CN218149621U - Shear force crane is removed in construction of house wall building - Google Patents

Shear force crane is removed in construction of house wall building Download PDF

Info

Publication number
CN218149621U
CN218149621U CN202222639571.2U CN202222639571U CN218149621U CN 218149621 U CN218149621 U CN 218149621U CN 202222639571 U CN202222639571 U CN 202222639571U CN 218149621 U CN218149621 U CN 218149621U
Authority
CN
China
Prior art keywords
fixedly connected
platform
lifting frame
base
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222639571.2U
Other languages
Chinese (zh)
Inventor
张伟
关添东
冉成海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Xinrui Urban Construction Co ltd
Original Assignee
Gansu Xinrui Urban Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Xinrui Urban Construction Co ltd filed Critical Gansu Xinrui Urban Construction Co ltd
Priority to CN202222639571.2U priority Critical patent/CN218149621U/en
Application granted granted Critical
Publication of CN218149621U publication Critical patent/CN218149621U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a movable shear lifting frame for building wall construction, which comprises a base, wherein the upper surface of the base is movably connected with a lifting frame, the upper surface of the lifting frame is movably connected with a platform, and the upper surface of the platform is fixedly connected with a guardrail; the protection mechanism comprises a movable plate, the movable plate is connected with the platform in a sliding mode, a protection plate is fixedly connected to the side surface of the movable plate, a rubber pad is arranged on the side surface of the protection plate, an elastic band is arranged on the front surface of the protection plate, and a buckle is arranged on the side surface of the elastic band. Through the structure, when the working personnel stand on the platform, the working personnel can be protected by walking, so that the safety of the device can be improved.

