CN218174477U - Handling device is used in construction of building water supply pipe - Google Patents

Handling device is used in construction of building water supply pipe Download PDF

Info

Publication number
CN218174477U
CN218174477U CN202221791237.2U CN202221791237U CN218174477U CN 218174477 U CN218174477 U CN 218174477U CN 202221791237 U CN202221791237 U CN 202221791237U CN 218174477 U CN218174477 U CN 218174477U
Authority
CN
China
Prior art keywords
fixedly connected
water supply
construction
base
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221791237.2U
Other languages
Chinese (zh)
Inventor
李剑峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongdian Huanyu Beijing Construction Engineering Co ltd
Original Assignee
Zhongdian Huanyu Beijing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongdian Huanyu Beijing Construction Engineering Co ltd filed Critical Zhongdian Huanyu Beijing Construction Engineering Co ltd
Priority to CN202221791237.2U priority Critical patent/CN218174477U/en
Application granted granted Critical
Publication of CN218174477U publication Critical patent/CN218174477U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a building water supply line construction technical field specifically is a handling device is used in construction of building water supply line, the on-line screen storage device comprises a base, the bottom fixedly connected with four gyro wheels of base, the top fixedly connected with riser of base, the top fixedly connected with diaphragm of riser, the bottom of diaphragm is provided with three protruding type groove, the inside of three protruding type groove all slides and is provided with protruding type strip, the internal thread connection of protruding type strip that is located in the middle has the screw rod, the screw rod rotates with the diaphragm to be connected, the right-hand member fixedly connected with motor of diaphragm, the output of motor and the right-hand member fixed connection of screw rod, the bottom fixedly connected with connecting strip of three protruding type strip; it is convenient for press from both sides the pipeline from one side and gets, has avoided people to roll the pipeline to the broad place and has got, has reduced people's labour, is convenient for directly carry stacking pipeline together, is convenient for carry many pipelines, has improved the practicality of using.

Description

Handling device is used in construction of building water supply pipe
Technical Field
The utility model relates to a building water supply pipe construction technical field specifically is a handling device is used in building water supply pipe construction.
Background
As is well known, a water supply and drainage system for buildings is a cold water supply system, which delivers water meeting water quality standards to water consumption points of water supply systems for life, production and fire fighting to meet the requirements of water quantity and water pressure.
Through the retrieval, chinese patent is CN202122476502. X's utility model discloses a handling device is used in construction of building water supply pipe, comprising a frame body, the central point fixed mounting at support body top has two sets of lift push rods, and the all fixed mounting of lift push rod's output has the lifter plate, and the bottom fixed mounting of lifter plate has the grip ring, and it is when using, needs people to roll single pipeline to the broad place, then moves the device to the upside of this pipeline, then carries the pipeline, and it is not convenient for directly carry stacking the pipeline together, and the practicality of use is lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a handling device is used in construction of building feed water pipeline to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building is handling device for water supply pipe construction, the on-line screen storage device comprises a base, four gyro wheels of bottom fixedly connected with of base, the top fixedly connected with riser of base, the top fixedly connected with diaphragm of riser, the bottom of diaphragm is provided with three protruding type groove, the inside in three protruding type groove all slides and is provided with protruding type strip, the inside threaded connection who is located the protruding type strip in middle has the screw rod, the screw rod rotates with the diaphragm to be connected, the right-hand member fixedly connected with motor of diaphragm, the output of motor and the right-hand member fixed connection of screw rod, the bottom fixedly connected with connecting strip of three protruding type strip, the first electronic jar of bottom front side and the equal fixedly connected with in bottom rear side of connecting strip, the equal fixedly connected with fixed plate in bottom of two first electronic jars, the bottom fixedly connected with connecting block of fixed plate, the bottom left side and the bottom right side of connecting block all rotate and are connected with the clamping jaw, the top of two clamping jaws all rotates and is connected with the electronic jar of second, the top of electronic jar is connected with the bottom of second rotates with the bottom of fixed plate and is connected with two third electronic jars, the equal fixedly connected with supporting seat in bottom of diaphragm, the equal fixedly connected with of two third electronic jars in bottom of two third electronic jars, the top of base right side fixedly connected with two backup pads, the right side fixedly connected with backup pads, the even standing grooves is provided with of two backup pads.
Preferably, the bottom end of the supporting seat is provided with an arc-shaped groove.
Further, the vertical plate is fixedly connected with the base through a plurality of first reinforcing plates, the vertical plate is fixedly connected with the transverse plate through two second reinforcing plates, and the two second reinforcing plates are respectively located on the front side and the rear side of the connecting strip.
Still further, the top left side fixedly connected with battery and balancing weight of base.
In a further scheme, a rubber pad is fixedly connected inside each placing groove.
On the basis of the scheme, the first electric cylinder is fixedly connected with the connecting strip through a plurality of third reinforcing plates.
(III) advantageous effects
Compared with the prior art, the utility model provides a handling device is used in construction of building water supply pipe possesses following beneficial effect:
this carrying device for construction of water supply pipelines of buildings pushes the device to one side of stacked multiple pipelines, push the supporting seat to move downwards through two third electric cylinders, make the supporting seat contact with the ground or contact with firmer pipelines, then drive the screw rod through the motor and rotate, the screw rod rotates to make three convex strips, the connecting strip, move the clamping jaw about the clamping jaw, move the clamping jaw to the upside that needs to carry the pipeline, then push the clamping jaw to move downwards through first electric cylinder, make the clamping jaw cover outside at the pipeline, then push the clamping jaw to rotate through second electric cylinder, press from both sides the pipeline tightly, then place the pipeline inside at corresponding standing groove through the cooperation of first electric cylinder and second electric cylinder, then carry the pipeline to corresponding position, it is convenient for press from both sides the pipeline from one side, people are avoided rolling the pipeline to the broad place and press from both sides and get, people's labour has been reduced, be convenient for directly carrying stacked pipelines together, be convenient for carrying multiple pipelines, the practicality of use has been improved.
Drawings
Fig. 1 is a schematic sectional structure of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic side view of the cross plate and the connecting strip of the present invention;
fig. 4 is a schematic view of a part of an enlarged structure at a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a roller; 3. a vertical plate; 4. a transverse plate; 5. a convex strip; 6. a screw; 7. a motor; 8. a connecting strip; 9. a first electric cylinder; 10. a fixing plate; 11. connecting blocks; 12. a clamping jaw; 13. a second electric cylinder; 14. a third electric cylinder; 15. a supporting seat; 16. a support plate; 17. a first reinforcing plate; 18. a second reinforcing plate; 19. a storage battery; 20. a balancing weight; 21. a rubber pad; 22. and a third reinforcing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, a carrying device for construction of a building water supply pipeline comprises a base 1, a storage battery 19 and a balancing weight 20 are fixedly connected to the left side of the top end of the base 1, the storage battery 19 supplies electric energy to electric equipment, the balancing weight 20 increases the weight of the left side of the base 1 to avoid side turning during pipeline carrying, four rollers 2 are fixedly connected to the bottom end of the base 1, the four rollers 2 roll on the ground to facilitate movement of the device, corresponding locking structures are arranged on the four rollers 2 to lock the rollers 2 to ensure the stability of the device during pipeline carrying, a vertical plate 3 is fixedly connected to the top end of the base 1, a transverse plate 4 is fixedly connected to the top end of the vertical plate 3, three convex grooves are arranged at the bottom end of the transverse plate 4, convex strips 5 are arranged inside the three convex grooves in a sliding manner, a screw rod 6 is connected to the inner threads of the convex strip 5 in the middle, the screw rod 6 is rotatably connected with the transverse plate 4, the right end of the transverse plate 4 is fixedly connected with a motor 7, the output end of the motor 7 is fixedly connected with the right end of the screw rod 6, the bottom ends of the three convex strips 5 are fixedly connected with a connecting strip 8, the bottom front side and the bottom rear side of the connecting strip 8 are both fixedly connected with first electric cylinders 9, the bottom ends of the two first electric cylinders 9 are both fixedly connected with a fixed plate 10, the bottom end of the fixed plate 10 is fixedly connected with a connecting block 11, the bottom left side and the bottom right side of the connecting block 11 are both rotatably connected with clamping jaws 12, the top ends of the two clamping jaws 12 are both rotatably connected with second electric cylinders 13, the top ends of the second electric cylinders 13 are rotatably connected with the bottom end of the fixed plate 10, the two clamping jaws 12 are driven to rotate by the two second electric cylinders 13, so that the two clamping jaws 12 clamp the pipeline, the bottom right side of the transverse plate 4 is fixedly connected with two third electric cylinders 14, the bottom ends of the two third electric cylinders 14 are fixedly connected with a supporting seat 15, the bottom ends of the supporting seats 15 are provided with arc grooves, the supporting seats 15 are conveniently supported on stable pipelines through the arc grooves, the transverse plate 4 is conveniently supported on the right side of the top end of the base 1, the top ends of the two supporting plates 16 are uniformly provided with a plurality of placing grooves, rubber pads 21 are fixedly connected inside each placing groove, the effect of damping and buffering is achieved, when the pipelines are placed in the placing grooves, the force of collision between the pipelines and the supporting seats 15 is relieved, the device is pushed to one side of a plurality of pipelines stacked together, the supporting seats 15 are pushed to move downwards through the two third electric cylinders 14, the supporting seats 15 are enabled to be in contact with the ground or in contact with the stable pipelines, and then the screw rods 6 are driven to rotate through the motors 7, screw 6 rotates and makes three protruding type strip 5, connecting strip 8, remove about first electronic jar 9 and clamping jaw 12, move clamping jaw 12 to the upside that needs the pipeline of transport, then promote clamping jaw 12 through first electronic jar 9 and remove downwards, make clamping jaw 12 cover the outside at the pipeline, then promote clamping jaw 12 through second electronic jar 13 and rotate, press from both sides the pipeline tightly, then through first motor 7, the inside at corresponding standing groove is placed the pipeline to the cooperation of first electronic jar 9 and second electronic jar 13, then carry the pipeline to corresponding position, it is convenient for press from both sides the pipeline from one side, avoided people to roll the pipeline to the broad place and got, people's labour has been reduced, be convenient for directly carry stacking together's pipeline, be convenient for carry many pipelines, the practicality of use has been improved.
It should be further noted that the vertical plate 3 is fixedly connected with the base 1 through the first reinforcing plates 17, so that the stability of connection between the vertical plate 3 and the base 1 is improved, the vertical plate 3 is fixedly connected with the transverse plate 4 through the second reinforcing plates 18, the second reinforcing plates 18 are respectively located on the front side and the rear side of the connecting strip 8, so that the stability of connection between the vertical plate 3 and the top plate is improved, and the first electric cylinder 9 is fixedly connected with the connecting strip 8 through the third reinforcing plates 22, so that the stability of connection between the first electric cylinder 9 and the connecting strip 8 is improved.
In summary, the carrying device for construction of the water supply pipeline of the building pushes the device to one side of a plurality of pipelines stacked together when in use, the two third electric cylinders 14 push the supporting seat 15 to move downwards, so that the supporting seat 15 is contacted with the ground or a more stable pipeline, the right side of the bottom end of the transverse plate 4 is supported by the third electric cylinders 14, then the screw rod 6 is driven to rotate by the motor 7, the screw rod 6 rotates to enable the three convex strips 5, the connecting strip 8, the first electric cylinder 9 and the clamping jaw 12 to move left and right, the clamping jaw 12 is moved to the upper side of the pipeline to be transported, then the clamping jaw 12 is pushed to move downwards by the first electric cylinder 9, so that the clamping jaw 12 is inserted into the gap between the pipelines, and two clamping jaws 12 on the same fixing plate 10 are respectively positioned at two sides to be carried and hung, then the clamping jaws 12 are pushed to rotate through the two second electric cylinders 13, so that the two clamping jaws 12 clamp and fix the pipeline, the pipeline is then pulled upwards by the two first electric cylinders 9, and moved onto the two support plates 16, then the motor 7 is started, the first pipeline moves to the upper side of the corresponding placing groove, then the first electric cylinder 9 pushes the pipeline to move downwards, so that the pipeline is placed in the corresponding placing groove, then the clamping jaw 12 is pulled by two second electric cylinders 13 to rotate outwards, so that the clamping jaw 12 is separated from the pipeline, the gripping jaws 12 are then pulled onto the pipe by means of the first electric cylinder 9, and the motor 7 is then activated, causing the gripping jaws 12 to move to the upper side of the other pipe, grabbing other pipelines, placing the pipelines with corresponding quantity in corresponding placing grooves, the apparatus is then moved to a location where the water supply piping of the building is to be constructed, and the piping is then carried and placed in the appropriate location.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a handling device is used in construction of building water supply pipe, includes base (1), its characterized in that: the bottom end of the base (1) is fixedly connected with four idler wheels (2), the top end of the base (1) is fixedly connected with a vertical plate (3), the top end of the vertical plate (3) is fixedly connected with a transverse plate (4), the bottom end of the transverse plate (4) is provided with three convex grooves, the three convex grooves are internally and all slidably provided with convex strips (5), the internal threads of the middle convex strips (5) are connected with a screw rod (6), the screw rod (6) is rotatably connected with the transverse plate (4), the right end of the transverse plate (4) is fixedly connected with a motor (7), the output end of the motor (7) is fixedly connected with the right end of the screw rod (6), the bottom ends of the three convex strips (5) are fixedly connected with a connecting strip (8), the bottom ends of the connecting strip (8) are respectively and fixedly connected with a first electric cylinder (9) at the front side and the bottom end rear side, the bottom ends of the two first electric cylinders (9) are respectively and fixedly connected with a fixed plate (10), the bottom end of the fixed plate (10) is fixedly connected with a connecting block (11), the left side and the bottom end of the connecting block (11) are respectively rotatably connected with a clamping jaw (12), the top ends of the two clamping jaws (12) are respectively, the top end of the second electric cylinder (13) is fixedly connected with the second electric cylinder (13), the bottom fixed plate (13), the bottom end of the second electric cylinder (4) is connected with the right side of the second electric cylinder (14), the equal fixedly connected with supporting seat (15) in bottom of two electronic jars of third (14), two backup pads of the top right side fixedly connected with (16) of base (1), the top of two backup pads (16) evenly is provided with a plurality of standing grooves.
2. The conveying device for construction of the water supply pipeline of the building as claimed in claim 1, wherein: the bottom of the supporting seat (15) is provided with an arc-shaped groove.
3. The conveying device for construction of the water supply pipeline of the building as claimed in claim 2, wherein: the vertical plate (3) is fixedly connected with the base (1) through a plurality of first reinforcing plates (17), the vertical plate (3) is fixedly connected with the transverse plate (4) through two second reinforcing plates (18), and the two second reinforcing plates (18) are respectively located on the front side and the rear side of the connecting strip (8).
4. The conveying device for construction of the water supply pipeline of the building as claimed in claim 3, wherein: the left side of the top end of the base (1) is fixedly connected with a storage battery (19) and a balancing weight (20).
5. The carrying device for construction of the water supply pipeline of the building as claimed in claim 4, wherein: rubber pads (21) are fixedly connected inside the placing grooves.
6. The conveying device for construction of the building water supply pipeline according to claim 5, characterized in that: the first electric cylinder (9) is fixedly connected with the connecting strip (8) through a plurality of third reinforcing plates (22).
CN202221791237.2U 2022-07-12 2022-07-12 Handling device is used in construction of building water supply pipe Active CN218174477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221791237.2U CN218174477U (en) 2022-07-12 2022-07-12 Handling device is used in construction of building water supply pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221791237.2U CN218174477U (en) 2022-07-12 2022-07-12 Handling device is used in construction of building water supply pipe

Publications (1)

Publication Number Publication Date
CN218174477U true CN218174477U (en) 2022-12-30

Family

ID=84611542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221791237.2U Active CN218174477U (en) 2022-07-12 2022-07-12 Handling device is used in construction of building water supply pipe

Country Status (1)

Country Link
CN (1) CN218174477U (en)

Similar Documents

Publication Publication Date Title
CN109573467B (en) Log conveying mechanism for wood working
CN218174477U (en) Handling device is used in construction of building water supply pipe
CN113003399A (en) Self-locking lifting appliance for transferring steel coil
CN110127376B (en) Glass transportation frame
CN208181714U (en) A kind of building board transport device of scratch
CN217707856U (en) Pipeline handling device for hydraulic engineering
CN218350008U (en) Detection device for transverse bearing capacity of building
CN209814632U (en) Pipe column conveying device
CN212075920U (en) Hydraulic engineering construction pipe laying pay-off
CN213228801U (en) Colliery is combined and is adopted working face advance support hydraulic prop handling device
CN209904789U (en) Foil winding and unwinding carrying device for formation foil production
CN211377397U (en) Power maintenance equipment
CN210942429U (en) Inferior gram force board tectorial membrane device
CN210618229U (en) Pipeline shifts uses support with protect function
CN218558924U (en) Fiber winding pultrusion pipeline transfer equipment
CN213357687U (en) Three-dimensional multilayer formula pipe fitting heat treatment frame
CN217840122U (en) Building pile foundation load capacity detection device
CN220809434U (en) Building material transfer device for house building
CN217680709U (en) Building installation protective structure
CN216332171U (en) Novel storage and transfer tool for precast concrete laminated slab
CN210503744U (en) Winding film storage device
CN215544020U (en) Pipe fitting indent processingequipment
CN215315247U (en) Automatic feeding device for pipe bending machine
CN210680854U (en) PET metal film roll moving device
CN212291152U (en) PC component storage fixing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant