CN218175603U - Template fixed connection device that arched bridge concrete placement used - Google Patents

Template fixed connection device that arched bridge concrete placement used Download PDF

Info

Publication number
CN218175603U
CN218175603U CN202222152020.3U CN202222152020U CN218175603U CN 218175603 U CN218175603 U CN 218175603U CN 202222152020 U CN202222152020 U CN 202222152020U CN 218175603 U CN218175603 U CN 218175603U
Authority
CN
China
Prior art keywords
mounting panel
connecting plate
piece
fixed connection
cup jointed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222152020.3U
Other languages
Chinese (zh)
Inventor
苏宁宁
董玉玲
刘源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Highway Maintenance Engineering Co ltd
Shandong Luda Regeneration Technology Co ltd
Binzhou Changtongda Highway Engineering Co ltd
Original Assignee
Binzhou Highway Maintenance Engineering Co ltd
Shandong Luda Regeneration Technology Co ltd
Binzhou Changtongda Highway Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou Highway Maintenance Engineering Co ltd, Shandong Luda Regeneration Technology Co ltd, Binzhou Changtongda Highway Engineering Co ltd filed Critical Binzhou Highway Maintenance Engineering Co ltd
Priority to CN202222152020.3U priority Critical patent/CN218175603U/en
Application granted granted Critical
Publication of CN218175603U publication Critical patent/CN218175603U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of the construction, and a template fixed connection device that arched bridge concrete placement used is disclosed, including the mounting panel, the connecting rod has been cup jointed in the activity of the left inner wall of mounting panel, the equal fixed mounting in mounting panel top and bottom has the installation piece. The utility model discloses a set up the connecting rod, gear and tooth piece, when the rotatory piece that revolves of operating personnel, will drive tooth piece through the screw rod and remove, and then will remove the joint to the gear through tooth piece, the connecting plate rotates simultaneously, make drive connecting rod and two gears take place to rotate, make it is rotatory to suitable angle, the rotatory piece that revolves this moment, make and drive threaded rod and tooth piece and reset, and carry out the joint again to the gear, thereby be convenient for operating personnel adjusts the angle between mounting panel and the connecting plate, make the operating personnel template of being convenient for carry out fixed connection, the use of giving operating personnel has brought the facility.

Description

Template fixed connection device that arched bridge concrete placement used
Technical Field
The utility model belongs to the technical field of the construction, specifically a template fixed connection device that arched bridge concrete pouring used.
Background
The arch bridge refers to a bridge with an arch as a main bearing component of the structure in a vertical plane, vertical load is transmitted to an arch center through a bent arch, and the arch bridge is not used for landscaping at first but meets the aims of flood discharge and underbridge navigation in engineering.
At present, operating personnel is when carrying out concrete placement to the arch bridge, make need carry out fixed connection to the template, thereby need use fixed connection device, and fixed connection device among the prior art is at the in-process of in-service use, although can realize basic connection fixed effect, but it is connecting two templates that can only be to same angle, make the template that can't be applicable to different angle installations, make its fixed connection device that can only change different angles, thereby be unfavorable for operating personnel's fixed use, and the connection efficiency of influence power template, consequently, need improve it.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above problem, the utility model provides a template fixed connection device that arch bridge concrete placement used has the advantage that different angles are connected.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a template fixed connection device that arched bridge concrete placement used, includes the mounting panel, the connecting rod has been cup jointed in the activity of the left inner wall of mounting panel, the equal fixed mounting in mounting panel top and bottom has the installation piece, the top and the bottom of connecting rod all extend to the inner chamber and the fixed cover of installation piece have connect the gear, the fixed surface cover of connecting rod has connect the connecting plate, the surface of connecting plate and the surface swing joint of mounting panel, the right side swing joint of installation piece has the piece soon, the left side fixedly connected with threaded rod of the piece soon, the left side of threaded rod runs through the installation piece and extends to the inner chamber and the activity of installation piece and has cup jointed tooth piece, the surface of threaded rod cup joints with the inner wall screw thread of installation piece, the surface of tooth piece cup joints with the inner wall activity of installation piece, the left side of tooth piece is connected with the surface meshing of gear, the equal swing joint in inner wall of mounting panel and connecting plate has the template body.
As the utility model discloses it is preferred, the inside of mounting panel and connecting plate is all seted up flutedly, the inside fixed mounting of recess has the installation pole, the surface activity of installation pole has cup jointed the connecting block, the surface of connecting block cup joints with the inner wall activity of recess.
As the utility model discloses it is preferred, the positive fixed mounting of connecting block has the cardboard, the quantity of cardboard is two, two the surface of cardboard respectively with the surface swing joint of mounting panel and connecting plate.
As the utility model discloses preferred, two the positive equal screw thread in upper and lower place of cardboard has cup jointed bolt one, the quantity of bolt one is four, four bolt one uses two to run through cardboard, mounting panel and connecting plate respectively and extend to inside mounting panel and the connecting plate for a set of.
As the utility model discloses preferred, two the equal screw thread in front of cardboard has cup jointed bolt two, the quantity of bolt two is four, four bolt two uses two to run through cardboard, template body, mounting panel and connecting plate respectively and extend to the inside of mounting panel and connecting plate for a set of back.
As the utility model discloses preferred, the quantity of gear and tooth piece is two, two the size of gear and tooth piece is the samely respectively.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the connecting rod, gear and tooth piece, when the rotatory piece that revolves of operating personnel, will drive tooth piece through the screw rod and remove, and then will remove the joint to the gear through tooth piece, the connecting plate rotates simultaneously, make drive connecting rod and two gears take place to rotate, make it is rotatory to suitable angle, the rotatory piece that revolves this moment, make and drive threaded rod and tooth piece and reset, and carry out the joint again to the gear, thereby be convenient for operating personnel adjusts the angle between mounting panel and the connecting plate, make the operating personnel template of being convenient for carry out fixed connection, the use of giving operating personnel has brought the facility.
2. The utility model discloses a set up the installation pole, connecting block and cardboard, when operating personnel rotating bolt is one time, will make bolt one follow the mounting panel, the connecting plate is inside to be shifted out, make it remove the fixed of two cardboards, and then stimulate the cardboard downwards, make and drive the connecting block through the cardboard and move down on the installation pole surface, will remove the blockking to mounting panel and connecting plate simultaneously, thereby be convenient for operating personnel to clear up the concrete of mounting panel and connecting plate inner wall, make it has the concrete to prevent follow-up mounting panel and connecting plate inner wall bonding when using, the use of giving operating personnel has brought the facility.
Drawings
Fig. 1 is a schematic perspective view of an embodiment of a formwork fixing and connecting device for arch bridge concrete pouring according to the present invention;
FIG. 2 is a schematic sectional elevational view of the formwork attachment system for pouring concrete into the arch bridge of FIG. 1;
FIG. 3 is a schematic structural view of the movable block of the formwork fixed connection device for concrete pouring of the arch bridge of FIG. 1;
FIG. 4 is a side elevational view of the formwork attachment system for pouring concrete into the arch bridge of FIG. 1;
fig. 5 is a partially enlarged structural view of a portion a in fig. 2.
In the figure: 1. mounting a plate; 2. a connecting rod; 3. a connecting plate; 4. mounting a block; 5. a gear; 6. rotating the block; 7. a threaded rod; 8. a tooth block; 9. a groove; 10. mounting a rod; 11. connecting blocks; 12. clamping a plate; 13. a first bolt; 14. a second bolt; 15. the template body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
As shown in fig. 1 to 5, the utility model provides a template fixed connection device that arched bridge concrete pouring used, including mounting panel 1, connecting rod 2 has been cup jointed in the activity of the left inner wall of mounting panel 1, the equal fixed mounting in mounting panel 1 top and bottom has installation piece 4, the top and the bottom of connecting rod 2 all extend to the inner chamber of installation piece 4 and fixed the cup joint has gear 5, the outer fixed surface of connecting rod 2 has cup jointed connecting plate 3, the surface of connecting plate 3 and the outer surface swing joint of mounting panel 1, the right side swing joint of installation piece 4 has revolves piece 6, the left side fixedly connected with threaded rod 7 of revolved piece 6, the left side of threaded rod 7 is run through installation piece 4 and is extended to the inner chamber and the activity of installation piece 4 and has been cup jointed tooth piece 8, the surface of threaded rod 7 cup joints with the inner wall screw thread of installation piece 4, the surface of tooth piece 8 cup joints with the inner wall activity of installation piece 4, the left side of tooth piece 8 is connected with the surface meshing of gear 5, the equal swing joint of inner wall of mounting panel 1 and connecting plate 3 has template body 15.
When the rotatory piece 6 that revolves of operating personnel, will drive threaded rod 7 and tooth piece 8 through revolving piece 6 and remove, and then will remove the joint to gear 5, swivelling joint board 3 is whole simultaneously, make to drive connecting rod 2 and gear 5 and take place rotatoryly, make rotatory to suitable position, and rotatory piece 6 that revolves this moment, make to drive threaded rod 7 and tooth piece 8 and reset, make it carry out the joint again to gear 5, thereby be convenient for operating personnel adjusts the angle of mounting panel 1 and connecting plate 3, make the operating personnel template of being convenient for carry out fixed connection, the use of giving operating personnel has brought the facility.
Referring to fig. 3, grooves 9 are formed in the mounting plate 1 and the connecting plate 3, a mounting rod 10 is fixedly mounted in the groove 9, a connecting block 11 is movably sleeved on the outer surface of the mounting rod 10, and the outer surface of the connecting block 11 is movably sleeved on the inner wall of the groove 9.
As a technical optimization scheme of the utility model, when removing through connecting block 11, will make connecting block 11 remove on the surface of installation pole 10, and then because the design of installation pole 10, will have good spacing modification when making connecting block 11 remove, make it prevent to take place the skew.
Referring to fig. 1, two clamping plates 12 are fixedly mounted on the front surface of the connecting block 11, and the outer surfaces of the two clamping plates 12 are movably connected with the outer surfaces of the mounting plate 1 and the connecting plate 3, respectively.
As a technical optimization scheme of the utility model, through the design of two cardboard 12, the operating personnel that will be convenient for blocks template body 15 for the operating personnel of being convenient for carries out fixed connection to template body 15.
Referring to fig. 1, bolts one 13 are sleeved on the upper and lower sides of the front surfaces of the two clamping plates 12 in a threaded manner, the number of the bolts one 13 is four, and the four bolts one 13 use two as a group to respectively penetrate through the clamping plates 12, the mounting plate 1 and the connecting plate 3 and extend to the insides of the mounting plate 1 and the connecting plate 3.
As a technical optimization scheme of the utility model, when 13 through four rotatory bolts of operating personnel, will make four bolts 13 shift out from mounting panel 1 and connecting plate 3 are inside respectively, make it relieve the fixed to two cardboards 12, and then stimulate cardboard 12 downwards for drive connecting block 11 downstream on the surface of installation pole 10, thereby be convenient for operating personnel clears up the concrete of mounting panel 1 and 3 inner walls of connecting plate, make the subsequent use of being convenient for.
Referring to fig. 1, the front surfaces of the two clamping plates 12 are respectively sleeved with two bolts 14 in a threaded manner, the number of the two bolts 14 is four, and the back surfaces of the two bolts 14, which are two in one group, respectively penetrate through the clamping plates 12, the template body 15, the mounting plate 1 and the connecting plate 3 and extend to the insides of the mounting plate 1 and the connecting plate 3.
As the utility model discloses a technical optimization scheme, when rotating bolt two 14 through operating personnel, will make bolt two 14 shift out from mounting panel 1, connecting plate 3 and template body 15 are inside, and then will remove the fixed to template body 15 for be convenient for dismantle template body 15.
Referring to fig. 2, the number of the gear 5 and the tooth block 8 is two, and the sizes of the two gear 5 and the tooth block 8 are the same.
As a technical optimization scheme of the utility model, through two gears 5 and two tooth piece 8's design, will make to have good joint effect when fixing connecting rod 2 for prevent to take place the position activity.
The utility model discloses a theory of operation and use flow:
first, when the operator is mounting the formwork body 15, the formwork body 15 is mounted inside the mounting plate 1 and the connecting plate 3 at this time, so that the formwork body 15 is fixed by the second bolt 14.
Then, when operating personnel is installing template body 15 to different angles, rotatory piece 6 of revolving this moment, will drive threaded rod 7 through revolving piece 6 and shift out from installation piece 4 is inside, and then drive tooth piece 8 and remove right, make the joint of removing gear 5, then rotatory connecting plate 3 is whole, it is rotatory to make to drive connecting rod 2 and gear 5 through connecting plate 3 and take place, make rotatory to suitable position, and rotatory piece 6 of revolving, make to drive threaded rod 7 and tooth piece 8 and reset, carry out the joint again through tooth piece 8 to gear 5 afterwards, thereby be convenient for operating personnel adjusts the angular position of mounting panel 1 and connecting plate 3, make the operating personnel of being convenient for install template body 15, the use of giving operating personnel has brought the facility.
Subsequently, when the operator is dismantling the fixed connection device, the first bolt 13 is rotated at the moment, the first bolt 13 is moved out from the inside of the mounting plate 1 and the connecting plate 3, the fixing of the two clamping plates 12 is released, the clamping plates 12 are pulled downwards at the same time, the connecting block 11 is driven to move downwards on the outer surface of the mounting rod 10, and further due to the design of the mounting rod 10, the connecting block 11 is enabled to have good limiting modification when moving, the position deviation is prevented from occurring, the blocking of the mounting plate 1 and the connecting plate 3 is enabled to be contacted, the inner walls of the mounting plate 1 and the connecting plate 3 are convenient to clean by the operator, concrete is adhered when the subsequent use is prevented, and convenience is brought to the operator.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a template fixed connection device that arched bridge concrete placement used, includes mounting panel (1), its characterized in that: connecting rod (2) has been cup jointed in the activity of the left inner wall of mounting panel (1), mounting panel (1) top and the equal fixed mounting in bottom have installation piece (4), the top and the bottom of connecting rod (2) all extend to the inner chamber and the fixed cover of installation piece (4) have connect gear (5), the external fixed surface of connecting rod (2) has cup jointed connecting plate (3), the surface of connecting plate (3) and the surface swing joint of mounting panel (1), the right side swing joint of installation piece (4) has revolves piece (6), revolve the left side fixedly connected with threaded rod (7) of piece (6), the left side of threaded rod (7) runs through installation piece (4) and extends to the inner chamber and the activity of installation piece (4) and has cup jointed tooth piece (8), the surface of threaded rod (7) cup joints with the inner wall screw thread of installation piece (4), the surface of tooth piece (8) cup joints the activity with the inner wall of installation piece (4), the left side of tooth piece (8) is connected with the surface meshing of gear (5), the equal movable connection of inner wall of mounting panel (1) and the connecting plate (3) is connected with movable mould board (15).
2. The formwork fixing and connecting device for arch bridge concrete pouring according to claim 1, characterized in that: mounting panel (1) and connecting plate (3) inside all seted up recess (9), the inside fixed mounting of recess (9) has installation pole (10), connecting block (11) have been cup jointed in the surface activity of installation pole (10), the surface of connecting block (11) is cup jointed with the inner wall activity of recess (9).
3. The formwork fixed connection device for arch bridge concrete pouring according to claim 2, characterized in that: the front surface of the connecting block (11) is fixedly provided with two clamping plates (12), and the outer surfaces of the two clamping plates (12) are movably connected with the outer surfaces of the mounting plate (1) and the connecting plate (3) respectively.
4. A form fixing and connecting device for arch bridge concrete pouring according to claim 3, characterized in that: two equal screw thread of the upper and lower side in cardboard (12) front has cup jointed bolt (13), the quantity of bolt (13) is four, four bolt (13) use two to run through cardboard (12), mounting panel (1) and connecting plate (3) respectively and extend to inside mounting panel (1) and connecting plate (3) for a set of.
5. The formwork fixed connection device for arch bridge concrete pouring according to claim 3, characterized in that: two equal screw thread of front of cardboard (12) has cup jointed bolt two (14), the quantity of bolt two (14) is four, four bolt two (14) use two to run through cardboard (12), template body (15), mounting panel (1) and connecting plate (3) and extend to the inside of mounting panel (1) and connecting plate (3) respectively as a set of back.
6. The formwork fixed connection device for arch bridge concrete pouring according to claim 1, characterized in that: the number of the gears (5) and the tooth blocks (8) is two, and the sizes of the gears (5) and the tooth blocks (8) are respectively the same.
CN202222152020.3U 2022-08-16 2022-08-16 Template fixed connection device that arched bridge concrete placement used Active CN218175603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222152020.3U CN218175603U (en) 2022-08-16 2022-08-16 Template fixed connection device that arched bridge concrete placement used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222152020.3U CN218175603U (en) 2022-08-16 2022-08-16 Template fixed connection device that arched bridge concrete placement used

Publications (1)

Publication Number Publication Date
CN218175603U true CN218175603U (en) 2022-12-30

Family

ID=84619471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222152020.3U Active CN218175603U (en) 2022-08-16 2022-08-16 Template fixed connection device that arched bridge concrete placement used

Country Status (1)

Country Link
CN (1) CN218175603U (en)

Similar Documents

Publication Publication Date Title
CN207453412U (en) A kind of semi-automatic wall flush coater rack
CN107931097B (en) Sand screening equipment with swing function for building construction
CN206987422U (en) A kind of filling device of filling concrete base contraction-free grouting concrete
CN107201823A (en) A kind of building wall is with exempting from type plastering machine of plastering
CN210888074U (en) Building engineering pours template connecting device convenient to carry out dismouting
CN218175603U (en) Template fixed connection device that arched bridge concrete placement used
CN109184744A (en) Plate device and its construction method for narrow space
CN209885304U (en) Archimedes spiral sludge scraper for sludge collection
CN211313119U (en) Green integrated solar roof
CN217205166U (en) Positioning scaffold for attaching building engineering wall
CN214972657U (en) Rare metal processing workshop environmental protection dust collecting equipment
CN211341631U (en) Leveling and plastering device for building decoration
CN211523331U (en) A silt pipeline transport desilting equipment for hydraulic and hydroelectric engineering
CN209614466U (en) Five linkage ring gear process equipments of one kind fix device with raw material
CN208699941U (en) A kind of steel pipe bundle automatic turn-over body mechanism
CN209040062U (en) A kind of drainage arrangement for hydraulic engineering
CN209453840U (en) A kind of anticlogging aerated bricks casting device
CN208858171U (en) A kind of novel combination tool of quickly building a wall
CN215100809U (en) High-efficient dust arrester installation of environment-friendly material jar for plaster production
CN111749483A (en) Wall skin dismounting device for construction
CN207184383U (en) Photovoltaic wall
CN206646778U (en) A kind of plaster head mechanism for mechanical float
CN216295355U (en) Building rubbish thick liquid bone stripping off device
CN220047585U (en) Building site enclosure spray set
CN211201187U (en) Shaping construction tool for material conveying hole of fabricated floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant