CN218205129U - Mounting structure of energy-saving curtain wall of high strength metal - Google Patents

Mounting structure of energy-saving curtain wall of high strength metal Download PDF

Info

Publication number
CN218205129U
CN218205129U CN202222414057.9U CN202222414057U CN218205129U CN 218205129 U CN218205129 U CN 218205129U CN 202222414057 U CN202222414057 U CN 202222414057U CN 218205129 U CN218205129 U CN 218205129U
Authority
CN
China
Prior art keywords
rod
curtain wall
installation
mounting
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222414057.9U
Other languages
Chinese (zh)
Inventor
程海斌
杨勇
陈继君
张栋
张峰
胡喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dingyuan Construction Group Co ltd
Original Assignee
China State Ding Yuan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Ding Yuan Construction Engineering Co Ltd filed Critical China State Ding Yuan Construction Engineering Co Ltd
Priority to CN202222414057.9U priority Critical patent/CN218205129U/en
Application granted granted Critical
Publication of CN218205129U publication Critical patent/CN218205129U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a curtain installation technical field specifically discloses a mounting structure of energy-saving curtain of high strength metal, and it includes the mounting bracket of constituteing by the installing frame of a plurality of cavity settings, corresponds the curtain board of installing in each installing frame and sets up the multiunit fixed establishment who is used for fixing the curtain board in each installing frame. Fixing mechanism in this application is located the installing frame, and fixing mechanism can fix the curtain board fast in corresponding the installing frame, realizes fixed the installation of curtain board, at this in-process, need not fix the curtain board through the screw, has avoided mounting such as screws to expose and ageing corrosion, makes the installation of curtain board more firm.

Description

Mounting structure of energy-saving curtain wall of high strength metal
Technical Field
The application relates to the technical field of curtain wall installation, in particular to a mounting structure of a high-strength metal energy-saving curtain wall.
Background
The energy-saving curtain wall is a building peripheral maintenance structure which is composed of a metal structure and plates, can have certain displacement capacity relative to a main structure or has certain deformation capacity per se, and does not bear the load and the effect of the main structure.
In the correlation technique, when the curtain wall board needs to be installed, the keel frame is installed and fixed firstly, and then the curtain wall board is directly fixed on the keel frame by using screws, so that the keel frame is installed and fixed. In this kind of fixed mode, the screw tip is exposed in the air all the time, receives rain water erosion or oxidation impaired easily, and impaired screw is difficult to provide good fixed effect for the curtain board, makes the installation stability of curtain board reduce.
SUMMERY OF THE UTILITY MODEL
In order to make the more stable installation of curtain board on keel frame, this application provides the mounting structure of energy-saving curtain of high strength metal.
The application provides a pair of mounting structure of energy-saving curtain of high strength metal adopts following technical scheme:
the utility model provides an installation structure of energy-saving curtain of high strength metal, includes the mounting bracket of constituteing by the installing frame of a plurality of cavity settings, corresponds to install each curtain board in the installing frame and set up in each be used for right the curtain board carries out the multiunit fixed establishment.
Through adopting above-mentioned technical scheme, when needs are installed fixedly to the curtain board, fixed establishment can fix the curtain board in corresponding the installing frame fast, realizes fixed the installation of curtain board, at this in-process, need not fix the curtain board through the screw, avoided mounting such as screw to expose and ageing corrosion, make the installation of curtain board more firm, consequently the life of curtain board is longer, reduced the damage change of curtain board to more energy-concerving and environment-protective.
Optionally, an insertion plate is fixed on the surface of the curtain wall plate, the insertion plate is inserted into the inner frame of the mounting frame, each side edge of the insertion plate is provided with an insertion groove perpendicular to the surface of the curtain wall plate, one end of each insertion groove extends to the end of the insertion plate far away from one side of the curtain wall plate, and the bottom wall of the insertion groove far away from one end of the curtain wall plate is provided with an insertion hole;
the fixing mechanism comprises an installation barrel fixedly installed on the inner wall of the installation frame, an insertion rod slidably installed in the installation barrel and a linkage assembly used for driving the insertion rod to be inserted into the insertion hole, an insertion port communicated with the end portion of the installation barrel is formed in the inner side wall of the installation frame, and the end portion of the insertion rod penetrates through the insertion port and is inserted into the insertion hole under the driving of the linkage assembly.
Through adopting above-mentioned technical scheme, when needs installation curtain board, only need aim at the inside casing of installing frame with curtain board, press the curtain board, the grafting integrated circuit board connects into the inner chamber of installing frame this moment, at the in-process of pressing the curtain board, the interlock subassembly drives the peg graft pole and pegs graft into in the spliced eye, the peg graft pole is fixed to the peg graft board locking this moment to the completion is fixed to the installation of curtain board.
Optionally, the linkage assembly comprises a pressing rod parallel to the insertion rod and a pushing rod perpendicular to the insertion rod, an installation opening is formed in the inner side wall of the installation frame along the thickness direction of the installation frame in an extending mode, the pressing rod is movably arranged in the installation opening, the pushing rod is movably arranged in the installation frame, one end of the pressing rod penetrates through the installation opening and is fixedly connected with one end of the pushing rod, the end portion of the insertion rod is arranged in a wedge shape, and the end portion of the pushing rod far away from the pressing rod is matched with the wedge-shaped end portion of the insertion rod in a matching mode.
Through adopting above-mentioned technical scheme, at the in-process of pressing the curtain board, the depression bar gets into the inserting groove in, continue to press the curtain board, make the mutual butt of inner wall of depression bar and inserting groove, the inserting plate drives the depression bar and removes to the moving direction of curtain board this moment, the depression bar drives and supports the push rod and remove, thereby the messenger supports in the push rod promotes the push rod tip and stretches out the installation section of thick bamboo, when the curtain board is pressed completely on the installing frame, the push rod tip stretches into the spliced eye this moment, can accomplish the installation of curtain board this moment and fix.
Optionally, the end of the insertion rod away from the pushing rod is arranged in a spherical shape, and the end of the insertion hole is arranged in a wide shape.
Through adopting above-mentioned technical scheme for during the plug rod can relax more inserts the spliced eye, thereby make the installation of curtain board fixed more smoothly.
Optionally, a guide groove extending along the thickness direction of the mounting frame is formed in the inner side wall of the mounting opening, a guide block is arranged on the pressing rod body corresponding to the guide groove, and the guide block is slidably clamped in the guide groove.
Through adopting above-mentioned technical scheme, when the plugboard promoted the depression bar and removed, the guide block fixed with the depression bar removed along the extending direction of guide way, and the guide way can lead and spacing the removal of depression bar this moment for support the push rod can be more stable support push rod's wedge face, make the grafting that the plugboard can be more smooth advance in the spliced eye.
Optionally, an elastic assembly for driving the insertion rod to be far away from the push rod and withdraw into the installation cylinder is arranged in the installation cylinder.
Through adopting above-mentioned technical scheme, when the curtain board is not installed fixedly, elastic component can make the insertion rod tip withdraw in the installation section of thick bamboo, makes insertion rod one end be located all the time and supports the removal route of push rod to make insertion rod can be more smooth support push away insertion rod, with this accomplish the grafting process of insertion rod and spliced eye.
Optionally, the elastic assembly comprises a mounting plate fixedly arranged on the insertion rod body and an elastic part sleeved on the insertion rod body, the mounting plate and the elastic part are both located in the mounting cylinder, one end of the elastic part is fixedly connected with the mounting plate, the other end of the elastic part is fixedly connected with the inner wall of the mounting cylinder, and the elastic part is in a compression state.
By adopting the technical scheme, the elastic piece can support and push the mounting plate, so that the mounting plate can push the end part of the insertion rod to move to the moving path of the support push rod, and the support push rod can smoothly support and push the insertion rod.
Optionally, a sealing cushion layer for keeping the sealing between the adjacent curtain wall plates is arranged on the periphery of each curtain wall plate.
Through adopting above-mentioned technical scheme, in the sealing cushion layer can reduce the rainwater entering installing frame to reduce the rainwater and to the corrosion of installing frame inner structure, make installing in the installing frame that the curtain board can be more firm.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the curtain wall board needs to be installed and fixed, the fixing mechanism can quickly fix the curtain wall board in the corresponding installation frame to realize the installation and the fixation of the curtain wall board, and in the process, the curtain wall board does not need to be fixed through screws, so that the phenomenon that the fixing parts such as the screws are exposed, aged and rusted is avoided, and the installation of the curtain wall board is more stable;
2. when the plug board pushes the pressure rod to move, the guide block fixed with the pressure rod moves along the extending direction of the guide groove, and the guide groove can guide and limit the movement of the pressure rod, so that the pushing rod can more stably push against the wedge-shaped surface of the plug rod, and the plug rod can be more smoothly plugged into the plug hole;
3. when the curtain board is not installed fixedly, the elastic component can enable the end part of the insertion rod to be retracted into the installation cylinder, so that one end of the insertion rod can be always located on a moving path of the pushing rod, the insertion rod can be smoothly pushed, and the insertion process of the insertion rod and the insertion hole is completed.
Drawings
Fig. 1 is a schematic overall structural diagram of an installation structure of a high-strength metal energy-saving curtain wall in an embodiment of the application.
Fig. 2 is a partial structural schematic view of the mounting structure of the high-strength metal energy-saving type curtain wall in fig. 1.
Fig. 3 is a schematic structural view of the curtain wall panel of fig. 1.
Fig. 4 is a partial structural schematic view of the mounting bracket of fig. 2.
Fig. 5 is an enlarged view at a in fig. 4.
Reference numerals: 1. a mounting frame; 11. installing a frame; 111. an installation port; 112. a guide groove; 2. a curtain wall plate; 21. a plugboard; 211. inserting grooves; 212. inserting holes; 22. sealing the cushion layer; 3. a fixing mechanism; 31. mounting the cylinder; 32. a plug rod; 33. a linkage assembly; 331. a pressure lever; 3311. a guide block; 332. pushing the push rod; 4. an elastic component; 41. mounting a plate; 42. an elastic member.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses mounting structure of energy-saving curtain wall of high strength metal.
Referring to fig. 1 and 2, a mounting structure of a high-strength metal energy-saving curtain wall includes a mounting frame 1 composed of a plurality of hollow mounting frames 11, curtain wall boards 2 correspondingly mounted in the mounting frames 11, and a plurality of sets of fixing mechanisms 3 arranged in the mounting frames 11 for fixing the curtain wall boards 2.
Referring to fig. 1, 2 and 3, the curtain wall plate 2 is made of high-strength metal, in this embodiment, the curtain wall plate 2 is made of an aluminum alloy material, the insertion plate 21 is fixed on the surface of the curtain wall plate 2, in this embodiment, the insertion plate 21 is fixed on the curtain wall plate 2 in an integrally connected manner, the insertion plate 21 is inserted into the inner frame of the installation frame 11, a sealing cushion 22 for keeping the sealing between the adjacent curtain wall plates 2 is arranged on the periphery of the curtain wall plate 2, each side edge of the insertion plate 21 is provided with an insertion groove 211 perpendicular to the surface of the curtain wall plate 2, one end of the insertion groove 211 extends to the end of the insertion plate 21 far away from the curtain wall plate 2, and the bottom wall of one end of the insertion groove 211 far away from the curtain wall plate 2 is provided with an insertion hole 212;
referring to fig. 3, fig. 4 and fig. 5, the fixing mechanism 3 includes an installation barrel 31 with one end fixedly installed on the inner wall of the installation frame 11, a plugging rod 32 slidably installed in the installation barrel 31 and a linkage component 33 for driving the plugging rod 32 to be plugged into the plugging hole 212, the installation barrel 31 is fixed by a bolt, a plugging port communicated with the end of the installation barrel 31 is provided on the inner side wall of the installation frame 11, the plugging port is communicated with the end of the installation barrel 31, and the end of the plugging rod 32 passes through the plugging port under the driving of the linkage component 33 and is plugged into the plugging hole 212.
Referring to fig. 5, the linkage assembly 33 includes a pressing rod 331 parallel to the insertion rod 32 and a pushing rod 332 perpendicular to the insertion rod 32, the inner side wall of the mounting frame 11 is extended along the thickness direction of the mounting frame 11 to form a mounting opening 111, the pressing rod 331 is movably disposed in the mounting opening 111, the pushing rod 332 is movably disposed in the mounting frame 11, one end of the pressing rod 331 penetrates through the mounting opening 111 and is fixedly connected with one end of the pushing rod 332, the end of the insertion rod 32 is wedge-shaped, and the end of the pushing rod 332 far away from the pressing rod 331 is matched with the wedge-shaped end of the insertion rod 32.
In order to keep the pressing rod 331 stable during the moving process, referring to fig. 5, a guide groove 112 extending along the thickness direction of the mounting frame 11 is formed on the inner side wall of the mounting opening 111, a guide block 3311 is provided on the rod body of the pressing rod 331 corresponding to the guide groove 112, and the guide block 3311 is slidably engaged in the guide groove 112.
When curtain board 2 is installed to needs, only need aim at the inside casing of installing frame 11 with curtain board 2, press curtain board 2, plugboard 21 joint this moment gets into the inner chamber of installing frame 11, in the in-process of pressing curtain board 2, depression bar 331 gets into in inserting groove 211, continue to press curtain board 2, make depression bar 331 and inserting groove 211's inner wall butt each other, plugboard 21 drives depression bar 331 and removes to the moving direction of curtain board 2 this moment, depression bar 331 drives and supports push rod 332 and remove, thereby make and support push rod 332 and promote in the installation section of thick bamboo 31 of pluging bar 32 tip, when curtain board 2 presses completely on installing frame 11, plugbar 32 tip stretches into in plughole 212 this moment, can accomplish the installation of curtain board 2 fixed this moment.
In order to insert the end of the inserting rod 32 into the inserting hole 212 more smoothly, referring to fig. 2 and 3, the end of the inserting rod 32 away from the pushing rod 332 is arranged in a spherical shape, the port of the inserting hole 212 is arranged in a wide-mouthed shape, when the inserting rod 32 is pressed against the wide-mouthed port of the inserting hole 212, the inserting rod 32 moves to the position of the inner cavity of the inserting hole 212 along the port of the inserting hole 212, and when the inserting rod 32 is aligned with the inner cavity of the inserting hole 212, the inserting rod 32 is inserted into the inserting hole 212, so that the limit fixation of the curtain wall board 2 is realized.
Further, referring to fig. 5, still be provided with in the installation section of thick bamboo 31 and be used for driving peg 32 to keep away from to support push rod 332 and withdraw elastic component 4 in the installation section of thick bamboo 31, elastic component 4 is including fixed mounting panel 41 that sets up on the peg 32 body of rod and establish the elastic component 42 on the peg 32 body of rod, mounting panel 41 and elastic component 42 all are located installation section of thick bamboo 31, and elastic component 42 one end and mounting panel 41 fixed connection, the other end and installation section of thick bamboo 31's inner wall fixed connection, elastic component 42 is in compression state.
The embodiment of the application provides a mounting structure of energy-saving curtain wall of high strength metal, and the implementation principle is as follows: when needs are installed fixedly to curtain board 2, press curtain board 2, plugboard 21 drives depression bar 331 and removes to the moving direction of curtain board 2, and depression bar 331 drives and supports push rod 332 and remove to in the messenger supports push rod 332 and promotes the plug rod 32 tip and stretch out installation section of thick bamboo 31, when curtain board 2 pressed completely on installing frame 11, plug rod 32 tip stretched into in the spliced eye 212 this moment, can accomplish the installation of curtain board 2 fixed this moment.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a mounting structure of energy-saving curtain of high strength metal which characterized in that: the curtain wall plate fixing device comprises a mounting frame (1) consisting of a plurality of hollow mounting frames (11), curtain wall plates (2) correspondingly mounted in the mounting frames (11) and a plurality of groups of fixing mechanisms (3) arranged in the mounting frames (11) and used for fixing the curtain wall plates (2).
2. The mounting structure of the high-strength metal energy-saving curtain wall as claimed in claim 1, wherein: an inserting plate (21) is fixed on the surface of the curtain wall plate (2), the inserting plate (21) is in inserting fit with the inner frame of the mounting frame (11), each side edge of the inserting plate (21) is provided with an inserting groove (211) perpendicular to the surface of the curtain wall plate (2), one end of each inserting groove (211) extends to the end part of one side, away from the curtain wall plate (2), of the inserting plate (21), and an inserting hole (212) is formed in the bottom wall of one end, away from the curtain wall plate (2), of each inserting groove (211);
the fixing mechanism (3) comprises an installation barrel (31) fixedly installed on the inner wall of the installation frame (11), an insertion rod (32) slidably installed in the installation barrel (31) and a linkage assembly (33) used for driving the insertion rod (32) to be inserted into the insertion hole (212), an insertion port communicated with the end portion of the installation barrel (31) is formed in the inner side wall of the installation frame (11), and the end portion of the insertion rod (32) penetrates through the insertion port and is inserted into the insertion hole (212) under the driving of the linkage assembly (33).
3. The mounting structure of the high-strength metal energy-saving curtain wall as claimed in claim 2, wherein: the linkage assembly (33) comprises a pressing rod (331) arranged in parallel to the plug-in rod (32) and a pushing rod (332) arranged perpendicular to the plug-in rod (32), the inner side wall of the installation frame (11) is provided with an installation opening (111) in an extending mode along the thickness direction of the installation frame (11), the pressing rod (331) is movably arranged in the installation opening (111), the pushing rod (332) is movably arranged in the installation frame (11), one end of the pressing rod (331) penetrates through the installation opening (111) and is fixedly connected with one end of the pushing rod (332), the end portion of the plug-in rod (32) is arranged in a wedge shape, and the end portion, far away from the pressing rod (331), of the pushing rod (332) is matched with the wedge-shaped end portion of the plug-in rod (32).
4. The mounting structure of the high-strength metal energy-saving curtain wall as claimed in claim 3, wherein: the end part of the insertion rod (32) far away from the pushing rod (332) is arranged in a spherical surface shape, and the end opening of the insertion hole (212) is arranged in a wide-mouth shape.
5. The mounting structure of the high-strength metal energy-saving curtain wall as claimed in claim 3, wherein: offer on the inside wall of installing port (111) along guide way (112) that installing frame (11) thickness direction extends, correspond on depression bar (331) the body of rod guide way (112) are provided with guide block (3311), guide block (3311) slip joint in guide way (112).
6. The mounting structure of the high-strength metal energy-saving curtain wall as claimed in claim 3, wherein: an elastic component (4) used for driving the insertion rod (32) to be far away from the pushing rod (332) and retracting into the installation cylinder (31) is arranged in the installation cylinder (31).
7. The mounting structure of the high-strength metal energy-saving curtain wall as claimed in claim 6, wherein: the elastic assembly (4) comprises a mounting plate (41) fixedly arranged on the rod body of the inserting rod (32) and an elastic piece (42) sleeved on the rod body of the inserting rod (32), the mounting plate (41) and the elastic piece (42) are both located in the mounting cylinder (31), one end of the elastic piece (42) is fixedly connected with the mounting plate (41), the other end of the elastic piece is fixedly connected with the inner wall of the mounting cylinder (31), and the elastic piece (42) is in a compression state.
8. The mounting structure of the high-strength metal energy-saving curtain wall as claimed in any one of claims 1 to 7, wherein: and a sealing cushion layer (22) used for keeping the sealing between the adjacent curtain wall plates (2) is arranged on the peripheral side of the curtain wall plates (2).
CN202222414057.9U 2022-09-08 2022-09-08 Mounting structure of energy-saving curtain wall of high strength metal Active CN218205129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222414057.9U CN218205129U (en) 2022-09-08 2022-09-08 Mounting structure of energy-saving curtain wall of high strength metal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222414057.9U CN218205129U (en) 2022-09-08 2022-09-08 Mounting structure of energy-saving curtain wall of high strength metal

Publications (1)

Publication Number Publication Date
CN218205129U true CN218205129U (en) 2023-01-03

Family

ID=84632466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222414057.9U Active CN218205129U (en) 2022-09-08 2022-09-08 Mounting structure of energy-saving curtain wall of high strength metal

Country Status (1)

Country Link
CN (1) CN218205129U (en)

Similar Documents

Publication Publication Date Title
CN210530021U (en) Steel construction assembled wallboard
CN218205129U (en) Mounting structure of energy-saving curtain wall of high strength metal
CN211281224U (en) Front and rear frame connecting mechanism convenient to mount
CN217871242U (en) Building curtain wall structure
CN215716550U (en) Evaporate and press aerated concrete block lintel structure
CN211143416U (en) Building curtain wall assembled coupling assembling
CN215577953U (en) Insulation board convenient to replace
CN216109230U (en) Curtain wall mounting and fixing device
CN219863791U (en) Panel installation location structure
CN220790401U (en) Conveniently spliced external wall heat insulation decorative plate
CN218574754U (en) Floating type adjustable stamping die structure
CN219158064U (en) Connection structure that fossil fragments wall was used
CN220156878U (en) Circuit board fastening structure and chassis
CN218933681U (en) Modular aluminum plate for building outer wall decoration
CN215897220U (en) Pre-plugging engineering junction box for building electrical installation
CN111997293B (en) Assembled veneer structure for interior decoration
CN220467259U (en) Elevator door pocket with rapid assembly modularized structure
CN220628791U (en) Plug-in type cable bridge
CN220247313U (en) Novel toughened glass building curtain wall
CN219411627U (en) Mounting structure of decorative wallboard
CN213174368U (en) Difficult not hard up building curtain connection structure
CN216803652U (en) Cutting machine with auxiliary cutting device
CN212381531U (en) Digital SDI network signal multiplexer
CN221442374U (en) On-spot equipment part in window frame bight
CN218071897U (en) High-frequency blind buried hole circuit board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 2, Yangguang 1st Road, Yangguang Avenue, Miaoshan Office, Jiangxia District, Wuhan City, Hubei Province 430200

Patentee after: Dingyuan Construction Group Co.,Ltd.

Country or region after: China

Address before: 430000, No.2, Yangguang 1st Road, Yangguang Avenue, Miaoshan office, Jiangxia District, Wuhan City, Hubei Province

Patentee before: China Construction Dingyuan Construction Engineering Co.,Ltd.

Country or region before: China