CN218205754U - Novel construction site standard culture pond - Google Patents

Novel construction site standard culture pond Download PDF

Info

Publication number
CN218205754U
CN218205754U CN202121860887.3U CN202121860887U CN218205754U CN 218205754 U CN218205754 U CN 218205754U CN 202121860887 U CN202121860887 U CN 202121860887U CN 218205754 U CN218205754 U CN 218205754U
Authority
CN
China
Prior art keywords
construction site
intelligent temperature
temperature controller
site standard
standard culture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121860887.3U
Other languages
Chinese (zh)
Inventor
邹勇
周昌文
陈祖刚
苏琦
辛桂华
王振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Bohong Construction Group Co ltd
Original Assignee
Wuhan Bohong Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Bohong Construction Group Co ltd filed Critical Wuhan Bohong Construction Group Co ltd
Priority to CN202121860887.3U priority Critical patent/CN218205754U/en
Application granted granted Critical
Publication of CN218205754U publication Critical patent/CN218205754U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Landscapes

  • Greenhouses (AREA)

Abstract

The utility model discloses a novel construction site standard curing pond relates to construction technical field, for solving current construction site standard curing pond and generally adopting air conditioner humidification degree controller and standard curing box dual mode to the concrete test block, dual mode exists that the power consumption is big, consume manpower resources, the test block is easy bad defect when placing to be unfavorable for the problem that the user used. The construction site standard maintenance pool comprises a construction site standard maintenance pool body, wherein a standard maintenance groove is arranged at the middle position of the construction site standard maintenance pool body, concrete test blocks are arranged in the standard maintenance groove, the concrete test blocks are provided with a plurality of the concrete test blocks, the concrete test blocks are arranged in parallel transversely and longitudinally, intelligent temperature controllers are arranged on the outer walls of the front end and the rear end of the construction site standard maintenance pool body, four groups of the intelligent temperature controllers are arranged on the outer walls of the front end and the rear end of the construction site standard maintenance pool body, the rear end of each intelligent temperature controller is detachably connected with the outer wall of the construction site standard maintenance pool body, and temperature control heating rods are arranged at the rear end of each intelligent temperature controller.

Description

Novel construction site standard culture pond
Technical Field
The utility model relates to a construction technical field specifically is a novel pond is supported to job site mark.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object in a specified place. The construction site is called a construction site or construction site, also called a construction site, and a construction site standard culture pond, namely a building for standard culture and maintenance of the concrete test block on the construction site.
However, the conventional construction site standard curing pool generally adopts two modes, namely an air conditioner humidifying degree controller and a standard curing box, to cure the concrete test block, and the two modes have the defects of large power consumption, human resource consumption and easy damage during test block placement, so that the problem of being not beneficial to the use of users is solved; therefore, the existing requirements are not met, and a novel construction site standard culture pond is provided for the existing requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel construction site standard curing pond to solve the current construction site standard curing pond that provides among the above-mentioned background art and generally adopt air conditioner humidification degree controller and standard curing box dual mode to carry out the maintenance to the concrete test block, dual mode exists that the power consumption is big, consume manpower resources, the test block defect of easily bad when placing, thereby is unfavorable for the problem that the user used.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel construction site standard maintenance pond, includes construction site standard maintenance pond body, construction site standard maintenance pond body's intermediate position department installs the standard maintenance groove, the interior concrete test block that is provided with of standard maintenance groove, and the concrete test block is provided with a plurality of, the horizontal vertical parallel arrangement of a plurality of concrete test block, intelligent temperature controller is all installed to the outer wall at both ends around construction site standard maintenance pond body, and intelligent temperature controller installs four groups, four groups the rear end face of intelligent temperature controller all is connected with construction site standard maintenance pond body's outer wall is detachable, the control by temperature change heating rod is installed to the rear end of intelligent temperature controller, and the one end of control by temperature change heating rod runs through to the inside of standard maintenance groove, the electric switch is installed to the output of intelligent temperature controller, the power supply case is installed to the output of electric switch, and the output of intelligent temperature controller passes through electric switch and power supply case electric connection, and the output of power supply case and the input electric connection of control heating rod, temperature sensor is installed to the input of intelligent temperature controller, the outlet is installed to the one end of standard maintenance groove.
Preferably, the construction site standard curing pool body is formed by building construction of common building site lime sand, and waterproof coating layers are arranged on the inner wall and the outer wall of the construction site standard curing pool body.
Preferably, connect the through hole is all installed at four angles of job site standard curing pond body upper surface, connect the through hole's upper end and install and insert the member, insert the upper end of inlaying the member and install the member installation piece, the top shielding plate is installed to the top of member installation piece, and the below of top shielding plate is inserted through inserting and is inlayed the member and connect through hole and insert the connection, and the upper end of inserting and inlaying the member is passed through member installation piece and is connected with the top shielding plate is detachable.
Preferably, the middle position department of top shielding plate top installs the upper portion water inlet, the water inlet switch cover is installed to the outer wall of upper portion water inlet.
Preferably, a drain pipe is installed at one end of the drain port, and an electromagnetic control valve and a flowmeter are installed on the outer wall of the drain pipe.
Preferably, a temperature controller display screen is installed on the outer wall of the front end face of the intelligent temperature controller, and an operation panel is installed on one side of the temperature controller display screen.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an utilize intelligent temperature controller to set for required heating temperature, the control by temperature change heating rod is used for connecting the power supply case and carries out the electrical heating, make the interior liquid of mark support inslot can heat up, temperature sensor detects inside liquid temperature, can transmit to intelligent temperature controller department when the high temperature, intelligent temperature controller retransmits to electric switch and power supply case department, cut off the electric power of control by temperature change heating rod, make it stop heating, inside liquid and temperature are discharged from the outlet, above-mentioned structure can improve the control by temperature change precision of mark support groove to the concrete test block, compare air conditioner humidification degree controller and mark support case dual mode, the utility model discloses once can place the concrete test block volume many, the heat radiation characteristic who has utilized water in the maintenance process dispels the heat, makes it save a large amount of electric power cost and manpower resources.
2. The construction site standard culture pond body is built by laying bricks or stones by the common lime sand in building site and is constructed, make it more simple, convenient when the construction site is built, and waterproof coating layer can improve the water-proof effects of its interior outer wall department, prevents it and leaks when being convenient for retaining for whole standard culture pond is more reasonable, perfect.
3. Can add on standard curing pond upper portion through inserting and inlaying member piece and connect the through-hole and establish the top shielding plate, utilize the reducible external environment of top shielding plate to the influence of standard curing pond and inside test block to its two installation and dismantlement are got up simple and conveniently, can choose for use with self demand according to the user.
4. The drain pipe is used for discharging the water body, and the electromagnetic control valve and the flowmeter can facilitate more accurate drainage operation of a user.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a partial structure of the top shielding plate of the present invention;
FIG. 3 is a schematic diagram of the present invention;
in the figure: 1. a construction site standard culture pond body; 2. a waterproof coating layer; 3. a standard culture groove; 4. testing concrete blocks; 5. an intelligent temperature controller; 6. a temperature controller display screen; 7. an operation panel; 8. a temperature-controlled heating rod; 9. a water outlet; 10. a drain pipe; 11. electromagnetic control valve and flowmeter; 12. a connecting through hole; 13. inserting and embedding the rod piece; 14. a rod piece mounting block; 15. a top shutter; 16. an upper water inlet; 17. a water inlet opening and closing cover; 18. a temperature sensor; 19. an electric switch; 20. a power supply box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: a novel construction site standard culture pond comprises a construction site standard culture pond body 1, wherein a standard culture groove 3 is arranged at the middle position of the construction site standard culture pond body 1, concrete test blocks 4 are arranged in the standard culture groove 3, a plurality of concrete test blocks 4 are arranged, the plurality of concrete test blocks 4 are arranged in parallel in the transverse direction and the longitudinal direction, intelligent temperature controllers 5 are respectively arranged on the outer walls of the front end and the rear end of the construction site standard culture pond body 1, four groups of intelligent temperature controllers 5 are arranged on the intelligent temperature controllers 5, the rear end faces of the four groups of intelligent temperature controllers 5 are detachably connected with the outer wall of the construction site standard culture pond body 1, a temperature control heating rod 8 is arranged at the rear end of each intelligent temperature controller 5, one end of each temperature control heating rod 8 penetrates into the standard culture groove 3, an electric switch 19 is installed at the output end of the intelligent temperature controller 5, a power supply box 20 is installed at the output end of the electric switch 19, the output end of the intelligent temperature controller 5 is electrically connected with the power supply box 20 through the electric switch 19, the output end of the power supply box 20 is electrically connected with the input end of the temperature control heating rod 8, a temperature sensor 18 is installed at the input end of the intelligent temperature controller 5, the input end of the intelligent temperature controller 5 is electrically connected with the output end of the temperature sensor 18, a water outlet 9 is installed at one end of the standard maintenance groove 3, the type of the temperature sensor 18 is ADT7310TRZ, the type of the intelligent temperature controller 5 is OHR-G310-A-0-2-A, and the type of the temperature control heating rod 8 is SC-QP-02.
Further, construction site standard curing pond body 1 is built by laying bricks or stones by the common lime sand of building site and is constructed and form, construction site standard curing pond body 1's inside and outside two walls all are provided with water proof coating layer 2, construction site standard curing pond body 1 is built by the common lime sand of building site and is constructed by laying bricks or stones, make it more simple when the construction site is built, it is convenient, water proof coating layer 2 can improve the water-proof effects of its inside and outside wall department, prevent it from leaking when being convenient for retaining, make whole standard curing pond more reasonable, perfect.
Further, connect the via hole 12 is all installed at four angles of job site standard curing pond body 1 upper surface, connect the upper end of via hole 12 and install and insert the member 13, insert the upper end of inlaying member 13 and install member installation piece 14, top shielding plate 15 is installed to member installation piece 14's top, the below of top shielding plate 15 is inserted through inserting and is inlayed member 13 and connect the via hole 12 and insert and connect, the upper end of inserting and inlaying member 13 is passed through member installation piece 14 and is connected with top shielding plate 15 is detachable, can add on standard curing pond upper portion through inserting and inlaying member 13 and connect the via hole 12 and establish top shielding plate 15, utilize the reducible external environment of top shielding plate 15 to the influence of standard curing pond and inside test block, and its two installation and dismantlement are got up simple and conveniently, can choose for use with self demand according to the user.
Further, an upper water inlet 16 is installed at the middle position above the top shielding plate 15, a water inlet switch cover 17 is installed on the outer wall of the upper water inlet 16, the upper water inlet 16 is used for adding water, and the water inlet switch cover 17 is used for playing a role in sealing when water does not need to be added.
Further, a drain pipe 10 is installed at one end of the drain port 9, an electromagnetic control valve and a flow meter 11 are installed on the outer wall of the drain pipe 10, the drain pipe 10 is used for discharging water, and the electromagnetic control valve and the flow meter 11 can facilitate a user to perform a drainage operation more accurately.
Further, the outer wall of the front end face of the intelligent temperature controller 5 is provided with a temperature controller display screen 6, one side of the temperature controller display screen 6 is provided with an operation panel 7, the temperature controller display screen 6 is convenient for users to observe data, and the operation panel 7 is convenient for users to change the temperature.
The working principle is as follows: when the intelligent maintenance water flow meter is used, the required heating temperature is set by using the intelligent temperature controller 5, the temperature control heating rod 8 is used for being connected with the power supply box 20 to carry out electric heating, liquid in the standard maintenance groove 3 can be heated, the temperature sensor 18 detects the temperature of the internal liquid, the internal liquid can be transmitted to the intelligent temperature controller 5 when the temperature is too high, the intelligent temperature controller 5 is transmitted to the electric switch 19 and the power supply box 20 again, the electric power of the temperature control heating rod 8 is cut off, the heating is stopped, the internal liquid and the temperature are discharged from the water outlet 9, the standard maintenance pool body 1 is formed by building construction of common building site lime sand, the standard maintenance pool is simpler and more convenient to build on a construction site, the waterproof effect of the internal and external walls of the waterproof layer 2 can be improved, the water storage is facilitated, the whole standard maintenance pool is more reasonable and perfect, the top shielding plate 15 can be additionally arranged on the upper portion of the standard maintenance pool through the inserting and embedding rod piece 13 and the connecting through hole 12, the top shielding plate 15 can reduce the influence of the external environment on the standard maintenance pool and the internal test blocks, the water flow meter and the water flow meter, the water flow meter can be simply and conveniently installed and detached according to the requirements of a user, the electromagnetic control water flow meter can be more conveniently discharged by using the electromagnetic control water flow meter 11.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a novel construction site standard curing pond, supports pond body (1) including construction site standard curing, its characterized in that: a standard curing groove (3) is arranged at the middle position of the construction site standard curing pool body (1), a concrete test block (4) is arranged in the standard curing groove (3), and a plurality of concrete test blocks (4) are arranged, a plurality of concrete test blocks (4) are arranged in parallel in the transverse and longitudinal directions, the outer walls of the front end and the rear end of the construction site standard culture pond body (1) are respectively provided with an intelligent temperature controller (5), four groups of intelligent temperature controllers (5) are arranged, the rear end faces of the four groups of intelligent temperature controllers (5) are detachably connected with the outer wall of the construction site standard culture pond body (1), the rear end of the intelligent temperature controller (5) is provided with a temperature control heating rod (8), one end of the temperature control heating rod (8) penetrates into the standard culture groove (3), an electric switch (19) is arranged at the output end of the intelligent temperature controller (5), the output end of the electric switch (19) is provided with a power supply box (20), the output end of the intelligent temperature controller (5) is electrically connected with the power supply box (20) through the electric switch (19), the output end of the power supply box (20) is electrically connected with the input end of the temperature control heating rod (8), the input end of the intelligent temperature controller (5) is provided with a temperature sensor (18), the input end of the intelligent temperature controller (5) is electrically connected with the output end of the temperature sensor (18), and a water outlet (9) is arranged at one end of the standard culture groove (3).
2. The novel construction site standard culture pond of claim 1, characterized in that: the construction site standard culture pond body (1) is formed by building construction of common lime sand in a construction site, and waterproof coating layers (2) are arranged on the inner wall and the outer wall of the construction site standard culture pond body (1).
3. The novel construction site standard culture pond of claim 1, characterized in that: connecting hole (12) are all installed at four angles of job site standard maintenance pond body (1) upper surface, connecting hole (12)'s upper end is installed and is inserted and inlays pole piece (13), insert and inlay the upper end of pole piece (13) and install pole piece installation piece (14), top shielding plate (15) are installed to the top of pole piece installation piece (14), and the below of top shielding plate (15) is inserted and is inlayed the connection through inserting and inlaying pole piece (13) and connecting hole (12), and the upper end of inserting and inlaying pole piece (13) is passed through pole piece installation piece (14) and is connected with top shielding plate (15) are detachable.
4. The novel construction site standard culture pond of claim 3, characterized in that: an upper water inlet (16) is installed at the middle position above the top shielding plate (15), and a water inlet switch cover (17) is installed on the outer wall of the upper water inlet (16).
5. The novel construction site standard culture pond of claim 1, characterized in that: a drain pipe (10) is installed at one end of the drain opening (9), and an electromagnetic control valve and a flowmeter (11) are installed on the outer wall of the drain pipe (10).
6. The novel construction site standard culture pond of claim 1, characterized in that: the intelligent temperature controller is characterized in that a temperature controller display screen (6) is installed on the outer wall of the front end face of the intelligent temperature controller (5), and an operation panel (7) is installed on one side of the temperature controller display screen (6).
CN202121860887.3U 2021-08-10 2021-08-10 Novel construction site standard culture pond Active CN218205754U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121860887.3U CN218205754U (en) 2021-08-10 2021-08-10 Novel construction site standard culture pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121860887.3U CN218205754U (en) 2021-08-10 2021-08-10 Novel construction site standard culture pond

Publications (1)

Publication Number Publication Date
CN218205754U true CN218205754U (en) 2023-01-03

Family

ID=84628066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121860887.3U Active CN218205754U (en) 2021-08-10 2021-08-10 Novel construction site standard culture pond

Country Status (1)

Country Link
CN (1) CN218205754U (en)

Similar Documents

Publication Publication Date Title
CN114397428B (en) Electroosmosis drainage combined electrode anchoring improved loess slope model test device
CN103380707A (en) Plant cultivation unit and three-dimensional greening wall comprising same
CN203148652U (en) A temperature tracing experiment device of the interaction between river water and underground water
CN218205754U (en) Novel construction site standard culture pond
CN108570961A (en) Sea bed simulation loop sink
CN210180872U (en) Test device for simulating karst fracture-pipeline water flow and solute transport rule
CN206690296U (en) A kind of circulating concrete curing device of hot-water bottle
CN203537951U (en) Plant cultivation unit and three-dimensional greening wall with same
CN206385495U (en) A kind of earth and rockfill dam landslide observed seepage behavior simulation test device
CN217332065U (en) Karst fracture water flow simulation test device with variable water level boundary
CN203893303U (en) Cyclic-heating device for backwater of branch pipes
CN205881301U (en) A salt solution experimental apparatus for simulating compound ventilation of building shaft formula
CN110501396B (en) Concrete repairing agent durability test system
CN202494176U (en) Special miniature constant temperature and humidity machine for cultural object display window
CN105133759A (en) Capillary tube water cooling curtain wall system
CN209345635U (en) With solar powered flower case apparatus
CN203555048U (en) Giant spiny frog spawn hatching device
CN206771617U (en) Industrial humidifier
CN203663865U (en) Constant-temperature overflow water tank
CN112669692B (en) Teaching demonstration device for building shape coefficient energy consumption
CN203704111U (en) Compound heat energy heating system
CN109898725A (en) It is a kind of to utilize the construction method and repairerment brick group of repairing brick progress ancient building ventilation regulation
CN106018756A (en) Thermal insulation test box with functions of water supplement at bottom and temperature control
CN212933935U (en) Experimental device for simulating natural convection effect in underground hot water migration process
CN110954352A (en) Energy underground structure model experiment test system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant