CN218090710U - Assembled flood-fighting wall - Google Patents

Assembled flood-fighting wall Download PDF

Info

Publication number
CN218090710U
CN218090710U CN202222090022.4U CN202222090022U CN218090710U CN 218090710 U CN218090710 U CN 218090710U CN 202222090022 U CN202222090022 U CN 202222090022U CN 218090710 U CN218090710 U CN 218090710U
Authority
CN
China
Prior art keywords
embedded
buried
plate
maintenance box
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222090022.4U
Other languages
Chinese (zh)
Inventor
王庆伟
张永庆
段常智
张艳意
董长民
郭新
罗凯
王勇
张有奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan DR Construction Group Steel Structure Co ltd
Henan DR Construction Group Co Ltd
Original Assignee
Henan DR Construction Group Steel Structure Co ltd
Henan DR Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan DR Construction Group Steel Structure Co ltd, Henan DR Construction Group Co Ltd filed Critical Henan DR Construction Group Steel Structure Co ltd
Priority to CN202222090022.4U priority Critical patent/CN218090710U/en
Application granted granted Critical
Publication of CN218090710U publication Critical patent/CN218090710U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an assembled flood fighting wall, which comprises a pre-buried maintenance box and H-shaped steel which are arranged in a pre-buried pit on the ground, wherein the bottom surface and the top surface of the pre-buried maintenance box are respectively provided with a pre-buried bottom plate and a pre-buried top plate, and the top surface of the pre-buried top plate is flush with the ground; an embedded plate is fixedly arranged in the embedded maintenance box, a plurality of vertically arranged positioning round steels are welded at the bottom end in the embedded maintenance box, steel pipes are welded at positions, corresponding to the positioning round steels, of the bottom end of the side wall of the H-shaped steel, the steel pipes are all embedded in the corresponding positioning round steels in a clamping manner, and the bottom ends of the H-shaped steel are in contact with the top surface of the embedded plate; draw-in groove between the H shaped steel all corresponds each other, and all inlay card between the draw-in groove of H shaped steel has the hollow baffle of a plurality of vertical settings, the utility model has the advantages of flood control wall installation is simple and convenient, and is consuming time few, and the dismouting is efficient, and flood control wall stable in structure is firm, the leakproofness is good, and flood control is effectual, effectively solves flood disasters.

Description

Assembled flood-fighting wall
Technical Field
The utility model relates to a flood control equipment technical field specifically is an assembled anti-flood wall.
Background
China is a country with frequent flood disasters, along with the increase of rainwater in summer, flood disasters and weather frequently occur, the life and property safety of people are seriously influenced, and great economic loss is caused.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide an assembled flood control wall, flood control wall installation is simple and convenient, consuming time few, the dismouting is efficient, flood control wall stable in structure is firm, the leakproofness is good, flood control is effectual, easy maintenance, repeatedly usable effectively solves the problem of flood disasters, protection people's lives and property safety, does not influence the normal traffic in ground after the flood control wall is dismantled, can effectively solve the problem in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: an assembled flood fighting wall comprises an embedded maintenance box and H-shaped steel, wherein the embedded maintenance box and the H-shaped steel are arranged in an embedded pit in the ground, a plurality of embedded pits are sequentially horizontally arranged on the ground, an embedded bottom plate and an embedded top plate are respectively arranged on the bottom surface and the top surface of the embedded maintenance box, the embedded bottom plate is of a plate-shaped structure, the embedded top plate is of a plate-frame structure extending outwards along the top ends of the peripheral side walls of the embedded maintenance box, the outer edge of the embedded top plate is in contact with the edge of an opening of the embedded pit, and the top surface of the embedded top plate is flush with the ground; an embedded plate is fixedly arranged in the embedded maintenance box, a plurality of positioning round steels which are vertically arranged are welded at the bottom end in the embedded maintenance box, and the top ends of the positioning round steels penetrate through the embedded plate and extend to the upper end in the embedded maintenance box; all steel pipes are welded at the positions, corresponding to the positioning round steels, of the bottom ends of the side walls of the H-shaped steel, are clamped and embedded in the corresponding positioning round steels, and the bottom ends of the H-shaped steel are in contact with the top surfaces of the pre-buried plates; the clamping grooves between the H-shaped steels correspond to each other, and a plurality of vertically arranged hollow baffles are embedded between the clamping grooves of the H-shaped steels in a clamping manner.
Furthermore, the embedded bottom plate is fixedly connected with the inner bottom end of the embedded pit through a connecting stud, a second concrete pouring layer is poured between the outer side wall of the embedded maintenance box and the embedded pit, and anti-shearing studs are arranged on the outer wall of the embedded maintenance box.
Furthermore, a first concrete pouring layer is poured between the bottom end inside the embedded maintenance box and the embedded plate, and a pouring hole is formed in the top surface of the embedded plate.
Furthermore, a plurality of embedded fastening steel bars are welded on the lower surface of the embedded plate.
Furthermore, the inner wall around the embedded maintenance box is provided with an embedded plate support piece, and the embedded plate is fixedly connected with the embedded plate support piece.
Furthermore, a grate is placed at the position, located at the box opening of the embedded maintenance box, of the embedded top plate.
Furthermore, the clamping grooves at the top end of the H-shaped steel are wide opening structures which are expanded outwards.
Furthermore, sealing layers I are arranged in the clamping grooves of the H-shaped steel and between the hollow baffle plates, and a sealing layer II is arranged between the hollow baffle plate at the lowest end and the ground.
Further, the subaerial rear side that lies in pre-buried maintenance box all is equipped with pre-buried hole, and all is equipped with pre-buried supporting box in this pre-buried hole, and the structure and the fixed mode of pre-buried supporting box all are the same with pre-buried maintenance box, the box internal fixation of pre-buried supporting box is equipped with the fixed plate, and the upper surface of fixed plate is all fixed and is equipped with connection otic placode two, the H shaped steel back is located the equal fixed connection otic placode one that is equipped with in position department that corresponds connection otic placode two, and all through round pin axle fixedly connected with bracing between connection otic placode one and the connection otic placode two.
Compared with the prior art, the beneficial effects of the utility model are that: this assembled flood control wall, through with the quick joint of hollow baffle in the draw-in groove of H shaped steel, form the flood control wall fast, pre-buried maintenance box and pre-buried supporting box are pre-buried in advance in the pre-buried hole on ground, and the internals of pre-buried maintenance box and pre-buried supporting box are fixed good in advance, the simple installation is convenient consuming time less, the dismouting is efficient, the flood control wall stable in structure is firm, the leakproofness is good, flood control is effectual, easy maintenance, repeatedly usable, effectively solve flood disasters 'problem, protect masses' life and property safety, do not influence the normal traffic on ground after the flood control wall is dismantled.
Drawings
FIG. 1 is a schematic view of the structure of the pre-buried maintenance box of the present invention;
FIG. 2 is a schematic view of the shaft side structure of the pre-buried maintenance box of the present invention;
fig. 3 is a schematic view of the internal structure of the pre-buried maintenance box of the present invention;
FIG. 4 is a schematic view of the fixing structure of the pre-buried maintenance box and the ground of the present invention;
FIG. 5 is a schematic view of the H-shaped steel structure of the present invention;
FIG. 6 is a schematic view of the connection between the H-shaped steel and the pre-buried maintenance box of the present invention;
fig. 7 is a schematic view of the flood fighting wall structure of the present invention;
FIG. 8 is a schematic view of the structure of the pre-buried supporting box of the present invention;
fig. 9 is a schematic view of the sealing structure of the hollow baffle of the present invention.
In the figure: the structure comprises 1 pre-buried maintenance box, 101 pre-buried bottom plate, 102 pre-buried top plate, 103 grate, 104 pre-buried plate support, 105 anti-shearing toggle pins, 2 connecting toggle pins, 3 pre-buried plate, 301 pre-buried fastening steel bar, 4 positioning round steel, 5 concrete pouring layer I, 6 concrete pouring layer II, 7H-shaped steel, 701 steel pipe, 702 connection lug plate I, 8 hollow baffle plate, 9 pre-buried support box, 901 fixing plate, 902 connection lug plate II, 10 diagonal brace, 11 sealing layer I and 12 sealing layer II.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1-9, the present invention provides a technical solution: an assembled flood fighting wall comprises an embedded maintenance box 1 and H-shaped steel 7 which are arranged in an embedded pit in the ground, wherein a plurality of embedded pits are sequentially horizontally arranged on the ground, an embedded bottom plate 101 and an embedded top plate 102 are respectively arranged on the bottom surface and the top surface of the embedded maintenance box 1, the embedded bottom plate 101 is of a plate-shaped structure, the embedded top plate 102 is of a plate frame structure extending outwards along the top ends of the peripheral side walls of the embedded maintenance box 1, the outer edge of the embedded top plate 102 is in contact with the edge of an opening of the embedded pit, and the top surface of the embedded top plate 102 is flush with the ground; the embedded bottom plate 101 is fixedly connected with the bottom end inside the embedded pit through a connecting stud 2, a second concrete pouring layer 6 is poured between the outer side wall of the embedded maintenance box 1 and the embedded pit, and anti-shearing studs 105 are arranged on the outer wall of the embedded maintenance box 1; an embedded plate 3 is fixedly arranged in the embedded maintenance box 1, a plurality of embedded fastening steel bars 301 are welded on the lower surface of the embedded plate 3, a plurality of vertically arranged positioning round steel 4 are welded at the bottom end inside the embedded maintenance box 1, and the top ends of the positioning round steel 4 extend to the upper end inside the embedded maintenance box 1 through the embedded plate 3; a first concrete pouring layer 5 is poured between the bottom end inside the embedded maintenance box 1 and the embedded plate 3, and a pouring hole is formed in the top surface of the embedded plate 3; the bottom ends of the side walls of the H-shaped steel 7 are welded with steel pipes 701 at positions corresponding to the positioning round steel 4, the steel pipes 701 are embedded in the corresponding positioning round steel 4 in a clamping manner, and the bottom ends of the H-shaped steel 7 are in contact with the top surfaces of the embedded plates 3; the clamping grooves among the H-shaped steels 7 correspond to each other, and a plurality of vertically arranged hollow baffles 8 are clamped and embedded among the clamping grooves of the H-shaped steels 7; a first sealing layer 11 is arranged in the clamping groove of the H-shaped steel 7 and between the hollow baffles 8, and a second sealing layer 12 is arranged between the hollow baffle 8 at the lowest end and the ground; the rear side that subaerial lies in pre-buried maintenance box 1 all is equipped with pre-buried hole, and all is equipped with pre-buried supporting box 9 in this pre-buried hole, and the structure and the fixed mode of pre-buried supporting box 9 box all are the same with pre-buried maintenance box 1, the box internal fixation of pre-buried supporting box 9 is equipped with fixed plate 901, and the upper surface of fixed plate 901 all fixes and is equipped with two 902 of connection otic placodes, 7 backs of H shaped steel are located the position department that corresponds two 902 of connection otic placodes and all fix and are equipped with a 702 of connection otic placode, and all through round pin axle fixedly connected with bracing 10 between a 702 of connection otic placode and the two 902 of connection otic placodes.
In the embodiment, the steel pipe 701 on the H-shaped steel 7 is fast clamped with the positioning round steel 4 in the embedded maintenance box 1, the hollow baffle 8 is fast clamped in the clamping groove of the H-shaped steel 7, the flood wall is fast formed, the embedded maintenance box 1 and the embedded support box 9 are pre-embedded in the embedded pit of the ground in advance, and the internal components of the embedded maintenance box 1 and the embedded support box 9 are fixed in advance, so that the assembly efficiency of the flood wall is further improved, the embedded maintenance box 1 and the embedded support box 9 are fixed through the concrete pouring layer II 6, the connection is firm, and the structural stability is further improved through the anti-shearing bolt 105 arranged on the outer walls of the embedded maintenance box 1 and the embedded support box 9; the embedded plate 3 and the positioning round steel 4 in the embedded maintenance box 1 are fixed through the concrete pouring layer I5, connection is firm, and the structural stability of the embedded maintenance box is further improved through the embedded fastening steel bars 301 arranged on the bottom surface of the embedded plate 3; the anti-impact performance of the flood wall is improved through the inclined strut 10 arranged between the pre-buried support box 9 and the H-shaped steel 7; the sealing performance of the flood fighting wall is improved through the first sealing layer 11 and the second sealing layer 12, the first sealing layer 11 is sealed in a glue injection or rubber pad filling mode, and the second sealing layer 12 is sealed in a rubber pad or mortar setting mode; the disclosed assembled flood control wall of this embodiment, the simple installation is convenient consuming time fewly, and the dismouting is efficient, and flood control wall stable in structure is firm, the leakproofness is good, and flood control is effectual, easy maintenance, and repeatedly usable effectively solves the problem of flood disaster, protects people's lives and property safety.
Furthermore, the inner walls around the embedded maintenance box 1 are provided with embedded plate supporting pieces 104, the embedded plate 3 is fixedly connected with the embedded plate supporting pieces 104, and the embedded plate 3 is supported by the embedded plate supporting pieces 104, so that the embedded plate 3 can be conveniently installed and fixed.
Furthermore, the grate 103 is placed at the position of the embedded top plate 102 at the box opening of the embedded maintenance box 1, the grate 103 is made of concrete plates, and after the flood fighting wall is disassembled, the grate 103 is buckled at the box openings of the embedded maintenance box 1 and the embedded supporting box 9 for normal ground traffic.
Furthermore, the clamping grooves in the top ends of the H-shaped steel 7 are wide-opening structures which are expanded outwards, and the hollow baffle 8 is convenient to mount through the wide-opening structures of the clamping grooves in the top ends of the H-shaped steel 7.
When in use: the method comprises the steps that firstly, an embedded maintenance box 1 and an embedded support box 9 are fixed in an embedded pit on the ground, a second concrete pouring layer 6 is poured between the outer walls of the embedded maintenance box 1 and the embedded support box 9 and the embedded pit respectively, after the second concrete pouring layer 6 is solidified, an embedded plate 3 is fixed in the embedded maintenance box 1, a first concrete pouring layer 5 is poured between the embedded plate 3 and the bottom end of the inner portion of the embedded maintenance box 1, the first concrete pouring layer 5 is solidified, and a fixing plate 901 is fixed in the embedded support box 9; a first sealing layer 11 is arranged in a clamping groove of the H-shaped steel 7 in advance; when no flood disaster occurs, covering the grate 103 on the box openings of the embedded maintenance box 1 and the embedded support box 9; when flood disasters occur, the grate 103 is opened, the steel pipe 701 on the H-shaped steel 7 is embedded in the embedded maintenance box 1 along the vertical clamping of the positioning round steel 4, the hollow baffle 8 is embedded in the clamping groove between the H-shaped steel 7, a second sealing layer 12 is arranged between the hollow baffle 8 at the lowest end and the ground, a first sealing layer 11 is arranged between the hollow baffles 8, and the inclined support 10 is fixedly connected between the H-shaped steel 7 and the embedded support box 9.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides an assembled flood control wall, is including setting up pre-buried maintenance box and the H shaped steel in the pre-buried hole in ground, and subaerial level in proper order is equipped with a plurality of pre-buried holes, its characterized in that: the bottom surface and the top surface of the embedded maintenance box are respectively provided with an embedded bottom plate and an embedded top plate, the embedded bottom plate is of a plate-shaped structure, the embedded top plate is of a plate frame structure extending outwards along the top ends of the side walls of the periphery of the embedded maintenance box, the outer edge of the embedded top plate is in contact with the edge of an opening of an embedded pit, and the top surface of the embedded top plate is flush with the ground; an embedded plate is fixedly arranged in the embedded maintenance box, a plurality of positioning round steels which are vertically arranged are welded at the bottom end in the embedded maintenance box, and the top ends of the positioning round steels penetrate through the embedded plate and extend to the upper end in the embedded maintenance box; all steel pipes are welded at the positions, corresponding to the positioning round steels, of the bottom ends of the side walls of the H-shaped steel, are clamped and embedded in the corresponding positioning round steels, and the bottom ends of the H-shaped steel are in contact with the top surfaces of the pre-buried plates; the draw-in groove between the H shaped steel all corresponds each other, and all inlay card between the draw-in groove of H shaped steel has the hollow baffle of a plurality of vertical settings.
2. A fabricated flood wall according to claim 1, wherein: the pre-buried bottom plate is connected with the bottom end of the inside of the pre-buried pit through a connecting stud, a concrete pouring layer II is poured between the outer side wall of the pre-buried maintenance box and the pre-buried pit, and anti-shearing studs are arranged on the outer wall of the pre-buried maintenance box.
3. A fabricated flood wall according to claim 1, wherein: a first concrete pouring layer is poured between the bottom end of the inner portion of the embedded maintenance box and the embedded plate, and a pouring hole is formed in the top surface of the embedded plate.
4. A fabricated flood wall according to claim 3, wherein: and a plurality of pre-buried fastening steel bars are welded on the lower surface of the pre-buried plate.
5. A fabricated flood wall according to claim 1, wherein: and the inner walls of the periphery of the embedded maintenance box are provided with embedded plate supporting pieces, and the embedded plates are fixedly connected with the embedded plate supporting pieces.
6. A fabricated flood wall according to claim 1, wherein: and a grate is arranged at the position of the embedded top plate, which is positioned at the box opening of the embedded maintenance box.
7. The prefabricated flood wall according to claim 1, wherein: the clamping groove at the top end of the H-shaped steel is of a wide opening structure expanding outwards.
8. The prefabricated flood wall according to claim 1, wherein: sealing layers I are arranged in the clamping grooves of the H-shaped steel and between the hollow baffles, and a sealing layer II is arranged between the hollow baffle at the lowest end and the ground.
9. A fabricated flood wall according to claim 2, wherein: the rear side that lies in pre-buried maintenance box on ground all is equipped with pre-buried hole, and all is equipped with pre-buried supporting box in this pre-buried hole, and the structure and the fixed mode of pre-buried supporting box all are the same with pre-buried maintenance box, the box internal fixation of pre-buried supporting box is equipped with the fixed plate, and the upper surface of fixed plate is all fixed and is equipped with connection otic placode two, the H shaped steel back is located the position department that corresponds connection otic placode two and all fixes and is equipped with connection otic placode one, and all through round pin axle fixedly connected with bracing between connection otic placode one and the connection otic placode two.
CN202222090022.4U 2022-08-10 2022-08-10 Assembled flood-fighting wall Active CN218090710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222090022.4U CN218090710U (en) 2022-08-10 2022-08-10 Assembled flood-fighting wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222090022.4U CN218090710U (en) 2022-08-10 2022-08-10 Assembled flood-fighting wall

Publications (1)

Publication Number Publication Date
CN218090710U true CN218090710U (en) 2022-12-20

Family

ID=84486889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222090022.4U Active CN218090710U (en) 2022-08-10 2022-08-10 Assembled flood-fighting wall

Country Status (1)

Country Link
CN (1) CN218090710U (en)

Similar Documents

Publication Publication Date Title
CN111075111A (en) Stand module and assembled cage structure building of assembled building
CN218090710U (en) Assembled flood-fighting wall
CN215858373U (en) Prefabricated shear wall of assembly type structure
CN113152505A (en) Construction method of underwater super-large scale bearing platform combined casing box enclosure structure with partial bottom sealing
CN110273432B (en) Extension construction method for main structure of existing subway station
CN215565997U (en) Prefabricated assembled arch wall structure of railway tunnel
CN215519950U (en) Beam column template for building construction
CN211340818U (en) Concrete back cover of deep water steel cofferdam
CN211200264U (en) Sliding type cast-in-situ deep arc type wave wall formwork
CN210530504U (en) Multifunctional protective railing for construction site
CN109972520B (en) Construction method of prefabricated bridge deck installation structure
CN108487762B (en) Electronic information engineering communication tower connecting device
CN216195253U (en) Light prefabricated channel cover plate
CN216641367U (en) Power transmission tower operation and maintenance platform
CN219033229U (en) Steel sheet pile transverse supporting device for foundation pit support
CN219034016U (en) Double-layer structure aluminum alloy template
CN110777843A (en) Cantilever type retaining wall and construction method thereof
CN212956592U (en) Additional strengthening for water conservancy construction cofferdam
CN220908798U (en) Assembled concrete frame shear wall structure
CN213797172U (en) Precast beam pedestal
CN112376622B (en) Post-cast strip retaining device and construction method for reinforcing post-cast strip template
CN217500236U (en) Prefabricated component for concrete side plate with assembled structure
CN212249171U (en) Steel plate net mounting structure of building formwork net wall
CN219509153U (en) Aluminum template for green construction
CN219410743U (en) Prefabricated assembled dam reinforced concrete slope protection panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant