CN218025322U - Supporting structure for pipeline engineering operation frame - Google Patents

Supporting structure for pipeline engineering operation frame Download PDF

Info

Publication number
CN218025322U
CN218025322U CN202221330225.XU CN202221330225U CN218025322U CN 218025322 U CN218025322 U CN 218025322U CN 202221330225 U CN202221330225 U CN 202221330225U CN 218025322 U CN218025322 U CN 218025322U
Authority
CN
China
Prior art keywords
rack
lifter
bracing piece
fixed mounting
driving motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221330225.XU
Other languages
Chinese (zh)
Inventor
鱼永强
王欣
李溪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Linhai Construction Engineering Group Co ltd
Original Assignee
Tianjin Linhai Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Linhai Construction Engineering Group Co ltd filed Critical Tianjin Linhai Construction Engineering Group Co ltd
Priority to CN202221330225.XU priority Critical patent/CN218025322U/en
Application granted granted Critical
Publication of CN218025322U publication Critical patent/CN218025322U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a pipeline engineering bearing structure for operation frame, which comprises a mounting table, the loose wheel is installed to the bottom of mount table, fixed mounting has the bracing piece around the surface of mount table, the inside fixed mounting of bracing piece has elevating system, elevating system's top fixed mounting has the operation panel, elevating system through being equipped with, control drive motor rotates, drive motor rotates the gear revolve that drives output end fixed mounting, the rack that the gear revolve drive meshing is connected rises, thereby the rack is installed and is driven the lifter and go up and down inside the bracing piece in one side of lifter, further drive the operation panel realization lift that the top is connected, be convenient for install the operation to the pipeline of co-altitude, the rail guard of operation panel fixed mounting plays protection operating personnel's effect, take place easily when preventing high altitude construction and fall, rail guard internally mounted's operating panel is convenient for personnel controls the lifter lift according to the mounting height.

Description

Supporting structure for pipeline engineering operation frame
Technical Field
The utility model relates to a pipeline erection equipment technical field specifically is a pipeline engineering bearing structure for handling frame.
Background
Piping refers to a device for transporting a gas, liquid or fluid with solid particles connected by pipes, pipe couplings, valves, etc. Need use the handling frame to satisfy the installation when carrying out piping erection at municipal pipeline engineering, wherein application number is: "201720175895.1" discloses a pipeline engineering steel pipe handling frame, including support frame and the operation panel of fixed mounting on the support frame, parallel arrangement has two guide rails on the operation panel, is provided with the supporting seat on the guide rail, and the support frame both sides are provided with the support and adjust the stand, and this use is novel according to the height condition of geomorphic through adjusting cap head adjusting screw for the operation panel is in horizontal position, and this kind of support framework can guarantee that the level of operation panel is placed, but the device still has following shortcoming in the use: after the operation panel is adjusted, the bottom support frame of the operation panel cannot realize the lifting adjustment of the operation panel, and pipe sections with different pipeline installation heights often appear in the pipeline installation process, so that the adjustability of the operation panel is reduced when pipelines with different heights are installed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline engineering is bearing structure for operation frame to solve the operation panel that above-mentioned background art provided and after the regulation was accomplished, its bottom sprag frame can't realize the lift adjustment to the operation panel, pipeline installation difference's pipeline section appears often in the pipeline installation in-process, this problem that just makes its adjustability of operation panel reduce when installing not co-altitude pipeline.
In order to achieve the above object, the utility model provides a following technical scheme: a supporting structure for a pipeline engineering operation frame comprises an installation table, movable wheels are installed at the bottom end of the installation table, supporting rods are fixedly installed on the periphery of the surface of the installation table, a lifting mechanism is fixedly installed inside the supporting rods, and an operation table is fixedly installed at the top end of the lifting mechanism;
the lifting mechanism comprises a lifting rod, a driving motor and a rack, wherein the lifting rod is connected inside the supporting rod in an inserting mode, and the operating platform is fixedly connected to the top of the lifting rod.
As a preferred embodiment of the present invention: the utility model discloses a rack-and-pinion type lifting device, including bracing piece, rack, driving motor, connecting hole, installation cover, gear, driving motor fixed mounting is in top one side of bracing piece, rack fixed connection is in one side of lifter, the connecting hole has been seted up on the surface of bracing piece, the surface cover of connecting hole is equipped with the installation cover, the inside of installation cover is equipped with the gear, driving motor's output runs through installation cover and fixed connection at the middle part of gear, the gear passes the connecting hole and is connected with rack toothing.
As a preferred embodiment of the present invention: and both ends of the rack are fixedly connected with limit stop blocks.
For being as a preferred scheme of the utility model: a ladder stand is fixedly installed on one side of the operating platform, a pedal is fixedly installed on one side of the installing platform, and the pedal and the ladder stand are correspondingly arranged.
As a preferred embodiment of the present invention: guard railings are fixedly installed on the periphery of the surface of the operating platform, and an operating panel is fixedly installed on the inner side of each guard railing.
As a preferred embodiment of the present invention: driving motor and operating panel electric connection, mount table internally mounted has stand-by power supply, operating panel and stand-by power supply electric connection.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) Through the arranged lifting mechanism, when the pipelines with different heights need to be installed and operated, the driving motor is controlled to rotate, the driving motor rotates to drive the gear fixedly installed at the output end to rotate, the gear rotates to drive the rack in meshing connection to ascend, the rack is installed on one side of the lifting rod to drive the lifting rod to ascend and descend in the supporting rod, the operating platform connected with the top is further driven to ascend and descend, and the pipelines with different heights can be conveniently installed and operated;
(2) Through the cat ladder that is equipped with, cat ladder fixed mounting is in operation panel one side, and the footboard that corresponds the connection of cat ladder department in mount table one side is convenient for climb to the cat ladder through the footboard to on getting into the operation panel through the cat ladder, install the pipeline.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic structural view of the lifting mechanism of the present invention;
fig. 4 is the schematic view of the ladder mounting structure of the present invention.
In the figure: 1. a mounting table; 2. a movable wheel; 3. a support bar; 4. a lifting mechanism; 41. a lifting rod; 42. a drive motor; 43. a rack; 44. connecting holes; 45. mounting a cover; 46. a gear; 47. a limit stop; 5. an operation table; 6. climbing a ladder; 7. a pedal; 8. protecting a fence; 9. an operation panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a supporting structure for a pipeline engineering operation frame comprises an installation platform 1, movable wheels 2 are installed at the bottom end of the installation platform 1, supporting rods 3 are fixedly installed on the periphery of the surface of the installation platform 1, a lifting mechanism 4 is fixedly installed inside the supporting rods 3, and an operation platform 5 is fixedly installed at the top end of the lifting mechanism 4;
the lifting mechanism 4 comprises a lifting rod 41, a driving motor 42 and a rack 43, wherein the lifting rod 41 is inserted into the supporting rod 3, and the operating platform 5 is fixedly connected to the top of the lifting rod 41.
In this embodiment: driving motor 42 fixed mounting is in top one side of bracing piece 3, rack 43 fixed connection is in one side of lifter 41, connecting hole 44 has been seted up on the surface of bracing piece 3, the surface cover of connecting hole 44 is equipped with installation cover 45, the inside of installation cover 45 is equipped with gear 46, driving motor 42's output runs through installation cover 45 and fixed connection at gear 46's middle part, gear 46 passes connecting hole 44 and is connected with rack 43 meshing, the equal fixedly connected with limit stop 47 in both ends of rack 43.
When in specific use: when the pipeline installation of co-altitude not needs to be operated, control driving motor 42 rotates, driving motor 42 rotates the gear 46 that drives output end fixed mounting and rotates, gear 46 rotates rack 43 that drives the meshing and connect and rises, thereby rack 43 installs and drives lifter 41 and go up and down in bracing piece 3 inside one side at lifter 41, thereby further drive operation panel 5 that the top is connected and realize going up and down, be convenient for install the operation to the pipeline of co-altitude not, spacing dog 47 of rack 43 both ends fixed connection plays spacing lifter 41 and rises the limit, prevent that gear 46 and rack 43 from connecting and droing.
In this embodiment: a ladder 6 is fixedly arranged on one side of the operating platform 5, a pedal 7 is fixedly arranged on one side of the mounting platform 1, and the pedal 7 is arranged corresponding to the ladder 6.
When in specific use: the cat ladder 6 fixed mounting is in operation panel 5 one side, and the footboard 7 that the footboard 6 department of installing platform one side corresponding was connected is convenient for climb to cat ladder 6 through footboard 7 on to on getting into operation panel 5 through cat ladder 6, install the pipeline.
In this embodiment: guard rails 8 are fixedly arranged on the periphery of the surface of the operating platform 5, and an operating panel 9 is fixedly arranged on the inner sides of the guard rails 8.
When in specific use: the guard rail 8 fixedly arranged on the surface of the operating platform 5 plays a role in protecting operators and preventing the operators from falling easily during high-altitude operation, and the operating panel 9 arranged inside the guard rail 8 is convenient for the operators to control the lifting rod 41 to lift according to the mounting height.
In this embodiment: the driving motor 42 is electrically connected with the operation panel 9, a standby power supply is installed inside the installation platform 1, and the operation panel 9 is electrically connected with the standby power supply.
When in specific use: when the operation panel 9 is connected to the backup power supply, the driving motor 42 operates to lift the operation panel 5 after being energized, and when the operation panel 9 is disconnected from the backup power supply, the driving motor 42 stops operating.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and equivalents may be made without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a pipeline engineering bearing structure for handling frame, includes mount table (1), its characterized in that: the movable wheel (2) is installed at the bottom end of the installation table (1), supporting rods (3) are fixedly installed on the periphery of the surface of the installation table (1), a lifting mechanism (4) is fixedly installed inside the supporting rods (3), and an operation table (5) is fixedly installed at the top end of the lifting mechanism (4);
elevating system (4) are including lifter (41), driving motor (42) and rack (43), lifter (41) alternate to be connected inside and operation panel (5) fixed connection at lifter (41) top in bracing piece (3).
2. The support structure for the pipe work handling frame according to claim 1, wherein: driving motor (42) fixed mounting is in top one side of bracing piece (3), rack (43) fixed connection is in one side of lifter (41), connecting hole (44) have been seted up on the surface of bracing piece (3), the surface cover of connecting hole (44) is equipped with installation cover (45), the inside of installation cover (45) is equipped with gear (46), the output of driving motor (42) runs through installation cover (45) and fixed connection at the middle part of gear (46), gear (46) pass connecting hole (44) and are connected with rack (43) meshing.
3. The support structure for the pipe work handling frame according to claim 2, wherein: both ends of the rack (43) are fixedly connected with limit stoppers (47).
4. The support structure for the pipe work handling frame according to claim 1, wherein: a ladder stand (6) is fixedly mounted on one side of the operating platform (5), a pedal (7) is fixedly mounted on one side of the mounting platform (1), and the pedal (7) and the ladder stand (6) are arranged correspondingly.
5. The support structure for the pipe work handling frame according to claim 1, wherein: guard rails (8) are fixedly mounted on the periphery of the surface of the operating platform (5), and an operating panel (9) is fixedly mounted on the inner side of each guard rail (8).
6. The support structure for the pipe work handling frame according to claim 5, wherein: driving motor (42) and operating panel (9) electric connection, mount table (1) internally mounted has stand-by power supply, operating panel (9) and stand-by power supply electric connection.
CN202221330225.XU 2022-05-31 2022-05-31 Supporting structure for pipeline engineering operation frame Active CN218025322U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221330225.XU CN218025322U (en) 2022-05-31 2022-05-31 Supporting structure for pipeline engineering operation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221330225.XU CN218025322U (en) 2022-05-31 2022-05-31 Supporting structure for pipeline engineering operation frame

Publications (1)

Publication Number Publication Date
CN218025322U true CN218025322U (en) 2022-12-13

Family

ID=84374268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221330225.XU Active CN218025322U (en) 2022-05-31 2022-05-31 Supporting structure for pipeline engineering operation frame

Country Status (1)

Country Link
CN (1) CN218025322U (en)

Similar Documents

Publication Publication Date Title
WO2018099469A1 (en) Multi-layer parking method and apparatus
CN106064798A (en) A kind of electric power overhaul hoistable platform
WO2017071053A1 (en) Automatic leveling device and method for variable-slope obliquely-running container
JP3225232U (en) Active compensation boarding equipment for offshore wind turbine platforms
CN218025322U (en) Supporting structure for pipeline engineering operation frame
CN205859529U (en) Automatic lifting supervising device
CN213418443U (en) Self-climbing type elevator shaft operation platform
CN215407312U (en) Overhanging climbing device
CN110685431A (en) Climbing type elevator shaft construction operation platform and construction method thereof
KR20040104223A (en) Scaffolding having vertically moving workplace
CN113463899B (en) Self-sealing gravity climbing wall type self-climbing operation platform
CN215756261U (en) Ladder rack equipment for 320 airplane maintenance
CN212003003U (en) Lifting device for electromechanical equipment maintenance
CN207122122U (en) Raise scaffold
CN217780705U (en) Electric power is maintained with overhauing frame
CN106812299B (en) Hanging basket for overflow weir surface
CN217427480U (en) Movable tunnel electromechanical installation device
CN111764667A (en) Steel structure truss installation construction equipment and installation construction method
CN215275545U (en) Workbench for fire fighting
CN217756798U (en) Power station boiler platform supporting beam
CN215258164U (en) Auxiliary mechanism for installation of clean pipelines
CN219261118U (en) Hydraulic equipment inspection well with lifting and shaking prevention functions
CN215208256U (en) Underground lead lifting platform
CN215439554U (en) Building construction elevator
CN219860376U (en) Riser mounting frame for fire-fighting water supply pipeline installation