CN218136211U - Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange - Google Patents

Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange Download PDF

Info

Publication number
CN218136211U
CN218136211U CN202222034616.3U CN202222034616U CN218136211U CN 218136211 U CN218136211 U CN 218136211U CN 202222034616 U CN202222034616 U CN 202222034616U CN 218136211 U CN218136211 U CN 218136211U
Authority
CN
China
Prior art keywords
bolt
main valve
valve flange
temporary
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222034616.3U
Other languages
Chinese (zh)
Inventor
田建弟
王俊飙
蒋浩
李峻
赵明
赵增文
张晋
李�杰
闫龙
刘明则
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Shanxi Electric Power Construction Co Ltd
Original Assignee
China Energy Engineering Group Shanxi Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Shanxi Electric Power Construction Co Ltd filed Critical China Energy Engineering Group Shanxi Electric Power Construction Co Ltd
Priority to CN202222034616.3U priority Critical patent/CN218136211U/en
Application granted granted Critical
Publication of CN218136211U publication Critical patent/CN218136211U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a drilling and removing device for a blow pipe temporary pipeline connecting bolt buckled on a main valve flange, which solves the problem of how to safely and quickly remove the bolt left in a bolt hole; a main throttle valve supporting iron plate (4) is arranged on a main throttle valve flange (1) of the steam turbine, a right convex tongue (6) and a left convex tongue (7) are respectively arranged on the main throttle valve supporting iron plate (4), the main throttle valve supporting iron plate (4) is fixed on the main throttle valve flange (1) of the steam turbine by connecting bolts arranged on the two convex tongues, a magnetic electric drill (12) for controlling the stroke of a drill bit by hand is arranged on the main throttle valve supporting iron plate (4), and a drill bit (13) on the magnetic electric drill (12) for controlling the stroke of the drill bit by hand is abutted against the exposed top end surface of a fastened bolt (3); the utility model discloses can demolish fast by the interim bolt of being held in the bolt hole, the time of having practiced thrift, protected the interior knot of screw on the steam turbine main throttle flange.

Description

Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange
Technical Field
The utility model relates to a remove device of connecting bolt, in particular to device that removal was bored to the interim pipeline connecting bolt of blowpipe that can't take out on the main throttle.
Background
Before a thermal generator set is installed and put into operation, in order to ensure safe and economic operation of the generator set, purging operation must be carried out on a main steam pipeline and a superheater pipeline in the generator set, so that rust, welding slag, iron oxide and other impurities in the pipelines are discharged out of the pipeline of the generator set under the hypochondriac flushing of high-temperature steam flow; when the operation is carried out on site, a boiler blow pipe temporary pipeline is fixed and sealed on a flange plate of a main throttle valve of the steam turbine by using a temporary bolt, so that high-temperature steam flows enter a generator set through the boiler blow pipe temporary pipeline, and the main steam pipeline and a superheater pipeline are cleaned; after the pipeline of the unit is washed clean through multiple times of pipe blowing operation, connecting bolts on a main throttle flange of the steam turbine connected with a temporary pipeline need to be detached, so that the main throttle flange of the steam turbine is restored to the original state, and the subsequent installation work is completed; because the purging operation is performed at high temperature and high pressure, some bolts and screw holes are tightly combined together after the purging operation is performed at high temperature and high pressure, and cannot be detached; when the situation is met, the cleaning pipeline connected to the main valve flange of the steam turbine is cut off on site, the cleaning pipeline is separated from the main valve flange of the steam turbine, and the phenomenon that connecting bolts which cannot be detached are left in bolt holes is caused by the treatment mode; in the prior art, the bolt is baked by adopting a mode that the air handle is left in the bolt hole, the inner buckle of the bolt hole is easy to damage by the operation method, and the air handle is long in time consumption for baking the bolt, sometimes up to more than ten hours; how to safely remove the bolt left in the bolt hole quickly is a difficult problem to be solved in field operation.
Disclosure of Invention
The utility model provides a by the interim pipeline connecting bolt's of blowpipe boring that is detained device is removed on main valve flange, has solved how swiftly to leave over the technical problem that the bolt safety in the bolt hole was got rid of safely.
The utility model discloses a solve above technical problem through following technical scheme:
a drilling device for a blow pipe temporary pipeline connecting bolt buckled on a main valve flange comprises a main valve flange (1) of a steam turbine, the main valve flange bolt holes (2) are arranged on the main valve flange (1) of the steam turbine at equal intervals in a radian way, a buckled bolt (3) is arranged in one of the main valve flange bolt holes (2), a main valve supporting iron plate (4) is arranged on a main valve flange (1) of the steam turbine, a right convex tongue (6) and a left convex tongue (7) are respectively arranged on the main valve support iron plate (4), the right convex tongue (6) is arranged on the right side of the main valve flange bolt hole where the snapped bolt (3) is positioned, the left convex tongue (7) is arranged on the left side of the main valve flange bolt hole where the snapped bolt (3) is positioned, a right temporary bolt through hole (8) is arranged on the right tongue (6), a right temporary bolt (9) is connected in the right temporary bolt through hole (8) in a penetrating way, the right temporary bolt (9) is screwed with the main valve flange bolt hole (2) on the right side of the engaged bolt (3), a left temporary bolt through hole (10) is arranged on the left tongue (7), a left temporary bolt (11) penetrates through the left temporary bolt penetrating hole (10), and the left temporary bolt (11) is in threaded connection with the main valve flange bolt hole (2) on the left side of the engaged bolt (3); a magnetic electric drill (12) for controlling the drill stroke by hand is arranged on the main throttle supporting iron plate (4), and a drill bit (13) on the magnetic electric drill (12) for controlling the drill stroke by hand is abutted against the exposed top end surface of the engaged bolt (3).
A central mark groove is arranged on the exposed top end surface of the snapped bolt (3), and a drill bit (13) on a magnetic electric drill (12) for controlling the drill bit stroke by hand is abutted in the central mark groove.
After the interim pipeline of blowpipe is cut off, the utility model discloses can demolish fast by the interim bolt of stinging the knot in the bolt hole, practice thrift the time, protect the interior knot of screw on the steam turbine main throttle flange.
Drawings
Fig. 1 is a schematic structural view in a top view direction of the present invention;
fig. 2 is a schematic structural view in the front view direction of the present invention.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings:
a drilling device for temporary pipeline connecting bolts of a hooked blowing pipe on a main valve flange comprises a main valve flange (1) of a steam turbine, the main valve flange bolt holes (2) are arranged on the main valve flange (1) of the steam turbine at equal intervals in a radian way, a buckled bolt (3) is arranged in one of the main valve flange bolt holes (2), a main valve supporting iron plate (4) is arranged on a main valve flange (1) of the steam turbine, a right convex tongue (6) and a left convex tongue (7) are respectively arranged on the main valve support iron plate (4), the right convex tongue (6) is arranged on the right side of the main valve flange bolt hole where the snapped bolt (3) is positioned, the left convex tongue (7) is arranged on the left side of the main valve flange bolt hole where the snapped bolt (3) is positioned, a right temporary bolt through hole (8) is arranged on the right tongue (6), a right temporary bolt (9) is connected in the right temporary bolt through hole (8) in a penetrating way, the right temporary bolt (9) is screwed with the main valve flange bolt hole (2) on the right side of the engaged bolt (3), a left temporary bolt through hole (10) is arranged on the left tongue (7), a left temporary bolt (11) penetrates through the left temporary bolt penetrating hole (10), and the left temporary bolt (11) is in threaded connection with the main valve flange bolt hole (2) on the left side of the engaged bolt (3); a magnetic electric drill (12) for controlling the drill stroke by hand is arranged on the main throttle supporting iron plate (4), and a drill bit (13) on the magnetic electric drill (12) for controlling the drill stroke by hand is abutted against the exposed top end surface of the engaged bolt (3).
A central marking groove is arranged on the top end surface of the exposed part of the engaged bolt (3), and a drill bit (13) on a magnetic electric drill (12) for controlling the drill bit stroke by hand is abutted in the central marking groove.
Fixing and sealing a boiler blowing pipe temporary pipeline on a flange plate of a main throttle valve of the steam turbine by using a temporary bolt, and allowing high-temperature steam to enter a generator set through the boiler blowing pipe temporary pipeline to clean a main steam pipeline and a superheater pipeline; after the operation is finished, when temporary bolts between a boiler blowpipe temporary pipeline and a flange plate of a main throttle of a steam turbine are dismounted, if a certain bolt is buckled, and the boiler blowpipe temporary pipeline is difficult to dismount, the boiler blowpipe temporary pipeline can be removed only in a hot cutting mode, and the buckled temporary bolts are left in bolt holes; according to the inner diameter of a thread buckle on the buckled temporary bolt, a drill bit (13) with the same diameter is selected; then, a main throttle valve supporting iron plate (4) is processed, the size of the main throttle valve supporting iron plate can be supported on a main throttle valve of the steam turbine, a left temporary bolt through hole (10) is butted on a main throttle valve flange bolt hole on the left side of the snap-in temporary bolt, a right temporary bolt through hole (8) is butted on a main throttle valve flange bolt hole on the right side of the snap-in temporary bolt, the snap-in temporary bolt is arranged between a right convex tongue (6) and a left convex tongue (7), connecting bolts are respectively penetrated in the left temporary bolt through hole (10) and the right temporary bolt through hole (8), and the main throttle valve supporting iron plate (4) is fixed on a main throttle valve flange (1) of the steam turbine; adsorbing a magnetic electric drill (12) on a main throttle supporting iron plate (4), aligning a drill bit (13) with a gripped bolt (3), after the electric drill is started, downwards pushing a control drill bit (13) through a hand wheel on the magnetic electric drill, drilling the gripped bolt (3), dismounting a rod piece drilling pin in a screw thread of the gripped bolt (3), then pulling out the drill bit (13), and finally taking out spiral residues still left in the internal thread of a threaded hole; the utility model discloses a this kind of operation method can be taken out from the bolt hole by the snap bolt (3), has protected the interior spiral shell of threaded hole again and has buckled at this process and not damaged.

Claims (2)

1. A drilling device for a blow pipe temporary pipeline connecting bolt buckled on a main valve flange comprises a main valve flange (1) of a steam turbine, the main valve flange bolt holes (2) are arranged on the main valve flange (1) of the steam turbine at equal intervals in radian, a buckled bolt (3) is arranged in one of the main valve flange bolt holes (2), it is characterized in that a main throttle valve supporting iron plate (4) is arranged on a main throttle valve flange (1) of the steam turbine, a right convex tongue (6) and a left convex tongue (7) are respectively arranged on the main valve support iron plate (4), the right convex tongue (6) is arranged on the right side of the main valve flange bolt hole where the snapped bolt (3) is positioned, the left convex tongue (7) is arranged on the left side of the main valve flange bolt hole where the snapped bolt (3) is positioned, a right temporary bolt through hole (8) is arranged on the right tongue (6), a right temporary bolt (9) is connected in the right temporary bolt through hole (8) in a penetrating way, the right temporary bolt (9) is screwed with the main valve flange bolt hole (2) on the right side of the engaged bolt (3), a left temporary bolt through hole (10) is arranged on the left tongue (7), a left temporary bolt (11) penetrates through the left temporary bolt penetrating hole (10), and the left temporary bolt (11) is in threaded connection with the main valve flange bolt hole (2) on the left side of the engaged bolt (3); a magnetic electric drill (12) for controlling the drill stroke by hand is arranged on the main throttle supporting iron plate (4), and a drill bit (13) on the magnetic electric drill (12) for controlling the drill stroke by hand is abutted against the exposed top end surface of the engaged bolt (3).
2. A device for drilling out a temporary pipeline connection bolt of a blow pipe which is snapped on a main valve flange according to claim 1, characterized in that a central marking groove is arranged on the exposed top end surface of the snapped bolt (3), and a drill bit (13) of a magnetic electric drill (12) which controls the stroke of the drill bit by hand is abutted in the central marking groove.
CN202222034616.3U 2022-08-03 2022-08-03 Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange Active CN218136211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222034616.3U CN218136211U (en) 2022-08-03 2022-08-03 Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222034616.3U CN218136211U (en) 2022-08-03 2022-08-03 Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange

Publications (1)

Publication Number Publication Date
CN218136211U true CN218136211U (en) 2022-12-27

Family

ID=84597118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222034616.3U Active CN218136211U (en) 2022-08-03 2022-08-03 Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange

Country Status (1)

Country Link
CN (1) CN218136211U (en)

Similar Documents

Publication Publication Date Title
JP6398923B2 (en) Tool for removing broken or damaged bolts
CN218136211U (en) Drilling and removing device for blow pipe temporary pipeline connecting bolt buckled on main throttle flange
CN113686195B (en) Intelligent monitoring and blocking removing equipment for air pre-heater of bag-type dust collector unit
CN114317851A (en) Online automatic cleaning device for blast furnace coal injection system and control method thereof
WO2021258569A1 (en) Umbrella-like collection system for chippings falling into pipe when cutting non-horizontally arranged pipe
CN210568511U (en) Target plate device for quickly replacing target plate in boiler steam blowpipe
CN210754179U (en) Condenser pipeline dredging device
CN109234481B (en) Method and system for fully recovering coal gas diffused by blast furnace top charging bucket
CN110496830B (en) Condenser pipeline dredging device and dredging method thereof
JPH0197544A (en) Device and method of machining periphery of opening of work
CN105986057B (en) A kind of gasification cooling flue heat pipe replacing options
JP5320052B2 (en) Soot blower and operation method thereof
CN111702660A (en) Online ultrahigh-pressure water jet cutting method for blast furnace shell and cooling wall
JP2005291710A (en) Dismantling method of nuclear reactor
CN208357393U (en) A kind of device of tube inner wall cleaning
CN220453649U (en) On-line blockage removing device for fluidized bed boiler returning charge device and fluidized bed boiler system
CN215982627U (en) Online cleaning structure for accumulated dust of smoke tube boiler
CN218295765U (en) Gun body advancing and retreating auxiliary device applicable to steam soot blower of thermal power station
CN210613144U (en) Pulse type dust removal mechanism
CN220880876U (en) High-pressure oxygen cutting gun device for cutting large nickel-iron blocks
CN207899256U (en) A kind of device of protection cooling spray gun
CN210425000U (en) Boiler water level automatic control device
CN211175892U (en) Pipeline blocking and isolating device
CN218270349U (en) Smoke heat exchanger header with snooping maintenance device
CN113211369B (en) Method for disassembling bolt working on marine equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant