CN218028394U CN202222439338.XU CN202222439338U CN218028394U CN 218028394 U CN218028394 U CN 218028394U CN 202222439338 U CN202222439338 U CN 202222439338U CN 218028394 U CN218028394 U CN 218028394U
Authority
CN
China
Prior art keywords
fossil fragments
subassembly
curtain wall
fixed
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222439338.XU
Other languages
Chinese (zh)
Inventor
丁浩
苏东升
马永超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhongke Supply Chain Technology Co ltd
Original Assignee
Shaanxi Zhongke Supply Chain Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Zhongke Supply Chain Technology Co ltd filed Critical Shaanxi Zhongke Supply Chain Technology Co ltd
Priority to CN202222439338.XU priority Critical patent/CN218028394U/en
Application granted granted Critical
Publication of CN218028394U publication Critical patent/CN218028394U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a building assembled unitized curtain wall subassembly, including two installation fossil fragments of fixing on the wall, be provided with interval accommodate the lead screw subassembly and spacing slip subassembly between two installation fossil fragments, the front transmission of interval accommodate the lead screw subassembly is connected with two opposite direction movement's fixed fossil fragments, two fixed fossil fragments all with spacing slip subassembly sliding connection, fixed mounting has the curtain board on the fixed fossil fragments. This building assembled unitized curtain wall subassembly is provided with interval accommodate the lead screw subassembly and spacing slip subassembly between two installation fossil fragments, is convenient for make the interval between two fixed fossil fragments of adjustment through the rotation of rotatory lead screw in the interval accommodate the lead screw subassembly to can be according to the size adjustment erection space of curtain wall plate, spacing slip subassembly plays spacing effect simultaneously, makes the lift of fixed fossil fragments more stable.

Description

Building assembled unitized curtain wall assembly
Technical Field
The utility model relates to a building curtain technical field specifically is a building assembled unitized curtain wall subassembly.
Background
The building curtain wall is composed of a supporting structure system and a panel, can have certain displacement capacity relative to the main body structure, and does not share the external protective structure or the decorative structure of the building acted on the main body structure. The curtain wall is an outer wall enclosure of a building, does not bear load, is hung like a curtain, is also called a hanging wall, and is a light wall with decoration effect commonly used by modern large-scale and high-rise buildings. The building envelope structure consists of a structural frame and embedded plates and does not bear the load and the effect of a main structure.
Building curtain among the prior art often can use coupling assembling in the installation, however current coupling assembling structure is mostly fixed when installing the curtain, inconvenient carry out erection joint to the curtain of different models size for current coupling assembling application scope is narrow, so proposes a building assembled unit formula curtain subassembly and solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a building assembled unitized curtain wall subassembly possesses advantages such as size adjustment installation spacing according to the curtain, has solved current coupling assembling structure when installing the curtain and has mostly been fixed, and inconvenient curtain to different models size carries out erection joint for the narrow problem of current coupling assembling application scope.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building assembled unit curtain subassembly, includes that two are fixed the installation fossil fragments on the wall, is provided with interval accommodate the lead screw subassembly and spacing slip subassembly between two installation fossil fragments, the positive transmission of interval accommodate the lead screw subassembly is connected with the fixed fossil fragments of two opposite directions removals, two fixed fossil fragments all with spacing slip subassembly sliding connection, fixed mounting has the curtain board on the fixed fossil fragments, wherein, interval accommodate the lead screw subassembly is including rotating the rotatory lead screw that sets up between two installation fossil fragments, and the outside of rotatory lead screw is provided with two sections opposite thread grooves, and the outside difference thread bush of two sections opposite thread grooves is equipped with the lift axle, and two fixed fossil fragments are connected with two lift axles respectively.
Furthermore, the adjusting screw rod assembly further comprises two rotary bearings which are respectively arranged on the opposite sides of the two installation keels, the rotary screw rod is rotatably arranged between the two rotary bearings, and one end of the rotary screw rod penetrates through the installation keels to be provided with a rotary screw head.
Furthermore, a transmission rod is arranged between the fixed keel and the lifting shaft.
Furthermore, the rotary screw head is a hexagon socket head screw.
Further, spacing slip subassembly is including setting up slide bar, the slip suit between two installation keels at the outside slide bar of slide bar to and set up the connecting rod in the outside of slide bar, the other end of connecting rod is connected with fixed keel.
Further, the number of the limiting sliding assemblies is two.
Furthermore, two spacing sliding assemblies are symmetrically arranged on two sides of the spacing adjusting screw rod assembly.
Further, the back of curtain board is provided with the hangers that are connected with fixed fossil fragments, and is fixed through the screw between fixed fossil fragments and the hangers.
(III) advantageous effects
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
this building assembled unitized curtain wall subassembly through being provided with interval accommodate the lead screw subassembly and spacing slip subassembly between two installation fossil fragments, is convenient for make the interval between two fixed fossil fragments of adjustment through the rotation of rotatory lead screw in the interval accommodate the lead screw subassembly to can be according to the size adjustment erection space of curtain plate, spacing slip subassembly plays spacing effect simultaneously, makes the lift of fixed fossil fragments more stable.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
FIG. 3 is a schematic structural view of the spacing adjustment screw assembly of the present invention;
fig. 4 is a schematic view of the top view structure of the present invention.
In the figure: the device comprises a mounting keel 1, a spacing adjusting screw rod assembly 2, a limiting sliding assembly 3, a fixing keel 4, a hanging lug 5, a curtain wall plate 6, a rotating bearing 201, a rotating screw rod 202, a lifting shaft 203, a transmission rod 204, a rotating screw head 205, a sliding rod 301, a sliding shaft 302 and a connecting rod 303.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-4, in the present embodiment, the building assembled unit curtain wall assembly includes two installation keels 1 fixed on a wall surface by screws, an interval adjustment screw assembly 2 and a limiting sliding assembly 3 are disposed between the two installation keels 1, the front surface of the interval adjustment screw assembly 2 is in transmission connection with two fixed keels 4 moving in opposite directions, both the two fixed keels 4 are in sliding connection with the limiting sliding assembly 3, so that the two fixed keels 4 move in opposite or separated directions by rotation of the interval adjustment screw assembly 2, the limiting sliding assembly 3 has a limiting effect, and a curtain wall panel 6 is fixedly installed on the fixed keels 4, wherein the interval adjustment screw assembly 2 includes a rotary screw 202 rotatably disposed between the two installation keels 1, two opposite thread grooves are disposed on the outside of the rotary screw 202, lifting shafts 203 are respectively thread-sleeved on the outside of the two opposite thread grooves, the two fixed keels 4 are respectively connected with the two lifting shafts 203, the rotary screw 202 rotates, and the two lifting shafts 203 move in opposite or separated directions under the restriction of the outside, thereby achieving the effect of adjusting the installation interval.
Wherein, accommodate the lead screw subassembly 2 still includes two fixed swivel bearing 201 that sets up at two installation fossil fragments 1 opposite sides respectively, swivel lead screw 202 rotates and sets up between two swivel bearing 201, and swivel lead screw 202's one end runs through installation fossil fragments 1 and is provided with rotatory screw head 205, rotatory screw head 205 and rotatory lead screw 202 are integrated into one piece, rotate rotatory screw head 205 through the screwdriver, can make rotatory lead screw 202 rotatory between two swivel bearing 201, thereby realize spacing's effect, rotatory screw head 205 is the hexagon socket head screw head in addition.
In this embodiment, an integrally formed transmission rod 204 is disposed between the fixing keel 4 and the lifting shaft 203, and the transmission rod 204 can be used to increase the installation space.
In this embodiment, the limiting sliding assembly 3 includes a sliding rod 301 fixedly disposed between two installation keels 1, a sliding shaft 302 slidably sleeved outside the sliding rod 301, and a connecting rod 303 disposed outside the sliding shaft 302, the other end of the connecting rod 303 is fixedly connected with the fixed keel 4, and the connecting rod 303 and the sliding shaft 302 are integrally formed, so that the limiting lifting effect is realized by the sliding of the sliding shaft 302 outside the sliding rod 301.
The number of the limiting sliding assemblies 3 is two, the two limiting sliding assemblies 3 are symmetrically arranged on two sides of the interval adjusting screw rod assembly 2, and the moving stability of the two fixed keels 4 is improved.
In this embodiment, the fixed hangers 5 that are connected with fixed fossil fragments 4 that are provided with in the back of curtain board 6, wherein be provided with on the fixed fossil fragments 4 with the spout of hangers 5 looks adaptation, pass through the screw fixation between fixed fossil fragments 4 and the hangers 5.
The working principle of the embodiment is as follows:
the rotating screw head 205 is rotated by a screwdriver, so that the rotating screw 202 rotates between the two rotating bearings 201, the two lifting shafts 203 move towards opposite or separated directions through two sections of opposite thread grooves under the limitation of the sliding shaft 302 and the sliding rod 301 until the two fixing keels 4 are adjusted to proper positions, and finally the curtain wall plate 6 is installed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a building assembled unitized curtain wall subassembly which characterized in that: including two installation fossil fragments (1) of fixing on the wall, be provided with interval accommodate the lead screw subassembly (2) and spacing slip subassembly (3) between two installation fossil fragments (1), the front transmission of interval accommodate the lead screw subassembly (2) is connected with two opposite direction's fixed fossil fragments (4), two fixed fossil fragments (4) all with spacing slip subassembly (3) sliding connection, fixed mounting has curtain board (6) on fixed fossil fragments (4), wherein, interval accommodate the lead screw subassembly (2) are including rotating rotatory lead screw (202) that sets up between two installation fossil fragments (1), and the outside of rotatory lead screw (202) is provided with two sections opposite thread grooves, and the outside difference thread bush of two sections opposite thread grooves is equipped with lift axle (203), and two fixed fossil fragments (4) are connected with two lift axles (203) respectively.
2. A building-assembled unitized curtain wall assembly as claimed in claim 1, wherein: the adjusting screw rod assembly (2) further comprises two rotary bearings (201) which are arranged on the opposite sides of the two mounting keels (1) respectively, the rotary screw rod (202) is rotatably arranged between the two rotary bearings (201), and one end of the rotary screw rod (202) penetrates through the mounting keels (1) to be provided with rotary screw heads (205).
3. A building-assembled unitized curtain wall assembly as claimed in claim 2, wherein: a transmission rod (204) is arranged between the fixed keel (4) and the lifting shaft (203).
4. A building-assembled unitized curtain wall assembly as claimed in claim 2, wherein: the rotary screw head (205) is a hexagon socket head screw.
5. A building-assembled unitized curtain wall assembly as claimed in claim 1 or claim 2, wherein: the limiting sliding assembly (3) comprises a sliding rod (301) arranged between two installation keels (1), a sliding shaft (302) which is sleeved outside the sliding rod (301) in a sliding mode, and a connecting rod (303) arranged outside the sliding shaft (302), and the other end of the connecting rod (303) is connected with a fixed keel (4).
6. The building assembled unitized curtain wall assembly of claim 5, wherein: the number of the limiting sliding assemblies (3) is two.
7. A building-assembled unitized curtain wall assembly as claimed in claim 1, wherein: the two limiting sliding assemblies (3) are symmetrically arranged on two sides of the distance adjusting screw rod assembly (2).
8. The building assembled unitized curtain wall assembly of claim 1, wherein: the back of curtain board (6) is provided with hangers (5) that are connected with fixed fossil fragments (4), passes through the screw fixation between fixed fossil fragments (4) and hangers (5).
CN202222439338.XU 2022-09-15 2022-09-15 Building assembled unitized curtain wall assembly Active CN218028394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222439338.XU CN218028394U (en) 2022-09-15 2022-09-15 Building assembled unitized curtain wall assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222439338.XU CN218028394U (en) 2022-09-15 2022-09-15 Building assembled unitized curtain wall assembly

Publications (1)

Publication Number Publication Date
CN218028394U true CN218028394U (en) 2022-12-13

Family

ID=84356216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222439338.XU Active CN218028394U (en) 2022-09-15 2022-09-15 Building assembled unitized curtain wall assembly

Country Status (1)

Country Link
CN (1) CN218028394U (en)

Similar Documents

Publication Publication Date Title
CN218028394U (en) Building assembled unitized curtain wall assembly
CN207092320U (en) Installing structure of stone curtain wall
CN212104709U (en) Building curtain wall with high applicability
CN215292067U (en) Door and window supporting device of building curtain wall
CN212358753U (en) Curtain wall plate with pipeline framework
CN204370632U (en) For regulating the linkage of glass surface angle angle
CN216740437U (en) Angle-adjustable sun shield
CN2705561Y (en) Built-in automatic reset rotary shaft type swing door
CN219992822U (en) Assembly type energy-saving curtain wall mounting assembly
CN216276333U (en) Combined decorative curtain wall for building
CN220598964U (en) Building outer elevation decorative structure
CN220790244U (en) Building curtain with adjustable
CN211341332U (en) Curtain wall structure for assembly type building
CN214402392U (en) Install convenient smallpox aluminum plate
CN219274130U (en) Aluminum core plate bending machine
CN219528736U (en) Concealed page
CN217782836U (en) Environment-friendly and cavity building templates of dismouting of being convenient for
CN212867228U (en) Anti-drop dustproof rear-pull type hinge
CN212613295U (en) Installation structure of hyperboloid panel
CN212224351U (en) Novel curtain owner frame mounting structure of multi-angle adjustment
CN213204599U (en) Building curtain wall with sun-shading structure
CN217028580U (en) Flat-open door and window with mounting wings
CN215948601U (en) Energy-saving sound-insulation horizontal hidden vertical exposed curtain wall
CN219061366U (en) Hidden type window handle mounting structure
CN215718125U (en) Energy-saving aluminum alloy door and window installation device convenient to operate

Legal Events