CN218082643U - Mounting device for upper structure in tunnel - Google Patents
Mounting device for upper structure in tunnel Download PDFInfo
- Publication number
- CN218082643U CN218082643U CN202221656211.7U CN202221656211U CN218082643U CN 218082643 U CN218082643 U CN 218082643U CN 202221656211 U CN202221656211 U CN 202221656211U CN 218082643 U CN218082643 U CN 218082643U
- Authority
- CN
- China
- Prior art keywords
- guardrail main
- block
- collecting box
- box
- main part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model belongs to the technical field of the engineering, especially, be an installation device of superstructure in tunnel, including the guardrail main part, the one end of guardrail main part is provided with the collection box, one side of collecting the box is fixed and is provided with the receiver, the spout has been seted up to the one end of guardrail main part, the collection box is close to the one end of guardrail main part and is fixed and is provided with two sliders, the upper end of guardrail main part is fixed and is provided with the guide block No. one, the upper end of collection box is fixed and is provided with the guide block No. two, the utility model discloses in, the collection box can be accomodate the foreign matter that falls down during operation, avoids the foreign matter to influence pedestrian's safety, has improved the security during operation; can accomodate the toolbox through setting up the receiver, improve work efficiency when the instrument of taking at the during operation is more convenient, through setting up No. two blocks even with the block of a block even, can be spacing with collection box, receiver and guardrail main part, avoid it to rock.
Description
Technical Field
The utility model belongs to the technical field of the engineering, concretely relates to superstructure's installation device in tunnel.
Background
With the rapid development of urban municipal construction and rail transit, underground space is continuously developed and utilized, the single-hole double-line large-diameter shield method is more and more applied to subway tunnels, and single-hole double-line tunnel engineering has the characteristics of long distance, short construction period, high construction difficulty and the like.
Superstructure's installation device does not put the position of toolbox in original tunnel, the instrument of taking not convenient for at the during operation to superstructure's installation device does not collect the box in original tunnel, and at the during operation, the foreign matter that falls down can injure the people by a crashing object, has certain potential safety hazard.
SUMMERY OF THE UTILITY MODEL
For solving the above-mentioned problem that exists among the prior art, the utility model provides an superstructure's installation device in tunnel has the characteristics adjustable, improvement security and practicality.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an upper structure's installation device in tunnel, includes the guardrail main part, the one end of guardrail main part is provided with collects the box, collect the fixed receiver that is provided with in one side of box, the spout has been seted up to the one end of guardrail main part, the fixed two sliders that are provided with of one end that collect the box and be close to the guardrail main part, the fixed guide block that is provided with in upper end of guardrail main part, the fixed guide block that is provided with No. two in upper end of collecting the box, the inside of guide block rotates and is provided with the control lever, the collecting vat has been seted up to the inside of collecting the box, the inside of collecting vat is provided with the net, the inside of collecting the box is inserted and is provided with the drawer, the inside of receiver is provided with the limiting plate, one side of limiting plate is rotated and is provided with the bolt, the fixed manual control pole that is provided with in one side of bolt, the fixed No. one that is provided with No. one piece that deviates from the receiver of collecting the box, the fixed stopper that is provided with in one end of guardrail main part, still be provided with the clamp plate in the guardrail main part, the fixed No. two piece that is provided with on the clamp plate.
As the utility model discloses an upper structure's preferred technical scheme of installation device in tunnel, the slider slides in the inside of spout, the receiver slides in the inside of spout through the slider with collecting the box.
As the utility model discloses a preferred technical scheme of superstructure's installation device in tunnel, the control lever rotates the inside at a guide block through the pivot damping, the control lever is inserted when accomodating and is closed the inside at No. two guide blocks.
As the utility model discloses a preferred technical scheme of superstructure's installation device in tunnel, the collecting vat is inside to be seted up the notch of inserting with the drawer and closing, the drawer is the tilt state when the collecting vat is inside.
As the utility model discloses an optimal technical scheme of superstructure's installation device in tunnel, the limiting plate passes through the screw thread with the bolt and rotates, the hand lever drives the bolt rotation when rotating.
As the utility model discloses an optimal technical scheme of superstructure's installation device in tunnel, the stopper sets up No. two even block tops.
Compared with the prior art, the beneficial effects of the utility model are that: in the utility model, the collecting box can contain the foreign matters falling down during the work, thereby avoiding the influence of the foreign matters on the safety of pedestrians and improving the safety during the work; can accomodate the toolbox through setting up the receiver, improve work efficiency when the instrument of taking at the during operation is more convenient, through setting up No. two blocks even with the block of a piece even, can be spacing with collection box, receiver and guardrail main part, avoid it to rock.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a schematic top view of the present invention;
fig. 3 is a schematic side view of the present invention;
fig. 4 is a schematic view of the partial cross-sectional structure of fig. 3 according to the present invention;
FIG. 5 is a partially enlarged schematic structural view of part A of the present invention;
in the figure: 1. a guardrail body; 2. a collection box; 3. a storage box; 4. a chute; 5. a slider; 6. a first guide block; 7. a second guide block; 8. a control lever; 9. collecting tank; 10. a grid; 11. a drawer; 12. a limiting plate; 13. a bolt; 14. a manual lever; 15. a first connecting block; 16. a limiting block; 17. pressing a plate; 18. and the second number is connected with the blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides the following technical solutions: the utility model provides an installation device of superstructure in tunnel, including guardrail main part 1, the one end of guardrail main part 1 is provided with collects box 2, collect the fixed receiver 3 that is provided with in one side of box 2, spout 4 has been seted up to the one end of guardrail main part 1, collect box 2 and be close to the fixed two sliders 5 that are provided with in one end of guardrail main part 1, the fixed guide block 6 that is provided with in upper end of guardrail main part 1, the fixed guide block 7 that is provided with No. two in upper end of collecting box 2, the inside of guide block 6 rotates and is provided with control lever 8, collect the inside of box 2 and seted up collecting vat 9, the inside of collecting vat 9 is provided with net 10, the inside of collecting box 2 is inserted and is closed and is provided with drawer 11, the inside of receiver 3 is provided with limiting plate 12, one side of limiting plate 12 is rotated and is provided with bolt 13, the fixed manual control pole 14 that is provided with in one side of bolt 13, collect box 2 and deviate from one side of 3 is fixed No. one and is provided with No. one link 15, the fixed stopper 16 that is provided with in one end of guardrail main part 1, still be provided with clamp plate 17 on the clamp plate 17, fixed No. two link 18 that is provided with on clamp plate 17.
Specifically, slider 5 slides in the inside of spout 4, and receiver 3 slides in the inside of spout 4 through slider 5 with collection box 2, through setting up slider 5 and spout 4 in this embodiment, has improved the practicality of collecting box 2 and receiver 3.
Specifically, the control rod 8 rotates inside the first guide block 6 through the rotating shaft damping, and the control rod 8 is inserted inside the second guide block 7 when being stored, in the embodiment.
The collecting groove 9 is internally provided with a notch inserted with the drawer 11, the drawer 11 is in an inclined state when the collecting groove 9 is internally arranged, the drawer 11 is set to be in an inclined state in the embodiment, and the drawer 11 is prevented from shaking during operation.
Specifically, limiting plate 12 passes through the screw thread with bolt 13 and rotates, and hand lever 14 drives bolt 13 when rotating and rotates, through setting up hand lever 14 in this embodiment, has improved the convenience of limiting plate 12 when using.
Specifically, the limiting block 16 is arranged above the second connecting block 18, and the limiting block 16 can limit the second connecting block 18 in this embodiment, so that the second connecting block 18 is prevented from shaking.
The utility model discloses a theory of operation and use flow: when in use: the manual control rod 14 is rotated, the limiting plate 12 is driven to a proper position through rotation of the manual control rod 14, the tool box is placed in the storage box 3, then the manual control rod 14 is rotated, the limiting plate 12 is driven to one side of the tool box, the tool box is limited, the collection box 2 and the storage box 3 are driven to the leftmost side through damping sliding of the sliding groove 4 and the sliding block 5, and the first connecting block 15 and the second connecting block 18 are inserted and combined through pressing of the pressing plate 17; during cleaning: when the device works, foreign matters fall into the grids 10 from the collecting groove 9, the foreign matters can fall into the drawer 11 through screening of the grids 10, the drawer 11 is pulled out, and the foreign matters are poured out to finish cleaning;
after use: through the slip of spout 4 and slider 5, will collect box 2 and receiver 3 and push away the one end that is close to stopper 16, will collect box 2 and slide to the end, no. one even piece 15 and No. two even piece 18 are through the pivot block that resets, and is spacing with receiver 3.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. A mounting device of superstructure in tunnel which characterized in that: the guardrail collecting device comprises a guardrail main body (1), a collecting box (2) is arranged at one end of the guardrail main body (1), a collecting box (3) is fixedly arranged at one side of the collecting box (2), a sliding groove (4) is formed in one end of the guardrail main body (1), two sliding blocks (5) are fixedly arranged at one end, close to the guardrail main body (1), of the collecting box (2), a first guide block (6) is fixedly arranged at the upper end of the guardrail main body (1), a second guide block (7) is fixedly arranged at the upper end of the collecting box (2), a control rod (8) is rotatably arranged inside the first guide block (6), a first collecting box (9) is arranged inside the collecting box (2), a grid (10) is arranged inside the collecting box (9), a drawer (11) is arranged in an inserting manner inside the collecting box (2), a limiting plate (12) is arranged inside the collecting box (3), a bolt (13) is rotatably arranged at one side of the limiting plate (12), a hand rod (14) is fixedly arranged at one side of the bolt (13), a first connecting block (15) is fixedly arranged at one side of the collecting box (2), a limiting block (15) is fixedly arranged at one side of the guardrail main body (1), a limiting block (17) is further arranged on the guardrail main body (1), and a second connecting block (18) is fixedly arranged on the pressing plate (17).
2. An installation device of an upper structure in a tunnel according to claim 1, wherein: the sliding block (5) slides in the sliding groove (4), and the storage box (3) and the collection box (2) slide in the sliding groove (4) through the sliding block (5).
3. An installation device of an upper structure in a tunnel according to claim 1, wherein: the control rod (8) rotates inside the first guide block (6) through rotating shaft damping, and the control rod (8) is inserted into the second guide block (7) when being stored.
4. An installation device of an upper structure in a tunnel according to claim 1, wherein: a notch inserted with the drawer (11) is formed in the collecting tank (9), and the drawer (11) is in an inclined state in the collecting tank (9).
5. An installation device of an upper structure in a tunnel according to claim 1, wherein: the limiting plate (12) and the bolt (13) rotate through threads, and the manual control rod (14) drives the bolt (13) to rotate when rotating.
6. An installation device of an upper structure in a tunnel according to claim 1, wherein: the limiting block (16) is arranged above the second connecting block (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221656211.7U CN218082643U (en) | 2022-06-30 | 2022-06-30 | Mounting device for upper structure in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221656211.7U CN218082643U (en) | 2022-06-30 | 2022-06-30 | Mounting device for upper structure in tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218082643U true CN218082643U (en) | 2022-12-20 |
Family
ID=84477505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221656211.7U Active CN218082643U (en) | 2022-06-30 | 2022-06-30 | Mounting device for upper structure in tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218082643U (en) |
-
2022
- 2022-06-30 CN CN202221656211.7U patent/CN218082643U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218082643U (en) | Mounting device for upper structure in tunnel | |
CN211547265U (en) | Land area management device for urban and rural planning | |
CN214750266U (en) | Underground water resource extraction and inspection device | |
CN214251884U (en) | Concrete strength testing arrangement for highway engineering | |
CN206090518U (en) | Highway is soil sampling device for engineering | |
CN207991865U (en) | A kind of Project Supervision cement sample collecting device | |
CN115627783A (en) | A consolidate construction equipment for geotechnical engineering bank protection net | |
CN214940611U (en) | Recycling device for automatically collecting rainwater for high-rise building | |
CN106592688A (en) | Opening-closing water collection device applied on wall | |
CN209722635U (en) | A kind of road emergency fills out pit device | |
CN108120618A (en) | A kind of roadbed testing sampler | |
CN214263215U (en) | Afforestation soil environmental protection prosthetic devices | |
CN218597091U (en) | Ditch debris barrier mechanism | |
CN216934915U (en) | Rainwater collecting device for energy-saving building | |
CN219508709U (en) | Building energy-saving rainwater collection device convenient to maintain | |
CN218204209U (en) | Safety protection structure for water channel construction | |
CN220676895U (en) | Intelligent rain and sewage treatment equipment for river drainage | |
CN207161866U (en) | A kind of municipal drainage tubular construction for being easy to clamping | |
CN215563177U (en) | Inspection shaft anti-clogging device | |
CN210665108U (en) | Highway engineering detects with sample device that fetches earth | |
CN211006948U (en) | Highway engineering drainage channel | |
CN220304873U (en) | Coal sample middle part sampling device | |
CN221234459U (en) | Building site solid waste classification collection processing apparatus | |
CN214289933U (en) | Zinc vapor absorption and collection cover | |
CN217053297U (en) | Road compactness detection device for road engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |