CN218061352U - Climbing frame - Google Patents

Climbing frame Download PDF

Info

Publication number
CN218061352U
CN218061352U CN202220536015.XU CN202220536015U CN218061352U CN 218061352 U CN218061352 U CN 218061352U CN 202220536015 U CN202220536015 U CN 202220536015U CN 218061352 U CN218061352 U CN 218061352U
Authority
CN
China
Prior art keywords
fixed mounting
casing
mounting
grid
creel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220536015.XU
Other languages
Chinese (zh)
Inventor
鲍银冬
屠峰瑞
黄立挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Juntai Construction Co ltd
Original Assignee
Zhejiang Juntai Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Juntai Construction Co ltd filed Critical Zhejiang Juntai Construction Co ltd
Priority to CN202220536015.XU priority Critical patent/CN218061352U/en
Application granted granted Critical
Publication of CN218061352U publication Critical patent/CN218061352U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The application discloses a climbing frame, which relates to the technical field of climbing frames and solves the problems that particles such as materials are easy to accumulate on the surface of a conventional climbing frame walkway plate in the construction process, so that the friction force on the surface is reduced, and certain potential safety hazards exist during walking; the climbing frame is characterized in that an installation shell is fixedly installed on the climbing frame body, a grid is fixedly installed at the top of the installation shell, and a plurality of partition grooves are formed in the installation shell. This application passes through the setting of grid, can make unrestrained material etc. fall into the inside of installation casing, guarantees constructor's safe construction, moreover, through the pulling handle, drives the mounting panel and the clearance brush of riser both sides and removes to clear up the inside material of installation casing, when the clearance brush removes to one side of riser, the inside material of installation casing falls inside the recovery casing of below, realizes the recovery to the material.

Description

Climbing frame
Technical Field
The application relates to a climb the frame field, especially relate to a climb frame.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can ascend or descend along the building. This system makes the scaffold technology completely changed: firstly, the frame does not need to be turned over; and secondly, the scaffold is free from the dismounting and mounting procedures (the scaffold is used until the construction is finished after one-time assembly), and is not limited by the height of a building, so that the manpower and the materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
In the process of realizing the application, the inventor finds that at least the following problems exist in the technology, particles such as materials are easily accumulated on the surface of the existing climbing frame walkway plate in the construction process, so that the friction force on the surface is reduced, certain potential safety hazards exist during walking, and therefore the climbing frame is provided at present.
SUMMERY OF THE UTILITY MODEL
In order to improve current frame pavement board of climbing in the work progress, the surface accumulates granule such as material easily to reduced the frictional force on surface, there is the problem of certain potential safety hazard during the walking, this application provides a frame climbs.
The application provides a climb frame adopts following technical scheme:
a climbing frame comprises a climbing frame body, wherein a protective net is fixedly arranged on the outer side of the climbing frame body;
climb and install the casing on the frame body, the top fixed mounting of installation casing has the grid, the inside of installation casing is provided with a plurality of segmentation groove, every the equal fixed mounting in inside of segmentation groove has the riser, the equal fixed mounting in both sides of riser has the slide bar, the surface slidable mounting of slide bar has the mounting panel, the bottom fixed mounting of mounting panel has the cleaning brush, fixed mounting has the spring between mounting panel and the riser, the spring suit is at the surface of slide bar, the upper surface of grid is provided with the handle, fixed mounting has the stay cord between handle and the mounting panel, the bottom fixed mounting of installation casing has the recovery casing with segmentation groove intercommunication.
Through adopting above-mentioned technical scheme, through the setting of grid, can make unrestrained material etc. fall into the inside of installation casing, guarantee constructor's safe construction.
Optionally, a limiting plate is fixedly mounted on the inner wall of the mounting shell, the grating is overlapped on the limiting plate, and the grating is connected with the limiting plate through a connecting bolt.
Through adopting above-mentioned technical scheme, the setting of this kind of structure is convenient for carry out the dismouting to the grid.
Optionally, a plurality of support rods are fixedly mounted inside the mounting housing and below the grid.
Through adopting above-mentioned technical scheme, the installation intensity of grid has been improved in the setting of bracing piece, the difficult condition that warp that appears.
Optionally, a steering roller is rotatably mounted inside the mounting shell, and the pull rope is wound below the steering roller.
Through adopting above-mentioned technical scheme, the setting of steering roll does benefit to and pulls the stay cord.
Optionally, a discharge pipe is fixedly mounted at the bottom of the recovery casing, and a control valve is mounted on the discharge pipe.
Through adopting above-mentioned technical scheme, the setting of discharge pipe is convenient will retrieve the inside material discharge of casing.
Optionally, a sun-shading cloth is installed on the inner side of the protection net.
Through adopting above-mentioned technical scheme, good sunshade effect can be played in the setting of puggaree to difficult messenger's operational environment is too high and makes constructor the condition of heatstroke appear.
Optionally, a storage shell is fixedly mounted at the top of the inner side of the protective screening, a motor is fixedly mounted inside the storage shell, a rotating rod is fixedly mounted at the output end of the motor and is rotatably connected with the storage shell, and the sun-shading cloth is wound on the rotating rod.
Through adopting above-mentioned technical scheme, the rotation of motor output drives the bull stick and rotates to the realization is to accomodating of puggaree, convenient to use.
Optionally, the bottom of the sun-shading cloth is fixedly connected with a vertical rod.
Through adopting above-mentioned technical scheme, the setting of pole that hangs down for the bottom of puggaree has certain weight, does benefit to the decline of puggaree.
In summary, the present application has the following beneficial effects:
this application passes through the setting of grid, can make unrestrained material etc. fall into the inside of installation casing, guarantees constructor's safe construction, moreover, through the pulling handle, drives the mounting panel and the clearance brush of riser both sides and removes to clear up the inside material of installation casing, when the clearance brush removes to one side of riser, the inside material of installation casing falls inside the recovery casing of below, realizes the recovery to the material.
Drawings
FIG. 1 is a side view schematic of the present application;
FIG. 2 is a front sectional view of the mounting housing of the present application;
fig. 3 is a schematic front view structure diagram of the protection net of the present application.
Description of reference numerals:
1. a climbing frame body; 2. a protective net; 3. installing a shell; 4. a grid; 5. dividing the groove; 6. a vertical plate; 7. a slide bar; 8. mounting a plate; 9. cleaning a brush; 10. a spring; 11. a handle; 12. pulling a rope; 13. recovering the shell; 14. a limiting plate; 15. a support bar; 16. a turning roll; 17. a discharge pipe; 18. a sun-shading cloth; 19. a housing case; 20. a motor; 21. a rotating rod; 22. a drop rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1-3, a climbing frame comprises a climbing frame body 1, a protective net 2 is fixedly mounted on the outer side of the climbing frame body 1, a sun-shading cloth 18 is mounted on the inner side of the protective net 2, and the sun-shading cloth 18 is arranged to achieve a good sun-shading effect, so that a worker is not prone to suffering from heatstroke due to an excessively high working environment. The top fixed mounting that the protection network 2 is inboard accomodates casing 19, and the inside fixed mounting that accomodates casing 19 has motor 20, and the output end fixed mounting of motor 20 has bull stick 21, and bull stick 21 rotates with accomodating casing 19 to be connected, and sunshade cloth 18 rolling is on bull stick 21, and the rotation of motor 20 output drives bull stick 21 and rotates to the realization is to accomodating of sunshade cloth 18, convenient to use. The bottom of the sunshade cloth 18 is fixedly connected with a vertical rod 22, and the vertical rod 22 is arranged, so that the bottom of the sunshade cloth 18 has certain weight, and the sunshade cloth 18 is favorably descended.
Referring to fig. 1 and 2, an installation shell 3 is fixedly installed on a climbing frame body 1, a grating 4 is fixedly installed at the top of the installation shell 3, and through the arrangement of the grating 4, scattered materials and the like can fall into the installation shell 3, so that the safe construction of constructors is guaranteed. The inside below fixed mounting that is located grid 4 of installation casing 3 has a plurality of bracing piece 15, and the setting of bracing piece 15 has improved the installation intensity of grid 4, the difficult condition that appears warping.
Referring to fig. 1 and 2, the inner wall of the installation shell 3 is fixedly provided with a limiting plate 14, the grating 4 is lapped on the limiting plate 14, the grating 4 is connected with the limiting plate 14 through a connecting bolt, and the grating 4 is convenient to disassemble and assemble due to the arrangement of the structure.
Referring to fig. 1 and 2, a plurality of dividing grooves 5 are arranged inside the mounting shell 3, a vertical plate 6 is fixedly mounted inside each dividing groove 5, sliding rods 7 are fixedly mounted on two sides of each vertical plate 6, a mounting plate 8 is slidably mounted on the outer surface of each sliding rod 7, and a cleaning brush 9 is fixedly mounted at the bottom of each mounting plate 8. Fixed mounting has spring 10 between mounting panel 8 and the riser 6, and spring 10 suit is at the surface of slide bar 7, and the upper surface of grid 4 is provided with handle 11, and fixed mounting has stay cord 12 between handle 11 and the mounting panel 8, through pulling handle 11, drives mounting panel 8 and the clearance brush 9 of 6 both sides of riser and removes to clear up the material of installation casing 3 inside. The installation shell 3 is internally provided with a steering roller 16 in a rotating way, the pull rope 12 is wound below the steering roller 16, and the steering roller 16 is favorable for pulling the pull rope 12.
Referring to fig. 1 and 2, a recovery casing 13 communicated with the dividing groove 5 is fixedly installed at the bottom of the installation casing 3, and when the cleaning brush 9 moves to one side of the vertical plate 6, the material inside the installation casing 3 falls into the recovery casing 13 below, so that the material is recovered. The bottom of the recovery shell 13 is fixedly provided with a discharge pipe 17, the discharge pipe 17 is provided with a control valve, and the discharge pipe 17 is arranged to facilitate discharging the materials inside the recovery shell 13.
The implementation principle of the application is as follows: through the setting of grid 4, can make unrestrained material etc. fall into the inside of installation casing 3, guarantee constructor's safe construction, and, through pulling handle 11, drive the mounting panel 8 and the clearance brush 9 of riser 6 both sides and remove, thereby clear up the inside material of installation casing 3, when clearance brush 9 removes to one side of riser 6, the inside material of installation casing 3 falls inside the recovery casing 13 of below, the realization is to the recovery of material, and simultaneously, the setting of puggaree 18, can play good sunshade effect, thereby be difficult for making operational environment too high and make constructor the condition of heatstroke appear.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a climb frame, includes and climbs frame body (1), its characterized in that: a protective net (2) is fixedly arranged on the outer side of the climbing frame body (1);
climb and go up fixed mounting and have installation casing (3) on frame body (1), the top fixed mounting of installation casing (3) has grid (4), the inside of installation casing (3) is provided with a plurality of segmentation groove (5), every the equal fixed mounting in inside of segmentation groove (5) has riser (6), the equal fixed mounting in both sides of riser (6) has slide bar (7), the surface slidable mounting of slide bar (7) has mounting panel (8), the bottom fixed mounting of mounting panel (8) has cleaning brush (9), fixed mounting has spring (10) between mounting panel (8) and riser (6), spring (10) suit is at the surface of slide bar (7), the upper surface of grid (4) is provided with handle (11), fixed mounting has stay cord (12) between handle (11) and mounting panel (8), the bottom fixed mounting of installation casing (3) has recovery casing (13) with segmentation groove (5) intercommunication.
2. The creel of claim 1, wherein: the inner wall fixed mounting of installation casing (3) has limiting plate (14), grid (4) overlap joint is on limiting plate (14), pass through connecting bolt between grid (4) and limiting plate (14) and be connected.
3. The creel of claim 1, wherein: a plurality of supporting rods (15) are fixedly arranged inside the mounting shell (3) and below the grating (4).
4. The creel according to claim 1, wherein: the inside of the installation shell (3) is rotatably provided with a steering roller (16), and the pull rope (12) is wound below the steering roller (16).
5. The creel of claim 1, wherein: the bottom of retrieving casing (13) fixed mounting has discharge pipe (17), install the control valve on discharge pipe (17).
6. The creel of claim 1, wherein: and sun-shading cloth (18) is arranged on the inner side of the protective net (2).
7. The creel of claim 6, wherein: the top fixed mounting of protection network (2) inboard has storage housing (19), the inside fixed mounting of storage housing (19) has motor (20), the output fixed mounting of motor (20) has bull stick (21), bull stick (21) rotate with storage housing (19) and are connected, puggaree (18) rolling is on bull stick (21).
8. The creel of claim 6, wherein: the bottom of the sunshade cloth (18) is fixedly connected with a vertical rod (22).
CN202220536015.XU 2022-03-11 2022-03-11 Climbing frame Active CN218061352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220536015.XU CN218061352U (en) 2022-03-11 2022-03-11 Climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220536015.XU CN218061352U (en) 2022-03-11 2022-03-11 Climbing frame

Publications (1)

Publication Number Publication Date
CN218061352U true CN218061352U (en) 2022-12-16

Family

ID=84413762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220536015.XU Active CN218061352U (en) 2022-03-11 2022-03-11 Climbing frame

Country Status (1)

Country Link
CN (1) CN218061352U (en)

Similar Documents

Publication Publication Date Title
CN111677278B (en) Equipment is demolishd to stair template for building
CN210032551U (en) Hanging flower basket is used in construction of building outer wall
CN218061352U (en) Climbing frame
CN211143412U (en) Self-cleaning glass curtain wall
CN111734156A (en) Building surface wall skin cleaning device and using method thereof
CN116815683B (en) Automatic cleaning equipment for bridge expansion joints
CN211899571U (en) Special construction platform of core section of thick bamboo elevator pit shaft
CN216110480U (en) Convenient self-cleaning building curtain wall
CN111206762A (en) Building outer wall operation platform capable of being clamped on floor slab and being quickly disassembled and assembled
CN213062880U (en) Building construction safety device
CN110214966A (en) A kind of Multi-functional green house covered with plastic film
CN214117421U (en) Plastering equipment is built in room
CN213980580U (en) Daylighting is with wood tripe of installation of being convenient for
CN212866799U (en) Attached scaffold main body for constructional engineering
CN216552717U (en) Internal and external support structure capable of being applied to color stone metal tile
CN209430218U (en) A kind of constructing tunnel waterproof material laying trolley
CN216691139U (en) Ventilation structure support for underground mine
CN202039759U (en) Lifting type easily-dismounted window curtain
CN220868756U (en) Exterior wall coating construction platform
CN110206331A (en) A kind of cart type elevator shaft mouth and hoistway protective device and construction method
CN213683530U (en) Building engineering construction safety control rail
CN211201114U (en) High-altitude safety hanging basket for construction engineering
CN217000423U (en) Decorative structure of building top surface
CN214423730U (en) Roof telescopic mechanism with automatic rolling shutter door
CN214365353U (en) Temporary fire-proof wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant