CN218029040U - Detachable water-stop split bolt structure - Google Patents

Detachable water-stop split bolt structure Download PDF

Info

Publication number
CN218029040U
CN218029040U CN202222554749.3U CN202222554749U CN218029040U CN 218029040 U CN218029040 U CN 218029040U CN 202222554749 U CN202222554749 U CN 202222554749U CN 218029040 U CN218029040 U CN 218029040U
Authority
CN
China
Prior art keywords
die plate
nut
fixed die
gear
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222554749.3U
Other languages
Chinese (zh)
Inventor
刘晓勇
周伟东
武学文
杨晓笨
贾莎莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Urban Construction Group Co Ltd
First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
China Railway Urban Construction Group Co Ltd
First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Urban Construction Group Co Ltd, First Engineering Co Ltd of China Railway Urban Construction Group Co Ltd filed Critical China Railway Urban Construction Group Co Ltd
Priority to CN202222554749.3U priority Critical patent/CN218029040U/en
Application granted granted Critical
Publication of CN218029040U publication Critical patent/CN218029040U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a can dismantle stagnant water split bolt structure in concrete placement field, the device include fixed die plate, the fixed die plate keeps away from vertical package bakelite one end and is equipped with stereoplasm open seam strip, one side that stereoplasm open seam strip is close to fixed die plate is connected with first slide bar, the first slide bar other end extends to in the fixed die plate, the first slide bar of fixed die plate cooperation is equipped with first spout, when needs carry out open seam to the wall body and handle, only need can carry out open seam art processing to the wall body through the stereoplasm open seam strip in the fixed die plate, before the construction form removal is accomplished to the wall body, the first spout in accessible side takes out stereoplasm open seam strip, and accessible second spout takes out the open seam groove after the wall body finishes the construction, later can also change the open seam groove of different patterns according to user's hobby in order to accomplish different artistic effects.

Description

Detachable water-stop split bolt structure
Technical Field
The utility model relates to a concrete placement field specifically indicates a can dismantle stagnant water split bolt structure.
Background
The concrete pouring refers to a process of pouring concrete into a mold until the concrete is plasticized, in the civil engineering and building engineering, materials such as concrete and the like are put into the mold to be made into a preset shape, when the concrete is poured, the free height of the concrete is not more than 2m, when the free height of the concrete is more than 3m, corresponding measures are taken, and in the concrete pouring construction, in order to form the concrete into the shape required by the engineering, counter bolts and templates are adopted to form a space for pouring the concrete.
At least two templates are required to be arranged oppositely in the existing concrete pouring engineering, the two templates are penetrated through by the split bolts simultaneously for fixing the templates, then concrete is poured, the templates of the concrete are dismantled after the concrete is initially set, and the concrete is continuously maintained until the concrete reaches final setting strength.
However, when the fair-faced concrete is poured, the wall body needs to be processed into open joints and buddhist joints, the existing split bolt structure is likely to be damaged during the form removal, and the artistic effect which can be made on the wall body is limited.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned problem that prior art exists, the to-be-solved technical problem of the utility model is: at present, when the split bolt structure is used for pouring the fair-faced concrete, the structure with the artistic effect is difficult to take out.
In order to solve the technical problem, the utility model adopts the following technical scheme:
can dismantle stagnant water split bolt structure, including fixed die plate, the one end that fixed die plate kept away from vertical package steel wood is equipped with stereoplasm open joint strip, one side that stereoplasm open joint strip is close to fixed die plate is connected with first slide bar, the first slide bar other end extends to in the fixed die plate, the first slide bar of fixed die plate cooperation is equipped with first spout.
When the wall body needs to be subjected to open joint processing, the wall body can be subjected to open joint artistic processing only through the hard open joint strips in the fixed template, and the hard open joint strips can be taken out through the first sliding grooves in the side surfaces before the construction and the form removal of the wall body are completed.
Preferably, a plurality of vertical steel clad wood is arranged on one side of the fixed template, a keel is transversely arranged on one side, away from the fixed template, of the vertical steel clad wood, a channel steel type gasket is arranged on one side, away from the vertical steel clad wood, of the keel, a sleeve nut is arranged on one side, away from the keel, of the channel steel type gasket, a first threaded rod is arranged at one end, away from the keel, of the sleeve nut, one end, close to the sleeve nut, of the first threaded rod penetrates through the sleeve nut, the channel steel type gasket and the keel and extends into the fixed template, a connecting nut is connected to one end, close to one side of the vertical steel clad wood, of the first threaded rod fixed template, a first transmission shaft is connected to the other end of the connecting nut, a water stop sheet is arranged on the first transmission shaft, a plurality of forward nuts are arranged at one end, close to one side of the vertical steel clad wood, of the fixed template is oppositely provided with a plurality of reverse nuts.
When the wall body is poured, the sleeve nut rotates on the first threaded rod to drive the channel steel type gasket, the keel and the template to move, and the effect of compacting concrete is achieved through matching between the templates.
Preferably, the sleeve nut shell is of a gear structure, a first gear is arranged on the sleeve nut in a matched gear structure, a motor is arranged on one side of the first gear, and the motor is connected with the first gear through a rotating shaft.
The gear structure outside the sleeve nut drives the first gear to rotate through the motor, so as to drive the sleeve nut to rotate, and further drive the sleeve nut to tighten inwards or loosen outwards.
Preferably, the fixed die plate is provided with Buddhist slot grooves at two ends of one side far away from the vertical steel clad wood, one ends of the Buddhist slot grooves close to the vertical steel clad wood are connected with a second sliding rod, the second sliding rod extends into the fixed die plate, and the fixed die plate is internally matched with the second sliding rod and is provided with a second sliding groove.
After the construction of the wall body is finished, the Buddhist slot can be taken out through the second sliding groove, and then the Buddhist slot with different styles can be replaced according to the preference of a user so as to achieve different artistic effects.
Preferably, one end of the fixed template, which is close to one side of the vertical steel clad wood, is provided with a plurality of forward nuts, and the other end of the fixed template, which is close to one side of the vertical steel clad wood, is oppositely provided with a plurality of reverse nuts.
The second gear is driven to rotate through the rotation of the motor, so that a second transmission rod penetrating through the forward nut and the reverse nut is driven to rotate, and the purpose of tightening the fixed template is achieved through different threads in the forward nut and the reverse nut.
Preferably, the first slide bar and the second slide bar are both umbrella-shaped structures.
Need fix the bright seam strip and the zen seam strip of preparation artistic effect before pouring cement, umbrella-shaped structure can be fine with the slide bar card in the spout that corresponds.
Compared with the prior art, the utility model discloses at least, following advantage has:
1. can rotate first threaded rod out from coupling nut through rotatory first threaded rod after concrete placement type to take out first threaded rod and reach the effect of dismantling.
2. Can customize the open seam strip zen seam strip according to user's demand before pouring, fix it in the assigned position through the spout, thereby the cooperation between telescopic nut, first threaded rod, first gear, the transmission shaft of rethread realizes different artistic effects.
Drawings
Fig. 1 is a schematic view of the entire structure of embodiment 1.
Fig. 2 is a partial structural schematic diagram of embodiment 1.
Fig. 3 is a schematic side view of the structure of embodiment 1.
Fig. 4 is a schematic top view of a part of the structure of embodiment 1.
In the figure: 1. a hard open seam strip; 2. vertically wrapping steel and wood; 3. a keel; 4. a sleeve-type nut; 5. a channel steel type gasket; 6. a connecting nut; 7. a first chute; 8. a first slide bar; 9. a first threaded rod; 10. a first transmission shaft; 11. a second chute; 12. a second slide bar; 13. a second drive shaft; 14. a positive nut; 15. a motor; 16. fixing the template; 17. a water stop sheet; 18. a first gear; 19. a second gear; 20. a reverse nut; 21. buddhist slot.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example 1
Referring to fig. 1-4, a detachable water stop split bolt structure, which comprises a fixed template 16, a plurality of vertical steel clad wood 2 is arranged on one side of the fixed template 16, a keel 3 is transversely arranged on one side, away from the fixed template 16, of the vertical steel clad wood 2, a channel steel type gasket 5 is arranged on one side, away from the keel 3, of the channel steel type gasket 5, a sleeve nut 4 is arranged on one side, away from the keel 3, of the channel steel type gasket 5, a shell of the sleeve nut 4 is of a gear structure, a first gear 18 is arranged on the sleeve nut 4 in a matched gear structure, a motor 15 is arranged on one side of the first gear 18, the motor 15 is connected with the first gear 18 through a rotating shaft, a first threaded rod 9 is arranged at one end, away from the keel 3, of the sleeve nut 4, one end, close to the sleeve nut 4, of the first threaded rod 9 penetrates through the sleeve nut 4, the channel steel type gasket 5, the keel 3 extends into the fixed template 16, one end, of the first threaded rod 9 in the fixed template 16 is connected with a connecting nut 6, the other end of the connecting nut 6 is connected with a first transmission shaft 10, and a water stop sheet 17 is arranged on the first transmission shaft 10. Drive telescope-feed nut 4 through motor 15 and rotate, thereby make telescope-feed nut 4 remove to fixed die plate 16 and drive fossil fragments 3, vertical package steel wood 2, the motion of channel-section steel type gasket 5, thereby reach fixed die plate 16 internal extrusion fixed purpose, only need open the motor 15 reversal during disassembly, just can drive fossil fragments 3 and remove, thereby drive channel-section steel type gasket 5, thereby remove and reach the effect of loosening vertical package steel wood 2, rotatory first threaded rod 9 of rethread, take out first threaded rod 9 from coupling nut 6, thereby reach the purpose of disassembling.
Furthermore, one end, far away from the vertical steel clad wood 2, of the fixed template 16 is provided with a hard open joint strip 1, one side, close to the fixed template 16, of the hard open joint strip 1 is connected with a first slide bar 8, the other end of the first slide bar 8 extends into the fixed template 16, the fixed template 16 is provided with a first slide groove 7 in cooperation with the first slide bar 8, the first slide bar 8 is of an umbrella-shaped structure, and after the wall body is poured and disassembled, the hard open joint strip 1 only needs to be drawn out from an opening of the slide groove on the side face.
Specifically, the one end that fixed die plate 16 is close to one side of vertical package steel wood 2 is equipped with a plurality of forward nut 14, the other end that fixed die plate 16 is close to one side of vertical package steel wood 2 is opposite to be equipped with a plurality of reverse nut 20, the one end that motor 15 was kept away from to first gear 18 is connected with first transmission shaft 10, second gear 19 is connected to the first transmission shaft 10 other end, second transmission shaft 13 is rotated to second gear 19, second transmission shaft 13 passes forward nut 14 and passes reverse nut 20 fixed die plate 16 and keeps away from the both ends symmetry of vertical package steel wood 2 one side and is equipped with zen's slot 21, the one end that zen's slot 21 is close to vertical package steel wood 2 is connected with second slide bar 12, second slide bar 12 extends to in fixed die plate 16, fixed die plate 16 fit in second slide bar 12 is equipped with second spout 11 is the umbrella-shaped structure, drive first gear 18 through motor 15 when using and rotate, thereby drive first transmission shaft 10 and rotate, thereby drive second gear 19 and rotate, thereby drive second transmission shaft 13 and rotate, reach the rotation of fixed die plate through the rotation of second transmission shaft 13 and adjust the nut 14 and the motion of fixed nut, thereby the zen's slot can reach the artistic effect of taking out according to the different reverse nut 21, thereby the requirement that the craft of the different artistic groove 21, thereby the change of the reverse nut 21, the craft groove can be taken out according to the reverse nut of the artistic distance of the reverse slot.
The working principle of the detachable water stop split bolt structure is as follows: when the concrete is poured into the fixed template 16, after the concrete is poured, the motor 15 is started to drive the sleeve nut 4 to rotate on the first threaded rod 9, the sleeve nut rotates towards the fixed template 16 through positive rotation, the channel steel type gasket 5 is driven to move towards the fixed template 16, the keel 3 is further driven to extrude the vertical steel clad wood 2, so that the vertical steel clad wood 2 compresses the fixed template 16 to realize the effect of fixing a statue, after initial setting, the sleeve nut 4 is rotated reversely to further release the compressed channel steel type gasket 5, so that the keel 3 and the vertical steel clad wood 2 are released, the channel steel type gasket 5, the keel 3 and the vertical steel clad wood 2 are taken out in sequence, and at the moment, the first threaded rod 9 is taken out from the connecting nut 6 arranged in the fixed template 16 through rotation of the first threaded rod 9, so that the purpose of disassembly is achieved.
When the exposed joint artistic effect is required to be made on the wall body, the hard exposed joint strip 1 can be inserted into the fixed template 16 through the first sliding groove 7 arranged on the side surface of the fixed template 7, after the installation, concrete is poured, the artistic effect is achieved on the surface of the cement wall through the hard exposed joint strip 1, and after the concrete is initially set, the hard exposed joint strip 1 is pulled out through the first sliding groove 7.
When needing to make buddhist seam artistic effect to the wall body, can be through setting up second spout 11 on fixed die plate 16, put into buddhist seam groove 21 according to second spout 11, concrete placement is being carried out, can also realize different artistic effects through changing different types of form buddhist seam groove 21, after putting into second spout 11 with buddhist seam groove 21, thereby it rotates to drive first transmission shaft 10 through the rotation of motor 15 and drive second gear 19 and rotate, thereby it moves to reach the purpose of tightening up the distance between the fixed die plate 16 to drive forward nut 14, reverse nut 20 through rotatory second transmission shaft 13.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.

Claims (7)

1. The utility model provides a can dismantle stagnant water split bolt structure, includes fixed die plate (16), its characterized in that: the fixed die plate is characterized in that one end, far away from the vertical steel clad wood (2), of the fixed die plate (16) is provided with a hard open seam strip (1), one side, close to the fixed die plate (16), of the hard open seam strip (1) is connected with a first sliding rod (8), the other end of the first sliding rod (8) extends into the fixed die plate (16), and the fixed die plate (16) is matched with the first sliding rod (8) to be provided with a first sliding groove (7).
2. A detachable water stop split bolt structure according to claim 1, characterized in that: the steel-clad wood fixing structure is characterized in that a plurality of vertical steel-clad wood (2) are arranged on one side of the fixing template (16), a keel (3) is transversely arranged on one side, far away from the fixing template (16), of the vertical steel-clad wood (2), a channel steel type gasket (5) is arranged on one side, far away from the fixing template (16), of the channel steel type gasket (2), a sleeve nut (4) is arranged on one side, far away from the keel (3), of the channel steel type gasket (5), one end, far away from the keel (3), of the sleeve nut (4) is provided with a first threaded rod (9), one end, close to the sleeve nut (4), of the first threaded rod (9) penetrates through the sleeve nut (4), the channel steel type gasket (5) and the keel (3) and extends into the fixing template (16), one end, close to one side, of the vertical steel-clad wood (2), of the fixing template (16) is connected with a connecting nut (6), the other end of the connecting nut (6) is connected with a first transmission shaft (10), a water stop sheet (17) is arranged on the first transmission shaft (10), one end, one side, one end, close to one side, close to the vertical steel-clad wood (16), and a plurality of the opposite fixing template (20) is arranged on one side.
3. A detachable water stop split bolt structure according to claim 2, characterized in that: the sleeve type nut (4) shell is of a gear structure, a first gear (18) is arranged on the sleeve type nut (4) in a matched gear structure, a motor (15) is arranged on one side of the first gear (18), and the motor (15) is connected with the first gear (18) through a rotating shaft.
4. A detachable water stop split bolt structure according to claim 3, characterized in that: one end, far away from motor (15), of first gear (18) is connected with first transmission shaft (10), second gear (19) is connected to first transmission shaft (10) other end, second gear (19) rotate and connect second transmission shaft (13), second transmission shaft (13) pass forward nut (14) and pass reverse nut (20).
5. A detachable water stop split bolt structure according to claim 1, characterized in that: two ends of one side of the fixed template (16) far away from the vertical steel clad wood (2) are symmetrically provided with Buddhist slot grooves (21), one ends of the Buddhist slot grooves (21) close to the vertical steel clad wood (2) are connected with second sliding rods (12), the second sliding rods (12) extend into the fixed template (16), and second sliding grooves (11) are formed in the fixed template (16) in a matched mode with the second sliding rods (12).
6. The detachable water stop split bolt structure according to claim 1, characterized in that: one end of one side of the fixed template (16) close to the vertical steel clad wood (2) is provided with a plurality of forward nuts (14), and the other end of one side of the fixed template (16) close to the vertical steel clad wood (2) is oppositely provided with a plurality of reverse nuts (20).
7. A detachable water stop split bolt structure according to claim 1, characterized in that: the first sliding rod (8) and the second sliding rod (12) are of umbrella-shaped structures.
CN202222554749.3U 2022-09-27 2022-09-27 Detachable water-stop split bolt structure Active CN218029040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222554749.3U CN218029040U (en) 2022-09-27 2022-09-27 Detachable water-stop split bolt structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222554749.3U CN218029040U (en) 2022-09-27 2022-09-27 Detachable water-stop split bolt structure

Publications (1)

Publication Number Publication Date
CN218029040U true CN218029040U (en) 2022-12-13

Family

ID=84356650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222554749.3U Active CN218029040U (en) 2022-09-27 2022-09-27 Detachable water-stop split bolt structure

Country Status (1)

Country Link
CN (1) CN218029040U (en)

Similar Documents

Publication Publication Date Title
CN112248188B (en) Preparation process of high-strength autoclaved aerated concrete block
CN217400356U (en) Novel aluminum alloy template adopting opposite pull rods
CN218029040U (en) Detachable water-stop split bolt structure
CN114319867A (en) Novel aluminum alloy template adopting opposite pull rods
CN211524076U (en) Clamping device of crossbeam plank
CN209799368U (en) Frame post template structure
CN208430643U (en) A kind of wall hole plugging device
CN111502312A (en) Clear water brick wall masonry tool and masonry method capable of improving compactness of vertical mortar joints
CN216470620U (en) Turnover device for producing autoclaved aerated concrete plates
CN214195535U (en) Template device for engineering service construction
CN114892961A (en) Expansion joint double-wall synchronous construction formwork system and construction method thereof
CN214266076U (en) Make things convenient for concrete prefabricated part mould of drawing of patterns
CN111021713B (en) Concrete embedded bolt mechanism and use method thereof
CN220645216U (en) Building templates link for civil engineering
CN209353705U (en) What a kind of quick peace was torn open blocks up hole device to pull-type exterior wall
CN101270611B (en) Bidirectional regulation positioning buckle device for building construction cast-in-situ concrete combined template
CN219171194U (en) Concrete prefab processing is with production device that vibrates
CN219241314U (en) Building aluminum alloy template outer wall K board reinforcement member
CN113482343B (en) Detachable waterproof split bolt
CN206170290U (en) C type cement template convenient to form removal
CN217537893U (en) Wall form reinforcing screw rod unilateral is to drawing structure and two sides are to drawing structure
CN220814290U (en) Novel semi-prefabricated windowsill coping
CN221546340U (en) Building engineering concatenation formula template
CN219522448U (en) Automatic poling tube drawing machine of duplex position
CN118148357B (en) Building template and wall construction method

Legal Events

Date Code Title Description
GR01 Patent grant