Description

Shear force crane is removed in construction of house wall building
Technical Field
The utility model relates to a remove shear force crane technical field, in particular to shear force crane is removed in building wall construction.
Background
The shear force crane is a very common lifting machinery, it has the lifting capacity reinforce, stable in structure's advantage, be used for in the middle of the jacking of material and various work platforms more, thereby it is comparatively convenient when carrying out construction to the wall to make the staff, present house wall construction removes the shear force crane when using, do not have other structures of protecting the staff except the guardrail around the platform, it is unexpected to lead to the staff to walk about on the platform easily, thereby the security when having reduced the device use, like patent theme "improved generation house wall construction removes the shear force crane", application number "202022980979.7", it is also only convenient to remove, easily control, the instrument is got and is put convenience etc..
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve one of the technical problem that exists among the prior art at least, provide a shear force crane is removed in construction of house wall building, when the staff stands on the platform, can walk about to the staff and protect to the device's security has been improved.
The utility model discloses still provide to have above-mentioned shear force crane is removed in construction of house wall building, a shear force crane is removed in construction of house wall building, include: the lifting frame is movably connected to the upper surface of the base, the platform is movably connected to the upper surface of the lifting frame, and the guardrail is fixedly connected to the upper surface of the platform; protection machanism, protection machanism includes the movable plate, and movable plate and platform sliding connection, the side surface fixedly connected with guard plate of movable plate, the side surface of guard plate is provided with the rubber pad, the front surface of guard plate is provided with the elastic webbing, the side surface of elastic webbing is provided with the buckle, when the staff stands on the platform, can walk about to the staff and protect, prevents that the staff from appearing skidding when walking about on the platform and falling down and cause danger.
According to the shear lifting frame for building wall construction, the lower surface of the base is provided with the travelling wheels, and the shear lifting frame can be moved to a specified position.
According to a house wall building construction removes shear force crane, the equal swing joint in both sides surface of base has the bearing plate, the side surface fixedly connected with bracing piece of bearing plate, the side surface fixedly connected with diaphragm of bearing plate, the inside sliding connection of diaphragm has the dead lever, and the dead lever is connected with the base gomphosis, can improve the steadiness when the device is placed.
According to the shear force crane is removed in building wall construction, the upper surface of base is located the both sides fixedly connected with electric putter of crane, and electric putter's output and platform fixed connection can adjust the device's height.
According to a building wall construction removes shear force crane, the lubricated case of side surface fixedly connected with of guardrail, the side surface fixedly connected with motor of lubricated case, the output fixedly connected with lead screw of motor conveniently promotes the baffle and removes.
According to a house wall building construction removes shear force crane, the lower fixed surface of lubricated case is connected with the pipeline, and the front fixed surface of pipeline and platform is connected, the inside sliding connection of lubricated case has the baffle, and baffle and pipeline laminating, make it shelter from the pipeline.
According to the shear force crane is removed in building wall construction, the upper surface fixed connection of baffle has the fixed block, and fixed block and lead screw threaded connection, conveniently remove the baffle.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The present invention will be further described with reference to the accompanying drawings and examples;
FIG. 1 is a schematic front view of the shear crane for building construction;
fig. 2 is a structural diagram of a part a in fig. 1 of the movable shear lifting frame for building wall construction of the utility model;
fig. 3 is a structural diagram of a mobile shear crane for building wall construction in fig. 1 at the position B;
fig. 4 is the utility model relates to a building wall construction removes platform structure sketch map of shear force crane.
Illustration of the drawings:
1. a base; 2. a fixing rod; 3. an electric push rod; 4. a lifting frame; 5. a station; 6. a guardrail; 7. a bearing plate; 8. a transverse plate; 9. a support bar; 10. a traveling wheel; 11. a protection mechanism; 12. a lubrication box; 13. a fixed block; 14. a screw rod; 15. a motor; 16. a pipeline; 17. a baffle plate;
111. moving the plate; 112. a rubber pad; 113. buckling; 114. a protection plate; 115. an elastic band.
Detailed Description
This section will describe in detail the embodiments of the present invention, preferred embodiments of the present invention are shown in the attached drawings, which are used to supplement the description of the text part of the specification with figures, so that one can intuitively and vividly understand each technical feature and the whole technical solution of the present invention, but they cannot be understood as the limitation of the protection scope of the present invention.
Referring to fig. 1-4, the embodiment of the utility model provides a shear force crane is removed in construction of house wall building, include: the base 1, the upper surface of base 1 swing joint has crane 4, the upper surface swing joint of crane 4 has platform 5, the upper surface fixedly connected with guardrail 6 of platform 5, the lower surface of base 1 is provided with walking wheel 10, the equal swing joint in both sides surface of base 1 has bearing plate 7, the side surface fixedly connected with bracing piece 9 of bearing plate 7, the side surface fixedly connected with diaphragm 8 of bearing plate 7, the inside sliding connection of diaphragm 8 has dead lever 2, and dead lever 2 is connected with the gomphosis of base 1, the upper surface of base 1 is located crane 4's both sides fixedly connected with electric putter 3, and electric putter 3's output and platform 5 fixed connection, utilize walking wheel 10 to promote house construction to the assigned position with building removal shear force crane 4, promote the wall to the assigned position after, utilize bearing plate 7's activity to make bracing piece 9 can with walking wheel 10 highly uniform and ground contact, thereby can improve the steadiness when the device places, the staff stands on platform 5, be connected with electric putter 3 and external power source, it can promote platform 5 to move to start electric putter, platform 5 can promote platform 5 when platform 5 can stretch the crane when moving, thereby can make the wall support 5 to make the constructor carry out the convenience of construction.
The protection mechanism 11 comprises a moving plate 111, the moving plate 111 is slidably connected with the platform 5, a protection plate 114 is fixedly connected to the side surface of the moving plate 111, a rubber pad 112 is arranged on the side surface of the protection plate 114, an elastic band 115 is arranged on the front surface of the protection plate 114, and a buckle 113 is arranged on the side surface of the elastic band 115.
Lubricated case 12 of the side surface fixedly connected with of guardrail 6, the side surface fixedly connected with motor 15 of lubricated case 12, the output fixedly connected with lead screw 14 of motor 15, the lower fixed surface of lubricated case 12 is connected with pipeline 16, and pipeline 16 is connected with the front surface fixed of platform 5, the inside sliding connection of lubricated case 12 has baffle 17, and baffle 17 and the laminating of pipeline 16, the last fixed surface of baffle 17 is connected with fixed block 13, and fixed block 13 and lead screw 14 threaded connection, pour lubricating oil into lubricated case 12 in, be connected motor 15 with external power source, it is rotatable to start motor 15 messenger's lead screw 14, fixed block 13 can drive baffle 17 and remove when lead screw 14 rotates, make baffle 17 can separate lubricating oil with pipeline 16 and can follow the interior discharge of pipeline 16 and lubricate crane 4, thereby can improve crane 4 tensile or folding efficiency.
The working principle is as follows: during the use, the activity that utilizes bearing plate 7 makes bracing piece 9 can with walking wheel 10 highly uniform and ground contact, the staff stands on platform 5, guard plate 114 can laminate with staff's waist, can fix guard plate 114 at staff's waist through buckle 113, start electric putter 3 and can promote platform 5 and remove, but crane 4 stretching supports platform 5 when platform 5 removes, thereby make the staff can conveniently be under construction to the house wall, motor 15 makes lead screw 14 rotatable, fixed block 13 can drive baffle 17 and remove when lead screw 14 is rotating, make baffle 17 can separate lubricating oil with pipeline 16 and can follow and discharge in pipeline 16 and lubricate crane 4.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (7)

1. The utility model provides a shear force crane is removed in construction of house wall, its characterized in that includes:
the device comprises a base (1), wherein the upper surface of the base (1) is movably connected with a lifting frame (4), the upper surface of the lifting frame (4) is movably connected with a platform (5), and the upper surface of the platform (5) is fixedly connected with a guardrail (6);
protection machanism (11), protection machanism (11) are including moving plate (111), and moving plate (111) and platform (5) sliding connection, the side surface fixedly connected with guard plate (114) of moving plate (111), the side surface of guard plate (114) is provided with rubber pad (112), the front surface of guard plate (114) is provided with elastic band (115), the side surface of elastic band (115) is provided with buckle (113).
2. The mobile shear lifting frame for house wall building construction according to claim 1, wherein the lower surface of the base (1) is provided with road wheels (10).
3. The shear lifting frame for building wall construction according to claim 1, wherein the two side surfaces of the base (1) are movably connected with a bearing plate (7), the side surface of the bearing plate (7) is fixedly connected with a supporting rod (9), the side surface of the bearing plate (7) is fixedly connected with a transverse plate (8), the transverse plate (8) is slidably connected with a fixing rod (2), and the fixing rod (2) is embedded and connected with the base (1).
4. The shear lifting frame is moved in building wall construction according to claim 1, characterized in that the upper surface of the base (1) is fixedly connected with electric push rods (3) at two sides of the lifting frame (4), and the output ends of the electric push rods (3) are fixedly connected with the platform (5).
5. The shear lifting frame for building wall construction according to claim 1, wherein a lubrication box (12) is fixedly connected to the side surface of the guardrail (6), a motor (15) is fixedly connected to the side surface of the lubrication box (12), and a screw rod (14) is fixedly connected to the output end of the motor (15).
6. The shear crane for building wall construction according to claim 5, wherein the lower surface of the lubricating box (12) is fixedly connected with a pipeline (16), the pipeline (16) is fixedly connected with the front surface of the platform (5), the inside of the lubricating box (12) is slidably connected with a baffle (17), and the baffle (17) is attached to the pipeline (16).
7. The mobile shear lifting frame for house wall building construction according to claim 6, wherein the upper surface of the baffle (17) is fixedly connected with a fixing block (13), and the fixing block (13) is in threaded connection with the screw rod (14).
CN202222639571.2U 2022-10-09 2022-10-09 Shear force crane is removed in construction of house wall building Active CN218149621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222639571.2U CN218149621U (en) 2022-10-09 2022-10-09 Shear force crane is removed in construction of house wall building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222639571.2U CN218149621U (en) 2022-10-09 2022-10-09 Shear force crane is removed in construction of house wall building

Publications (1)

Publication Number Publication Date
CN218149621U true CN218149621U (en) 2022-12-27

Family

ID=84566794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222639571.2U Active CN218149621U (en) 2022-10-09 2022-10-09 Shear force crane is removed in construction of house wall building

Country Status (1)

Country Link
CN (1) CN218149621U (en)

Similar Documents

Publication Publication Date Title
CN103539037B (en) A kind of high-altitude operation platform
CN202808267U (en) High-altitude operation platform
CN106698280A (en) Electric power overhauling lifting platform
CN207144792U (en) A kind of maintenance ladder of electrician
CN211867822U (en) Building site construction safety prevention robot based on artificial intelligence
CN112853973B (en) Suspension type construction device for bridge construction and construction method thereof
CN106315475A (en) Power maintenance vehicle
CN218149621U (en) Shear force crane is removed in construction of house wall building
CN105621268A (en) Multifunctional electric work vehicle
CN210828245U (en) Lifting and lifting integrated machine for rail transit engineering construction
CN216664173U (en) A interim side slope protector for municipal building
CN212656123U (en) Bridge engineering construction platform
CN214787425U (en) Tunnel intelligent construction trolley capable of automatically lifting
CN213173332U (en) Bridge maintenance device
CN206707248U (en) A kind of hanging basket for overflow weir
CN215926631U (en) Safety support device is used in civil engineering construction
CN220927544U (en) Bridge construction lifting equipment
CN219261679U (en) Overhead platform for construction of overhead warehouse area
CN213174715U (en) A remove handling frame for building engineering
CN220950934U (en) Hoisting system suitable for high pier pushing
CN213774584U (en) Protector is used in civil engineering construction
CN213626557U (en) Construction operation trolley
CN212726026U (en) Outdoor switch cabinet convenient to maintain
CN211713676U (en) Portable municipal bridge overhauls device
CN215876044U (en) Miniature fire station with emergency fire-fighting tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant