CN218031989U - Waste gas treatment conveying mechanism for waste gas treatment - Google Patents

Waste gas treatment conveying mechanism for waste gas treatment Download PDF

Info

Publication number
CN218031989U
CN218031989U CN202220362196.9U CN202220362196U CN218031989U CN 218031989 U CN218031989 U CN 218031989U CN 202220362196 U CN202220362196 U CN 202220362196U CN 218031989 U CN218031989 U CN 218031989U
Authority
CN
China
Prior art keywords
gas transmission
gas
gas treatment
support
rotating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220362196.9U
Other languages
Chinese (zh)
Inventor
王明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220362196.9U priority Critical patent/CN218031989U/en
Application granted granted Critical
Publication of CN218031989U publication Critical patent/CN218031989U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a waste gas treatment conveying mechanism for waste gas treatment, which relates to the technical field of waste gas treatment and solves the technical problems that the connection of gas transmission pipes is influenced because the topography of partial gas transmission pipes is not smooth enough when the existing gas transmission pipelines are connected in a multi-section way, and the waste gas and the reverse transportation are needed when the waste gas is purified by the existing waste gas treatment device; the device comprises a gas transmission connecting cylinder, wherein gas transmission pipes are arranged on two sides of the gas transmission connecting cylinder, protective outer pipes are fixedly sleeved outside the two gas transmission pipes, a sleeved assembly component is arranged outside the gas transmission connecting cylinder, a supporting bottom plate is arranged at the bottom of the gas transmission connecting cylinder, and two switching frames are fixedly mounted at the top of the supporting bottom plate; the utility model discloses have and make both ends gas-supply pipe carry out fast assembly and connect to and can adjust the support position of even a section of thick bamboo of gas transmission, so that realize connecting the both ends gas-supply pipe of co-altitude not.

Description

Waste gas treatment conveying mechanism for waste gas treatment
Technical Field
The utility model relates to a waste gas treatment technical field especially relates to a waste gas treatment conveying mechanism for waste gas treatment.
Background
Waste gas purification mainly refers to the work of administering such as dust particulate matter, flue gas smoke and dust, peculiar smell gas, poisonous and harmful gas to the industrial waste gas that industrial site produced, and the device is administered to waste gas on the existing market when purifying waste gas, need carry waste gas, because current gas transmission pipeline carries out the multistage and connects, can appear the gas-supply pipe relief of subsection not smooth enough, leads to the connection of gas-supply pipe to receive the influence.
SUMMERY OF THE UTILITY MODEL
The utility model provides a waste gas treatment conveying mechanism for improvement has solved the waste gas treatment device, when purifying waste gas, needs to carry waste gas and retrograde motion, because current gas transmission pipeline carries out the multistage when connecting, can appear the gas-supply pipe relief of subsection and level and smooth inadequately, leads to the connection of gas-supply pipe to receive the technical problem of influence.
For solving the technical problem, the utility model provides a pair of exhaust-gas treatment conveying mechanism for waste gas treatment, including a gas transmission even section of thick bamboo, the both sides that a gas transmission even section of thick bamboo all are equipped with the gas-supply pipe, two the outside of gas-supply pipe is all fixed the protection outer tube that has cup jointed, the outside that a gas transmission even section of thick bamboo is equipped with cup joints the equipment subassembly, the bottom that a gas transmission even section of thick bamboo is equipped with supporting baseplate, supporting baseplate's top fixed mounting has two switching framves, two switching frame's inside all rotates and has cup jointed the rotation extension board, two switching frame's top fixed mounting accepts the extension board, the top of accepting the extension board is equipped with the support height adjustment subassembly.
Preferably, two sealing sleeves are fixedly sleeved in the gas transmission connecting cylinder, and the two gas transmission pipes are hermetically sleeved with the gas transmission connecting cylinder through the sealing sleeves.
Preferably, the inside of each of the two switching frames is rotatably sleeved with a supporting rotating rod, and each of the two rotating support plates is rotatably sleeved with the switching frame through the supporting rotating rod.
Preferably, cup joint the equipment subassembly including accept even board, connecting screw, cup joint even board, locking screw and support even board, the gas transmission is even the outside of a section of thick bamboo all accepts even board through four of three connecting screw fixedly connected with, every accept the equal fixedly connected with of one end of linking the board and support even board, per two corresponding support even the equal activity of bridging between the board has cup jointed four and has cup jointed even board, per two corresponding cup joint the outer wall of linking the board and contact, per two corresponding cup joint even equal fixedly connected with locking screw between the board.
Preferably, support height adjustment subassembly including cup jointing support, rotatory sleeve, two-way screw rod, threaded sleeve, rotation pole and rotation handle, the top fixed mounting who accepts the extension board has the cup jointing support, the fixed cover in inside that cup joints the support has two rotatory sleeves, two it has two-way screw rod, two to rotate to cup joint between the rotatory sleeve the threaded sleeve has all been cup jointed through rotating the pole in the inside of rotating the extension board, the both ends of two-way screw rod cup joint with corresponding threaded sleeve screw respectively, the outside of two-way screw rod is all cup jointed and is rotated the handle.
Preferably, the two rotating support plates are rotatably sleeved with bearing support plates, and the bottoms of the gas transmission connecting cylinders are in contact with the tops of the two bearing support plates.
Compared with the prior art, the utility model provides a pair of exhaust-gas treatment conveying mechanism for waste gas treatment has following beneficial effect:
the utility model provides a waste gas is administered and is used exhaust-gas treatment conveying mechanism, accept even board through four outside fixedly connected with of even a section of thick bamboo at the gas transmission, and then even board fixed connection to supporting, secondly cup joint four and cup joint even board in per two corresponding support even equal activities between the board for per two corresponding outer walls that cup joint even board contact, the cooperation cup joints even equal fixedly connected with locking screw between the board at per two corresponding, make the both ends gas-supply pipe carry out fast assembly and connect from this.
The utility model provides a waste gas treatment conveying mechanism for improvement, bottom through linking a section of thick bamboo at the gas transmission is equipped with supporting baseplate, secondly there are two switching framves at supporting baseplate's top fixed mounting, and then rotate the extension board and support, realize linking a section of thick bamboo to the gas transmission and rotate the support, the cooperation is cup jointed the support at the top fixed mounting who accepts the extension board, secondly cup joint two rotatory sleeve regulations, and then rotate the support to two-way screw rod, the screw sleeve has all been cup jointed in two inside rotations that rotate the extension board to the deuterogamy, make two-way screw rod's both ends cup joint with corresponding screw sleeve screw thread respectively, and then must adjust the support position that links a section of thick bamboo to the gas transmission, so that the realization is connected the both ends gas-supply pipe of co-altitude not.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic view of the side view of the present invention;
fig. 3 is an enlarged schematic structural view at a position a of the present invention;
fig. 4 is an enlarged schematic structural diagram of the position B of the present invention.
Reference numbers in the figures: 1. a gas transmission connecting cylinder; 2. a sealing sleeve; 3. a gas delivery pipe; 4. a protective outer tube; 5. sleeving the assembly component; 501. carrying the connecting plate; 502. a connecting screw; 503. sleeving a connecting plate; 504. locking the screw rod; 505. supporting the connecting plate; 6. a support base plate; 7. a transfer rack; 8. rotating the support plate; 9. a support height adjustment assembly; 901. sleeving a support; 902. rotating the sleeve; 903. a bidirectional screw; 904. a threaded sleeve; 905. rotating the round bar; 906. rotating the handle; 10. supporting the rotating rod; 11. a supporting plate is supported; 12. A load bearing support plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Embodiment one, given by fig. 1-4, the utility model discloses a gas transmission is a 1 even, gas transmission is a 1 both sides all are equipped with gas-supply pipe 3 even, the outside of two gas-supply pipes 3 is all fixed has cup jointed protection outer tube 4, gas transmission is equipped with the equipment subassembly 5 that cup joints even 1's outside, gas transmission is equipped with supporting baseplate 6 even 1's bottom, supporting baseplate 6's top fixed mounting has two switching framves 7, the inside of two switching framves 7 all rotates and has cup jointed rotation extension board 8, the top fixed mounting of two switching framves 7 has accepts extension board 11, the top of accepting extension board 11 is equipped with supporting height adjustment subassembly 9.
In the second embodiment, on the basis of the first embodiment, the two sealing sleeves 2 are fixedly sleeved in the gas transmission connecting cylinder 1, and the two gas transmission pipes 3 are hermetically sleeved with the gas transmission connecting cylinder 1 through the sealing sleeves 2, so that the problem of leakage of the two gas transmission pipes 3 in the inserting process is avoided.
In the third embodiment, on the basis of the first embodiment, the supporting rotating rods 10 are rotatably sleeved inside the two adapter racks 7, and the two rotating support plates 8 are rotatably sleeved with the adapter racks 7 through the supporting rotating rods 10, so that the two rotating support plates 8 are rotatably supported.
Fourth embodiment, on the basis of first embodiment, cup joint equipment subassembly 5 is including accepting even board 501, connecting screw 502, cup joint even board 503, locking screw 504 and support even board 505, the even outside of a section of thick bamboo 1 of gas transmission all accepts even board 501 through three connecting screw 502 fixedly connected with four, every one end of accepting even board 501 all fixedly connected with supports even board 505, every two corresponding support even board 505 between all the activity cup joint four and cup joint even board 503, every two corresponding cup joint the outer wall of even board 503 and contact, every two corresponding cup joint even fixedly connected with locking screw 504 between even board 503, make both ends gas pipe 3 carry out fast assembly and connect from this.
Fifth embodiment, on the basis of first embodiment, the supporting height adjusting assembly 9 includes a sleeve joint support 901, a rotating sleeve 902, a two-way screw 903, a threaded sleeve 904, a rotating round rod 905 and a rotating handle 906, a sleeve joint support 901 is fixedly installed at the top of the receiving support plate 11, two rotating sleeves 902 are fixedly sleeved inside the sleeve joint support 901, two-way screw 903 is rotatably sleeved between the two rotating sleeves 902, the threaded sleeve 904 is rotatably sleeved inside two rotating support plates 8 through the rotating round rod 905, two ends of the two-way screw 903 are respectively in threaded sleeve joint with the corresponding threaded sleeves 904, the rotating handle 906 is fixedly sleeved outside the two-way screw 903, and further the supporting position of the gas transmission connecting cylinder 1 can be adjusted, so that two ends of gas transmission pipes 3 with different heights can be connected.
Sixth embodiment, on the basis of the first embodiment, the bearing support plates 12 are rotatably sleeved inside the two rotating support plates 8, and the bottom of the gas transmission connecting cylinder 1 is in contact with the tops of the two bearing support plates 12, so that the gas transmission connecting cylinder 1 can be stably supported.
The working principle is as follows:
the first innovation point implementation step:
the first step is as follows: firstly, two sealing sleeves 2 are fixedly sleeved in the gas transmission connecting cylinder 1, so that the problem of leakage of two gas transmission pipes 3 in the inserting process is avoided;
the second step: four receiving connecting plates 501 are fixedly connected to the outside of the gas transmission connecting cylinder 1 in a matching manner, the supporting connecting plates 505 are further fixedly connected, and then four sleeving connecting plates 503 are movably sleeved between every two corresponding supporting connecting plates 505, so that the outer walls of every two corresponding sleeving connecting plates 503 are in contact;
the third step: and locking screws 504 are fixedly connected between every two corresponding sleeving connecting plates 503, so that the air pipes 3 at two ends are quickly assembled and connected.
The second innovation point implementation step:
the first step is as follows: the bottom of the gas transmission connecting cylinder 1 is provided with the supporting bottom plate 6, and then the top of the supporting bottom plate 6 is fixedly provided with the two switching frames 7, so that the rotating support plate 8 is rotatably supported, and the gas transmission connecting cylinder 1 is rotatably supported;
the second step: a sleeve joint bracket 901 is fixedly arranged on the top of the bearing support plate 11 in a matching way, and then two rotary sleeves 902 are sleeved in a specified way, so that a bidirectional screw 903 is rotatably supported;
the third step: and then the two rotating support plates 8 are matched to be rotatably sleeved with threaded sleeves 904, so that the two ends of the two-way screw 903 are respectively in threaded sleeve connection with the corresponding threaded sleeves 904, and the support position of the gas transmission connecting cylinder 1 is adjusted, so that the gas transmission pipes 3 at two ends with different heights are connected.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a waste gas treatment conveying mechanism for waste gas treatment, includes even a section of thick bamboo of gas transmission (1), its characterized in that: the both sides of a gas transmission even section of thick bamboo (1) all are equipped with gas-supply pipe (3), two protection outer tube (4) have all been fixed to have cup jointed in the outside of gas-supply pipe (3), the outside of a gas transmission even section of thick bamboo (1) is equipped with cup joints equipment subassembly (5), the bottom of a gas transmission even section of thick bamboo (1) is equipped with supporting baseplate (6), the top fixed mounting of supporting baseplate (6) has two switching framves (7), two the inside of switching frame (7) all rotates and has cup jointed and rotate extension board (8), two the top fixed mounting of switching frame (7) accepts extension board (11), the top of accepting extension board (11) is equipped with support height adjustment subassembly (9).
2. The waste gas treatment conveying mechanism for waste gas treatment as claimed in claim 1, wherein two sealing sleeves (2) are fixedly sleeved inside the gas transmission connecting cylinder (1), and the two gas transmission pipes (3) are hermetically sleeved with the gas transmission connecting cylinder (1) through the sealing sleeves (2).
3. The exhaust-gas treatment conveying mechanism for exhaust-gas treatment according to claim 1, characterized in that a support rotating rod (10) is rotatably sleeved inside each of the two adapter racks (7), and each of the two rotating support plates (8) is rotatably sleeved with the adapter rack (7) through the support rotating rod (10).
4. The exhaust-gas treatment conveying mechanism for exhaust-gas treatment of claim 1, characterized in that, the assembly subassembly (5) that cup joints includes and accepts even board (501), connecting screw (502), cup joints even board (503), locking screw (504) and support even board (505), the gas transmission is all connected with four through three connecting screw (502) and accepts even board (501) in the outside of even section of thick bamboo (1), each one end of accepting even board (501) all fixedly connected with support even board (505), every two corresponding support even board (505) between the activity cup joint four and cup joint even board (503), every two corresponding cup joint the outer wall of even board (503) and contact, every two corresponding cup joint even board (503) between the all fixedly connected with locking screw (504).
5. The exhaust-gas treatment conveying mechanism for exhaust-gas treatment of claim 1, characterized in that, the supporting height adjustment subassembly (9) includes a sleeve joint support (901), a rotating sleeve (902), a bidirectional screw (903), a threaded sleeve (904), a rotating round bar (905) and a rotating handle (906), the sleeve joint support (901) is fixedly installed at the top of the receiving support plate (11), two rotating sleeves (902) are fixedly sleeved on the inside of the sleeve joint support (901), the bidirectional screw (903) is rotatably sleeved between the two rotating sleeves (902), the two rotating support plates (8) are rotatably sleeved with the threaded sleeve (904) through the rotating round bar (905), two ends of the bidirectional screw (903) are respectively in threaded sleeve joint with the corresponding threaded sleeve (904), and the rotating handle (906) is fixedly sleeved on the outside of the bidirectional screw (903).
6. The exhaust-gas treatment conveying mechanism for exhaust-gas treatment according to claim 1, characterized in that a bearing support plate (12) is rotatably sleeved inside each of the two rotating support plates (8), and the bottom of the gas transmission connecting cylinder (1) is in contact with the top of each of the two bearing support plates (12).
CN202220362196.9U 2022-02-22 2022-02-22 Waste gas treatment conveying mechanism for waste gas treatment Active CN218031989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220362196.9U CN218031989U (en) 2022-02-22 2022-02-22 Waste gas treatment conveying mechanism for waste gas treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220362196.9U CN218031989U (en) 2022-02-22 2022-02-22 Waste gas treatment conveying mechanism for waste gas treatment

Publications (1)

Publication Number Publication Date
CN218031989U true CN218031989U (en) 2022-12-13

Family

ID=84339918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220362196.9U Active CN218031989U (en) 2022-02-22 2022-02-22 Waste gas treatment conveying mechanism for waste gas treatment

Country Status (1)

Country Link
CN (1) CN218031989U (en)

Similar Documents

Publication Publication Date Title
CN206982234U (en) A kind of pipe fitting clamp system
CN218031989U (en) Waste gas treatment conveying mechanism for waste gas treatment
CN215616178U (en) Robot welding synchronizer for pipe intersection line and pipe joint
CN208929085U (en) A kind of civil engineering reinforcing bar bending device
CN208169764U (en) A kind of stainless steel tube facilitating connection
CN217253773U (en) Laser welding auxiliary device for processing flat plate type solar heat collector
CN216802216U (en) Portable positioning fixture for steel pipe welding
CN207420002U (en) A kind of scaffold fixed structure for building
CN208896052U (en) Plastic pipe bracket
CN210818236U (en) Novel pipeline bracket
CN211398801U (en) Support device for gas conveying pipeline
CN219449341U (en) Whole house water purification equipment
CN213701126U (en) Anti-dropping mechanism for high-pressure spray gun
CN208493696U (en) A kind of environmentally-friefabric fabric printing equipment
CN214551511U (en) Dirty liquid filter and dirty liquid collection transfer device who constitutes thereof
CN217815380U (en) Energy-saving dust removal pipeline arrangement structure
CN213778682U (en) Flue gas waste heat exchanger
CN216896511U (en) Supporting mechanism for gas conveying equipment
CN209811612U (en) Support frame for automatic welding processing of pipeline
CN216692468U (en) Drainage pipe for building drainage convenient to angle regulation
CN220551627U (en) Pressure pipeline connection structure
CN214289925U (en) Weld cigarette dust collector convenient to remove regulation
CN219997711U (en) Welding training operation panel
CN208058119U (en) A kind of adjustable stainless steel supporting rod of steel pipe fixation
CN212806162U (en) Filtering device for condenser

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant