CN217998893U - Collision buffering protection mechanism for building engineering - Google Patents
Collision buffering protection mechanism for building engineering Download PDFInfo
- Publication number
- CN217998893U CN217998893U CN202221751774.4U CN202221751774U CN217998893U CN 217998893 U CN217998893 U CN 217998893U CN 202221751774 U CN202221751774 U CN 202221751774U CN 217998893 U CN217998893 U CN 217998893U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- flower basket
- building engineering
- hanging flower
- front side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a collision buffering protection mechanism for building engineering, including the building engineering hanging flower basket, the front side fixedly connected with buffer gear of building engineering hanging flower basket, buffer gear is including flexible shell, the equal fixedly connected with anticollision institution in both sides of building engineering hanging flower basket, anticollision institution includes first fixed plate and second fixed plate, the top fixedly connected with handrail of building engineering hanging flower basket front side, the four corners of building engineering hanging flower basket bottom is all seted up flutedly, the equal fixedly connected with shock attenuation moving mechanism in inner chamber of four recesses, the rear side of flexible shell and the front side fixed connection of building engineering hanging flower basket. The utility model discloses a cooperation that sets up building engineering hanging flower basket, buffer gear, anticollision mechanism, handrail, recess and shock attenuation moving mechanism is used, has solved current hanging flower basket at work, if under the disturbance condition of strong air current, carries out the problem of protecting to building wall's outer wall or curtain.
Description
Technical Field
The utility model belongs to the technical field of building engineering, especially, relate to a collision buffer protection mechanism for building engineering.
Background
The existing construction tool for construction engineering comprises a construction engineering hanging basket for bearing workers, and the construction engineering hanging basket is as follows: CN201820572884.1, install the support horizontal pole around the building cradle outer wall, the guardrail is evenly installed to both sides about the support horizontal pole, support the horizontal pole top guardrail other end and building cradle top inner wall connection, support the horizontal pole bottom guardrail other end and be connected bottom the building cradle, building cradle bottom is connected with the adsorption equipment base, install two sets of exhaust tubes in the adsorption equipment base inner chamber, safety device is including the couple, a couple right-hand member is connected with little catch, little catch is installed in the safety belt left side, the safety belt right side is connected with big catch, building cradle top is connected with the connection rope, the connection rope has cup jointed the safety lock, installs adsorption equipment on the hanging flower basket, has guaranteed high altitude construction's stability to install safety device on the support horizontal pole, give the utility model discloses simple structure, stability is high, and the security performance is good.
But the problems of the prior art are that: in the building engineering, the hanging basket is used for wall curtain wall installation, outer wall cleaning and the like, the wind power in high air is generally larger than the ground, the existing hanging basket generally has no collision buffer mechanism, and the hanging basket is easy to collide with the wall under the condition of strong disturbance of airflow, so that the safety of workers is threatened, and huge damage can be caused to the outer wall or the curtain wall of the building wall.
SUMMERY OF THE UTILITY MODEL
Problem to prior art exists, the utility model provides a collision buffering protection mechanism for building engineering possesses the construction hanging flower basket and carries out the advantage of protecting to building wall's outer wall or curtain in the course of the work, has solved current hanging flower basket at work, if under the disturbance condition of strong air current, carries out the problem of protecting to building wall's outer wall or curtain.
The utility model discloses a realize like this, a collision buffering protection mechanism for building engineering, including the building engineering hanging flower basket, the front side fixedly connected with buffer gear of building engineering hanging flower basket, buffer gear is including flexible shell, the equal fixedly connected with anticollision institution in both sides of building engineering hanging flower basket, anticollision institution includes first fixed plate and second fixed plate, the top fixedly connected with handrail of building engineering hanging flower basket front side, the four corners of building engineering hanging flower basket bottom is all seted up flutedly, the equal fixedly connected with shock attenuation moving mechanism of inner chamber of four recesses.
As the utility model discloses it is preferred, the rear side of flexible shell and the front side fixed connection of building engineering hanging flower basket, six spring telescopic links of the front side fixedly connected with of flexible shell inner chamber, six spring telescopic link's rear side all with the front side fixed connection of building engineering hanging flower basket, the equal fixedly connected with rubber pad in four corners of flexible shell front side.
As the utility model discloses preferred, the equal fixedly connected with stopper in both sides of flexible shell, the rear side of two stoppers all with the front side fixed connection of building engineering hanging flower basket.
As the utility model discloses it is preferred, the right side and the building engineering hanging flower basket fixed connection of first fixed plate, the equal swing joint in both sides of first fixed plate bottom has the dead lever, and the equal fixedly connected with in surface of two dead levers cushions the wheelset, and swing joint has the second fixed plate between the bottom of two dead levers, the right side and the building engineering hanging flower basket fixed connection of second fixed plate.
As the utility model discloses preferred, the top of two dead levers all runs through to the top of first fixed plate and swing joint has the bearing frame, the bottom of two bearing frames all with the top fixed connection of first fixed plate.
As the utility model discloses preferred, the equal fixedly connected with locating piece in both sides at the both sides of first fixed plate bottom and second fixed plate top, between the right side of four locating pieces with building engineering hanging flower basket fixed connection.
As the utility model discloses it is preferred, shock attenuation moving mechanism includes first fixed block, the top of first fixed block and groove cavity's top fixed connection, the bottom fixedly connected with extension spring of first fixed block, the bottom fixedly connected with second fixed block of extension spring, the surface of second fixed block and the inner chamber contact of recess, the bottom fixedly connected with location shell of second fixed block, the inner chamber of location shell has the gyro wheel through pivot swing joint.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a cooperation that sets up building engineering hanging flower basket, buffer gear, anticollision mechanism, handrail, recess and shock attenuation moving mechanism is used, has solved current hanging flower basket at work, if under the disturbance condition of strong air current, carries out the problem of protecting to building wall's outer wall or curtain.
2. The utility model discloses a cooperation that sets up flexible shell, spring telescopic link and rubber pad is used, when the staff during operation in the building engineering hanging flower basket, leads to the hanging flower basket to rock because of the disturbance of air current often to rub or collide to the wall body, when the hanging flower basket will strike the wall body because of the air current, at first the rubber pad touches the wall body, the rubber pad is extruding backward through pressure, spring telescopic link contracts in the extruded, thereby comes to protect and cushion the wall body.
3. The utility model discloses a set up the stopper, the stopper has played fixed and limiting displacement to flexible shell with the front side fixed connection of building engineering hanging flower basket.
4. The utility model discloses a cooperation that sets up first fixed plate, the dead lever, buffering wheelset and second fixed plate is used, when the air current disturbs the hanging flower basket and touch the wall, stir through the air current and make the buffering wheelset roll at the wall through the dead lever to this reduces the impact force of air current to the building engineering hanging flower basket, the buffering wheelset can not make the wall receive the injury or scrape when the wall rolls and bump, when the buffering wheelset rolls, first fixed plate and second fixed plate carry out the centre gripping to dead lever and buffering wheelset.
5. The utility model discloses a set up the bearing frame, the fixed and limiting displacement to the dead lever has been played to the top fixed connection of bearing frame and first fixed plate.
6. The utility model discloses a set up the locating piece, locating piece and building engineering hanging flower basket fixed connection have played the fixed action to first fixed plate and second fixed plate.
7. The utility model discloses a set up first fixed block, the extension spring, the second fixed block, the cooperation of location shell and gyro wheel is used, after the user protects or works the wall, the construction engineering hanging flower basket whereabouts to ground this moment, the gyro wheel is at first touched ground, secondly gyro wheel rethread pressure exerts pressure to the second fixed block, the extension spring contracts, consequently, the cushioning effect to when the construction engineering hanging flower basket has been played, the user wants to remove the construction engineering hanging flower basket to other when local, roll through promoting the construction engineering hanging flower basket drive gyro wheel, remove the construction engineering hanging flower basket with this.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a left side view of a partial structure provided by an embodiment of the present invention;
fig. 3 is a partial structural sectional view provided by an embodiment of the present invention;
fig. 4 is a partial cross-sectional view of the mechanism provided by the embodiment of the present invention;
fig. 5 is an enlarged view of a portion a in fig. 4 according to an embodiment of the present invention.
In the figure: 1. a construction engineering basket; 2. a buffer mechanism; 201. a telescoping shell; 202. a spring telescopic rod; 203. a rubber pad; 204. a limiting block; 3. an anti-collision mechanism; 301. a first fixing plate; 302. fixing the rod; 303. a buffer wheel set; 304. a second fixing plate; 305. a bearing seat; 306. positioning blocks; 4. a handrail; 5. a groove; 6. a shock-absorbing moving mechanism; 601. a first fixed block; 602. a tension spring; 603. a second fixed block; 604. a positioning shell; 605. and a roller.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 5, the embodiment of the utility model provides a pair of collision buffer protection mechanism for building engineering, including building engineering hanging flower basket 1, building engineering hanging flower basket 1's front side fixedly connected with buffer gear 2, buffer gear 2 is including flexible shell 201, the equal fixedly connected with anticollision institution 3 in both sides of building engineering hanging flower basket 1, anticollision institution 3 includes first fixed plate 301 and second fixed plate 304, the top fixedly connected with handrail 4 of 1 front side of building engineering hanging flower basket, the four corners of 1 bottom of building engineering hanging flower basket is all seted up flutedly 5, the equal fixedly connected with shock attenuation moving mechanism 6 of inner chamber of four recesses 5.
Referring to fig. 1 and 2, the rear side of the telescopic shell 201 is fixedly connected with the front side of the construction engineering hanging basket 1, the front side of the inner cavity of the telescopic shell 201 is fixedly connected with six spring telescopic rods 202, the rear sides of the six spring telescopic rods 202 are fixedly connected with the front side of the construction engineering hanging basket 1, and four corners of the front side of the telescopic shell 201 are fixedly connected with rubber pads 203.
Adopt above-mentioned scheme: through the cooperation of setting up flexible shell 201, spring telescopic link 202 and rubber pad 203 and using, when the staff was worked in building engineering hanging flower basket 1, often because the disturbance of air current leads to the hanging flower basket to rock to rub or collide the wall body, when the hanging flower basket because the air current will strike the wall body, at first rubber pad 203 touched the wall body, rubber pad 203 was extrudeed backward through pressure, spring telescopic link 202 contracts when the extrusion, thereby comes to protect and cushion the wall body.
Referring to fig. 1 and 2, both sides of the telescopic shell 201 are fixedly connected with limit blocks 204, and the rear sides of the two limit blocks 204 are fixedly connected with the front side of the construction engineering hanging basket 1.
Adopt above-mentioned scheme: through setting up stopper 204, stopper 204 and the front side fixed connection of building engineering hanging flower basket 1 have played the fixed and spacing effect to flexible shell 201.
Referring to fig. 1 and 3, the right side of the first fixing plate 301 is fixedly connected to the construction engineering hanging basket 1, fixing rods 302 are movably connected to both sides of the bottom of the first fixing plate 301, buffer wheel sets 303 are fixedly connected to the surfaces of the two fixing rods 302, a second fixing plate 304 is movably connected between the bottoms of the two fixing rods 302, and the right side of the second fixing plate 304 is fixedly connected to the construction engineering hanging basket 1.
Adopt above-mentioned scheme: through setting up first fixed plate 301, dead lever 302, the cooperation of buffering wheelset 303 and second fixed plate 304 is used, when the air current disturbs the hanging flower basket and touch the wall, stir through the air current and make buffering wheelset 303 roll at the wall through dead lever 302, reduce the impact force of air current to building engineering hanging flower basket 1 with this, buffering wheelset 303 can not make the wall receive the injury or scrape when the wall rolls, when buffering wheelset 303 rolls, first fixed plate 301 and second fixed plate 304 carry out the centre gripping to dead lever 302 and buffering wheelset 303.
Referring to fig. 3, the top portions of the two fixing rods 302 penetrate through to the top portion of the first fixing plate 301 and are movably connected with bearing seats 305, and the bottom portions of the two bearing seats 305 are fixedly connected with the top portion of the first fixing plate 301.
The scheme is adopted: through setting up bearing frame 305, bearing frame 305 and the top fixed connection of first fixed plate 301 have played the fixed and spacing effect to dead lever 302.
Referring to fig. 3, the tops of the two fixing rods 302 penetrate through the top of the first fixing plate 301 and are movably connected with bearing seats 305, and the bottoms of the two bearing seats 305 are fixedly connected with the top of the first fixing plate 301.
Adopt above-mentioned scheme: through setting up locating piece 306, locating piece 306 and building engineering hanging flower basket 1 fixed connection have played the fixed effect to first fixed plate 301 and second fixed plate 304.
Referring to fig. 1, 4 and 5, the damping moving mechanism 6 includes a first fixing block 601, the top of the first fixing block 601 is fixedly connected with the top of the inner cavity of the groove 5, the bottom of the first fixing block 601 is fixedly connected with a tension spring 602, the bottom of the tension spring 602 is fixedly connected with a second fixing block 603, the surface of the second fixing block 603 is in contact with the inner cavity of the groove 5, the bottom of the second fixing block 603 is fixedly connected with a positioning shell 604, and the inner cavity of the positioning shell 604 is movably connected with a roller 605 through a shaft pin.
Adopt above-mentioned scheme: through setting up first fixed block 601, extension spring 602, second fixed block 603, the cooperation of location shell 604 and gyro wheel 605 is used, after the user protects or works the wall, construction engineering hanging flower basket 1 whereabouts to ground this moment, gyro wheel 605 at first touches ground, gyro wheel 605 rethread pressure exerts pressure to second fixed block 603, extension spring 602 contracts, consequently, played the cushioning effect to when construction engineering hanging flower basket 1, the user wants to remove construction engineering hanging flower basket 1 to other places when, drive gyro wheel 605 through promoting construction engineering hanging flower basket 1 and roll, remove construction engineering hanging flower basket 1 with this.
The utility model discloses a theory of operation:
when the hanging basket is used, when a worker works in the construction hanging basket 1, the hanging basket frequently shakes due to disturbance of air flow, so that friction or collision is carried out on a wall body, when the hanging basket is about to collide with the wall body due to the air flow, firstly, the rubber pads 203 touch the wall body, the rubber pads 203 are extruded backwards through pressure, the spring telescopic rods 202 shrink while extruding, so that the wall body is protected and buffered, when the hanging basket is interfered by the air flow and touches the wall surface, the buffer wheel sets 303 roll on the wall surface through the fixing rods 302 through stirring of the air flow, so that impact force of the air flow on the construction hanging basket 1 is reduced, the buffer wheel sets 303 do not hurt or scrape the wall surface when the wall surface rolls, finally, when the user protects or works the wall surface, at the moment, the construction hanging basket 1 falls to the ground, the rollers 605 touch the ground firstly, the rollers 605 press the second fixing rods 603 through pressure, the tension springs 602 shrink, so that the damping effect on the construction hanging basket 1 is achieved, when the user wants to move the construction hanging basket 1 to other places, the construction hanging basket is driven by pushing the rollers 605 to roll to move the construction hanging basket 1.
In summary, the following steps: this collision buffering protection mechanism for building engineering leads to building engineering hanging flower basket 1, buffer gear 2, anticollision mechanism 3, handrail 4, recess 5 and the cooperation of shock attenuation moving mechanism 6 and uses, has solved current hanging flower basket at work, if under the disturbance condition of strong air current, protects the problem of building wall's outer wall or curtain.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a collision buffering protection mechanism for building engineering, includes building engineering hanging flower basket (1), its characterized in that: front side fixedly connected with buffer gear (2) of building engineering hanging flower basket (1), buffer gear (2) are including flexible shell (201), the equal fixedly connected with anticollision institution (3) in both sides of building engineering hanging flower basket (1), anticollision institution (3) are including first fixed plate (301) and second fixed plate (304), top fixedly connected with handrail (4) of building engineering hanging flower basket (1) front side, recess (5) have all been seted up in the four corners of building engineering hanging flower basket (1) bottom, the equal fixedly connected with shock attenuation moving mechanism (6) of inner chamber of four recesses (5).
2. The collision buffer protection mechanism for construction engineering of claim 1, characterized in that: the rear side of flexible shell (201) and the front side fixed connection of building engineering hanging flower basket (1), six spring telescopic links (202) of the front side fixedly connected with of flexible shell (201) inner chamber, the rear side of six spring telescopic links (202) all with the front side fixed connection of building engineering hanging flower basket (1), the equal fixedly connected with rubber pad (203) in four corners of flexible shell (201) front side.
3. The collision buffer protection mechanism for construction engineering of claim 1, characterized in that: the equal fixedly connected with stopper (204) in both sides of flexible shell (201), the rear side of two stoppers (204) all with the front side fixed connection of building engineering hanging flower basket (1).
4. The collision buffer protection mechanism for construction engineering according to claim 1, characterized in that: the right side and the building engineering hanging flower basket (1) fixed connection of first fixed plate (301), the equal swing joint in both sides of first fixed plate (301) bottom has dead lever (302), and the equal fixedly connected with in surface of two dead levers (302) cushions wheelset (303), swing joint has second fixed plate (304) between the bottom of two dead levers (302), the right side and the building engineering hanging flower basket (1) fixed connection of second fixed plate (304).
5. The collision buffer protection mechanism for construction engineering as claimed in claim 4, wherein: the tops of the two fixing rods (302) penetrate through the top of the first fixing plate (301) and are movably connected with bearing seats (305), and the bottoms of the two bearing seats (305) are fixedly connected with the top of the first fixing plate (301).
6. The collision buffer protection mechanism for construction engineering of claim 1, characterized in that: the two sides of the bottom of the first fixing plate (301) and the two sides of the top of the second fixing plate (304) are fixedly connected with positioning blocks (306), and the right sides of the four positioning blocks (306) are fixedly connected with the construction engineering hanging basket (1).
7. The collision buffer protection mechanism for construction engineering according to claim 1, characterized in that: shock attenuation moving mechanism (6) include first fixed block (601), the top of first fixed block (601) and the top fixed connection of recess (5) inner chamber, the bottom fixedly connected with extension spring (602) of first fixed block (601), the bottom fixedly connected with second fixed block (603) of extension spring (602), the surface of second fixed block (603) and the inner chamber contact of recess (5), the bottom fixedly connected with location shell (604) of second fixed block (603), the inner chamber of location shell (604) has gyro wheel (605) through pivot swing joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221751774.4U CN217998893U (en) | 2022-07-08 | 2022-07-08 | Collision buffering protection mechanism for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221751774.4U CN217998893U (en) | 2022-07-08 | 2022-07-08 | Collision buffering protection mechanism for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217998893U true CN217998893U (en) | 2022-12-09 |
Family
ID=84314808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221751774.4U Active CN217998893U (en) | 2022-07-08 | 2022-07-08 | Collision buffering protection mechanism for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217998893U (en) |
-
2022
- 2022-07-08 CN CN202221751774.4U patent/CN217998893U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211289321U (en) | Damping device for electromechanical device | |
CN217998893U (en) | Collision buffering protection mechanism for building engineering | |
CN111395737A (en) | Arc anti-collision stabilizer for construction hanging basket | |
CN213601619U (en) | Protection device for data storage equipment | |
CN213265223U (en) | Buffer device of construction elevator | |
CN212101539U (en) | Elevator safety combination pliers | |
CN219033992U (en) | Lifting hanging basket | |
CN211058280U (en) | Safe firm aerial working hanging flower basket | |
CN209721511U (en) | A kind of adjustable high-altitude working safety protective device of protective fence | |
CN209124665U (en) | A kind of stamping device with bumper and absorbing shock function | |
CN215563278U (en) | People goods ladder platform of walking of encorbelmenting | |
CN217680414U (en) | Hanging basket for outer wall construction engineering | |
CN215479064U (en) | Shock attenuation safety coefficient of construction elevator | |
CN217782820U (en) | Anti-falling safety protection wall-attached seat | |
CN214167289U (en) | Staircase for engineering detection | |
CN217153525U (en) | Vapour is repaiied and is used safety protection damping device | |
CN218815123U (en) | Collision buffer protection mechanism | |
CN219651943U (en) | Material storage rack | |
CN210194447U (en) | Hanging basket with safety protection device | |
CN216549134U (en) | Protection device for elevator car | |
CN218597700U (en) | Collision buffer protection mechanism | |
CN216305331U (en) | Bearing hanging rack for civil engineering construction | |
CN219467919U (en) | Carbon fiber bicycle front fork of moving away to avoid possible earthquakes | |
CN219587182U (en) | Basket for high-rise building construction | |
CN214090939U (en) | Good-stability climbing frame connecting seat for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |