CN218176434U - Fireproof heat-insulation board for building external wall - Google Patents

Fireproof heat-insulation board for building external wall Download PDF

Info

Publication number
CN218176434U
CN218176434U CN202221927226.2U CN202221927226U CN218176434U CN 218176434 U CN218176434 U CN 218176434U CN 202221927226 U CN202221927226 U CN 202221927226U CN 218176434 U CN218176434 U CN 218176434U
Authority
CN
China
Prior art keywords
heated board
cooperation
board
cooperation installation
fossil fragments
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221927226.2U
Other languages
Chinese (zh)
Inventor
邹燕玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Qiang
Original Assignee
Zhongshan Qiangsheng Door Window And Curtain Wall Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Qiangsheng Door Window And Curtain Wall Decoration Engineering Co ltd filed Critical Zhongshan Qiangsheng Door Window And Curtain Wall Decoration Engineering Co ltd
Priority to CN202221927226.2U priority Critical patent/CN218176434U/en
Application granted granted Critical
Publication of CN218176434U publication Critical patent/CN218176434U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a building outer wall fire prevention heated board, include: the wall surface, when this device installs, through first recess, with first heated board and fossil fragments cooperation installation, through the second recess, with second heated board and first heated board cooperation installation, through first draw-in groove, with second heated board and fossil fragments cooperation installation, through third recess and second draw-in groove, with third heated board and first heated board cooperation installation, third heated board and second heated board cooperation installation, through fourth draw-in groove and lug, with two third heated boards on upper portion respectively with two third heated board cooperation installations of lower part, the pulling handle, make the fixture block remove, with the third heated board cooperation installation on fourth heated board and upper portion, loosen the handle, make fixture block and third draw-in groove cooperation installation, through the spring, make fixture block and third draw-in groove cooperation installation stable, and then make fourth heated board and third heated board cooperation installation stable, and easy operation, the installation of the heated board of being convenient for.

Description

Fireproof heat-insulation board for building exterior wall
Technical Field
The utility model relates to a building outer wall technical field specifically is a building outer wall fire prevention heated board.
Background
The heated board is with polystyrene resin as the raw materials including other raw and auxiliary materials with gather the thing, pour into the catalyst simultaneously through the heating mixture, then extrusion molding extrusion shaping and the stereoplasm foamed plastic board of making, have dampproofing, waterproof performance, can make and reduce building exterior envelope thickness, thereby increase indoor usable floor area, current building external wall heated board when the installation, every heated board all fixes through the bolt, need the cost for a long time, the installation of the heated board of being not convenient for.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building outer wall fire prevention heated board to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building outer wall fire prevention heated board, includes the wall, the fixed surface of wall is connected with fossil fragments, first heated board and second heated board are installed to the surface fit of fossil fragments, and first heated board and the cooperation installation of second heated board, the third heated board is installed to the surface symmetry cooperation of fossil fragments, and the cooperation installation of third heated board between two liang, third heated board and the cooperation installation of first heated board, third heated board and the cooperation installation of second heated board, the fourth heated board is installed in the surface symmetry cooperation of fossil fragments, fourth heated board and the cooperation installation of third heated board, the fixed surface of fossil fragments is connected with fixed establishment, two the fourth heated board all with the fixed establishment cooperation installation.
Preferably, fixed establishment includes connecting rod, fixed block, spring, connecting plate, handle and fixture block, the surperficial symmetry fixedly connected with connecting rod of fossil fragments, the one end fixedly connected with fixed block of fossil fragments is kept away from to the connecting rod, the fixed block is close to the surperficial fixedly connected with spring of fossil fragments, two the one end fixedly connected with connecting plate of fixed block is kept away from to the spring, the surface fixedly connected with handle that the connecting plate is close to the fixed block, the surface symmetry fixedly connected with fixture block of handle, two are kept away from to the connecting plate the fixture block all with fossil fragments sliding connection, the fixture block cooperates the installation with the fourth heated board, stimulates the handle, and the connecting plate removes, drives the fixture block and removes, loosens the handle with the third heated board cooperation installation on fourth heated board and upper portion, and the connecting plate removes, makes fixture block and third draw-in groove cooperation installation, and then, and the effort that the spring was compressed to be produced acts on the surface of connecting plate makes fixture block and third draw-in groove cooperation installation stable, and then makes fourth heated board and third heated board cooperation installation stable.
Preferably, first recess has been seted up on the surface of first heated board, first recess and fossil fragments cooperation installation, the second recess has been seted up on the surface of first heated board, second recess and the cooperation installation of second heated board, the third recess has been seted up on the surface of first heated board, the cooperation installation of third recess and third heated board, through first recess, the first heated board of being convenient for is installed with fossil fragments cooperation, through the second recess, the second heated board of being convenient for and first heated board, through the third recess, the cooperation installation of the third heated board of being convenient for and first heated board.
Preferably, the surface card of second heated board is equipped with first draw-in groove, first draw-in groove and fossil fragments cooperation installation, the surface card of second heated board is equipped with the second draw-in groove, the cooperation installation of second draw-in groove and third heated board, through first draw-in groove, the second heated board of being convenient for and fossil fragments cooperation installation, through the second draw-in groove, the second heated board of being convenient for and the cooperation installation of third heated board.
Preferably, a third clamping groove is formed in the surface of the fourth insulation board, the third clamping groove is installed in a matched mode with the clamping block, and the fourth insulation board 6 is prevented from moving through the installation of the third clamping groove in a matched mode with the clamping block.
Preferably, the surface of the third insulation board is provided with a fourth clamping groove, wherein the surface of the third insulation board is fixedly connected with a convex block, the fourth clamping groove is matched with the convex block, and the two third insulation boards on the upper portion are matched with the two third insulation boards on the lower portion respectively through the fourth clamping groove and the convex block.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses during the installation, through first recess, with first heated board and fossil fragments cooperation installation, through the second recess, from the top with second heated board and first heated board cooperation installation, through first draw-in groove, from the top with second heated board and fossil fragments cooperation installation, through third recess and second draw-in groove, from the top with third heated board and first heated board cooperation installation, third heated board and second heated board cooperation installation, through fourth draw-in groove and lug, from the top with two third heated boards cooperation installations on upper portion respectively with two third heated boards of lower part, the pulling handle, the connecting plate removes, drive the fixture block and remove, with the third heated board cooperation installation on fourth heated board and upper portion, loosen the handle, the connecting plate removes, drive the fixture block and remove, make fixture block and third draw-in groove cooperation installation, this moment, the effort that the spring was compressed to produce acts on the surface of connecting plate, make fixture block and third draw-in groove cooperation installation stable, and then make fourth heated board and third heated board cooperation installation stable, and easy operation, be convenient for the installation.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of the keel structure of the present invention;
FIG. 3 is a schematic view of the fixing mechanism of the present invention;
fig. 4 is a schematic structural view of a first heat-insulating plate of the present invention;
FIG. 5 is a schematic view of a second thermal insulation plate structure of the present invention;
fig. 6 is a schematic view of the structure of the third lower thermal insulation plate of the present invention;
fig. 7 is a schematic diagram of the structure of the third upper thermal insulation plate of the present invention;
fig. 8 is a schematic diagram of a fourth thermal insulation plate structure of the present invention.
In the figure: 1. a wall surface; 2. a keel; 3. a first heat-insulating plate; 4. a second insulation board; 5. a third insulation board; 6. a fourth insulation board; 7. a fixing mechanism; 8. a connecting rod; 9. a fixed block; 10. a spring; 11. a connecting plate; 12. a handle; 13. a clamping block; 14. a first groove; 15. a second groove; 16. a third groove; 17. a first card slot; 18. a second card slot; 19. a third card slot; 20. a fourth card slot; 21. and (6) a bump.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: the utility model provides a building outer wall fire prevention heated board, includes wall 1, the fixed surface of wall 1 is connected with fossil fragments 2, first heated board 3 and second heated board 4 are installed to the surface fit of fossil fragments 2, and first heated board 3 and the cooperation installation of second heated board 4, third heated board 5 is installed in the surface symmetry cooperation of fossil fragments 2, and the cooperation installation between 5 two liang of third heated board, third heated board 5 and the cooperation installation of first heated board 3, third heated board 5 and the cooperation installation of second heated board 4, fourth heated board 6 is installed in the surface symmetry cooperation of fossil fragments 2, fourth heated board 6 and the cooperation installation of third heated board 5, the fixed surface of fossil fragments 2 is connected with fixed establishment 7, two fourth heated board 6 all cooperates the installation with fixed establishment 7, first heated board 3, second heated board 4, third heated board 5 and fourth heated board 6 all are through mortar binder and wall cooperation installation.
Referring to fig. 1, 2 and 3, the fixing mechanism 7 includes a connecting rod 8, a fixing block 9, a spring 10, a connecting plate 11, a handle 12 and a fixture block 13, the connecting rod 8 is fixedly connected to the surface of the keel 2, the fixing block 9 is fixedly connected to one end of the connecting rod 8 away from the keel 2, the spring 10 is fixedly connected to the surface of the fixing block 9 close to the keel 2, the connecting plate 11 is fixedly connected to one end of the spring 10 away from the fixing block 9, the handle 12 is fixedly connected to the surface of the connecting plate 11 close to the fixing block 9, the fixture block 13 is fixedly connected to the surface of the connecting plate 11 close to the handle 12, the connecting plate 11 is slidably connected to the keel 2, the fixture block 13 is installed in cooperation with the fourth insulation board 6, the handle 12 is pulled, the connecting plate 11 is moved to drive the fixture block 13 to move in cooperation with the third insulation board 5 on the upper portion, the handle 12 is loosened, the connecting plate 11 moves to drive the fixture block 13 to move, and the fixture block 13 to cooperate with the third insulation board 19, and the third insulation board 5 to stably install the third insulation board.
Referring to fig. 1 and 4, a first groove 14 is formed in the surface of the first heat insulation plate 3, the first groove 14 is installed in cooperation with the keel 2, a second groove 15 is formed in the surface of the first heat insulation plate 3, the second groove 15 is installed in cooperation with the second heat insulation plate 4, a third groove 16 is formed in the surface of the first heat insulation plate 3, the third groove 16 is installed in cooperation with the third heat insulation plate 5, the first heat insulation plate 3 and the keel 2 are conveniently installed in cooperation through the first groove 14, the second groove 15 is convenient for the second heat insulation plate 4 and the first heat insulation plate 3, and the third groove 16 is convenient for the third heat insulation plate 5 and the first heat insulation plate 3 to be installed in cooperation.
Referring to fig. 1 and 5, a first clamping groove 17 is clamped on the surface of the second insulation board 4, the first clamping groove 17 is installed in cooperation with the keel 2, a second clamping groove 18 is clamped on the surface of the second insulation board 4, the second clamping groove 18 is installed in cooperation with the third insulation board 5, the second insulation board 4 and the keel 2 are installed in cooperation through the first clamping groove 17, and the second insulation board 4 and the third insulation board 5 are installed in cooperation through the second clamping groove 18.
Referring to fig. 1, 3 and 8, a third slot 19 is formed on the surface of the fourth insulation board 6, the third slot 19 is installed in cooperation with the fixture block 13, and the fourth insulation board 6 is prevented from moving by the installation of the third slot 19 in cooperation with the fixture block 13.
Referring to fig. 1, 6 and 7, fourth locking grooves 20 are clamped on the surfaces of the two third insulation boards 5, wherein the surfaces of the two third insulation boards 5 are fixedly connected with bumps 21, the fourth locking grooves 20 are installed in cooperation with the bumps 21, and the two upper third insulation boards 5 are respectively installed in cooperation with the two lower third insulation boards 5 through the fourth locking grooves 20 and the bumps 21.
The working principle is as follows: during installation, through first recess 14, install first heated board 3 and fossil fragments 2 cooperation, through second recess 15, install second heated board 4 and first heated board 3 cooperation from the top, through first draw-in groove 17, install second heated board 4 and fossil fragments 2 cooperation from the top, through third recess 16 and second draw-in groove 18, install third heated board 5 and first heated board 3 cooperation from the top, third heated board 5 and second heated board 4 cooperation are installed, through fourth draw-in groove 20 and lug 21, install two third heated boards 5 on upper portion respectively with two third heated boards 5 cooperations of lower part from the top, pulling handle 12, connecting plate 11 removes, drive fixture block 13 and remove, install fourth heated board 6 and third heated board 5 cooperation on upper portion, loosen handle 12, connecting plate 11 removes, drive fixture block 13 and remove, make fixture block 13 and third draw-in groove 19 cooperation installation, at this moment, the effort that spring 10 was compressed and produced acts on the surface of fixture block 11, make fixture block 13 and third draw-in groove 19 cooperation installation stable, and then make fourth heated board 5 cooperation installation stable connection plate 6 and third draw-in combination.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building outer wall fire prevention heated board, includes wall (1), its characterized in that: the fixed surface of wall (1) is connected with fossil fragments (2), first heated board (3) and second heated board (4) are installed in the surface fit of fossil fragments (2), and first heated board (3) and second heated board (4) cooperation installation, third heated board (5) are installed in the surface symmetry cooperation of fossil fragments (2), and third heated board (5) cooperation installation between two liang, third heated board (5) and first heated board (3) cooperation installation, third heated board (5) and second heated board (4) cooperation installation, fourth heated board (6) are installed in the surface symmetry cooperation of fossil fragments (2), fourth heated board (6) and third heated board (5) cooperation installation, the fixed surface of fossil fragments (2) is connected with fixed establishment (7), two fourth heated board (6) all install with fixed establishment (7) cooperation.
2. The fireproof and heat-insulation board for the exterior wall of the building as claimed in claim 1, wherein: fixing mechanism (7) are including connecting rod (8), fixed block (9), spring (10), connecting plate (11), handle (12) and fixture block (13), the symmetry of surface fixedly connected with connecting rod (8) of fossil fragments (2), the one end fixedly connected with fixed block (9) of fossil fragments (2) are kept away from in connecting rod (8), fixed block (9) are close to the fixed surface fixedly connected with spring (10) of fossil fragments (2), two the one end fixedly connected with connecting plate (11) of fixed block (9) are kept away from in spring (10), the fixed surface fixedly connected with handle (12) of fixed block (9) are close to in connecting plate (11), the symmetry of surface fixedly connected with fixture block (13) of handle (12), two fixture block (13) all with fossil fragments (2) sliding connection, fixture block (13) and fourth heated board (6) cooperation installation.
3. The fireproof and heat-insulation board for the exterior wall of the building as claimed in claim 1, wherein: first recess (14) have been seted up on the surface of first heated board (3), first recess (14) and fossil fragments (2) cooperation installation, second recess (15) have been seted up on the surface of first heated board (3), second recess (15) and second heated board (4) cooperation installation, third recess (16) have been seted up on the surface of first heated board (3), third recess (16) and third heated board (5) cooperation installation.
4. The fireproof heat-insulation board for the exterior wall of the building as claimed in claim 1, wherein: the surface card of second heated board (4) is equipped with first draw-in groove (17), first draw-in groove (17) and fossil fragments (2) cooperation installation, the surface card of second heated board (4) is equipped with second draw-in groove (18), second draw-in groove (18) and third heated board (5) cooperation installation.
5. The fireproof and heat-insulation board for the exterior wall of the building as claimed in claim 2, wherein: and a third clamping groove (19) is formed in the surface of the fourth heat-insulation plate (6), and the third clamping groove (19) is matched with the clamping block (13) for installation.
6. The fireproof heat-insulation board for the exterior wall of the building as claimed in claim 1, wherein: the surface of the two third insulation boards (5) is provided with a fourth clamping groove (20) in a clamped mode, the surface of the two third insulation boards (5) is fixedly connected with a convex block (21), and the fourth clamping groove (20) is installed in a matched mode with the convex block (21).
CN202221927226.2U 2022-07-25 2022-07-25 Fireproof heat-insulation board for building external wall Active CN218176434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221927226.2U CN218176434U (en) 2022-07-25 2022-07-25 Fireproof heat-insulation board for building external wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221927226.2U CN218176434U (en) 2022-07-25 2022-07-25 Fireproof heat-insulation board for building external wall

Publications (1)

Publication Number Publication Date
CN218176434U true CN218176434U (en) 2022-12-30

Family

ID=84614532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221927226.2U Active CN218176434U (en) 2022-07-25 2022-07-25 Fireproof heat-insulation board for building external wall

Country Status (1)

Country Link
CN (1) CN218176434U (en)

Similar Documents

Publication Publication Date Title
JP6587332B1 (en) Wall decoration heat insulation integrated mechanism and wall decoration heat insulation device
CN218176434U (en) Fireproof heat-insulation board for building external wall
CN103216066A (en) Ceramic tile thermal-insulation decoration composite board as well as manufacture method and installation method thereof
CN204163220U (en) A kind of compound insulating board
CN113696594B (en) Equipment for laying aluminum foil for curved groove heat-insulation board
CN212405519U (en) Novel installation mechanism of thermal-insulated heat preservation building energy-saving wallboard
CN211923063U (en) External wall insulation board and installation structure thereof
CN215631029U (en) Color steel sandwich panel convenient to install
CN213296837U (en) Prefabricated roof and wall body assembly system
CN218061157U (en) Building energy-saving external wall heat-insulation decorative plate structure
CN220827924U (en) Heat-insulating sound-insulating outer wall
CN202644857U (en) Reinforced profiling metal plate rib top clamp
CN217782418U (en) Building energy conservation and structure integrated external wall self-insulation template
CN107201816B (en) Hanging plate, hanging piece, mounting node of hanging plate and preparation method of hanging plate
CN211447858U (en) Building site is with fixed PC wallboard ware
CN219909421U (en) Assembled steel construction house outer wall hanging sandwich insulation board
CN220377638U (en) Sanding powder aerated concrete block
CN214497921U (en) High strength loss prevention formula combination heat preservation wallboard for building
CN216664554U (en) Combined splicing and connecting mechanism for heat-insulating wallboards
CN213359232U (en) Mounting structure of assembled composite wall panel
CN219992766U (en) Wall insulation board mounting structure
CN217000253U (en) Steel wire mesh frame composite external wall insulation board
CN215442678U (en) Assembled energy-conserving wallboard floor
CN214246414U (en) Heat preservation and decoration integrated board installation pendant
CN213509098U (en) Stone curtain wall with good heat preservation effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240308

Address after: Room 3303, Building 19, Health Flower City, No. 30 Kangle Avenue, Torch Development Zone, Zhongshan City, Guangdong Province, 528437

Patentee after: Chen Qiang

Country or region after: China

Address before: Room 303, Floor 3, Building 3, No. 41, Jiangling West Road, Torch Development Zone, Zhongshan, Guangdong 528400

Patentee before: Zhongshan Qiangsheng Door, Window and Curtain Wall Decoration Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right