CN218148043U - Building construction working face sprays dust fall heat sink - Google Patents

Building construction working face sprays dust fall heat sink Download PDF

Info

Publication number
CN218148043U
CN218148043U CN202221806527.XU CN202221806527U CN218148043U CN 218148043 U CN218148043 U CN 218148043U CN 202221806527 U CN202221806527 U CN 202221806527U CN 218148043 U CN218148043 U CN 218148043U
Authority
CN
China
Prior art keywords
water
fixedly connected
dust
base
working face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221806527.XU
Other languages
Chinese (zh)
Inventor
韩卷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221806527.XU priority Critical patent/CN218148043U/en
Application granted granted Critical
Publication of CN218148043U publication Critical patent/CN218148043U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model relates to a construction technical field, and a building construction operation face sprays dust fall heat sink is disclosed, the on-line screen storage device comprises a base, the last fixed surface of base is connected with the air extractor, the output fixed mounting of air extractor has a dirt pipe, the one end of going out the dirt pipe is pegged graft and is had the dust collection case, the input fixed mounting of air extractor has the suction hood, ring is placed to base surface one side fixed connection, places ring fixedly connected with cask, diapire fixedly connected with water pump in the cask, the input fixedly connected with inlet tube of water pump, the output fixed connection water hose of water pump, the one end fixedly connected with water spray assembly of water hose, one side fixedly connected with bracing piece of base upper surface. This building construction working face sprays dust fall heat sink, through the setting of water pump, water spray assembly and bearing, after personnel switch on water pump power, personnel can adjust water spray assembly from top to bottom and make the water injection area enlarge to the effect of dust fall cooling has been played.

Description

Building construction working face sprays dust fall heat sink
Technical Field
The utility model relates to a construction technical field specifically is a building construction working face sprays dust fall heat sink.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place.
The construction operation face that discloses in chinese utility model patent application laid-open specification CN209138217U sprays dust fall heat sink, though, through the setting to the shower nozzle device, the shower nozzle device includes first shower nozzle, the second shower nozzle, the third shower nozzle, three shower nozzle has realized that the device sprays hierarchical adjustability of cooling, the unit area water spray volume of first shower nozzle is big, later shower nozzle water spray area increases in proper order, the unit water spray volume reduces, greatly increased the efficiency of cooling dust fall, joint effect between the shower nozzle makes three shower nozzle conveniently dismantle, the top joint of shower nozzle has the shower nozzle lid, the setting of shower nozzle lid has made things convenient for the connection between the shower nozzle.
However, the spraying dust-fall cooling device for the construction working face has the defects of inconvenience in dust fall for many times and inconvenience in enlarging the dust-fall cooling area.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building construction working face sprays dust fall heat sink has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a building construction operation face sprays dust fall heat sink, includes the base, the last fixed surface of base is connected with the air exhauster, the output fixed mounting of air exhauster has out the dirt pipe, the one end of going out the dirt pipe is pegged graft and is had the dust collection case, the input fixed mounting of air exhauster has the suction hood, ring is placed to base surface one side fixed connection, place ring fixedly connected with cask, diapire fixedly connected with water pump in the cask, the input fixedly connected with inlet tube of water pump, the output fixed connection play water hose of water pump, the one end fixedly connected with water spray component of play water hose, water spray component's bottom fixedly connected with telescopic link, one side fixedly connected with bracing piece of base upper surface, the board is placed to the one end fixedly connected with of bracing piece, the fixed surface of placing the board is connected with the connecting block, the fixed surface of connecting block is connected with the connecting rod, the one end fixedly connected with bearing of connecting rod, one side of bearing rotates and connects in water spray component's surface.
Optionally, the water spray assembly comprises a water guide pipe, shunt pipes and a spray head, one end of the water outlet hose is fixedly connected with the water guide pipe, the surface of the water guide pipe is fixedly connected with the shunt pipes, and one ends of the shunt pipes are fixedly connected with the spray head.
Optionally, the other side of the upper surface of the base is fixedly connected with a supporting column, and the surface of the supporting column is fixedly connected with a handle.
Optionally, a water injection hole is formed in the upper surface of the bucket, and a closing plug is inserted into the water injection hole.
Optionally, a water level groove is formed in the surface of the water barrel, and glass is embedded in the water level groove.
Optionally, the bottom of the base is fixedly connected with universal wheels, and the surface of the dust collection box is provided with air holes.
(III) advantageous effects
The utility model provides a building construction working face sprays dust fall heat sink possesses following beneficial effect:
1. this building construction working face sprays dust fall heat sink, through the setting of water pump and water spray assembly and bearing, after personnel switch on water pump power, personnel can adjust water spray assembly from top to bottom and make the water injection area enlarge to the effect of dust fall cooling has been played.
2. This building construction working face sprays dust fall heat sink through the setting of air extractor, play dirt pipe, extraction hood and dust collection box, behind personnel switch-on air extractor power, the air extractor begins work, and then the extraction hood carries out the dust in the air extraction, then goes out the dirt pipe and sends into dust collection incasement with dust to the effect of dust fall has been played many times.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the sectional structure of the bucket of the present invention;
FIG. 3 is a schematic sectional view of the water spraying assembly of the present invention;
FIG. 4 is a schematic sectional view of the dust collecting box of the present invention;
fig. 5 is a schematic view of the structure of the air extractor of the present invention.
In the figure: 1. a base; 2. an air extractor; 3. a dust outlet pipe; 4. a dust hood; 5. placing a ring; 6. a water bucket; 7. a water pump; 8. a water outlet hose; 9. a water spray assembly; 901. a water conduit; 902. a spray head; 10. a support bar; 11. placing a plate; 12. connecting blocks; 13. a connecting rod; 14. a bearing; 15. a dust collection box; 16. a support column; 17. the plug is closed.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 5, the present invention provides a technical solution: a spraying dust-reducing temperature-reducing device for building construction operation surface comprises a base 1, an air pump 2 is fixedly connected to the upper surface of the base 1, dust is sucked by the air pump 2, a dust outlet pipe 3, a dust hood 4 and a dust collection box 15, when a person turns on the power supply of the air pump 2, the dust hood 4 starts to suck dust, then the dust outlet pipe 3 conveys dust to the dust collection box 15, thereby playing a role of discharging dust, the output end of the air pump 2 is fixedly provided with the dust outlet pipe 3, one end of the dust outlet pipe 3 is inserted with the dust collection box 15, the input end of the air pump 2 is fixedly provided with the dust hood 4, one side of the surface of the base 1 is fixedly connected with a placing ring 5, the placing ring 5 is fixedly connected with a water barrel 6, the role of placing a water source is played by the arrangement of the water barrel 6, a water pump 7 is fixedly connected to the inner bottom wall of the water outlet hose 8 and a water spraying assembly 9, after the person turns on the power supply of the water pump 7, the water outlet hose 8 is connected with a water-guiding pipe 901, thereby playing a role of automatically reducing temperature by the water, one end of the water-spraying plug 9, and the water-reducing device is connected to the bottom of the water-reducing device, and the water-reducing device is connected with a water-reducing device by the bottom of the water-reducing device, and the water-reducing device is connected with the water-reducing device, and the bottom of the water-reducing device, and the water-reducing device, the fixed surface of connecting block 12 is connected with connecting rod 13, the one end fixedly connected with bearing 14 of connecting rod 13, setting through bearing 14, the adjustable angle from top to bottom of personnel when spraying water, thereby played the effect that can enlarge the water spray area, one side of bearing 14 is rotated and is connected in spraying water subassembly 9, spraying water subassembly 9 includes aqueduct 901 and shower nozzle 902, the one end fixedly connected with aqueduct 901 of delivery hose 8, the one end fixedly connected with a plurality of shower nozzle 902 of aqueduct 901, the opposite side fixedly connected with support column 16 of base 1 upper surface, the fixed surface of support column 16 is connected with the handle, the water injection hole has been seted up to the upper surface of cask 6, the grafting of water injection hole has closed stopper 17, the water level groove has been seted up to the surface of cask 6, through the setting of water level groove, thereby played and made things convenient for personnel to observe the water level, the inside in water level groove is inlayed and is equipped with glass, the bottom fixedly connected with the universal wheel of base 1, the bleeder vent has been seted up to the surface of case 15 gathers dust.
The utility model discloses in, the device's working procedure as follows:
1. firstly, after a person switches on a power supply of the air extractor 2, the dust hood 4 starts to absorb dust, and then the dust outlet pipe 3 conveys the dust into the dust collection box 15, so that the dust absorption and dust falling effects are achieved;
2. then, after a person switches on a power supply of the water pump 7, the water outlet hose 8 conveys water to the water guide pipe 901, then the person adjusts the position of the spray head 902 and fixes the spray head 902 by using a telescopic rod, and then the spray head 902 starts to spray water, so that the water spraying area is enlarged, and the effects of enlarging the area, reducing dust and cooling are achieved;
3. and finally, a person holds the handle to push the device to move for dust fall.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building construction working face sprays dust fall heat sink, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with an air extractor (2), the output end of the air pump (2) is fixedly provided with a dust outlet pipe (3), one end of the dust outlet pipe (3) is inserted with a dust collection box (15), the input end of the air pump (2) is fixedly provided with a dust collection cover (4), one side of the surface of the base (1) is fixedly connected with a placing ring (5), the placing ring (5) is fixedly connected with a bucket (6), the inner bottom wall of the bucket (6) is fixedly connected with a water pump (7), the input end of the water pump (7) is fixedly connected with a water inlet pipe, the output end of the water pump (7) is fixedly connected with a water outlet hose (8), one end of the water outlet hose (8) is fixedly connected with a water spraying component (9), the bottom of the water spray component (9) is fixedly connected with a telescopic rod, one side of the upper surface of the base (1) is fixedly connected with a supporting rod (10), one end of the supporting rod (10) is fixedly connected with a placing plate (11), the surface of the placing plate (11) is fixedly connected with a connecting block (12), the surface of the connecting block (12) is fixedly connected with a connecting rod (13), one end of the connecting rod (13) is fixedly connected with a bearing (14), one side of the bearing (14) is rotatably connected to the surface of the water spray assembly (9).
2. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 1, which is characterized in that: the water spraying assembly (9) comprises a water guide pipe (901), shunt pipes (903) and a spray head (902), one end of the water outlet hose (8) is fixedly connected with the water guide pipe (901), the surface of the water guide pipe (901) is fixedly connected with the shunt pipes (903), and one end of each shunt pipe (903) is fixedly connected with the spray head (902).
3. The building construction working face spraying dust fall cooling device according to claim 1, characterized in that: the other side fixedly connected with support column (16) of base (1) upper surface, the fixed surface of support column (16) is connected with the handle.
4. The building construction working face spraying dust fall cooling device according to claim 1, characterized in that: the upper surface of the bucket (6) is provided with a water injection hole, and a closing plug (17) is inserted into the water injection hole.
5. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 1, which is characterized in that: the water barrel (6) is characterized in that a water level groove is formed in the surface of the water barrel, and glass is embedded in the water level groove.
6. The building construction working face spraying dust fall cooling device according to claim 1, characterized in that: the bottom of the base (1) is fixedly connected with universal wheels, and the surface of the dust collection box (15) is provided with air holes.
CN202221806527.XU 2022-07-13 2022-07-13 Building construction working face sprays dust fall heat sink Active CN218148043U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221806527.XU CN218148043U (en) 2022-07-13 2022-07-13 Building construction working face sprays dust fall heat sink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221806527.XU CN218148043U (en) 2022-07-13 2022-07-13 Building construction working face sprays dust fall heat sink

Publications (1)

Publication Number Publication Date
CN218148043U true CN218148043U (en) 2022-12-27

Family

ID=84594642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221806527.XU Active CN218148043U (en) 2022-07-13 2022-07-13 Building construction working face sprays dust fall heat sink

Country Status (1)

Country Link
CN (1) CN218148043U (en)

Similar Documents

Publication Publication Date Title
CN108854343B (en) Dust device for civil construction
CN107552968A (en) A kind of tubular article laser engraving machine
CN215782420U (en) City environment-friendly construction site dust removal dust device
CN218148043U (en) Building construction working face sprays dust fall heat sink
CN213699273U (en) Automatic dust removal and spraying device for green building construction
CN213761070U (en) Environmental protection dust collecting equipment of building engineering construction
CN209934381U (en) Dust fall dust suppression device for building site
CN216398412U (en) Dust removal device of laser engraving machine
CN216572290U (en) Building civil engineering job site is with watering dust fall equipment
CN213836505U (en) Atomizing dust device for construction
CN213132491U (en) Building construction dust device
CN211656306U (en) Wireless base station power supply device
CN110882872A (en) Construction is with even atomizing spray set
CN219111213U (en) Dust removing device
CN208742171U (en) A kind of novel vertical deduster
CN110680227A (en) Dust collecting equipment for multi-purpose building construction
CN218880704U (en) Dust device for construction
CN219784258U (en) Hand-push type dust removing equipment for construction site
CN212017208U (en) Building construction dust collector
CN209753633U (en) Construction site dust collecting equipment
CN218924190U (en) High-efficient raise dust processing apparatus
CN218794909U (en) Dust collector for house construction
CN215138209U (en) Dust device for building finishing engineering
CN211436733U (en) Construction is with even atomizing spray set
CN219462937U (en) Environment-friendly dust fall device for worksite

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant