CN218149032U - Quick construction environmental protection and energy saving wall body of housing construction - Google Patents

Quick construction environmental protection and energy saving wall body of housing construction Download PDF

Info

Publication number
CN218149032U
CN218149032U CN202220449342.1U CN202220449342U CN218149032U CN 218149032 U CN218149032 U CN 218149032U CN 202220449342 U CN202220449342 U CN 202220449342U CN 218149032 U CN218149032 U CN 218149032U
Authority
CN
China
Prior art keywords
wallboard
fixed
wall body
base
seted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220449342.1U
Other languages
Chinese (zh)
Inventor
陈桥渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Haoke Construction Group Co ltd
Original Assignee
Shanghai Haoke Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Haoke Construction Group Co ltd filed Critical Shanghai Haoke Construction Group Co ltd
Priority to CN202220449342.1U priority Critical patent/CN218149032U/en
Application granted granted Critical
Publication of CN218149032U publication Critical patent/CN218149032U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a housing construction environmental protection and energy saving wall body of being under construction fast, including the base, the upper portion fixed mounting of base has limit baffle, and the last fixed surface of base installs the gag lever post, and the side fixed mounting of gag lever post has the fixed strip, and upper portion one side demountable installation of base has first wallboard, and the upper portion opposite side demountable installation of base has the second wallboard, and spacing hole has been seted up at the middle part of first wallboard and second wallboard. This kind of housing construction is environment-friendly and energy-saving wall body of being under construction fast, the fixed strip makes first wallboard and second wallboard skew can not appear when the installation, the piece of interlude is located the inside of interlude groove, can connect the side of first wallboard and second wallboard, simultaneously because of the piece of interlude with the big or small phase-match of interlude groove, can be so that the junction of first wallboard and second wallboard is more inseparable, through the inside screw thread of fixed thread and fixed orifices, can make the side of interlude piece and first wallboard connect more firmly, can accelerate the construction installation of wall body.

Description

Housing construction is environment-friendly energy-saving wall body of being under construction fast
Technical Field
The utility model relates to a housing construction technical field, in particular to housing construction is environmental protection and energy saving wall body under construction fast.
Background
At present, along with the continuous development of society and the continuous construction of cities, better building materials can be selected for ensuring the building quality, and one of the energy-saving wallboards is provided, because the energy-saving wallboards have the characteristics of light weight, heat insulation, sound insulation, heat preservation, no formaldehyde, no benzene, no pollution and the like.
In the building construction, the traditional wall body is stacked by adopting light bricks and connected by cement mortar, the steps for manufacturing the cement mortar are complicated, and in the construction of the wall body, cement mortar needs to be smeared on each light brick to be connected with the previous light brick, so that the construction is troublesome.
Therefore, the environment-friendly and energy-saving wall body for rapid construction of the house building needs to be designed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a housing construction environmental protection and energy saving wall body of being under construction fast to solve the traditional wall body that proposes in the above-mentioned background art and adopt light brick to pile up and connect through cement mortar, make cement mortar step loaded down with trivial details, and during this kind of wall body construction, need all smear cement mortar and be connected with last light brick at every light brick, the comparatively trouble problem of construction.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a housing construction environmental protection and energy saving wall body of being under construction fast, includes the base, the upper portion fixed mounting of base has limit baffle, the last fixed surface of base installs the gag lever post, the side fixed mounting of gag lever post has the fixed strip, upper portion one side demountable installation of base has first wallboard, the upper portion opposite side demountable installation of base has the second wallboard, spacing hole has been seted up at the middle part of first wallboard and second wallboard, the fixed slot has been seted up to the side in spacing hole.
As a preferred technical scheme of the utility model, the lower part of first wallboard and second wallboard and limit baffle's inside size phase-match, and be located limit baffle's inside.
As a preferred technical scheme of the utility model, the diameter phase-match in the diameter of gag lever post and spacing hole, the side of gag lever post is located the inside in spacing hole, the gag lever post runs through in the middle part of first wallboard and second wallboard.
As an optimal technical scheme of the utility model, the width of fixed slot and the width phase-match of fixed strip, the quantity of fixed slot is the same with the quantity of fixed strip, the side of fixed strip is located the inside of fixed slot.
As a preferred technical scheme of the utility model, the interlude groove has been seted up to the one end of first wallboard, the interlude piece has been seted up to the side of second wallboard, the interlude piece is located the inside of interlude groove.
As a preferred technical scheme of the utility model, the fixed orifices has been seted up to the side of wearing slot and interlude piece, the screw hole has been seted up to the rear side of fixed orifices, the inside demountable installation of fixed orifices has the dead lever, fixed screw has been seted up to the one end of dead lever, the one end of dead lever has been seted up and has been borrowed the power groove.
As a preferred technical scheme of the utility model, fixed screw thread and screw hole pass through threaded connection, the one end of dead lever does not surpass the side of first wallboard.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to a housing construction environmental protection and energy saving wall body of being under construction fast has the characteristics of quick construction, specifically speaking:
this kind of housing construction is environment-friendly and energy-saving wall body of being under construction fast, central point between them can be restricted through spacing hole and gag lever post puts, simultaneously because of the width of fixed slot and the width phase-match of fixed strip, the quantity of fixed slot is the same with the quantity of fixed strip, the side of fixed strip is located the inside of fixed slot, can be so that skew can not appear in the installation of first wallboard and second wallboard, it is located the inside of wearing the slot to alternate the piece, can connect the side of first wallboard and second wallboard, simultaneously because of the big or small phase-match of interlude piece and interlude slot, can be so that the junction of first wallboard and second wallboard is more inseparable, through the inside screw thread of fixed thread and fixed orifices, can make the side of interlude piece and first wallboard connect more firmly, can accelerate the construction installation of wall body.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the middle structure of the present invention;
FIG. 3 is a schematic view of the lower structure of the present invention;
fig. 4 is a schematic diagram of the internal structure of the present invention.
In the figure: 1. a base; 2. a limit baffle; 3. a limiting rod; 4. a fixing strip; 5. a first wall panel; 6. a second wall panel; 7. a limiting hole; 8. fixing grooves; 9. inserting the slot; 10. inserting the block; 11. a fixing hole; 12. fixing the rod; 13. fixing threads; 14. a force-borrowing groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-4, the utility model provides a housing construction environmental protection and energy saving wall body that is under construction fast, including base 1, base 1's upper portion fixed mounting has limit baffle 2, base 1's last fixed surface installs gag lever post 3, the side fixed mounting of gag lever post 3 has fixed strip 4, put down first wallboard 5 and second wallboard 6 from the upper portion of gag lever post 3, make both remove to the lower part of gag lever post 3, can restrict central point between them through spacing hole 7 and gag lever post 3 and put, simultaneously because of the width of fixed slot 8 and the width phase-match of fixed strip 4, the quantity of fixed slot 8 is the same with the quantity of fixed strip 4, the side of fixed strip 4 is located the inside of fixed slot 8, can make skew can not appear in first wallboard 5 and second wallboard 6 when the installation, upper portion one side demountable installation of base 1 has first wallboard 5, base 1's upper portion opposite side demountable installation has second wallboard 6, spacing hole 7 has been seted up at the middle part of first wallboard 5 and second wallboard 6, fixed slot 8 has been seted up to the side of spacing hole 7.
The lower part of first wallboard 5 and second wallboard 6 and limiting baffle 2's inside size phase-match, and be located limiting baffle 2's inside, the diameter of gag lever post 3 and the diameter phase-match of spacing hole 7, the side of gag lever post 3 is located the inside of spacing hole 7, gag lever post 3 runs through in the middle part of first wallboard 5 and second wallboard 6, the width of fixed slot 8 and the width phase-match of fixed strip 4, the quantity of fixed slot 8 is the same with the quantity of fixed strip 4, the side of fixed strip 4 is located the inside of fixed slot 8, slot 9 has been seted up to the one end of first wallboard 5, insert piece 10 has been seted up to the side of second wallboard 6, insert piece 10 is located the inside of slot 9, first wallboard 5 and second wallboard 6 are from the time of installing, make insert piece 10 be located the inside of slot 9, can connect the side of first wallboard 5 and second wallboard 6, simultaneously because of insert piece 10 and the size phase-match of slot 9, can be so that the junction of first wallboard 5 and second wallboard 6 is inseparabler more inseparable.
Wear slot 9 and the side of interlude piece 10 and seted up fixed orifices 11, the rear side of fixed orifices 11 is opened and is equipped with the screw hole, the inside demountable installation of fixed orifices 11 has dead lever 12, fixed screw 13 has been seted up to the one end of dead lever 12, through the inside screw thread of fixed screw 13 and fixed orifices 11, can make the side connection of interlude piece 10 and first wallboard 5 more firm, borrow power groove 14 has been seted up to the one end of dead lever 12, fixed screw 13 and screw hole pass through threaded connection, the one end of dead lever 12 does not surpass the side of first wallboard 5.
The working principle is as follows:
this kind of housing construction is environmental protection and energy saving wall body of being under construction fast, at first put down first wallboard 5 and second wallboard 6 from gag lever post 3's upper portion, make both remove to gag lever post 3's lower part, can restrict central point between them through spacing hole 7 and gag lever post 3 and put, simultaneously because of the width of fixed slot 8 and the width phase-match of fixed strip 4, the quantity of fixed slot 8 is the same with the quantity of fixed strip 4, the side of fixed strip 4 is located the inside of fixed slot 8, can make first wallboard 5 and second wallboard 6 can not appear the skew when the installation, it is located the inside of wearing slot 9 to alternate piece 10, can connect the side of first wallboard 5 and second wallboard 6, simultaneously because of the size phase-match that alternates piece 10 and interlude groove 9, can make the junction of first wallboard 5 and second wallboard 6 more inseparable, screw thread through fixed thread 13 and fixed hole 11 inside, can make the side connection that alternates piece 10 and first wallboard 5 and 5 more firm.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a housing construction environmental protection and energy saving wall body of being under construction fast, includes base (1), its characterized in that: the utility model discloses a wall-mounted ceiling lamp, including base (1), the upper portion fixed mounting of base (1) has limit baffle (2), the last fixed surface of base (1) installs gag lever post (3), the side fixed mounting of gag lever post (3) has fixed strip (4), upper portion one side demountable installation of base (1) has first wallboard (5), the upper portion opposite side demountable installation of base (1) has second wallboard (6), spacing hole (7) have been seted up at the middle part of first wallboard (5) and second wallboard (6), fixed slot (8) have been seted up to the side of spacing hole (7).
2. The house building rapid construction environment-friendly energy-saving wall body as claimed in claim 1, characterized in that: the lower parts of the first wallboard (5) and the second wallboard (6) are matched with the inner size of the limiting baffle (2), and are positioned in the limiting baffle (2).
3. The house building rapid construction environment-friendly energy-saving wall body as claimed in claim 1, characterized in that: the diameter of gag lever post (3) and the diameter phase-match of spacing hole (7), the side of gag lever post (3) is located the inside of spacing hole (7), gag lever post (3) run through in the middle part of first wallboard (5) and second wallboard (6).
4. The house building rapid construction environment-friendly energy-saving wall body as claimed in claim 1, characterized in that: the width of fixed slot (8) and the width phase-match of fixed strip (4), the quantity of fixed slot (8) is the same with the quantity of fixed strip (4), the side of fixed strip (4) is located the inside of fixed slot (8).
5. The house building rapid construction environment-friendly energy-saving wall body as claimed in claim 1, characterized in that: the one end of first wallboard (5) has been seted up and has been worn slot (9), the side of second wallboard (6) has been seted up and has been worn insertion block (10), it is located the inside of wearing slot (9) to wear insertion block (10).
6. The house building rapid construction environment-friendly energy-saving wall body as claimed in claim 5, wherein: wear the side of slot (9) and insertion piece (10) and seted up fixed orifices (11), the rear side of fixed orifices (11) is opened and is equipped with the screw hole, the inside demountable installation of fixed orifices (11) has dead lever (12), fixed screw thread (13) have been seted up to the one end of dead lever (12), borrow power groove (14) have been seted up to the one end of dead lever (12).
7. The building construction rapid construction environment-friendly energy-saving wall body as claimed in claim 6, is characterized in that: the fixing threads (13) are connected with the threaded holes through threads, and one end of the fixing rod (12) does not exceed the side face of the first wall plate (5).
CN202220449342.1U 2022-03-03 2022-03-03 Quick construction environmental protection and energy saving wall body of housing construction Active CN218149032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220449342.1U CN218149032U (en) 2022-03-03 2022-03-03 Quick construction environmental protection and energy saving wall body of housing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220449342.1U CN218149032U (en) 2022-03-03 2022-03-03 Quick construction environmental protection and energy saving wall body of housing construction

Publications (1)

Publication Number Publication Date
CN218149032U true CN218149032U (en) 2022-12-27

Family

ID=84548504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220449342.1U Active CN218149032U (en) 2022-03-03 2022-03-03 Quick construction environmental protection and energy saving wall body of housing construction

Country Status (1)

Country Link
CN (1) CN218149032U (en)

Similar Documents

Publication Publication Date Title
CN218149032U (en) Quick construction environmental protection and energy saving wall body of housing construction
CN110761479A (en) Mounting structure and mounting method of assembly type ceiling
CN211949103U (en) Building curtain wall who founds outward convenient to maintain
CN209323870U (en) A kind of marble mounting suspension member and its marble decorative integrated plate
CN106685323A (en) Lightweight double-sided power generation photovoltaic tile with double-glass structures
CN215054047U (en) Prefabricated formula rubber concrete wallboard mosaic structure
CN214220059U (en) Building energy-saving inner partition wall with multiple heat preservation and heat insulation functions
CN211898960U (en) Assembled concrete building connection structure
CN210659032U (en) Light energy-saving wallboard with mounting structure
CN112376747A (en) Building decoration is with assembled partition wall that inside can lay circuit
CN211548481U (en) Energy-conserving wallboard of building of easily installing
CN211691057U (en) Assembled steel construction outer wall
CN221646239U (en) Energy-saving light decorative external wall panel
CN218124079U (en) Prefabricated section convenient to installation electronic box
CN211369228U (en) Mounting structure of assembled furred ceiling
CN217759425U (en) Novel light composite wall board
CN215106278U (en) Green building energy-saving wall
CN219909465U (en) Wall structure convenient to installation has heat preservation effect
CN214739031U (en) Quick installation device of partition plate in assembled
CN211421581U (en) Waterproof heat-insulating wall for pseudo-classic architecture
CN214220119U (en) Building decoration is with assembled partition wall that inside can lay circuit
CN210713392U (en) Slidable argil plate curtain wall connecting piece
CN217580949U (en) Green energy-saving building decorative board
CN216516084U (en) Assembly type structure major structure easy to assemble
CN216380225U (en) Magnesium assembled light composite wall panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant