CN218093128U - Underground drainage channel construction shaping device - Google Patents

Underground drainage channel construction shaping device Download PDF

Info

Publication number
CN218093128U
CN218093128U CN202221015259.XU CN202221015259U CN218093128U CN 218093128 U CN218093128 U CN 218093128U CN 202221015259 U CN202221015259 U CN 202221015259U CN 218093128 U CN218093128 U CN 218093128U
Authority
CN
China
Prior art keywords
connecting rod
rectangular frame
drainage channel
rod
underground drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221015259.XU
Other languages
Chinese (zh)
Inventor
李启帅
何清琦
范备战
刘海涛
郑新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guotun Coal Mine Of Heze Coal Power Co Ltd Of Linyi Mining Group
Original Assignee
Guotun Coal Mine Of Heze Coal Power Co Ltd Of Linyi Mining Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guotun Coal Mine Of Heze Coal Power Co Ltd Of Linyi Mining Group filed Critical Guotun Coal Mine Of Heze Coal Power Co Ltd Of Linyi Mining Group
Priority to CN202221015259.XU priority Critical patent/CN218093128U/en
Application granted granted Critical
Publication of CN218093128U publication Critical patent/CN218093128U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a drainage channel construction setting device in pit, including rectangular frame and bar baffle, rectangular frame is formed by top connecting rod, right connecting rod, bottom connecting rod and left connecting rod end to end, and rectangular frame's top left and right sides symmetry is equipped with the decurrent draw-in groove of opening, all is equipped with in the draw-in groove bar baffle. Through the device, only one constructor is needed to complete the construction operation, the construction efficiency is greatly improved, time and labor are saved, and meanwhile, the phenomena of inclination and unevenness of the wall of the water tank are improved, so that the water tank is more attractive.

Description

Underground drainage channel construction shaping device
Technical Field
The utility model relates to a drainage technical field under the colliery particularly, relates to drainage tank construction setting device in pit.
Background
The drainage under the coal mine is directly related to the safety production of the coal mine, and in the underground mining process of the coal mine, because of the reasons of water burst in the stratum, river water, rainwater and the like, a large amount of accumulated water is often in the underground, and the accumulated water must be removed to ensure the safety of underground operation and the personal safety of workers. The simplest and most practical drainage mode is that drainage is carried out through a drainage ditch, namely a drainage groove is built underground and subaerially, water flows to a designated area through the drainage groove, the concrete construction process is adopted, two parallel groove walls are built by concrete, and the drainage groove is formed between the groove walls and the ground. In the construction process, the molding of the groove wall is not easy to control, the phenomena of uneven and inclined groove wall are easily caused, the working efficiency is low, and in addition, the impression is poor.
In this regard, there is a need for improvements in the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water drainage tank construction setting device in pit to in solving prior art water drainage tank work progress in the pit, the shaping of cell wall is difficult to control, problem that work efficiency is low.
In order to achieve the above purpose, the utility model adopts the technical proposal that:
the underground drainage channel construction shaping device comprises a rectangular frame and strip-shaped baffles, wherein the rectangular frame is formed by connecting a top connecting rod, a right connecting rod, a bottom connecting rod and a left connecting rod end to end, clamping grooves with downward openings are symmetrically formed in the left side and the right side of the top of the rectangular frame, and the strip-shaped baffles are arranged in the clamping grooves.
Preferably, the left side of top connecting rod outwards extends and forms left extension rod, and the one end bending type downwards that the top connecting rod was kept away from to left extension rod forms left locating lever, and left extension rod, left locating lever and left connecting rod form the draw-in groove.
Preferably, the right side of top connecting rod outwards extends and forms right extension rod, and the one end that top connecting rod was kept away from to right extension rod bends downwards and forms right locating lever, and right extension rod, right locating lever and right connecting rod form the draw-in groove.
Preferably, the strip-shaped baffle is in interference fit with the clamping groove.
Preferably, the rectangular frame is made of metal.
Preferably, the strip-shaped baffle is made of plastic or wood.
Compared with the prior art the utility model discloses the beneficial effect who has:
the utility model discloses real underground drainage channel construction setting device only needs a constructor to accomplish the construction operation through the device, has improved the efficiency of construction greatly, and labour saving and time saving has improved basin cell wall slope, straight phenomenon not simultaneously, makes the basin more pleasing to the eye.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings required for the embodiments will be briefly described below, and obviously, the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of the present invention.
In the figure: 1. a strip-shaped baffle plate; 2. a top link; 3. a right connecting rod; 4. a bottom link; 5. a left connecting rod; 6. a left extension bar; 7. a left positioning rod; 8. a right extension bar; 9. and a right positioning rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Furthermore, in the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "top", "bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
As shown in fig. 1, the preferred embodiment of the present invention provides a setting device for underground drainage channel construction, including: rectangular frame and bar baffle 1, it is concrete, rectangular frame is the metal material, the utility model discloses preferred adoption iron, bar baffle 1's material is plastics or timber.
The rectangular frame is formed by connecting a top connecting rod 2, a right connecting rod 3, a bottom connecting rod 4 and a left connecting rod 5 end to end in a welding mode.
The left side of top connecting rod 2 outwards extends and forms left extension rod 6, and left extension rod 6 is kept away from the one end of top connecting rod and is buckled downwards and form left locating lever 7, and left extension rod 6, left locating lever 7 and left connecting rod 5 form the draw-in groove that the opening is decurrent.
The right side of top connecting rod 2 outwards extends and forms right extension rod 8, and the one end that top connecting rod 2 was kept away from to right extension rod 8 is buckled downwards and is formed right locating lever 9, and right extension rod 8, right locating lever 9 and right connecting rod 3 form the draw-in groove that the opening is decurrent.
The clamping grooves on the left side and the right side of the top of the rectangular frame are symmetrically arranged.
Wherein, bar baffle 1 has two, blocks respectively in the draw-in groove that corresponds, and is specific, draw-in groove and bar baffle 1 interference fit.
Use the utility model discloses the process of building water drainage tank explains:
at first with two bar baffle 1 parallels place subaerially in the pit, then block the rectangular frame between two bar baffles 1, and simultaneously, 1 card of a bar baffle is in the left draw-in groove of rectangular frame, another bar baffle 1 card is in the draw-in groove on rectangular frame right side, at least need two rectangular frame according to bar baffle 1's length, can guarantee like this that bar baffle 1 can not take place the slope, then pour the concrete in the outside of every bar baffle 1 and form the cell wall, at last treat to beat rectangular frame and bar baffle 1 completion drawing of patterns with the hammer after the concrete sets and can form water drainage tank.
To sum up, the embodiment of the utility model provides a water drainage tank construction setting device in pit, only need a constructor to accomplish the construction operation through the device, improved the efficiency of construction greatly, labour saving and time saving has improved basin cell wall slope, not straight phenomenon simultaneously, makes the basin more pleasing to the eye.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (6)

1. A construction shaping device for an underground drainage channel is characterized by comprising a rectangular frame and strip-shaped baffles, wherein the rectangular frame is formed by connecting a top connecting rod, a right connecting rod, a bottom connecting rod and a left connecting rod end to end, clamping grooves with downward openings are symmetrically formed in the left side and the right side of the top of the rectangular frame, and the strip-shaped baffles are arranged in the clamping grooves.
2. The underground drainage channel construction and shaping device as claimed in claim 1, wherein the left side of the top connecting rod extends outwards to form a left extension rod, one end of the left extension rod, which is far away from the top connecting rod, is bent downwards to form a left positioning rod, and the left extension rod, the left positioning rod and the left connecting rod form the clamping groove.
3. The underground drainage channel construction and shaping device as claimed in claim 1, wherein the right side of the top connecting rod extends outwards to form a right extension rod, one end of the right extension rod, which is far away from the top connecting rod, is bent downwards to form a right positioning rod, and the right extension rod, the right positioning rod and the right connecting rod form the clamping groove.
4. The underground drainage channel construction and sizing device of claim 1, wherein the strip-shaped baffle is in interference fit with the clamping groove.
5. The underground drainage channel construction and shaping device as claimed in claim 1, wherein the rectangular frame is made of metal.
6. The underground drainage channel construction and shaping device as claimed in claim 1, wherein the strip-shaped baffle is made of plastic or wood.
CN202221015259.XU 2022-04-28 2022-04-28 Underground drainage channel construction shaping device Active CN218093128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221015259.XU CN218093128U (en) 2022-04-28 2022-04-28 Underground drainage channel construction shaping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221015259.XU CN218093128U (en) 2022-04-28 2022-04-28 Underground drainage channel construction shaping device

Publications (1)

Publication Number Publication Date
CN218093128U true CN218093128U (en) 2022-12-20

Family

ID=84460020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221015259.XU Active CN218093128U (en) 2022-04-28 2022-04-28 Underground drainage channel construction shaping device

Country Status (1)

Country Link
CN (1) CN218093128U (en)

Similar Documents

Publication Publication Date Title
CN212200879U (en) Connect reliable prefabricated assembled shear force wall
CN218093128U (en) Underground drainage channel construction shaping device
CN204676608U (en) A kind of template-setup structure reserving ater-casting for basement wall
CN210888070U (en) Right-angle back edge buckle
CN217379518U (en) Constructional column and horizontal tie beam formwork-free construction component
CN109252879A (en) A kind of vcehicular tunnel gutter liner tool-typed formwork and construction method
CN2511740Y (en) Wet frame for metal net paste jetting/filling wall
CN212919869U (en) Binding moulding bed for prefabricated underground comprehensive pipe gallery steel reinforcement framework
CN208215615U (en) For making the plate device of catch-basin concrete lintel
CN212336724U (en) Formwork support is striden to height
CN208884842U (en) A kind of crossbeam of integrated fashioned iron class house easy for construction
CN209066419U (en) A kind of combination shaped steel plate pile ground-connecting-wall
CN209384486U (en) A kind of fixation device manufacturing floor
CN211647310U (en) Building formwork reinforced structure
CN210177562U (en) Excavator lengthening slope repairing structure for repairing soft soil high slope
CN209523208U (en) A kind of foundation pit of prestressing force assembled abnormity piling wall and side slope building enclosure
CN209538526U (en) For the anchor bolt type bayonet unit in type steel bar truss floor support plate
CN216341609U (en) Firm type reinforced concrete door frame post
CN204715752U (en) Side form block
CN217378943U (en) Domatic afforestation structure of garden engineering
CN218436990U (en) A setting device that is used for underground continuous wall to lead wall template to support
CN214942350U (en) Concrete pouring template system for large-slope roof surface
CN220117182U (en) U-shaped plate pile with improved performance
CN217997986U (en) Mountain style of calligraphy template reinforcing apparatus
CN216664130U (en) Pile top elevation control device for cast-in-place pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant