CN218061128U - Glass guardrail system - Google Patents

Glass guardrail system Download PDF

Info

Publication number
CN218061128U
CN218061128U CN202220849207.6U CN202220849207U CN218061128U CN 218061128 U CN218061128 U CN 218061128U CN 202220849207 U CN202220849207 U CN 202220849207U CN 218061128 U CN218061128 U CN 218061128U
Authority
CN
China
Prior art keywords
glass
curtain wall
guardrail system
groove
glass curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220849207.6U
Other languages
Chinese (zh)
Inventor
上官佳洪
王红生
陈雪茹
陈志凯
唐晓建
李博文
李首保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongming Construction Development Co ltd
Original Assignee
Shanghai Zhongming Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongming Construction Development Co ltd filed Critical Shanghai Zhongming Construction Development Co ltd
Priority to CN202220849207.6U priority Critical patent/CN218061128U/en
Application granted granted Critical
Publication of CN218061128U publication Critical patent/CN218061128U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a glass guardrail system sets up between two stands of a building structure, including railing handrail, glass curtain wall and a plurality of installation base, railing handrail's both ends respectively with two the stand is connected, the installation base is fixed building structure's subaerial, the installation base has opening first draw-in groove up, railing handrail has opening second draw-in groove down, glass curtain wall's bottom card is located in the first draw-in groove, and the top card is located in the second draw-in groove. Through the both ends that make railing armrest direct with the stand is connected, makes the load that railing armrest bore can directly transmit the stand for both sides, glass curtain wall's load passes through installation base directly transmits for ground, and it is more direct reliable to pass power, need not set up the stand simultaneously, has realized the effect of no stand, can realize great glass box, and the outward appearance effect is more succinct, also safer than traditional glass railing of encorbelmenting.

Description

Glass guardrail system
Technical Field
The utility model relates to a curtain design technical field especially relates to a glass guardrail system.
Background
Balcony guardrails are facilities for beautifying and protecting the outer edge of a balcony and are also main measures for improving the safety of the balcony, and in balcony design and decoration, the balcony guardrails are used as a part of the balcony guardrail, so that the exerted decoration effect is extremely important. An pleasing to the eye balcony guardrail to a great extent, has strengthened pleasing to the eye degree for the whole outward appearance effect of balcony. Common balcony guardrails on the market have glass balcony guardrail, stone carving balcony guardrail, iron art balcony guardrail, aluminum alloy balcony guardrail, PVC balcony railing, cement balcony railing etc.. Different balcony guardrail materials, the visual effect who designs is also different.
Among the commonly used glass balcony guardrail at present, separate into a plurality of units with whole glass curtain wall through the stand, the top and the handrail of stand are connected simultaneously for the load of handrail passes through the stand and transmits building body or the ground of below for. With the increasing demand of people, different requirements are made on the aesthetic property of the glass guardrail, for example, the design without the upright posts brings new problems to the transmission of the handrail load.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a glass guardrail system, it is direct reliable to pass power, need not set up the stand, has realized the effect of no stand, can realize great glass box, and the outward appearance effect is more succinct, also safer than traditional glass railing of encorbelmenting.
In order to achieve the above object, the utility model provides a glass guardrail system sets up between two stands of a building structure, including railing, glass curtain wall and a plurality of installation base, railing's both ends respectively with two the stand is connected, the installation base is fixed building structure's subaerial, the installation base has opening first draw-in groove up, railing has opening second draw-in groove down, glass curtain wall's bottom card is located in the first draw-in groove, and the top card is located in the second draw-in groove.
Optionally, the handrail comprises a steel insertion core and a decorative outer frame, two ends of the steel insertion core are respectively connected with the two upright posts, the decorative outer frame is wrapped outside the steel insertion core, and the steel insertion core is provided with the first clamping groove.
Optionally, the decorative outer frame is made of stainless steel, and the decorative outer frame and the steel inserting core are welded and fixed.
Optionally, the handrail and the upright post are connected by welding or by screw thread.
Optionally, a first elastic cushion block is arranged between the side wall of the first clamping groove and the glass curtain wall.
Optionally, the bottom of the first elastic cushion block is further filled with a sealant.
Optionally, the top wall of the first clamping groove has a distance with the upper surface of the glass curtain wall, and the top wall of the first clamping groove is further provided with a second elastic cushion block.
Optionally, a plurality of connecting pieces are pre-buried in the ground, two opposite sides of the installation base are respectively welded with an angle steel, and the angle steels are connected with the connecting pieces in a welding mode.
Optionally, third elastic cushion blocks are arranged between the side wall and the bottom wall of the second clamping groove and the glass curtain wall.
Optionally, the glass curtain wall is formed by splicing a plurality of glass panels.
The utility model provides a glass guardrail system, through making the both ends of railing handrail direct with the stand is connected, makes the stand of both sides can directly be transmitted to the load that railing handrail bore, glass curtain wall's load passes through the installation base directly transmits for ground, and it is more direct reliable to pass power, need not set up the stand simultaneously, has realized the effect of no stand, can realize great glass box, and the outward appearance effect is more succinct, also safer than traditional glass railing of encorbelmenting.
Drawings
Those skilled in the art will appreciate that the drawings are provided for a better understanding of the invention and do not constitute any limitation on the scope of the invention. Wherein:
fig. 1 is an elevational view of a glass guardrail system provided by an embodiment of the present invention;
fig. 2 is a vertical sectional view of a glass guardrail system according to an embodiment of the present invention.
In the drawings:
10-upright post; 20-handrail; 21-a steel ferrule; 22-decorative outer frame; 30-glass curtain wall; 40-mounting a base; 51-a first resilient pad; 52-a second resilient pad; 53-a third resilient pad; 60-sealing glue; 70-a connector; 80-angle steel.
Detailed Description
To make the objects, advantages and features of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings and specific embodiments. It is to be noted that the drawings are in simplified form and are not to scale, and are merely intended to facilitate and clarify the explanation of the embodiments of the present invention. Further, the structures illustrated in the drawings are often part of actual structures. In particular, the drawings are intended to show different emphasis, sometimes in different proportions.
As used in this application, the singular forms "a," "an," and "the" include plural referents unless the content clearly dictates otherwise. As used in this disclosure, the term "or" is generally employed in its sense including "and/or" unless the content clearly dictates otherwise. As used in this disclosure, the term "plurality" is generally used in a sense including "at least one" unless the content clearly dictates otherwise. As used in the present application, the term "at least two" is generally used in a sense including "two or more" unless the content clearly dictates otherwise. Furthermore, the terms "first", "second", "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", "third" may explicitly or implicitly include one or at least two of the features.
Referring to fig. 1-2, fig. 1 is an elevation view of a glass guardrail system provided by an embodiment of the present invention;
fig. 2 is a vertical sectional view of a glass guardrail system provided by an embodiment of the present invention. The embodiment provides a glass guardrail system, sets up between two stands 10 of a building structure, including railing 20, glass curtain wall 30 and a plurality of installation base 40, railing 20's both ends respectively with two stand 10 is connected, installation base 40 is fixed building structure's subaerial, installation base 40 has opening first draw-in groove up, railing 20 has opening second draw-in groove down, glass curtain wall 30's bottom card is located in the first draw-in groove, and the top card is located in the second draw-in groove.
Through making handrail 20's both ends direct with stand 10 is connected, makes handrail 20 bears the load can directly transmit for the stand 10 of both sides, glass curtain wall 30's load passes through installation base 40 directly transmits for ground, and it is more direct reliable to pass power, need not set up stand 10 simultaneously, has realized the effect of no stand 10, can realize great glass box, and the outward appearance effect is more succinct, also safer than traditional glass railing of encorbelmenting.
Specifically, the glass guardrail system provided in this embodiment may be applied to balconies of building structures, and may also be disposed at other positions that need to be protected, and the column 10 may be a steel structure column, and may also be a reinforced concrete column, which is not limited in this application.
The two ends of the handrail 20 are respectively connected with the two upright posts 10, the handrail 20 comprises a steel inserting core 21 and a decorative outer frame 22, the two ends of the steel inserting core 21 are respectively connected with the two upright posts 10, the decorative outer frame 22 is wrapped outside the steel inserting core 21, and the first clamping groove is formed in the steel inserting core 21. The steel inserting core 21 is the main body structure of the handrail 20 and is used for bearing and transmitting load, and the decorative outer frame 22 is wrapped outside the steel inserting core 21 and mainly plays a decorative role.
Referring to fig. 2, the steel ferrule 21 includes a U-shaped portion and an inward extending portion, the U-shaped portion is mainly used for mounting the glass curtain wall 30 to achieve reliable positioning of the glass curtain wall 30, the inward extending portion is used as a handrail to facilitate manual leaning, and the shape of the inward extending portion may be a regular polygon or an irregular shape, which is not limited in this application.
Further, the material of the decorative outer frame 22 is stainless steel, and the decorative outer frame 22 and the steel ferrule 21 are welded and fixed. The stainless steel is convenient to process, has good weldability, corrosion resistance and polishing performance, can improve the service life of the handrail 20, and ensures the surface smoothness of the handrail 20.
In this embodiment, the balustrade handrail 20 is welded or screwed to the post 10. For example, when the column 10 is a steel column 10, the handrail 20 may be directly welded to the column 10, or a connecting plate may be welded to an end of the handrail 20, and threaded holes may be correspondingly formed in the connecting plate and the column 10, and then the connecting plate and the column 10 may be connected by a fastener such as a bolt. Or, when the vertical column 10 is of a concrete structure, a connecting steel plate may be embedded in the vertical column 10, and the connecting steel plate may be directly welded to the handrail 20, or may be connected to the handrail by a fastener through a thread, which is not limited in this application.
Further, a first elastic cushion block 51 is arranged between the side wall of the first clamping groove and the glass curtain wall 30. The first elastic cushion block 51 is used for isolating the steel inserting core 21 from the glass curtain wall 30, preventing the glass curtain wall 30 from being scratched by the steel inserting core 21, and meanwhile, the first elastic cushion block can also play a certain limiting role, so that the glass curtain wall 30 is prevented from moving back and forth in the first clamping groove. In this embodiment, the decorative outer frame 22 partially extends into the first slot and partially covers an inner wall of the first slot, and the first elastic cushion block 51 is located between the decorative outer frame 22 and the glass curtain wall 30.
The first elastic cushion block 51 can be an ethylene propylene diene monomer cushion block, and ethylene propylene diene monomer has good elasticity, compression deformation resistance, excellent weather resistance and heat aging resistance, and is a better choice. The first resilient pad 51 may be attached to the glass curtain wall 30 by bonding.
Further, the bottom of the first elastic cushion block 51 is filled with a sealant 60. The sealant 60 is mainly used for further sealing the gap between the glass curtain wall 30 and the side wall of the first clamping groove, so that the sealing effect is improved. In this embodiment, the sealant 60 includes but is not limited to a silicone sealant, which has a strong adhesion and a high tensile strength, and also has the characteristics of weather resistance, vibration resistance, moisture resistance, odor resistance, and adaptability to large changes in cold and heat.
Referring to fig. 2, a distance is formed between the top wall of the first clamping groove and the upper surface of the glass curtain wall 30, and a second elastic cushion block 52 is further disposed on the top wall of the first clamping groove. Through first draw-in groove with reserve certain clearance between the glass curtain wall 30, can effectively prevent handrail warp the extrusion glass curtain wall 30, it is right glass curtain wall 30 causes the damage. The provision of the second resilient pad 52 at the same time further prevents the balustrade from deforming and crushing the glass curtain wall 30. The present embodiment does not set any limit to the specific value of the pitch.
In this embodiment, the second elastic cushion block 52 may also be an epdm cushion block, and is directly bonded to the steel ferrule 21.
The mounting base 40 may be one, for example, disposed along the length direction of the glass curtain wall 30, or may be a plurality of mounting bases, which may be equally spaced or unequally spaced, disposed along the length direction of the glass curtain wall 30, which is not limited in this application. In this embodiment, the number of the mounting bases 40 is four, and the four mounting bases 40 are arranged at equal intervals along the length direction of the glass curtain wall 30. The mounting base 40 may be made of steel, and has a U-shaped groove or a C-shaped groove formed thereon for mounting the glass curtain wall 30.
Referring to fig. 1 and 2, a plurality of connecting members 70 are embedded in the ground, two opposite sides of the mounting base 40 are welded with an angle steel 80, and the angle steel 80 is welded with the connecting members 70. The connecting member 70 includes, for example, a top steel plate partially exposed from the concrete ground and welded to one end of the angle iron 80, and a buried steel bar positioned in the concrete ground and vertically connected to the top steel plate, and the other end of the angle iron 80 is welded to the outer wall of the mounting base 40.
Further, third elastic cushion blocks 53 are arranged between the side wall and the bottom wall of the second clamping groove and the glass curtain wall 30. With the same principle as the first elastic cushion block 51, the third elastic cushion block 53 is also arranged to prevent the mounting base 40 from contacting and easily scratching the glass curtain wall 30, and can also play a certain limiting role to prevent the glass curtain wall 30 from moving back and forth in the second clamping groove.
In this embodiment, the third elastic cushion block 53 may also be made of an epdm cushion block, and is fixed by adhesion.
When the glass curtain wall 30 has a long length, the glass curtain wall 30 may be formed by splicing a plurality of glass panels. When the length is short, the glass curtain wall 30 formed integrally can be directly adopted. The present embodiment is not limited to the specific number of the glass panels.
In this embodiment, the glass curtain wall 30 is made of ultra-white tempered glass, and the ultra-white tempered glass has few impurities therein, is not easy to explode, has excellent light transmittance and processability, and is a preferred choice. Of course, the material of the glass curtain wall 30 is not particularly limited in the present application.
To sum up, the embodiment of the utility model provides a glass guardrail system sets up between two stands of a building structure, including railing, glass curtain wall and a plurality of installation base, railing's both ends respectively with two the stand is connected, the installation base is fixed building structure's subaerial, the installation base has opening first draw-in groove up, railing has opening second draw-in groove down, glass curtain wall's bottom card is located in the first draw-in groove, and the top card is located in the second draw-in groove. Through making handrail's both ends direct with the stand is connected, makes handrail bore load can directly transmit the stand for both sides, glass curtain wall's load passes through installation base directly transmits for ground, and it is more direct reliable to pass power, need not set up the stand simultaneously, has realized the effect of no stand, can realize great glass box, and the outward appearance effect is more succinct, and it is safer than traditional glass handrail of encorbelmenting.
The above description is only for the preferred embodiment of the present invention, and does not limit the present invention in any way. Any technical personnel who belongs to the technical field, in the scope that does not deviate from the technical scheme of the utility model, to the technical scheme and the technical content that the utility model discloses expose do the change such as the equivalent replacement of any form or modification, all belong to the content that does not break away from the technical scheme of the utility model, still belong to within the scope of protection of the utility model.

Claims (10)

1. The utility model provides a glass guardrail system, sets up between two stands of a building structure, its characterized in that, including railing, glass curtain wall and a plurality of installation base, railing's both ends respectively with two the stand is connected, the installation base is fixed building structure's subaerial, the installation base has opening first draw-in groove up, railing has opening second draw-in groove down, glass curtain wall's bottom card is located in the first draw-in groove, and the top card is located in the second draw-in groove.
2. The glass guardrail system of claim 1, wherein the handrail comprises a steel insertion core and a decorative outer frame, two ends of the steel insertion core are respectively connected with the two posts, the decorative outer frame is wrapped outside the steel insertion core, and the steel insertion core is provided with the first clamping groove.
3. The glass guardrail system of claim 2 wherein the decorative frame is made of stainless steel and the decorative frame is welded to the steel insert.
4. The glass guardrail system of claim 3, wherein the balustrade handrail is welded or threaded to the post.
5. The glass guardrail system of claim 1 wherein a first resilient pad is disposed between the sidewall of the first channel and the glass curtain wall.
6. The glass guardrail system of claim 5 wherein the bottom of the first resilient pad is further filled with a sealant.
7. The glass guardrail system of claim 1, wherein a top wall of the first slot is spaced from an upper surface of the glass curtain wall, and wherein the top wall of the first slot is further provided with a second resilient pad.
8. The glass guardrail system of claim 1, wherein a plurality of connectors are embedded in the ground, and wherein an angle steel is welded to each of opposite sides of the mounting base, and wherein the angle steel is welded to the connectors.
9. The glass guardrail system of claim 1, wherein third resilient pads are disposed between the glass curtain wall and the side and bottom walls of the second slot.
10. The glass guardrail system of claim 1, wherein the glass curtain wall is formed by splicing a plurality of glass panels.
CN202220849207.6U 2022-04-11 2022-04-11 Glass guardrail system Active CN218061128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220849207.6U CN218061128U (en) 2022-04-11 2022-04-11 Glass guardrail system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220849207.6U CN218061128U (en) 2022-04-11 2022-04-11 Glass guardrail system

Publications (1)

Publication Number Publication Date
CN218061128U true CN218061128U (en) 2022-12-16

Family

ID=84417039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220849207.6U Active CN218061128U (en) 2022-04-11 2022-04-11 Glass guardrail system

Country Status (1)

Country Link
CN (1) CN218061128U (en)

Similar Documents

Publication Publication Date Title
CN218061128U (en) Glass guardrail system
US7665574B2 (en) Soundproofing restraining system
CN210238874U (en) Hidden frame glass curtain wall with protective edge
CN203113679U (en) Decoration heat insulation board system
CN212078270U (en) Prestressed hollow slab
CN211396142U (en) Novel outer facade view curtain
CN211172608U (en) Keel of cold-bending glass curtain wall
CN220644943U (en) Glass guardrail side dress structure
KR200413016Y1 (en) Rib glass and patch type glass structure comprised of the same glass material
CN107938826A (en) A kind of building balcony
CN217681258U (en) Anti-falling stable aluminum alloy window
CN217537469U (en) Glass curtain wall structure
CN202000742U (en) Connecting component of transverse pipe of upright post
CN211007234U (en) Separation type exposed frame glass curtain wall
CN213897867U (en) Balcony glass railing installation node structure
WO2001055522A1 (en) Discrete anchor means for joining units of construction
CN210564176U (en) Eccentric straight vertex angle sign indicating number
CN214531405U (en) Unit type curtain wall mounting system
CN219672504U (en) Antiknock window
CN213979662U (en) Gap-proof splicing type railing
CN217106650U (en) Full glass belt type window structure of house
CN211396183U (en) U type glass curtain wall convenient to installation
CN211646895U (en) Outer door fill glass T type curtain
CN215105986U (en) Weak connection open web truss steel corridor
CN219281026U (en) Super-large load curtain wall system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant