Steel ball rapid cooling device Download PDFInfo
- Publication number
- CN218033985U CN218033985U CN202221525398.7U CN202221525398U CN218033985U CN 218033985 U CN218033985 U CN 218033985U CN 202221525398 U CN202221525398 U CN 202221525398U CN 218033985 U CN218033985 U CN 218033985U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- breather pipe
- gas
- steel ball
- aspiration pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a quick cooling device of steel ball, including the cooler bin, cooler bin top central point puts and runs through and the first breather pipe of fixedly connected with, first breather pipe one end is provided with the aspiration pump, and first breather pipe one end and aspiration pump gas outlet fixed connection, aspiration pump air inlet fixedly connected with second breather pipe, and second breather pipe one end is provided with the gas holder, gas holder left side bottom position and fixed connection are run through to second breather pipe one end. The utility model discloses in, open the aspiration pump and make the aspiration pump bleed from the gas holder through the second breather pipe, make the aspiration pump give vent to anger to first breather pipe again, make inert gas pass through the gas outlet and get into the cooler bin, the gas outlet is in the inside top of cooler bin, and the iron ball is placed and is provided with the gas circulation groove on the board, makes gaseous top-down reach the circulation effect, makes inert gas can make full use of to abundant contact reaches the effect of cooling down more, is worth promoting.
Description
Technical Field
The utility model relates to a steel ball cooling technology field especially relates to a quick cooling device of steel ball.
Background
The steel ball is divided into grinding, forging and casting according to the production and processing technology. The steel is divided into bearing steel balls, stainless steel balls, carbon steel balls, copper bearing steel balls, alloy balls and the like according to processing materials. The bearing steel ball is an important industrial basic part, and the alloy steel ball is a spherical ferroalloy wear-resistant body which is generated by using carbon, chromium, manganese, molybdenum and the like as main added metal elements and through forging, spinning, rolling, casting and other modes, and is the most important component part of the prior ball for crushing industrial mines, cement and the like.
The traditional steel ball cooling mode is natural cooling, the cooling time of the natural cooling is long, the processed steel ball is directly contacted with the outside air, and the phenomenon of surface oxidation of the steel ball is easily caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a steel ball quick cooling device.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a quick cooling device of steel ball, includes the cooler bin, cooler bin top central point puts the first breather pipe of running through and fixedly connected with, first breather pipe one end is provided with the aspiration pump, and first breather pipe one end and aspiration pump gas outlet fixed connection, aspiration pump air inlet fixedly connected with second breather pipe, and second breather pipe one end is provided with the gas holder, gas holder left side bottom position and fixed connection are run through to second breather pipe one end, the equal three evenly distributed's of the equal fixedly connected with first spout in the cooler bin inner wall left and right sides, six the inside equal sliding connection of first spout has first slider, two of relative setting equal fixedly connected with iron ball places the board between the first slider, and is three the iron ball places the board top and all runs through and is provided with a plurality of evenly distributed's iron ball standing groove, cooler bin front end top and the equal fixedly connected with second spout in the bottom, two the inside equal sliding connection of second spout has the second slider, two equal fixedly connected with sealing baffle between the second slider.
As a further description of the above technical solution:
the other end of the first vent pipe is fixedly connected with a high-temperature-resistant air outlet and the high-temperature-resistant air outlet is located inside the cooling box.
As a further description of the above technical solution:
and a thermometer is fixedly connected to the right side of the top of the cooling box close to the rear end.
As a further description of the above technical solution:
and the right side of the gas storage tank is penetrated and fixedly connected with a gas storage tank valve near the bottom.
As a further description of the above technical solution:
four corners of the bottom of the cooling box are fixedly connected with box legs.
As a further description of the above technical solution:
the middle position of the left side of the sealing baffle is fixedly connected with a handle.
As a further description of the above technical solution:
two the inside right side of second spout all fixedly connected with limit block.
As a further description of the above technical solution:
and gas circulation grooves are formed in the periphery of the top of the three iron ball placing plates in a penetrating mode.
The utility model discloses following beneficial effect has:
the utility model discloses in, aerify the gas holder through switch gas holder valve, after adding proper amount inert gas, on the iron ball standing groove is placed to processing completion iron ball, it makes the iron ball place the board and get into the cooler bin to slide through first slider and first spout after accomplishing to put, three iron ball places the board and puts in proper amount and accomplish the back, it reaches sealedly to make the cooler bin through handle push-and-pull seal baffle, reduce iron ball and air contact time, prevent oxidation, open the aspiration pump and bleed from the gas holder, make the aspiration pump give vent to anger to first breather pipe again, make inert gas get into the cooler bin, through the gas circulation groove, make gaseous top-down reach circulation effect make full use of, the abundant contact reaches faster cooling effect, at last through observing the thermometer, treat to take out after iron ball temperature reduces to suitable temperature, make it accomplish the work of cooling to the iron ball, save resource convenient operation, the iron ball quality of accomplishing the work of cooling can obtain guaranteeing, be worth promoting.
Drawings
Fig. 1 is a front perspective view of a steel ball rapid cooling device provided by the utility model;
fig. 2 is a schematic view of the inside of a cooling box of the rapid cooling device for steel balls provided by the utility model;
fig. 3 is a schematic view of a sealing baffle of the steel ball rapid cooling device provided by the utility model;
fig. 4 is a schematic plan view of a cooling box of the rapid cooling device for steel balls according to the present invention.
Illustration of the drawings:
1. a cooling tank; 2. an air pump; 3. a gas storage tank; 4. a first breather pipe; 5. box legs; 6. a first chute; 7. a high temperature resistant air outlet; 8. an iron ball placing plate; 9. a gas circulation groove; 10. a first slider; 11. a limiting block; 12. a second chute; 13. a handle; 14. sealing the baffle; 15. a second slider; 16. a thermometer; 17. a gas tank valve; 18. iron ball placing grooves; 19. a second vent pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides an embodiment: the utility model provides a quick cooling device of steel ball, including cooler bin 1, 1 top central point of cooler bin puts and runs through and the first breather pipe 4 of fixedly connected with, 4 one end of first breather pipe is provided with aspiration pump 2, and 4 one end of first breather pipe and 2 gas outlet fixed connection of aspiration pump, 2 air inlet fixedly connected with second breather pipe 19 of aspiration pump, and 19 one end of second breather pipe is provided with gas holder 3, 19 one end of second breather pipe runs through gas holder 3 left side bottom position and fixed connection, 1 inner wall left and right sides equal fixedly connected with three evenly distributed's first spout 6 of cooler bin, the inside equal sliding connection of six first spouts 6 has first slider 10, equal fixedly connected with iron ball places board 8 between two first sliders 10 that set up relatively, 8 tops of board are all run through and are provided with a plurality of evenly distributed's iron ball standing groove 18 all, 1 front end top and the equal fixedly connected with second spout 12 in bottom of cooler bin, two inside equal sliding connection has second slider 15 of second spout 12, equal fixedly connected with push-pull baffle 14 between two second sliders 15, make second slider 15 slide block 15 reach second slider 12 and slide when the gas storage tank 2 contacts the gas outlet through 2 gas inlet and make the cooling pump reach the gas outlet, make the inert gas circulation effect of inert gas reach through the gas tank 2, make the gas pump reach the gas inlet 2, make the gas inlet of inert gas inlet 2 and make the gas circulation that the inert gas inlet 2 make the inert gas inlet of inert gas pump reach and make the cooling pump reach and make the gas inlet 2, and make the gas circulation and make the gas tank reach the gas outlet, and make the gas tank, and make the inert gas tank reach the gas inlet 2.
4 other end fixedly connected with high temperature resistant gas outlet 7 of first breather pipe and high temperature resistant gas outlet 7 are located cooling box 1 inside, 1 top right side of cooling box leans on rear end fixedly connected with thermometer 16, 3 right sides of gas holder run through and fixedly connected with gas holder valve 17 by bottom position, aerify gas holder 3 through switch gas holder valve 17, add appropriate amount inert gas, 1 equal fixedly connected with case leg 5 in bottom four corners of cooling box, 14 left side intermediate position fixedly connected with handles 13 of sealed baffle, 12 inside equal fixedly connected with limiting blocks 11 in right sides of two second spouts, 8 tops of board are placed all to run through all around to be provided with gas circulation groove 9 to three iron ball, through observing thermometer 16, treat that the iron ball temperature reduces and takes out after the suitable temperature, accomplish the cooling.
The working principle is as follows: firstly, a gas storage tank 3 is inflated by opening and closing a gas storage tank valve 17, after a proper amount of inert gas is added, iron balls are placed on an iron ball placing groove 18 after processing is completed, after placing is completed, an iron ball placing plate 8 enters a cooling box 1 through sliding of a first sliding block 10 and a first sliding groove 6, after three iron ball placing plates 8 are placed in proper amount, a second sliding block 15 slides in a second sliding groove 12 through pushing and pulling a sealing baffle plate 14 by a handle 13, the cooling box 1 is sealed when being pushed to a limiting block 11, an air suction pump 2 is opened to suck air from the gas storage tank 3, then the air suction pump 2 is enabled to discharge air to a first vent pipe 4, the inert gas enters the cooling box 1, the gas is enabled to be fully utilized in a circulating effect from top to bottom through a gas circulation groove 9, full contact is achieved to achieve a faster cooling effect, and finally, the air is taken out after the temperature of the iron balls is reduced to the proper temperature through observing a thermometer, and cooling is completed.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (8)
1. The utility model provides a quick cooling device of steel ball, includes cooler bin (1), its characterized in that: cooler bin (1) top central point puts and runs through and the first breather pipe of fixedly connected with (4), first breather pipe (4) one end is provided with aspiration pump (2), and first breather pipe (4) one end and aspiration pump (2) gas outlet fixed connection, aspiration pump (2) air inlet fixedly connected with second breather pipe (19), and second breather pipe (19) one end is provided with gas holder (3), gas holder (3) left side bottom position and fixed connection are run through to second breather pipe (19) one end, the equal three evenly distributed's of the equal fixedly connected with in cooler bin (1) inner wall left and right sides first spout (6), six the equal sliding connection in first spout (6) inside has first slider (10), relative two that sets up equal fixedly connected with iron ball places board (8) between first slider (10), it is three the iron ball places board (8) top and all runs through and is provided with a plurality of evenly distributed's iron ball standing groove (18), cooler bin (1) front end top and the equal fixedly connected with second spout (12) in bottom, two equal sliding connection with second slider (12) inside sliding connection has second slider (15), two equal sliding connection with between second slider (15) sealing baffle (15).
2. The device for rapidly cooling the steel ball according to claim 1, characterized in that: the other end of the first vent pipe (4) is fixedly connected with a high-temperature-resistant air outlet (7) and the high-temperature-resistant air outlet (7) is located inside the cooling box (1).
3. The steel ball rapid cooling device according to claim 1, characterized in that: a thermometer (16) is fixedly connected to the right side of the top of the cooling box (1) close to the rear end.
4. The device for rapidly cooling the steel ball according to claim 1, characterized in that: the right side of the gas storage tank (3) is penetrated by the bottom and is fixedly connected with a gas storage tank valve (17).
5. The device for rapidly cooling the steel ball according to claim 1, characterized in that: four corners of the bottom of the cooling box (1) are fixedly connected with box legs (5).
6. The device for rapidly cooling the steel ball according to claim 1, characterized in that: the middle position of the left side of the sealing baffle (14) is fixedly connected with a handle (13).
7. The steel ball rapid cooling device according to claim 1, characterized in that: the right sides in the two second sliding grooves (12) are fixedly connected with limiting blocks (11).
8. The steel ball rapid cooling device according to claim 1, characterized in that: and gas circulation grooves (9) are formed in the periphery of the top of each iron ball placing plate (8) in a penetrating mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221525398.7U CN218033985U (en) | 2022-06-17 | 2022-06-17 | Steel ball rapid cooling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221525398.7U CN218033985U (en) | 2022-06-17 | 2022-06-17 | Steel ball rapid cooling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218033985U true CN218033985U (en) | 2022-12-13 |
Family
ID=84375665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221525398.7U Active CN218033985U (en) | 2022-06-17 | 2022-06-17 | Steel ball rapid cooling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218033985U (en) |
-
2022
- 2022-06-17 CN CN202221525398.7U patent/CN218033985U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218033985U (en) | Steel ball rapid cooling device | |
CN103639388A (en) | Trimming system for aluminum alloy die castings | |
CN214234738U (en) | Vertical impregnation system | |
CN206467268U (en) | A kind of new VD vacuum degassing furnaces | |
CN211645368U (en) | Cold stamping die ion nitriding treatment device | |
CN208116734U (en) | A kind of non-oxidation copper alloy casting ingot device of nitrogen protection | |
CN218146881U (en) | Tail material recovery processing device in production process of zirconium sponge and hafnium sponge | |
CN219934688U (en) | Waste heat utilization device for steel smelting cooling pool | |
CN107830410A (en) | A kind of coal gas drainer | |
CN217412314U (en) | Forging cooling device for metal forging | |
CN214244338U (en) | Low-temperature production equipment of rice bran oil | |
CN201459023U (en) | Rivet weld processing dry coke quenching furnace top water seal tank | |
CN215113967U (en) | Graphite casket alms bowl is used to anodal ferrite lithium cell | |
CN212375331U (en) | Tapered roller surface quenching device | |
CN215668106U (en) | Multi-station full-automatic cold assembly equipment | |
CN206033828U (en) | Plumbum smelter | |
CN212401692U (en) | Water cooling device applied to vacuumizing packaging machine | |
CN216182362U (en) | Plastic injection molding is with injection mold of being convenient for get material | |
CN212741277U (en) | Essence leaching tank with quick cooling function | |
CN208883933U (en) | A kind of miniature workpiece vacuum high pressure gas quenching charging basket | |
CN212549625U (en) | Novel cold bath pot | |
CN211299528U (en) | Coffee extraction device | |
CN221069434U (en) | Storage equipment for test chip | |
CN216936105U (en) | Movable rapid cooling sample box for blast furnace pig iron sample | |
CN212889090U (en) | Briquetting machine for waste steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||