CN218083380U - Automatic concrete pouring device for building construction - Google Patents
Automatic concrete pouring device for building construction Download PDFInfo
- Publication number
- CN218083380U CN218083380U CN202221306325.9U CN202221306325U CN218083380U CN 218083380 U CN218083380 U CN 218083380U CN 202221306325 U CN202221306325 U CN 202221306325U CN 218083380 U CN218083380 U CN 218083380U
- Authority
- CN
- China
- Prior art keywords
- motor
- churn
- face
- bottom plate
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009435 building construction Methods 0.000 title claims description 16
- 238000007599 discharging Methods 0.000 claims description 9
- 239000004568 cement Substances 0.000 abstract description 25
- 238000010276 construction Methods 0.000 abstract description 7
- 235000017166 Bambusa arundinacea Nutrition 0.000 abstract description 4
- 235000017491 Bambusa tulda Nutrition 0.000 abstract description 4
- 241001330002 Bambuseae Species 0.000 abstract description 4
- 235000015334 Phyllostachys viridis Nutrition 0.000 abstract description 4
- 239000011425 bamboo Substances 0.000 abstract description 4
- 239000000463 material Substances 0.000 description 7
- 238000005457 optimization Methods 0.000 description 5
- 238000003756 stirring Methods 0.000 description 4
- ODINCKMPIJJUCX-UHFFFAOYSA-N Calcium oxide Chemical compound [Ca]=O ODINCKMPIJJUCX-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000012255 calcium oxide Nutrition 0.000 description 1
- 239000000292 calcium oxide Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a device is pour automatically to construction concrete belongs to construction technical field, and its technical scheme main points include the bottom plate, the up end fixed mounting of bottom plate has a fixed section of thick bamboo, the electric push rod is installed to the inside bottom face of a fixed section of thick bamboo, the bracing piece with fixed section of thick bamboo inside wall sliding connection is installed to the output of electric push rod, the fixed slot has been seted up to the up end of bracing piece, first motor is installed to the inside bottom face of fixed slot, the support frame is installed to the output of first motor, the couple is installed to the right-hand member of support frame bottom face to through starting first motor, make first motor cooperation electric push rod move the cement bag to in the inlet pipe feed tube, start the second motor after that for the axis of rotation drives the cutting wheel and rotates and breaks the cement bag, thereby be convenient for add cement in the churn, saved reinforced labour, effectively improve the work efficiency of pouring.
Description
Technical Field
The utility model relates to a construction technical field, in particular to construction concrete automatic pouring device.
Background
The concrete pouring refers to a process from pouring concrete into a mold until the concrete is plasticized, and in civil engineering and building engineering, materials such as concrete and the like are put into the mold to form a predetermined shape, and the concrete pouring is used by stirring and pouring slurry, cement, quicklime, gravel and the like according to a certain proportion.
And current building construction concrete automatic pouring device, though generally have the function of automatic stirring, when throwing the material with cement in to the agitator tank, adopt the manual work to throw the material mostly, the labour is great and speed is slow to lead to concrete placement work efficiency to hang down.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to above problem, provide a building construction concrete automatic pouring device, have be convenient for add the churn with cement in, saved reinforced labour, effectively improve the work efficiency's of pouring characteristics.
The utility model discloses a realize like this, a building construction concrete automatic pouring device, including the bottom plate, the up end fixed mounting of bottom plate has a fixed cylinder, the inside bottom face of fixed cylinder installs electric push rod, the output of electric push rod installs the bracing piece with fixed cylinder inside wall sliding connection, the up end of bracing piece has seted up the fixed slot, the inside bottom face of fixed slot installs first motor, the output of first motor installs the support frame, the right-hand member of support frame bottom face installs the couple;
the right side of a fixed section of thick bamboo is provided with the churn, the up end intercommunication of churn has the inlet pipe, the internally mounted of inlet pipe has the cutting wheel, the third motor is installed to the right side wall of churn, the output of third motor runs through the right side wall and the fixed mounting of churn and has the puddler through pivot and the inside left side wall swing joint of churn, the bottom face intercommunication of churn has the discharging pipe, the other end intercommunication of discharging pipe has the booster pump of installing in the bottom plate up end, booster pump right side wall intercommunication has the conveyer pipe.
In order to make the cutting wheel rotate and break the cement bag, as the utility model discloses a building construction concrete automatic pouring device is preferred, the second motor is installed to the preceding terminal surface of inlet pipe, the output of second motor runs through the preceding terminal surface and the fixed mounting of inlet pipe and has the axis of rotation that runs through in the cutting wheel, the rear end of axis of rotation is through pivot and inlet pipe inside wall swing joint.
In order to open the ejection of compact with the discharging pipe, as the utility model discloses a construction concrete automatic pouring device is preferred, the valve is installed to the lateral wall of discharging pipe.
In order to support the churn, as the utility model discloses a building construction concrete automatic pouring device is preferred, the bottom face fixed mounting of churn have about two distribute and with bottom plate fixed connection's landing leg.
In order to facilitate removing the device, conduct the utility model discloses a construction concrete automatic pouring device is preferred, a plurality of universal wheels are installed to the bottom face of bottom plate, the left end fixed mounting of bottom plate up end has the handrail.
In order to facilitate taking up the conveyer pipe and pour, conduct the utility model discloses a construction concrete automatic pouring device is preferred, the conveyer pipe is the telescopic hose.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a building construction concrete automatic pouring device, after removing the device to the appointed place, start first motor, make the support frame rotate and drive the couple and keep away from the churn, and start the electric push rod, make the electric push rod can stimulate bracing piece and support frame and couple after moving down to suitable height, articulate the cement bag on the couple, then start the electric push rod once more, make the electric push rod promote the bracing piece rebound, make support frame and couple hoist the cement bag, start first motor simultaneously, make first motor cooperation electric push rod, move the cement bag to the inlet tube, start the second motor after that, make the axis of rotation drive the cutting wheel and rotate and break the cement bag, thereby be convenient for add cement in the churn, the labour of feeding in raw material has been saved, add water and other auxiliary materials in the churn after that, through starting the third motor, make the puddler rotate will mix the stirring, start the booster pump after having stirred, can pour the muddy suction earth in the churn in the earth conveying pipe, thereby effectively improve the work efficiency of pouring.
Drawings
Fig. 1 is a cross-sectional view of the automatic concrete pouring device for building construction of the utility model;
FIG. 2 is a schematic diagram of the mixing drum of FIG. 1 according to the present invention;
fig. 3 is a top view structural diagram of the feeding pipe in fig. 1 according to the present invention.
In the figure, 1, a bottom plate; 101. a universal wheel; 102. a handrail; 2. a fixed cylinder; 201. an electric push rod; 3. a support bar; 301. fixing grooves; 302. a first motor; 303. a support frame; 304. hooking; 4. a mixing drum; 401. a feed pipe; 402. a cutting wheel; 4021. a rotating shaft; 403. a second motor; 5. a stirring rod; 501. a third motor; 6. a discharge pipe; 601. a valve; 7. a booster pump; 701. a delivery pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. In addition, in the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1-3, an automatic concrete pouring device for building construction includes a bottom plate 1, a fixed cylinder 2 is fixedly mounted on an upper end surface of the bottom plate 1, an electric push rod 201 is mounted on an inner bottom end surface of the fixed cylinder 2, a support rod 3 slidably connected with an inner side wall of the fixed cylinder 2 is mounted at an output end of the electric push rod 201, a fixed groove 301 is formed in the upper end surface of the support rod 3, a first motor 302 is mounted on an inner bottom end surface of the fixed groove 301, a support frame 303 is mounted at an output end of the first motor 302, and a hook 304 is mounted at a right end of a bottom end surface of the support frame 303;
the right side of fixed cylinder 2 is provided with churn 4, the up end intercommunication of churn 4 has inlet pipe 401, the internally mounted of inlet pipe 401 has cutting wheel 402, third motor 501 is installed to the right side wall of churn 4, the output of third motor 501 runs through right side wall and the fixed mounting of churn 4 has puddler 5 through pivot and the inside left side wall swing joint of churn 4, the bottom face intercommunication of churn 4 has discharging pipe 6, the other end intercommunication of discharging pipe 6 has the booster pump 7 of installing in bottom plate 1 up end, booster pump 7 right side wall intercommunication has conveyer pipe 701.
In this embodiment: after the device is moved to a specified place, the first motor 302 is started, the support frame 303 is made to rotate to drive the hook 304 to be far away from the mixing drum 4, the electric push rod 201 is started, the electric push rod 201 can pull the support rod 3, the support frame 303 and the hook 304 to move downwards to a proper height, a cement bag is hung on the hook 304, then the electric push rod 201 is started again, the electric push rod 201 pushes the support rod 3 to move upwards, the support frame 303 and the hook 304 are made to lift the cement bag, the first motor 302 is started simultaneously, the first motor 302 is matched with the electric push rod 201 to move the cement bag into the feeding pipe 401, then the second motor 403 is started, the rotating shaft 4021 drives the cutting wheel 402 to rotate to break the cement bag, thereby adding cement into the mixing drum 4 conveniently, the labor force for feeding is saved, then water and other auxiliary materials are added into the mixing drum 4, the mixing drum 5 is made to rotate to uniformly mix soil by starting the third motor 501, the booster pump 7 is started after mixing is well mixed, the mixed soil in the mixing drum 4 can be pumped into the mixing drum 701, and the pouring efficiency is improved effectively.
As a technical optimization scheme of the utility model, second motor 403 is installed to the preceding terminal surface of inlet pipe 401, and the output of second motor 403 runs through the preceding terminal surface and the fixed mounting of inlet pipe 401 and has the axis of rotation 4021 that runs through in cutting wheel 402, and axis of rotation 4021's rear end is through pivot and inlet pipe 401 inside wall swing joint.
In this embodiment: by starting the second motor 403, the rotating shaft 4021 rotates to drive the rotating shaft 4021 to drive the cutting wheel 402 to rotate, so that the cutting wheel 402 breaks the cement bag, and the cement bag is convenient to pour out.
As a technical optimization scheme of the utility model, valve 601 is installed to the lateral wall of discharging pipe 6.
In this embodiment: by opening the valve 601, the mixed concrete is discharged from the mixing drum 4 through the discharge pipe 6.
As a technical optimization scheme of the utility model, the bottom face fixed mounting of churn 4 has about two distribute and with bottom plate 1 fixed connection's landing leg.
In this embodiment: the leg can be installed to stably support the mixing drum 4.
As a technical optimization scheme of the utility model, a plurality of universal wheels 101 are installed to the bottom face of bottom plate 1, and the left end fixed mounting of bottom plate 1 up end has handrail 102.
In this embodiment: by installing the universal wheel 101, the handrail 102 can be pushed, so that the universal wheel 101 can carry the bottom plate 1 to move.
As a technical optimization scheme of the utility model, conveyer pipe 701 is the telescopic hose.
In this embodiment: the conveying pipe 701 is telescopic, so that workers can conveniently take the conveying pipe 701 to pour concrete.
The utility model discloses a theory of operation and use flow: firstly, when the device is used, a worker pushes the handrail 102, so that the universal wheel 101 bears the device and moves to a specified place, then the device is connected with an external power supply, when a material needs to be added into the mixing drum 4, the first motor 302 is started first, so that the support frame 303 rotates to drive the hook 304 to move away from the mixing drum 4 (rotate by 90 degrees or 180 degrees), then the electric push rod 201 is started, so that the electric push rod 201 can pull the support rod 3 to move downwards along the fixed drum 2, so that the support rod 3 drives the support frame 303 and the hook 304 to move downwards to a proper height, then the worker hangs the cement bag on the hook 304, then the electric push rod 201 is started, so that the electric push rod 201 pushes the support rod 3 to move upwards, so that the support rod 3 pushes the support frame 303 and the hook 304 to move upwards, the cement bag can be lifted, then the first motor 302 is started, so that the support frame 303 rotates to move the cement bag to be right above the feeding pipe 401, the electric push rod 201 adjusts the height of the support frame 303 again, so that the cement bag falls into the feeding pipe 401, then the second motor 402403 is started, so that the cutting wheel 1 rotates to drive the cement bag to open, then the mixing drum 701, and the mixing drum 701 is started, and the cement auxiliary material is added into the mixing drum 601, and mixed in the mixing drum 601, and the mixing drum 701 uniformly.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention should be included within the protection scope of the present invention.
Claims (6)
1. The utility model provides a building construction concrete automatic pouring device, includes bottom plate (1), its characterized in that: a fixed cylinder (2) is fixedly mounted on the upper end face of the bottom plate (1), an electric push rod (201) is mounted on the inner bottom end face of the fixed cylinder (2), a support rod (3) which is connected with the inner side wall of the fixed cylinder (2) in a sliding mode is mounted at the output end of the electric push rod (201), a fixed groove (301) is formed in the upper end face of the support rod (3), a first motor (302) is mounted on the inner bottom end face of the fixed groove (301), a support frame (303) is mounted at the output end of the first motor (302), and a hook (304) is mounted at the right end of the bottom end face of the support frame (303);
the right side of fixed cylinder (2) is provided with churn (4), the up end intercommunication of churn (4) has inlet pipe (401), the internally mounted of inlet pipe (401) has cutting wheel (402), third motor (501) are installed to the right side wall of churn (4), the output of third motor (501) runs through right side wall and the fixed mounting of churn (4) has puddler (5) through pivot and the inside left side wall swing joint of churn (4), the bottom face intercommunication of churn (4) has discharging pipe (6), the other end intercommunication of discharging pipe (6) has booster pump (7) of installing in bottom plate (1) up end, booster pump (7) right side wall intercommunication has conveyer pipe (701).
2. The automatic pouring device for the building construction concrete according to claim 1, is characterized in that: second motor (403) is installed to the preceding terminal surface of inlet pipe (401), the output of second motor (403) runs through the preceding terminal surface and the fixed mounting of inlet pipe (401) have axis of rotation (4021) that runs through in cutting wheel (402), the rear end of axis of rotation (4021) is through pivot and inlet pipe (401) inside wall swing joint.
3. The automatic pouring device for the building construction concrete according to claim 1, is characterized in that: and a valve (601) is arranged on the outer side wall of the discharge pipe (6).
4. The automatic pouring device for the building construction concrete according to claim 1, is characterized in that: the bottom end face of the mixing drum (4) is fixedly provided with two supporting legs which are distributed left and right and are fixedly connected with the bottom plate (1).
5. The automatic pouring device for the building construction concrete according to claim 1, is characterized in that: a plurality of universal wheels (101) are installed on the bottom end face of the bottom plate (1), and a handrail (102) is fixedly installed on the left end of the upper end face of the bottom plate (1).
6. The automatic pouring device for the building construction concrete according to claim 1, is characterized in that: the conveying pipe (701) is a telescopic hose.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221306325.9U CN218083380U (en) | 2022-05-28 | 2022-05-28 | Automatic concrete pouring device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221306325.9U CN218083380U (en) | 2022-05-28 | 2022-05-28 | Automatic concrete pouring device for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218083380U true CN218083380U (en) | 2022-12-20 |
Family
ID=84462392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221306325.9U Active CN218083380U (en) | 2022-05-28 | 2022-05-28 | Automatic concrete pouring device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218083380U (en) |
-
2022
- 2022-05-28 CN CN202221306325.9U patent/CN218083380U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214819654U (en) | High-efficient concrete mixing device is used in engineering | |
CN210939886U (en) | Cement manufacture is with automatic agitated vessel in advance | |
CN215241918U (en) | High-efficient concrete feeding agitating unit | |
CN218083380U (en) | Automatic concrete pouring device for building construction | |
CN210552138U (en) | High-efficient concrete mixer of building machinery | |
CN213926269U (en) | Concrete placement equipment for hydraulic engineering construction | |
CN215311932U (en) | Coating stirring device for interior decoration engineering | |
CN215589549U (en) | Building construction is plastered wall and is used cement mixing device | |
CN212554435U (en) | Agitating unit for construction | |
CN211941473U (en) | Concrete mixing pumping installations for hydraulic and hydroelectric engineering | |
CN212948399U (en) | Concrete prefabricated section processing equipment | |
CN210025805U (en) | Material distributing device for mortar equipment | |
CN218713033U (en) | Grouting device for water leakage reinforcement of bottom plate | |
CN209755673U (en) | Construction is with multi-functional slip casting bucket that can stir cement | |
CN212948472U (en) | High-efficient feeding device that building equipment used | |
CN210210882U (en) | Be applied to cement mixer of town road construction | |
CN213674790U (en) | Building engineering pours device | |
CN211713618U (en) | Grouting device for cement concrete pavement slab bottom void | |
CN205343439U (en) | Cement mixing device | |
CN213868803U (en) | Plastering device for building construction | |
CN220203496U (en) | Grouting device | |
CN214459470U (en) | Crack prosthetic devices that road bridge construction was used | |
CN217501073U (en) | A plugging device for concrete construction joint | |
CN218429124U (en) | Civil engineering cement watering device | |
CN218875869U (en) | Building cement mixing stirring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231130 Address after: No. 243, Haiyang Road, Haiyang City, Yantai City, Shandong Province, 265100 Patentee after: FANGYUAN GROUP HAIYANG CONSTRUCTION MACHINERY Co.,Ltd. Address before: 400060 17-6, Block B, Jinyuan Times Square, Jiangbei District, Chongqing Patentee before: Chongqing Yixin Construction Engineering Co.,Ltd. |
|