CN218149958U - Construction safety net - Google Patents

Construction safety net Download PDF

Info

Publication number
CN218149958U
CN218149958U CN202221846102.1U CN202221846102U CN218149958U CN 218149958 U CN218149958 U CN 218149958U CN 202221846102 U CN202221846102 U CN 202221846102U CN 218149958 U CN218149958 U CN 218149958U
Authority
CN
China
Prior art keywords
safety net
support column
connecting plate
holes
supporting column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202221846102.1U
Other languages
Chinese (zh)
Inventor
雷蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yanyu Construction Engineering Co ltd
Original Assignee
Fujian Yanyu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Yanyu Construction Engineering Co ltd filed Critical Fujian Yanyu Construction Engineering Co ltd
Priority to CN202221846102.1U priority Critical patent/CN218149958U/en
Application granted granted Critical
Publication of CN218149958U publication Critical patent/CN218149958U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model provides a construction safety net, including support column, connecting plate and safety net, the welding of support column top has the fixture block, the support column bottom has begun to have the draw-in groove, support column skin weld has a plurality of stoppers, a plurality of screw holes have been seted up on the support column surface, screw thread fixedly connected with connecting plate is passed through to support column one side, a plurality of fixed orificess have been seted up on the connecting plate surface, a plurality of trompils have been seted up to the connecting plate, the welding of connecting plate one side has a plurality of fixed plates, the through-hole has been seted up to fixed plate one side, support column one side is provided with connects the rope, the support column is connected with the safety net through connecting the rope. This kind of safety net has the advantage such as be convenient for collect and fix, fixes the safety net completely through a plurality of connecting holes and through-hole, will dismantle after the support column through rotating the safety net and collect, save time and manpower, improve work efficiency.

