 is movably inserted with a gate 3, an overflow port on the right side wall of the grit chamber 2 is provided with a blocking net 5, an overflow port on the right side surface of the grit chamber 2 is provided with a flow guide pipe 6, the middle part of the foundation 1 is provided with an auxiliary sedimentation tank 7 and a main sedimentation tank 8, the auxiliary sedimentation tank 7 is positioned on the front side of the main sedimentation tank 8, impurities in water after industrial wastewater and sewage are discharged into the grit chamber 2 through a pipeline are slowly settled to the bottom of the grit chamber 2 under the action of gravity, because the water discharged into the grit chamber 2 is quantitatively discharged, when the water in the grit chamber 2 reaches a set volume, redundant water flows out from the overflow port and flows into the main sedimentation tank 8 and the auxiliary sedimentation tank 7 through the flow guide pipe 6, the blocking net 5 can block floating objects during the flow, and the bottom wall of the flow guide pipe 6 is provided with a screen plate which can further filter the water flow, the water in the auxiliary sedimentation tank 7 enters the main sedimentation tank 8 through a gap at the rear end after sedimentation, the middle part of the auxiliary sedimentation tank 7 is provided with an auxiliary sludge pump 12 through a first support frame, the left end of the main sedimentation tank 8 is provided with a main sludge pump 13 through a second support frame, a certain amount of impurities can be accumulated at the bottom of the main sedimentation tank 8 after long-time filtration, at the moment, a control switch group 11 is used for starting the main sludge pump 13 to suck a mixture of the impurities at the bottom and water back to the grit chamber 2 so as to promote the water to be circularly precipitated, a gate filter screen 14 is arranged at a water permeating hole at the lower end of the gate 3, the gate 3 drives the gate filter screen 14 to move out from a slot at the bottom, then the water in the grit chamber 2 flows out through the gate filter screen 14, then flows into the auxiliary sedimentation tank 7 through a flow passage of the foundation 1, the auxiliary sedimentation tank 7 precipitates the impurities in the water, after long-time filtering and use, a certain amount of impurities can be accumulated at the bottom of the auxiliary sedimentation tank 7, at the moment, a mixture of the impurities at the bottom and water is pumped back to the interior of the grit chamber 2 by opening the auxiliary silt pump 12, repeated sedimentation is further carried out, a water retaining boss 15 is arranged at the bottom of the grit chamber 2, the bottom of the grit chamber 2 is non-planar, the position of the bottom is slightly higher close to the gate 3 in actual work, the water retaining boss 15 is arranged at the position connected with the gate 3, sediment is prevented from being blocked at the gate opening in drainage, the working difficulty of a forklift is facilitated, and a standby tank 10 is arranged at the right end of the foundation 1, so that sewage can be conveniently stored in an emergency;
the control unit 4: the control unit 4 comprises a gate portal 41, a support seat 42, a worm wheel 43, a screw rod 44, a worm 45 and a synchronizing shaft 46, the gate portal 41 is arranged on the upper surface of the grit chamber 2, the support seat 42 is symmetrically arranged on the upper surface of the gate portal 41, the gate portal 41 supports parts above the gate portal, the worm wheel 43 is rotatably connected inside the support seat 42 through a bearing, the support seat 42 is rotatably connected with a boss on the lower surface of the worm wheel 43 through a bearing, the screw rod 44 is rotatably connected with a threaded hole in the center of the worm wheel 43, the lower end of the screw rod 44 is fixedly connected with the upper surface of the gate 3, the worm 45 is rotatably connected with the rear end of the support seat 42 through a bearing, the worm 45 is respectively connected with the worm wheel 43 in a meshed manner, the synchronizing shaft 46 is arranged between the two worms 45, the control unit 4 further comprises a gate motor 47, the gate motor 47 is arranged on the left side of the upper surface of the gate portal frame 41, an output shaft of the gate motor 47 is fixedly connected with a worm 45 at the left end, an input end of the gate motor 47 is electrically connected with an output end of the control switch group 11, the gate motor 47 runs, the output shaft of the gate motor 47 drives the worm 45 at the left side to rotate, the worm 45 at the left side drives the worm 45 at the right side to rotate through a synchronizing shaft 46, the worm 45 drives a worm wheel 43 to rotate, a threaded hole in the worm wheel 43 drives a screw rod 44 to drive the gate 3 to move upwards, after water in the grit chamber 2 is completely drained, the gate 3 is opened to facilitate the passing of a forklift, then the baffle 91 is reset to close to facilitate the passing of the forklift, then the working forklift enters the grit chamber 2 to shovel impurities deposited at the bottom out of the loading truck, and after the shoveling is completed, the gate 3 is reset;
wherein: the sand settling tank comprises a baffle plate unit 9, the baffle plate unit 9 comprises a baffle plate 91, a baffle plate motor 92, a belt pulley 93, a speed reducer 94 and a belt pulley 95, the baffle plate 91 is rotatably connected to the inside of the foundation 1, the baffle plate motor 92 is arranged at the left end of the foundation 1 through a support frame, the belt pulley 93 is arranged on an output shaft of the baffle plate motor 92, the speed reducer 94 is arranged at the left end of the upper surface of the foundation 1, the belt pulley 95 is arranged on an input shaft of the speed reducer 94, the belt pulley 95 is in transmission connection with the belt pulley 93 through a belt, an output shaft of the speed reducer 94 is fixedly connected with a shaft body at the right end of the baffle plate 91, the speed reducer 94 performs speed reduction to improve the torque of the rotary baffle plate 91, an input end of the baffle plate motor 92 is electrically connected with an output end of a control switch group 11, when sediment in the sand settling tank 1 reaches a set maximum storage amount, the baffle plate motor 92 operates, the belt pulley 93 is driven by the output shaft of the baffle plate motor 92, the belt pulley 93 rotates, the belt pulley 93 drives the input shaft of the speed reducer 94 to rotate through the belt and the belt pulley 95, the output shaft of the speed reducer 94 drives the baffle plate 91 to rotate, and further the baffle plate 91 opens a flow channel at the front end of the foundation 1;
wherein: the device also comprises a control switch group 11, wherein the control switch group 11 is arranged at the left end of the foundation 1, the input ends of the auxiliary sludge pump 12 and the main sludge pump 13 are electrically connected with the output end of the control switch group 11, and the input end of the control switch group 11 is electrically connected with an external power supply.
The utility model provides a waste incinerator slag factory is with sewage circulation settlement treatment device's theory of operation as follows: after industrial wastewater and sewage are discharged into the grit chamber 2 through a pipeline, impurities in the water are slowly settled to the bottom of the grit chamber 2 under the action of gravity, because the water discharged into the grit chamber 2 is discharged quantitatively, when the water in the grit chamber 2 reaches a set volume, the excessive water flows out of an overflow port, flows into the main sedimentation tank 8 and the auxiliary sedimentation tank 7 through the guide pipe 6, the floating objects are intercepted by the blocking net 5 when the excessive water flows out, meanwhile, the bottom wall of the guide pipe 6 is provided with the net plate which can further filter the water flow, the water in the auxiliary sedimentation tank 7 enters the main sedimentation tank 8 through a gap at the rear end after sedimentation, a certain amount of impurities can be accumulated at the bottom of the main sedimentation tank 8 after long-time filtering use, at the moment, the main silt pump 13 is started through the control switch group 11 to pump the mixture of the impurities and the water at the bottom back to the grit chamber 2 to promote the water to further sedimentation, when the sediment in the grit chamber 1 reaches the set maximum storage capacity, the baffle motor 92 operates, the output shaft of the baffle motor 92 drives the belt pulley 93 to rotate, the belt pulley 93 drives the input shaft of the speed reducer 94 to rotate through the belt and the belt pulley 95, the output shaft of the speed reducer 94 drives the baffle 91 to rotate, the baffle 91 opens the runner at the front end of the foundation 1, then the gate motor 47 operates, the output shaft of the gate motor 47 drives the worm 45 at the left side to rotate, the worm 45 at the left side drives the worm 45 at the right side to rotate through the synchronizing shaft 46, further the worm 45 drives the worm wheel 43 to rotate, the threaded hole in the worm wheel 43 drives the screw rod 44 to drive the gate 3 to move upwards, further the gate 3 drives the gate filter screen 14 to move out of the slot at the bottom, further, the water in the grit chamber 2 flows out through the gate filter screen 14, and then flows into the auxiliary settling chamber 7 through the runner of the foundation 1, the impurity of vice sedimentation tank 7 in to the water deposits, after the log raft in grit chamber 2 is clean, open the passing through of making things convenient for the forklift with gate 3, then reset the baffle 91 and close the passing through of making things convenient for the forklift, then work forklift drives and goes into grit chamber 2 and shovels the loading truck with the impurity of deposit in the bottom, the back of finishing of shoveling, reset gate 3, can save a certain amount of impurity bottom the vice sedimentation tank 7 after long-time filtration use, this moment through opening the inside of the mixture pumpback of the impurity of bottom and water of vice silt pump 12, and then carry out the repeated sediment.
It should be noted that the gate motor 47, the baffle motor 92, the sub sludge pump 12 and the main sludge pump 13 disclosed in the above embodiments can be freely configured according to practical application scenarios, the sub sludge pump 12 and the main sludge pump 13 can be a sewage pump with a model number of 100JYWQ70-15-2000-5.5, the gate motor 47 and the baffle motor 92 can be gear reduction motors with a model number of CH40-2.2KW, and the control switch group 11 is provided with switch buttons which are in one-to-one correspondence with the gate motor 47, the baffle motor 92, the sub sludge pump 12 and the main sludge pump 13 and are used for controlling the on-off operation thereof.
The above-mentioned only be the embodiment of the present invention, not consequently the restriction of the patent scope of the present invention, all utilize the equivalent structure or equivalent flow transform made of the content of the specification and the attached drawings, or directly or indirectly use in other relevant technical fields, all including in the same way the patent protection scope of the present invention.

Claims (7)

1. Waste incinerator slag mill subsides processing apparatus with sewage cycle, its characterized in that: comprises a foundation (1) and a control unit (4);
foundation (1): a grit chamber (2) is arranged at the right end of the device, a gate (3) is movably inserted at the front end of the grit chamber (2), a blocking net (5) is arranged at an overflow port of the right side wall of the grit chamber (2), a guide pipe (6) is arranged at an overflow port of the right side surface of the grit chamber (2), an auxiliary sedimentation tank (7) and a main sedimentation tank (8) are arranged in the middle of the foundation (1), the auxiliary sedimentation tank (7) is positioned at the front side of the main sedimentation tank (8), an auxiliary sludge pump (12) is arranged in the middle of the auxiliary sedimentation tank (7) through a first support frame, and a main sludge pump (13) is arranged at the left end of the main sedimentation tank (8) through a second support frame;
control unit (4): the lower end of the control unit (4) is fixedly connected with the upper surface of the gate (3);
wherein: the device is characterized by further comprising a control switch group (11), wherein the control switch group (11) is arranged at the left end of the foundation (1), the input ends of the auxiliary sludge pump (12) and the main sludge pump (13) are electrically connected with the output end of the control switch group (11), and the input end of the control switch group (11) is electrically connected with an external power supply.
2. The waste incineration slag plant sewage circulating and settling treatment device according to claim 1, characterized in that: control unit (4) are including gate portal (41), supporting seat (42), worm wheel (43), lead screw (44), worm (45) and synchronizing shaft (46), gate portal (41) set up in the upper surface of grit chamber (2), the upper surface symmetry of gate portal (41) is equipped with supporting seat (42), the inside of supporting seat (42) all is connected with worm wheel (43) through the bearing rotation, the equal threaded connection in screw hole at worm wheel (43) center has lead screw (44), the lower extreme of lead screw (44) all is connected with the last fixed surface of gate (3), the rear end of supporting seat (42) all is connected with worm (45) through the bearing rotation, worm (45) are connected with worm wheel (43) meshing respectively, be equipped with synchronizing shaft (46) between two worm (45).
3. The waste incineration slag plant sewage circulating and settling treatment device according to claim 2, characterized in that: the control unit (4) further comprises a gate motor (47), the gate motor (47) is arranged on the left side of the upper surface of the gate portal frame (41), an output shaft of the gate motor (47) is fixedly connected with a worm (45) at the left end, and an input end of the gate motor (47) is electrically connected with an output end of the control switch group (11).
4. The waste incineration slag plant sewage circulating and settling treatment device according to claim 1, characterized in that: a gate filter screen (14) is arranged at the water permeable hole at the lower end of the gate (3).
5. The waste incineration slag plant sewage circulating and settling treatment device according to claim 1, characterized in that: still include baffle unit (9), baffle unit (9) are including baffle (91), baffle motor (92), belt pulley (93), speed reducer (94) and belt pulley two (95), baffle (91) rotate to be connected in the inside of ground (1), baffle motor (92) pass through the support frame and set up in the left end of ground (1), be equipped with belt pulley one (93) on the output shaft of baffle motor (92), speed reducer (94) set up in the left end of ground (1) upper surface, be equipped with belt pulley two (95) on the input shaft of speed reducer (94), belt pulley two (95) and belt pulley one (93) are connected through belt transmission, the output shaft of speed reducer (94) and the axis body fixed connection of baffle (91) right-hand member, the output of the input electricity connection control switch group (11) of baffle motor (92).
6. The waste incineration slag plant sewage circulating and settling treatment device according to claim 1, characterized in that: and a water retaining boss (15) is arranged at the bottom of the grit chamber (2).
7. The waste incineration slag plant sewage circulating and settling treatment device according to claim 1, characterized in that: and a standby pool (10) is arranged at the right end of the foundation (1).
CN202221787205.5U 2022-07-12 2022-07-12 Waste incineration slag factory uses sewage circulation settlement processing apparatus Active CN218221196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221787205.5U CN218221196U (en) 2022-07-12 2022-07-12 Waste incineration slag factory uses sewage circulation settlement processing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221787205.5U CN218221196U (en) 2022-07-12 2022-07-12 Waste incineration slag factory uses sewage circulation settlement processing apparatus

Publications (1)

Publication Number Publication Date
CN218221196U true CN218221196U (en) 2023-01-06

Family

ID=84675247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221787205.5U Active CN218221196U (en) 2022-07-12 2022-07-12 Waste incineration slag factory uses sewage circulation settlement processing apparatus

Country Status (1)

Country Link
CN (1) CN218221196U (en)

Similar Documents

Publication Publication Date Title
CN212561672U (en) Dredging device for river regulation
CN218221196U (en) Waste incineration slag factory uses sewage circulation settlement processing apparatus
CN210562373U (en) River course ecological remediation sediment removal device for hydraulic engineering
CN218620457U (en) Wastewater dephosphorization reaction settling device
CN211035473U (en) Advanced water supply treatment reaction device
CN217613480U (en) Concrete waste water recycle device
CN217479205U (en) Air supporting filters industrial waste water purifier
CN217613473U (en) Sedimentation tank for stone processing sewage treatment
CN215105615U (en) Non-stop high-efficiency dredging device for water cooling tower of industrial enterprise
CN112479441B (en) Sewage treatment system
CN213313503U (en) Sewage removing and impurity removing device for sewage pool of chemical plant
CN219240818U (en) Water conservancy hydropower construction drainage device
CN217567847U (en) Sewage treatment device with silt clearance structure
CN213348085U (en) Environmental engineering sewage treatment sedimentation tank
CN220223665U (en) Wastewater treatment purifying tank convenient for diversion
CN212119238U (en) Desilting equipment for sewage environmental protection treatment
CN214243955U (en) Sewage treatment device convenient to separate sewage sundries
CN220469039U (en) Ground rainwater recovery processing device
CN220860846U (en) Wastewater treatment cloth filter device
CN214570910U (en) A skimming collection device for sewage treatment
CN220237877U (en) Confluence overflow pollution purification device
CN215403498U (en) High-efficient purifier with deironing denitrogenation function
CN212315766U (en) Central driving pipe type sludge discharging and removing integrated machine
CN220609510U (en) Sand sedimentation tank for water and soil conservation
CN214763512U (en) Large-scale ultra-deep foundation ditch engineering is with cistern that has effluent disposal mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant