CN218117674U - Building engineering building climbing frame - Google Patents

Building engineering building climbing frame Download PDF

Info

Publication number
CN218117674U
CN218117674U CN202221832264.XU CN202221832264U CN218117674U CN 218117674 U CN218117674 U CN 218117674U CN 202221832264 U CN202221832264 U CN 202221832264U CN 218117674 U CN218117674 U CN 218117674U
Authority
CN
China
Prior art keywords
frame body
wall
frame
building
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221832264.XU
Other languages
Chinese (zh)
Inventor
夏文秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Changchen Construction Engineering Co ltd
Original Assignee
Anhui Changchen Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Changchen Construction Engineering Co ltd filed Critical Anhui Changchen Construction Engineering Co ltd
Priority to CN202221832264.XU priority Critical patent/CN218117674U/en
Application granted granted Critical
Publication of CN218117674U publication Critical patent/CN218117674U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a building engineering technology field just discloses a building engineering building climbs frame, including the framework, be provided with installation mechanism in the framework, installation mechanism includes: two connection pieces are fixedly installed on the left side of the top of the outer wall of the frame body in sequence, the bottom end of the support arm is hinged between the two connection pieces through a first bolt, the bottom of the insertion block is fixedly connected with the top end of the support arm, one end of the hook arm is hinged on the left side of the front top of the outer wall of the frame body through a second bolt, and the slot is formed in the left side of the front bottom of the outer wall of the frame body. Insert in the T groove of another framework through the T board in a framework, the connection piece is inserted in the slot of another to rotatory support arm inserts the jack with the inserted block, promotes and climbs the stability between the installation, prevents to drop, pegs graft through slot and connection piece, and inserted block and jack are pegged graft, collude arm and bayonet lock joint, and T groove and T board are pegged graft, have made things convenient for installation and the dismantlement of climbing the frame, provide the work convenience.

Description

Building engineering building climbing frame
Technical Field
The utility model relates to a building engineering technical field specifically is a building engineering building climbs frame.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized in that the building is provided with a top cover, a beam column, a wall, a foundation and an inner space, and the engineering building climbing frame meeting the requirements of production, living, learning and public activities of people is often used in large buildings.
Most of the prior building creeps are formed by splicing a plurality of frames, and the connection between the frames is usually fixed by matching screws and nuts.
But when climbing the mutual installation of frame, stability between still has the space of promotion, and it is loaded down with trivial details to climb the frame installation and dismantle moreover, and work is convenient inadequately.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering building climbs frame reaches the purpose of solving above-mentioned problem.
In order to achieve the above purpose, the utility model provides a following technical scheme: a climbing frame for building engineering buildings comprises a frame body, wherein an installation mechanism is arranged on the frame body;
the installation mechanism includes:
the two connecting sheets are sequentially and fixedly arranged on the left side of the top of the outer wall of the frame body;
the bottom end of the support arm is hinged between the two connecting sheets through a first bolt;
the bottom of the inserting block is fixedly connected with the top end of the supporting arm;
one end of the hook arm is hinged to the left side of the top of the front surface of the outer wall of the frame body through a second bolt;
the slot is arranged on the left side of the front bottom of the outer wall of the frame body.
Preferably, the number of the mounting mechanisms is two, and the other mounting mechanism is symmetrically arranged on the right side of the outer wall of the frame body.
Preferably, two jacks are sequentially formed in the bottom of the inner wall of the frame body. The two frame bodies are fixed by inserting the insertion block into the insertion hole.
Preferably, two clamping pins are sequentially and fixedly mounted at the bottom of the front surface of the outer wall of the frame body. The hook arm is rotated to buckle the bayonet of the other frame body.
Preferably, a T-plate is fixedly mounted on the left side of the outer wall of the frame.
Preferably, a T-shaped groove is formed in the right side of the outer wall of the frame body. And the two frames are transversely assembled by arranging a T groove and inserting the T plate.
The utility model provides a frame is climbed to building engineering building. The method has the following beneficial effects:
(1) The utility model discloses a T board in the framework is inserted in the T groove of another framework, and the connection piece is inserted in another slot to rotatory support arm inserts the jack with the inserted block, promotes the stability of climbing between the installation, prevents to drop.
(2) The utility model discloses a slot and connection piece are pegged graft, and inserted block and jack are pegged graft, collude arm and bayonet lock joint, and T groove and T board are pegged graft, have made things convenient for the installation and the dismantlement of climbing the frame, provide the work convenience.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a perspective view of the frame of the present invention;
fig. 3 is a top cross-sectional view of the frame of the present invention.
In the figure: 1. a frame body; 2. an installation mechanism; 201. connecting sheets; 202. a first bolt; 203. a support arm; 204. inserting a block; 205. a second bolt; 206. a hook arm; 207. a slot; 3. a jack; 4. a bayonet lock; 5. a T plate; 6. t groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or may be connected through the use of two elements or the interaction of two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The first embodiment is as follows:
as shown in fig. 1-3, the utility model provides a technical scheme: the utility model provides a frame is climbed to building engineering building, includes framework 1, is provided with installation mechanism 2 on the framework 1, and installation mechanism 2 includes: the two connecting pieces 201 are sequentially and fixedly arranged on the left side of the top of the outer wall of the frame body 1, the bottom end of the support arm 203 is hinged between the two connecting pieces 201 through a first bolt 202, the bottom of the inserting block 204 is fixedly connected with the top end of the support arm 203, one end of the hook arm 206 is hinged on the left side of the top of the front face of the outer wall of the frame body 1 through a second bolt 205, the slot 207 is arranged on the left side of the bottom of the front face of the outer wall of the frame body 1, the two mounting mechanisms 2 are arranged, the other mounting mechanism is symmetrically arranged on the right side of the outer wall of the frame body 1, two inserting holes 3 are sequentially arranged at the bottom of the inner wall of the frame body 1, and two clamping pins 4 are sequentially and fixedly arranged at the bottom of the front face of the outer wall of the frame body 1;
in this embodiment, the connecting piece 201 of one frame 1 is inserted into the slot 207 of the other frame, the support arm 203 is rotated, the inserting block 204 on the connecting piece 201 is inserted into the inserting hole 3 on the other frame 1 to fix the two frames 1, and the hook arm 206 is rotated to be buckled on the bayonet 4 of the other frame 1 to fix the two frames 1, thereby completing the assembly of the upper and lower frames 1.
The second embodiment:
as shown in fig. 1-3, on the basis of the first embodiment, the utility model provides a technical solution: a T plate 5 is fixedly arranged on the left side of the outer wall of the frame body 1, and a T groove 6 is formed in the right side of the outer wall of the frame body 1;
in this embodiment, the T-plate 5 of one frame 1 is inserted into the T-groove 6 of the other frame 1, so as to resist the force from the left and right sides, and at the same time, the insertion of the T-plate 5 and the T-groove 6 can be released for quick detachment, thereby completing the assembly of the left and right frames 1.
When the climbing frame is used, a plurality of frame bodies 1 are sequentially overlapped to form the climbing frame, the T plate 5 on one frame body 1 is inserted into the T groove 6 of the other frame body 1 to resist transverse force, the connecting piece 201 of one frame body 1 is inserted into the other slot 207, the support arm 203 is rotated by taking the first bolt 202 as an axis, the inserting block 204 is inserted into the inserting hole 3 to fix the two frame bodies 1 to resist front-back force and oblique force, and then the hook arm 206 is rotated by taking the second bolt 205 as an axis to be buckled on the bayonet 4 of the other frame body 1 to be fixed to resist gravity.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a reference structure" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.

Claims (6)

1. The utility model provides a frame is climbed to building engineering building, includes framework (1), its characterized in that: the frame body (1) is provided with an installation mechanism (2);
the mounting mechanism (2) comprises:
the two connecting pieces (201) are sequentially fixedly arranged on the left side of the top of the outer wall of the frame body (1);
the bottom end of the support arm (203) is hinged between the two connecting pieces (201) through a first bolt (202);
the bottom of the inserting block (204) is fixedly connected with the top end of the support arm (203);
one end of a hook arm (206) is hinged to the left side of the top of the front side of the outer wall of the frame body (1) through a second bolt (205);
the slot (207) is arranged on the left side of the front bottom of the outer wall of the frame body (1).
2. The construction engineering building climbing frame according to claim 1, characterized in that: the number of the installation mechanisms (2) is two, and the other installation mechanism is symmetrically arranged on the right side of the outer wall of the frame body (1).
3. The building engineering building climbing frame according to claim 1, characterized in that: two jacks (3) are sequentially arranged at the bottom of the inner wall of the frame body (1).
4. The construction engineering building climbing frame according to claim 1, characterized in that: two clamping pins (4) are sequentially and fixedly mounted at the bottom of the front side of the outer wall of the frame body (1).
5. The construction engineering building climbing frame according to claim 1, characterized in that: the left side of the outer wall of the frame body (1) is fixedly provided with a T plate (5).
6. The construction engineering building climbing frame according to claim 1, characterized in that: and a T-shaped groove (6) is formed in the right side of the outer wall of the frame body (1).
CN202221832264.XU 2022-07-17 2022-07-17 Building engineering building climbing frame Expired - Fee Related CN218117674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221832264.XU CN218117674U (en) 2022-07-17 2022-07-17 Building engineering building climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221832264.XU CN218117674U (en) 2022-07-17 2022-07-17 Building engineering building climbing frame

Publications (1)

Publication Number Publication Date
CN218117674U true CN218117674U (en) 2022-12-23

Family

ID=84516881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221832264.XU Expired - Fee Related CN218117674U (en) 2022-07-17 2022-07-17 Building engineering building climbing frame

Country Status (1)

Country Link
CN (1) CN218117674U (en)

Similar Documents

Publication Publication Date Title
CN111851913B (en) Assembled detachable wallboard system and installation method
CN113356365B (en) Box type house structure connected through full bolts and construction method
CN218117674U (en) Building engineering building climbing frame
CN113006340A (en) Modular assembly type partition wall
JP5270147B2 (en) Temporary scaffolding connection structure
CN220184350U (en) Assembled building outer wall connecting component
CN213358959U (en) Building house frame roof beam
CN217353057U (en) Modular assembly type partition wall structure
CN211172654U (en) Assembled light gauge steel structure
CN212249347U (en) Pump house
CN215717275U (en) Connecting piece for aluminum alloy template system
CN220620564U (en) Spliced partition panel
CN219833628U (en) Bridge frame with cover capable of being detached
CN210508304U (en) Multistage assembled lattice frame building structure
CN219196258U (en) One-way plug-in beam column connector of assembled concrete beam column
CN215406803U (en) Strip buckle type curtain wall and inner chamber ceiling
CN219386661U (en) Movable board house connection structure
CN116084747A (en) Movable board house convenient to installation
CN218405827U (en) Board house rapid disassembly structure
CN217379223U (en) Anti-seismic staggered truss steel frame structure
CN216641124U (en) Keel connecting structure at window opening
CN220565511U (en) Curtain wall with mortise and tenon mounting structure
CN220580467U (en) Lifting platform
CN214272425U (en) Connecting piece for mounting steel structure of light steel house
CN113802718B (en) Reinforced assembled wall mounting piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221223

CF01 Termination of patent right due to non-payment of annual fee