Description

Construction safety net
Technical Field
The utility model relates to a safety net technical field specifically is a construction safety net.
Background
The safety net is when carrying out high altitude construction equipment installation or high altitude construction, the net that plays the guard action that sets up under it or its side, in order to prevent the accident that causes because of people or thing fall, the installation of current safety net is fixed and is all directly binded on the scaffold frame through the rope, phenomenon such as not hard up appears very easily like this, especially fall the thing at the high altitude and fall the back, can lead to the hookup location to drop, can't effectively play the guard action, and the safety net need fold the collection with the safety net after dismantling, very consuming time and wasting force.
Consequently, design a neotype construction safety net, make it have be convenient for collect with advantages such as fixed, fix the safety net completely through a plurality of connecting holes and through-hole, solve the fixed poor problem of effect of safety net, will dismantle later safety net through rotating the support column and collect, the safety net after collecting is convenient for operation personnel's storage and transportation, saves time and manpower, waits for next use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the shortcoming that exists among the background art, provide a construction safety net.
In order to realize the above-mentioned purpose, the utility model provides a following technical scheme, a construction safety net, including support column, connecting plate and safety net, the welding of support column top has the fixture block, the draw-in groove has been seted up to the support column bottom, support column skin weld has a plurality of stoppers, a plurality of screw holes have been seted up on the support column surface, support column one side is through screw thread fixedly connected with connecting plate, connecting plate one side fixed mounting has the couple, a plurality of fixed orificess have been seted up on the connecting plate surface, a plurality of trompils have been seted up on one side of the connecting plate, be connected with the bolt between screw hole and the trompil, connecting plate one side welding has a plurality of fixed plates, the through-hole has been seted up on one side of the fixed plate, support column one side is provided with the connection rope, the support column is connected with the safety net through connecting the rope, a plurality of spacing holes have been seted up on the safety net surface, a plurality of connecting holes have been seted up on the safety net surface, safety net one side is provided with safety net lock strake.
Furthermore, the support columns are made of stainless steel materials.
Further, the safety net is made of vinylon materials.
Further, the outer diameter of the support column is consistent with the inner diameter of the fixing hole.
Furthermore, the connecting holes are uniformly arranged on two sides of the safety net at equal intervals.
Furthermore, the clamping block is matched with the clamping groove in shape, and the clamping block is of a cross-shaped structure.
The utility model provides a construction safety net has following beneficial effect:
1. the utility model has the advantages of, after the safety net finishes using, can take the ground with the safety net and dismantle, and use the support column to roll up the safety net as the central point through rotating the support column, make things convenient for the operation personnel to the collection of safety net, the safety net after rolling up is also convenient for operation personnel's storage and transportation, reduces operation personnel's work load, and labour saving and time saving has improved work efficiency.
2. Secondly, through-hole on a plurality of connecting holes and a plurality of fixed plates that the safety net both sides were arranged, make the installation of safety net more firm, avoid the safety net installation insecure for when article drop, lead to the safety connection position to drop, can't play the protection effect, and make the local position of safety net can not appear receiving the influence of gravity factor, lead to appearing great gap between safety net and the connecting plate, make article from the gap kind outside that drops, cause very big potential safety hazard.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an overall structure front view of the present invention.
Fig. 3 is a cross-sectional view of the overall structure of the present invention.
Fig. 4 is a schematic view of the structure of the support column of the present invention.
Fig. 5 is an enlarged view of the position a of the present invention.
In FIGS. 1-5: the safety net comprises a support column-1, a clamping block-101, a limiting block-102, a clamping groove-103, a threaded hole-104, a bolt-2, an opening-201, a fixing plate-3, a through hole-301, a connecting rope-4, a connecting plate-5, a hook-501, a fixing hole-502, a safety net-6, a limiting hole-601, a connecting hole-602 and a safety net locking edge-603.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment is as follows:
please refer to fig. 1-5;
the embodiment provides a building construction safety net, including support column 1, connecting plate 5 and safety net 6, 1 top welding of support column has fixture block 101, draw-in groove 103 has been seted up to 1 bottom of support column, 1 skin weld of support column has a plurality of stopper 102, a plurality of screw holes 104 have been seted up on 1 surface of support column, 1 one side of support column is through screw thread fixedly connected with connecting plate 5, 5 one side fixed mounting of connecting plate has couple 501, a plurality of fixed orificess 502 have been seted up on 5 surface of connecting plate, a plurality of trompils 201 have been seted up on 5 one side of connecting plate, be connected with bolt 2 between screw hole 104 and the trompil 201, 5 one side welding of connecting plate has a plurality of fixed plates 3, through-hole 301 has been seted up to fixed plate 3 one side, 1 one side of support column is provided with connection rope 4, support column 1 is connected with safety net 6 through connecting rope 4, a plurality of spacing holes 601 have been seted up on the surface of safety net 6, a plurality of connecting hole 602 has been seted up on the surface of safety net 6, safety net 6 one side is provided with safety net lock strake 603.
Further, support column 1 is made for stainless steel material, and stainless steel material has characteristics such as corrosion resistance and intensity height, makes support column 1 avoid the erosion of rainwater sand blown by the wind, has prolonged support column 1's life, prevents that support column 1 from appearing rustting under the erosion of external factor, leads to the decline of support column 1 hardness, and then leads to droing of safety net 6.
Furthermore, the safety net 6 is made of vinylon materials, the vinylon materials have the characteristics of difficult ignition, sunlight resistance, good fiber strength, dry heat resistance and the like, if a fire disaster situation occurs in the construction process of a building, the vinylon materials are difficult to ignite and can effectively inhibit the diffusion of the disaster situation and reduce the economic loss, the safety net 6 needs to be hung outside the construction building for a long time, the relative strength of the safety net 6 can be kept due to the characteristics of sunlight resistance, good fiber strength, dry heat resistance and the like, and the phenomenon that the safety net 6 is subjected to strength reduction after being irradiated by sunlight for a long time and the safety net 6 is scratched by falling articles in the construction process is avoided.
Further, the external diameter of support column 1 is unanimous with the internal diameter of fixed orifices 502, makes support column 1 be connected with connecting plate 5 through fixed orifices 502, and support column 1 and the mutual sliding fit of fixed orifices 502 have increased holistic stability, have reduced the potential safety hazard, appear the deviation when avoiding the installation of safety net 6.
Further, a plurality of connecting holes 602 equidistance align to grid are in safety net 6 both sides, and the position of connecting hole 602 corresponds the position at fixed plate 3 place respectively, make connecting hole 602 and through-hole 301 pass through bolt 2 fixed connection, make safety net 6 can carry out maximum cover after expanding, if safety net 6 middle part is not connected with fixed plate 3, can lead to the middle unconnected portion of safety net 6 down to squint because of the influence of gravity factor, make great gap appear between safety net 6 and the connecting plate 5, make the article that drops in the work progress drop to the outside from the gap, cause very big potential safety hazard.
Further, fixture block 101 suits with draw-in groove 103 shape, and fixture block 101 is cross structure, makes fixture block 101 just inlay inside draw-in groove 103, makes safety net 6 at the in-process that the installation was built, has increased the stability of safety net 6 integral erection, avoids safety net 6 to appear installing the condition that the shakiness leads to dropping in the installation, and the user can be according to the height of construction building, adjusts the height that required safety net 6 installed.
When the safety net for building construction is used, whether each structure of the safety net 6 has problems before use is checked, when in installation, the lower end of a support column 1 is firstly embedded into a connecting plate 5 through a fixing hole 502, one end of a connecting rope 4 is connected with a limiting hole 601 by pulling the connecting rope 4 on the safety net 6, the safety net 6 is rotatably unfolded at the center of the support column 1, the safety net 6 passes through a fixing plate 3, after the safety net 6 is completely unfolded, the connecting rope 4 is hung on a hook 501, the safety net 6 is straightened and fixed, a threaded hole 104 is aligned with an opening 201 through a limiting block 102 on the surface of the support column 1, an accurate positioning effect is achieved, the support column 1 is fixedly connected with the connecting plate 5 through a bolt 2, then the other connecting plate 5 is slidably connected to the upper end of the support column 1 through the fixing hole 502, and the limiting block 102 on the upper end of the support column 1, the threaded holes 104 and the open holes 201 at the upper end of the support column 1 are aligned and fixedly connected through the bolts 2, after the support column is completely unfolded, the connecting holes 602 just correspond to the through holes 301 on the fixing plates 3, the connecting holes 602 are fixedly connected with the through holes 301 through the bolts 2, the safety net 6 can be fixedly connected with a plurality of fixing plates 3, if the middle part of the safety net 6 is not connected with the fixing plates 3, the middle unconnected part of the safety net 6 can be shifted downwards due to the influence of gravity factors, so that a large gap can be formed between the safety net 6 and the connecting plate 5, articles dropped in the construction process can fall out from the gap, great potential safety hazards are caused, through the clamping blocks 101 at the top end of the support column and the clamping grooves 103 at the bottom, position positioning and stability are provided for the installation process of the safety net 6, a single safety net 6 is installed on the ground firstly, at the construction of going on safety net 6 through fixture block 101 and draw-in groove 103, reduce the work load that the operation personnel built safety net 6 at the high altitude, the user can confirm how many blocks of safety net 6 of needs installation according to the required height of construction, after having used up safety net 6, dismantle safety net 6 alone, split safety net 6 on ground, loosen screw hole 104 and trompil 201 department and connecting hole 602 and bolt 2 of through-hole 301 department earlier, through rotating support column 1, roll up safety net 6, be convenient for to the recovery of safety net 6, reduce operation personnel's work load, and behind each part that the split becomes, be convenient for to the storage of safety net 6, wait for next use.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.

Claims (6)

1. A building construction safety net comprises support columns (1), connecting plates (5) and a safety net (6), it is characterized in that a clamping block (101) is welded at the top of the supporting column (1), the bottom of the supporting column (1) is provided with a clamping groove (103), one side of the supporting column (1) is welded with a plurality of limiting blocks (102), the surface of the supporting column (1) is provided with a plurality of threaded holes (104), one side of the supporting column (1) is fixedly connected with a connecting plate (5) through threads, a hook (501) is fixedly arranged on one side of the connecting plate (5), a plurality of fixing holes (502) are arranged on the surface of the connecting plate (5), a plurality of open holes (201) are arranged on one side of the connecting plate (5), a bolt (2) is connected between the threaded hole (104) and the opening (201), a plurality of fixing plates (3) are welded on one side of the connecting plate (5), a through hole (301) is arranged at one side of the fixing plate (3), a connecting rope (4) is arranged at one side of the supporting column (1), the supporting column (1) is connected with a safety net (6) through a connecting rope (4), the surface of the safety net (6) is provided with a plurality of limiting holes (601), the surface of the safety net (6) is provided with a plurality of connecting holes (602), and a safety net locking edge strip (603) is arranged on one side of the safety net (6).
2. The construction safety net according to claim 1, wherein the supporting columns (1) are made of stainless steel material.
3. The construction safety net according to claim 1, characterized in that the safety net (6) is made of vinylon material.
4. The construction safety net according to claim 1, wherein the outer diameter of the supporting column (1) coincides with the inner diameter of the fixing hole (502).
5. The construction safety net according to claim 1, wherein the plurality of connection holes (602) are uniformly arranged at equal intervals on both sides of the safety net (6).
6. The construction safety net according to claim 1, wherein the fixture block (101) is adapted to the shape of the clamping groove (103), and the fixture block (101) has a cross-shaped structure.
CN202221846102.1U 2022-07-18 2022-07-18 Construction safety net Withdrawn - After Issue CN218149958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221846102.1U CN218149958U (en) 2022-07-18 2022-07-18 Construction safety net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221846102.1U CN218149958U (en) 2022-07-18 2022-07-18 Construction safety net

Publications (1)

Publication Number Publication Date
CN218149958U true CN218149958U (en) 2022-12-27

Family

ID=84593976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221846102.1U Withdrawn - After Issue CN218149958U (en) 2022-07-18 2022-07-18 Construction safety net

Country Status (1)

Country Link
CN (1) CN218149958U (en)

Similar Documents

Publication Publication Date Title
CN106499202B (en) The portable edge protection column of box-type for safety management in construction site
CN209771142U (en) Safety belt wall-through fixing device
CN218149958U (en) Construction safety net
CN212613236U (en) Fixed connection structure for building curtain wall engineering
CN211173080U (en) Early-dismantling formwork support frame connecting device for building construction
CN210684727U (en) Construction safety supporting construction
CN216841016U (en) Oil gas field ground engineering construction safety protection isolating device
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN209874526U (en) Integral lifting type hoistway steel platform protection device
CN221074304U (en) Tunneling operation protection device in coal mining process
CN202265762U (en) Connective component for blanket plate and support beam
CN201730306U (en) Light-weight scaffold
CN204081441U (en) A kind of locking device fixing for railing
CN208363547U (en) A kind of assembly scaffold for concrete column construction
CN217897254U (en) Inclined support structure for building scaffold
CN213806524U (en) Protective net frame for scaffold
CN220100598U (en) Be applied to guard plate connecting piece of building engineering scaffold frame
CN112282343B (en) Dual self-lifting type external climbing frame for super high-rise building
CN213626586U (en) Safety hanging basket for construction engineering construction
CN210264009U (en) Attached lifting scaffold protective net mounting structure
CN214461524U (en) Composite wallboard steel module structure
CN217399633U (en) Anchorage device safety dismounting device
CN220395121U (en) Detachable building engineering scaffold
CN220058977U (en) Foldable portable safety net device of dismouting of construction
CN220432040U (en) Novel lifting device of unit plate formula glass curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20221227

Effective date of abandoning: 20230117

AV01 Patent right actively abandoned

Granted publication date: 20221227

Effective date of abandoning: 20230117

AV01 Patent right actively abandoned