CN218055258U CN202121923378.0U CN202121923378U CN218055258U CN 218055258 U CN218055258 U CN 218055258U CN 202121923378 U CN202121923378 U CN 202121923378U CN 218055258 U CN218055258 U CN 218055258U
Authority
CN
China
Prior art keywords
fixedly connected
concrete pipe
pipe pile
fixed frame
slide bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121923378.0U
Other languages
Chinese (zh)
Inventor
董金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Branch Of China Construction Third Engineering Group Co ltd
Original Assignee
Qingdao Branch Of China Construction Third Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Branch Of China Construction Third Engineering Group Co ltd filed Critical Qingdao Branch Of China Construction Third Engineering Group Co ltd
Priority to CN202121923378.0U priority Critical patent/CN218055258U/en
Application granted granted Critical
Publication of CN218055258U publication Critical patent/CN218055258U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model relates to a building engineering technical field specifically is a building conveyor for concrete pipe pile, comprising a base plate, the fixed frame of fixedly connected with on the bottom plate, two spouts have been seted up on the fixed frame, sliding connection has a plurality of sliders in the spout, and the spout internal rotation is connected with the screw rod, each screw rod all passes through threaded connection with corresponding slider, the looks remote site fixedly connected with top board of two corresponding sliders, a plurality of arcs and a plurality of fixed slots have been seted up on the top board, sliding connection has the limiting plate in the fixed slot, spring and slide bar are popped out to the both ends difference fixedly connected with of limiting plate, the inside that the top board extended to corresponding arc is run through to the one end of slide bar, and the one end fixedly connected with splint of slide bar, a plurality of holding down plates of fixedly connected with in the fixed frame, a plurality of positions and the corresponding standing groove of arc have on the holding down plate, it fixes according to the thickness of concrete pipe pile to have can the person of facilitating the use, the higher effect of practicality.

Description

Conveying device for building concrete pipe piles
Technical Field
The utility model relates to a building engineering technical field specifically is a building concrete pipe pile is with transporting device.
Background
As is well known, a pipe pile is divided into a prestressed concrete pipe pile, a prestressed concrete thin-wall pipe pile and a prestressed high-strength concrete pipe pile according to the concrete strength grade and the wall thickness, and when the concrete pipe pile is conveyed, a conveying device is indispensable.
Through the retrieval, chinese patent application number is CN 202022046115.8's utility model discloses a conveyor for building concrete pipe pile, it is through setting up first spring, the buffer board, elasticity damper, the sliding sleeve, the slide bar, the fixed block, the second spring, the baffle-box, the third spring, the fly leaf, the support column, the gyro wheel, the spout, slider and cushion mutually support, the advantage that improves conveyor shock-absorbing capacity has been reached, make building concrete pipe when transporting, can effectually carry out elasticity buffering shock attenuation to building concrete pipe, prevent that building concrete pipe from appearing jolting cracked damage, construction cost is reduced, user's user demand can be satisfied.
Although can effectually carry out elasticity buffering shock attenuation to building concrete pipe, prevent that building concrete pipe from appearing jolting cracked damage, because concrete pipe pile's thickness is different, the person of not being convenient for fixes according to concrete pipe pile's thickness, and it is lower to use the practicality.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building concrete pipe pile is with conveyor, it can be fixed according to concrete pipe pile's thickness by the person of facilitating the use, and it is higher to use the practicality.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building is conveyor for concrete pipe pile, comprising a base plate, the fixed frame of fixedly connected with on the bottom plate, two spouts have been seted up on the fixed frame, sliding connection has a plurality of sliders in the spout, and the spout internal rotation is connected with the screw rod, each screw rod all passes through threaded connection with corresponding slider, the looks remote site fixedly connected with top board of two corresponding sliders, a plurality of arcs and a plurality of fixed slots have been seted up on the top board, sliding connection has the limiting plate in the fixed slot, the both ends difference fixedly connected with of limiting plate pop out spring and slide bar, the one end of slide bar runs through the top board and extends to the inside of corresponding arc, and the one end fixedly connected with splint of slide bar, a plurality of holding downs of fixedly connected with in the fixed frame, the corresponding standing groove of a plurality of positions and arc has been seted up on the holding down plate, install the motor on the fixed frame, the first sprocket of output fixedly connected with of motor, the one end fixedly connected with connecting axle of screw rod, the one end fixedly connected with connecting axle of connecting axle runs through fixed frame and extends to the outside, and fixedly connected with second sprocket on the connecting axle, two second sprockets pass through chain drive with first sprocket and are connected with.
Preferably, the equal fixedly connected with fixing base in bottom four corners department of bottom plate has seted up the mounting groove on the fixing base, installs electric putter in the mounting groove, electric putter's output fixedly connected with universal wheel.
Furthermore, one end of the clamping plate is fixedly connected with an anti-slip mat.
Still further, two stress rods are fixedly connected to the bottom plate, and handles are fixedly connected to the stress rods.
As a further scheme of the scheme, the handle is provided with anti-skid lines.
As a further scheme of the scheme, the connecting shaft is rotatably connected with the fixing frame.
(III) advantageous effects
Compared with the prior art, the utility model provides a building concrete is conveyor for tubular pile possesses following beneficial effect:
this building is conveyor for concrete pipe pile, through popping out the spring, the limiting plate, the cooperation of slide bar and splint, can be convenient for fix according to concrete pipe pile's thickness, it is higher to use the practicality, and through the elasticity that pops out the spring, can reduce splint to concrete pipe pile's pressure, prevent that concrete pipe pile from breaking the damage, through the cooperation of motor, first sprocket, second sprocket, connecting axle, screw rod and slider, can drive the top board and remove, and then can fix a plurality of concrete pipe piles, it is higher to use the practicality.
Drawings
FIG. 1 is a schematic sectional view of the present invention;
FIG. 2 is a schematic view of a portion of the enlarged structure of FIG. 1;
FIG. 3 is a schematic view of a portion of the enlarged structure of FIG. 1 at B according to the present invention;
fig. 4 is a schematic diagram of a partial enlarged structure at C in fig. 1 according to the present invention.
In the figure: 1. a base plate; 2. a fixing frame; 3. a slider; 4. a screw; 5. an upper pressure plate; 6. a limiting plate; 7. ejecting a spring; 8. a slide bar; 9. a splint; 10. pressing the plate downwards; 11. a motor; 12. a first sprocket; 13. a connecting shaft; 14. a second sprocket; 15. a chain; 16. a fixed seat; 17. an electric push rod; 18. a universal wheel; 19. a non-slip mat; 20. a force-bearing rod; 21. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, a conveying device for building concrete pipe piles comprises a base plate 1, a fixing frame 2 is fixedly connected to the base plate 1, two sliding grooves are formed in the fixing frame 2, a plurality of sliding blocks 3 are slidably connected in the sliding grooves, screw rods 4 are rotatably connected in the sliding grooves, each screw rod 4 is in threaded connection with the corresponding sliding block 3, an upper pressing plate 5 is fixedly connected to opposite ends of the two corresponding sliding blocks 3, a plurality of arc-shaped grooves and a plurality of fixing grooves are formed in the upper pressing plate 5, a limiting plate 6 is slidably connected in the fixing groove, a spring 7 and a sliding rod 8 are respectively and fixedly connected to two ends of the limiting plate 6, one end of the sliding rod 8 penetrates through the upper pressing plate 5 and extends into the corresponding arc-shaped groove, a clamping plate 9 is fixedly connected to one end of the sliding rod 8, a non-slip mat 19 is fixedly connected to one end of the clamping plate 9, and the concrete pipe pile can be prevented from falling off the clamping plate 9 by the mat 19, a plurality of lower pressing plates 10 are fixedly connected in the fixed frame 2, a plurality of placing grooves with positions corresponding to the arc-shaped grooves are arranged on the lower pressing plates 10, a motor 11 is installed on the fixed frame 2, the motor 11 is a speed reducer, and the motor 11 can rotate forwards and backwards, a first chain wheel 12 is fixedly connected with the output end of the motor 11, a connecting shaft 13 is fixedly connected with one end of the screw rod 4, one end of the connecting shaft 13 penetrates through the fixed frame 2 and extends to the outside, the connecting shaft 13 is rotatably connected with the fixed frame 2 and is rotatably connected with the fixed frame 2 through the connecting shaft 13, the stability of the connecting shaft 13 can be improved, a second chain wheel 14 is fixedly connected on the connecting shaft 13, the two second chain wheels 14 are in transmission connection with the first chain wheel 12 through a chain 15, and the fixing can be conveniently carried out according to the thickness of the concrete pipe pile through the matching of the ejection spring 7, the limiting plate 6, the sliding rod 8 and the clamping plate 9, the practicality is higher in use to elasticity through popping out spring 7 can reduce splint 9 and to concrete pipe pile's pressure, prevent that concrete pipe pile from breaking and damaging, through the cooperation of motor 11, first sprocket 12, second sprocket 14, connecting axle 13, screw rod 4 and slider 3, can drive top board 5 and remove, and then can fix a plurality of concrete pipe piles, and the practicality is higher.
Still further explain, the equal fixedly connected with fixing base 16 in bottom four corners department of bottom plate 1, the mounting groove has been seted up on the fixing base 16, install electric putter 17 in the mounting groove, electric putter 17's output fixedly connected with universal wheel 18, cooperation through electric putter 17 and universal wheel 18, but convenient to use person removes bottom plate 1, two atress poles 20 of fixedly connected with on the bottom plate 1, fixedly connected with handle 21 on the atress pole 20, cooperation through atress pole 20 and handle 21, but convenient to use person promotes universal wheel 18 and removes, be provided with anti-skidding line on the handle 21, can prevent through anti-skidding line that handle 21 from droing in user's hand.
The motor 11 and the electric push rod 17 in this embodiment are conventional devices that are purchased on the market and known to those skilled in the art, and can be customized or selected according to actual needs, and we only use them in this patent, and do not improve their structures and functions, and their setting mode, installation mode, and electrical connection mode, for those skilled in the art, as long as debug according to the requirements of their use specifications, they are not described herein any more, and the motor 11 and the electric push rod 17 are both provided with control switches that are matched with them, and the installation positions of the control switches are selected according to the actual use needs, so that the operators can perform operation control conveniently.
To sum up, this conveyor for building concrete pipe pile's theory of operation and working process do, when using, at first place this conveyor for building concrete pipe pile in the place that needs to use, and connect motor 11 according to the description positive and negative circuit, the user puts the concrete pipe pile into the standing groove, then the user opens motor 11, motor 11's output drives first sprocket 12 and rotates, first sprocket 12 drives second sprocket 14 through chain 15 and rotates, second sprocket 14 drives connecting axle 13 and rotates, connecting axle 13 drives screw rod 4 and rotates, screw rod 4 drives slider 3 and moves, slider 3 drives top board 5 and moves, make the arc wall coincide with the standing groove, concrete pipe pile compresses clamp plate 9 and moves, clamp plate 9 drives slide bar 8 and moves, slide bar 8 drives limiting plate 6 and moves, limiting plate 6 extrudes spring 7, and then fix the concrete pipe pile.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building conveyor for concrete pipe pile, includes bottom plate (1), its characterized in that: the fixed frame of fixedly connected with (2) on bottom plate (1), two spouts have been seted up on fixed frame (2), sliding connection has a plurality of sliders (3) in the spout, and the spout internal rotation is connected with screw rod (4), each screw rod (4) all pass through threaded connection with corresponding slider (3), looks remote site fixedly connected with top board (5) of two corresponding sliders (3), a plurality of arcs and a plurality of fixed slots have been seted up on top board (5), sliding connection has limiting plate (6) in the fixed slot, the both ends difference fixedly connected with of limiting plate (6) pop out spring (7) and slide bar (8), the one end of slide bar (8) runs through top board (5) and extends to the inside of corresponding arc, and the one end fixedly connected with splint (9) of slide bar (8), a plurality of holding down plates of fixedly connected with (10) in fixed frame (2), set up the corresponding standing groove of a plurality of positions and arc on holding down plate (10), install motor (11) on fixed frame (2), the output fixedly connected with first sprocket (12) of motor (11), the one end fixedly connected with of one end fixedly connected with screw rod (4) has a plurality of (13), one end (13) and chain sprocket (13) and second sprocket (14) and second sprocket (13) extend through connecting axle (14) and second sprocket (13) and chain (14), and connecting axle (14) outside chain (13) are connected with connecting axle (13) on fixed chain wheel (13) are connected with ) And (5) transmission connection.
2. The conveying device for the building concrete pipe pile according to claim 1, characterized in that: the bottom four corners department of bottom plate (1) has all fixedly connected with fixing base (16), has seted up the mounting groove on fixing base (16), installs electric putter (17) in the mounting groove, and the output fixedly connected with universal wheel (18) of electric putter (17).
3. The conveying device for the building concrete pipe pile according to claim 2, characterized in that: one end of the clamping plate (9) is fixedly connected with an anti-skid pad (19).
4. The conveying device for the building concrete pipe pile according to claim 3, characterized in that: two stress rods (20) are fixedly connected to the bottom plate (1), and a handle (21) is fixedly connected to the stress rods (20).
5. The conveying device for the building concrete pipe pile according to claim 4, characterized in that: the handle (21) is provided with anti-skid lines.
6. The conveying device for the building concrete pipe pile according to claim 5, characterized in that: the connecting shaft (13) is rotatably connected with the fixing frame (2).
CN202121923378.0U 2021-08-16 2021-08-16 Conveying device for building concrete pipe piles Active CN218055258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121923378.0U CN218055258U (en) 2021-08-16 2021-08-16 Conveying device for building concrete pipe piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121923378.0U CN218055258U (en) 2021-08-16 2021-08-16 Conveying device for building concrete pipe piles

Publications (1)

Publication Number Publication Date
CN218055258U true CN218055258U (en) 2022-12-16

Family

ID=84413745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121923378.0U Active CN218055258U (en) 2021-08-16 2021-08-16 Conveying device for building concrete pipe piles

Country Status (1)

Country Link
CN (1) CN218055258U (en)

Similar Documents

Publication Publication Date Title
CN218055258U (en) Conveying device for building concrete pipe piles
CN108791393A (en) A kind of engineering survey equipment cart
CN203332984U (en) Double-line block brick stacker crane
CN212703450U (en) Improved generation water conservancy water pipe edulcoration auxiliary device
CN209814632U (en) Pipe column conveying device
CN210707513U (en) Portable regulator cubicle conveyer
CN210460473U (en) Insulating ladder for electric power installation
CN215102773U (en) Movable sludge dewatering integrated device
CN210971183U (en) Evaporate handling device who presses fly ash brick
CN214741052U (en) Multifunctional ladder for building construction
CN208292603U (en) A kind of tunnel excavation operation platform
CN219523978U (en) Anti-slip assembled prefabricated member conveying device
CN218261746U (en) Detachable assembled screw jack
CN210171662U (en) Concentrating table driven by cam
CN217516643U (en) Assembled case arch passageway transfer device
CN217437028U (en) Steel pusher's of steel production usefulness collection material platform
CN218148127U (en) Ecological slope protection system
CN214358180U (en) General type rubbish clearance dolly that construction used
CN215663565U (en) Automatic staircase installation is with survey marking device now
CN216833831U (en) Culvert pipe transfer device for municipal engineering construction
CN218852196U (en) Shelf beam convenient to disassemble and assemble
CN216443624U (en) Concrete test block maintenance handling device
CN211054950U (en) Fill electric pile convenient to accomodate
CN212950743U (en) Prefabricated section is handling device in batches
CN218662525U (en) Construction is with old and useless electric wire collection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant