CN217998228U - Bulldozer with brand new traction frame - Google Patents

Bulldozer with brand new traction frame Download PDF

Info

Publication number
CN217998228U
CN217998228U CN202221119369.0U CN202221119369U CN217998228U CN 217998228 U CN217998228 U CN 217998228U CN 202221119369 U CN202221119369 U CN 202221119369U CN 217998228 U CN217998228 U CN 217998228U
Authority
CN
China
Prior art keywords
filter screen
bulldozer
box
dozer
bull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221119369.0U
Other languages
Chinese (zh)
Inventor
蒋宏刚
李猛猛
陈洪新
黄家琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hantui Heavy Industry Co ltd
Original Assignee
Jiangsu Hantui Heavy Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hantui Heavy Industry Co ltd filed Critical Jiangsu Hantui Heavy Industry Co ltd
Priority to CN202221119369.0U priority Critical patent/CN217998228U/en
Application granted granted Critical
Publication of CN217998228U publication Critical patent/CN217998228U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)

Abstract

The utility model discloses a bull-dozer with brand-new traction frame, including bull-dozer main part, first filter screen, collection box, second filter screen and transfer pump, be provided with the box in the bull-dozer main part, and be connected with in the bull-dozer main part and handle the case, handle the case setting in the box left side simultaneously, bull-dozer main part right side is connected with the dozer blade, first filter screen runs through the setting and is handling the incasement, and runs through on the first filter screen and handle the case and be connected with first arm-tie. This bull-dozer with brand-new traction frame, it installs in bull-dozer main part left side through the third bolt to pull the bed frame, easy dismounting, the towing pin passes through screw thread portion screw thread in spacing, can be spacing fixed to the towing pin, prevent to lose, when needing to be changed the towing pin, twist the frame through the hand and twist the towing pin, twist it and move and take out the change, during the operation of bull-dozer main part, through the water pump, connecting pipe and spray line are with the water blowout in the box, play the dust fall effect, reduce the influence of dust to the surrounding environment.

Description

Bulldozer with brand new traction frame
Technical Field
The utility model relates to a bull-dozer technical field specifically is a bull-dozer with brand-new traction frame.
Background
A bulldozer is an earthwork machine capable of excavating, transporting and discarding rock and soil, and has wide application in open-pit mines. For example, for construction of refuse dumps, levelling of automobile refuse dumps, accumulation of dispersed rock, levelling of work pans, construction sites, etc. It is not only used for auxiliary work, but also for main mining work. For example, the stripping and mining of sand ore deposit, the traction and boosting of scraper and plough, the reduction of stripping step height when there is no transportation mining method, etc. in order to avoid losing the traction pin on the traction frame of the existing bulldozer, the traction pin and other parts are connected together through chain links, although the loss phenomenon is avoided, the replacement is inconvenient because the traction pin and the chain links are welded together, and the existing bulldozer is easy to produce a large amount of dust when in operation, which affects the environment, and the structure thereof needs to be improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bull-dozer with brand-new traction frame to solve the towing pin on the current bull-dozer traction frame that proposes in the above-mentioned background art and for avoiding losing, all can be connected to together towing pin and other parts through the chain link, nevertheless because towing pin and chain link welding are in the same place, it is comparatively inconvenient to change, and current bull-dozer when the operation, produces a large amount of dusts easily, influences the problem of environment.
In order to achieve the above object, the utility model provides a following technical scheme: a bulldozer with a brand-new traction frame comprises a bulldozer main body, a first filter screen, a collection box, a second filter screen and an infusion pump,
the bulldozer comprises a bulldozer body and is characterized in that a box body is arranged on the bulldozer body, a treatment box is connected to the bulldozer body, the treatment box is arranged on the left side of the box body, and a blade is connected to the right side of the bulldozer body;
the first filter screen is arranged in the treatment box in a penetrating manner, the upper end of the first filter screen penetrates through the treatment box and is connected with a first pulling plate, and meanwhile, the first pulling plate is arranged at the upper end of the treatment box through a first bolt;
the transfer pump sets up in handling the case, and the transfer pump is connected with the spray tube, it is connected with the pipe of discharging fume to handle case left side.
Preferably, the bull-dozer main part is including the third bolt, pull bed frame, connecting plate, spacing, towing pin, hand and twist frame and screw thread portion, and bull-dozer main part left side installs through third bolted connection and pull the bed frame, it is provided with two connecting plates to pull bed frame one side, and the connecting plate lower extreme of below is provided with spacing, run through being provided with the towing pin in the connecting plate, and be connected with the hand on the towing pin and twist the frame, towing pin below department is provided with screw thread portion, and screw thread portion threaded connection is in spacing.
Through adopting above-mentioned technical scheme, it is fixed, easy dismounting to pull the bed frame through the installation of third bolt.
Preferably, the box is including scale window, water pump, connecting pipe and spray line, and the box side is provided with the scale window, be provided with the water pump in the box, and the water pump is connected with the spray line through the connecting pipe, and the spray line is kept away from connecting pipe one end simultaneously and is set up on the dozer blade.
Through adopting above-mentioned technical scheme, conveniently observe the liquid level in the box through the scale window.
Preferably, handle the case including pendulum rope and pendulum ball, and handle the incasement top and be provided with the pendulum rope, the pendulum rope lower extreme even has pendulum ball simultaneously, pendulum ball sets up on first filter screen right side.
Through adopting above-mentioned technical scheme, first filter screen can be to the flue gas filtration processing that the bull-dozer main part produced.
Preferably, the collection box runs through the setting and is handling the incasement, and collects the box lower extreme and be provided with the gyro wheel, it is provided with hand-screwed bolt to run through on the collection box, and hand-screwed bolt one end threaded connection handles the case on.
Through adopting above-mentioned technical scheme, collect the box and can collect the dust that drops.
Preferably, the second filter screen runs through the setting and is handling the incasement, and the second filter screen setting is in first filter screen left side, the second filter screen setting is in the transfer pump top, and second filter screen left side runs through and handles the case and be connected with the second arm-tie, run through on the second arm-tie and be provided with the second bolt, and second bolt one end threaded connection is on handling the case.
Through adopting above-mentioned technical scheme, dismantle the second bolt, accessible second arm-tie pulls out second filter screen clearance and maintains.
Compared with the prior art, the beneficial effects of the utility model are that: the bulldozer with the brand-new traction frame,
(1) The traction base frame is arranged on the left side of the bulldozer main body through a third bolt, the assembly and disassembly are convenient, the traction pin is arranged in the limiting frame through threads of the thread part, the traction pin can be limited and fixed, the traction pin is prevented from being lost, and when the traction pin needs to be replaced, the traction pin is screwed through the hand-screwing frame and is taken out for replacement;
(2) During the operation of bull-dozer main part, spout the box internal water through water pump, connecting pipe and shower nozzle, play the dust fall effect, reduce the influence of dust to the surrounding environment, can filter the flue gas that the bull-dozer main part produced through first filter screen, discharge after rethread transfer pump and spray tube spraying water are handled the flue gas wet-type, reduce the influence of flue gas to the environment.
Drawings
FIG. 1 is a front view of the main body of the bulldozer;
FIG. 2 is a schematic view of the three-dimensional structure of the traction base frame and the connection plate of the present invention;
FIG. 3 is a schematic view of the cross-sectional structure of the connecting plate of the present invention;
fig. 4 is an enlarged schematic structural view of a in fig. 3 according to the present invention.
In the figure: 1. the bulldozer comprises a bulldozer body, 101, a third bolt, 102, a traction base frame, 103, a connecting plate, 104, a limiting frame, 105, a traction pin, 106, a hand-operated frame, 107, a threaded portion, 2, a box body, 201, a scale window, 202, a water pump, 203, a connecting pipe, 204, a spray pipe, 3, a treatment box, 301, a swing rope, 302, a swing ball, 4, a first filter screen, 5, a first pull plate, 6, a first bolt, 7, a collection box, 8, a roller, 9, a hand-operated bolt, 10, a second filter screen, 11, a second pull plate, 12, a second bolt, 13, an infusion pump, 14, a spray pipe, 15, a smoke exhaust pipe, 16 and a soil pushing shovel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a bulldozer with a brand-new traction frame is disclosed, as shown in FIG. 1, FIG. 2 and FIG. 3, a box body 2 is arranged on a bulldozer body 1, a processing box 3 is connected on the bulldozer body 1, the processing box 3 is arranged on the left side of the box body 2, the bulldozer body 1 comprises a third bolt 101, a traction base frame 102, a connecting plate 103, a limiting frame 104, a traction pin 105, a hand-screwed frame 106 and a thread part 107, the left side of the bulldozer body 1 is connected with the traction base frame 102 through the third bolt 101, one side of the traction base frame 102 is provided with two connecting plates 103, the lower end of the lower connecting plate 103 is provided with the limiting frame 104, the traction pin 105 penetrates through the connecting plate 103, the upper end of the traction pin 105 is connected with the hand-screwed frame 106, the lower part of the traction pin 105 is provided with the thread part 107, the thread part 107 is in the limiting frame 104, the traction pin 105 is screwed on the limiting frame 104 through the thread part 107, the loss of the traction pin 105 can be avoided, the traction pin 105 is screwed by the hand-screwed frame 106 to be detached and taken out, the replacement is convenient, the box body 2 comprises a scale window 201, a water pump 202, a connecting pipe 203 and a spray pipe 204, the scale window 201 is arranged on the side surface of the box body 2, the water pump 202 is arranged in the box body 2, the water pump 202 is connected with the spray pipe 204 through the connecting pipe 203, one end of the spray pipe 204 far away from the connecting pipe 203 is arranged on the dozer blade 16, the water is sprayed under the action of the water pump 202, the connecting pipe 203 and the spray pipe 204 to achieve a dust fall effect during the operation of the bulldozer body 1, the water level is conveniently observed through the scale window 201, the water is conveniently added in time, the processing box 3 comprises a swinging rope 301 and a swinging ball 302, the swinging rope 301 is arranged at the top end in the processing box 3, the swinging ball 302 is connected with the lower end of the swinging rope 301, the swinging ball 302 is arranged at the right side of the first filter screen 4, the swinging rope 301 and the swinging ball 302 under the action of gas, it may hit the first screen 4 so that the filtered soot falls off.
As shown in fig. 1, fig. 3 and fig. 4, a blade 16 is connected to the right side of the bulldozer main body 1, a first filter screen 4 is arranged in the processing box 3 in a penetrating manner, the upper end of the first filter screen 4 is connected with a first pulling plate 5 in a penetrating manner through the processing box 3, meanwhile, the first pulling plate 5 is arranged at the upper end of the processing box 3 through a first bolt 6, the first filter screen 4 is pulled out through the first pulling plate 5 to be convenient for cleaning and maintenance, the collecting box 7 is arranged in the processing box 3 in a penetrating manner, a roller 8 is arranged at the lower end of the collecting box 7, a hand-screwing bolt 9 is arranged on the collecting box 7 in a penetrating manner, one end of the hand-screwing bolt 9 is connected to the processing box 3, the hand-screwing disassembling hand-screwing bolt 9 is screwed, and the collecting box 7 can be taken out through the roller 8 to process smoke collected by the collecting box 7.
As shown in fig. 1 and 3, a second filter screen 10 is arranged in the treatment tank 3 in a penetrating manner, the second filter screen 10 is arranged on the left side of the first filter screen 4, the second filter screen 10 is arranged above the infusion pump 13, the left side of the second filter screen 10 is connected with a second pulling plate 11 in a penetrating manner through the treatment tank 3, a second bolt 12 is arranged on the second pulling plate 11 in a penetrating manner, one end of the second bolt 12 is connected to the treatment tank 3 in a threaded manner, the second filter screen 10 can be used for filtering and recycling the spraying water for flue gas treatment, the second bolt 12 is detached, the second filter screen 10 can be pulled out through the second pulling plate 11 for cleaning and maintenance, the infusion pump 13 is arranged in the treatment tank 3, the infusion pump 13 is connected with the spraying pipe 14, and the left side of the treatment tank 3 is connected with a smoke exhaust pipe 15.
When the bulldozer body 1 works through the dozer blade 16, water can be sprayed under the action of the water pump 202, the connecting pipe 203 and the spraying pipe 204 for dust fall, smoke generated by the bulldozer body 1 is filtered through the first filter screen 4, is sprayed through the liquid conveying pump 13 and the spray pipe 14 for wet treatment and then is discharged through the smoke discharge pipe 15, the towing pin 105 is screwed in the limiting frame 104 through the threaded part 107, so that the loss can be prevented, and when the bulldozer body needs to be disassembled and replaced, the towing pin 105 is screwed through the hand screwing frame 106 to be disassembled and replaced.
The terms "central," "longitudinal," "lateral," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like refer to orientations or positional relationships illustrated in the drawings, and are used merely to simplify the description of the present disclosure, rather than to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and are not to be construed as limiting the scope of the present disclosure.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a bull-dozer with brand-new traction frame, includes bull-dozer main part (1), first filter screen (4), collects box (7), second filter screen (10) and transfer pump (13), its characterized in that:
the bulldozer is characterized in that a box body (2) is arranged on the bulldozer main body (1), a treatment box (3) is connected to the bulldozer main body (1), the treatment box (3) is arranged on the left side of the box body (2), and a dozer blade (16) is connected to the right side of the bulldozer main body (1);
the first filter screen (4) penetrates through the treatment box (3), the upper end of the first filter screen (4) penetrates through the treatment box (3) and is connected with a first pulling plate (5), and meanwhile, the first pulling plate (5) is arranged at the upper end of the treatment box (3) through a first bolt (6);
the infusion pump (13) is arranged in the treatment box (3), the infusion pump (13) is connected with the spray pipe (14), and the left side of the treatment box (3) is connected with a smoke exhaust pipe (15).
2. A bulldozer with new traction frame according to claim 1, in which: bulldozer body (1) comprises a third bolt (101), a traction base frame (102), a connecting plate (103), a limiting frame (104), a traction pin (105), a hand-operated frame (106) and a thread portion (107), the traction base frame (102) is installed on the left side of bulldozer body (1) through connection of third bolt (101), two connecting plates (103) are arranged on one side of the traction base frame (102), the limiting frame (104) is arranged at the lower end of the connecting plate (103) below, the traction pin (105) penetrates through the connecting plate (103), the hand-operated frame (106) is connected to the upper end of the traction pin (105), the thread portion (107) is arranged at the lower portion of the traction pin (105), and the thread portion (107) is connected to the limiting frame (104).
3. A bulldozer with new traction frame according to claim 1, in which: the box body (2) comprises a scale window (201), a water pump (202), a connecting pipe (203) and a spraying pipe (204), the scale window (201) is arranged on the side face of the box body (2), the water pump (202) is arranged in the box body (2), the water pump (202) is connected with the spraying pipe (204) through the connecting pipe (203), and one end, far away from the connecting pipe (203), of the spraying pipe (204) is arranged on the dozer blade (16).
4. A bulldozer with new traction frame according to claim 1, in which: handle case (3) including pendulum rope (301) and pendulum ball (302), and handle case (3) interior top and be provided with pendulum rope (301), pendulum rope (301) lower extreme even has pendulum ball (302) simultaneously, pendulum ball (302) set up on first filter screen (4) right side.
5. A bulldozer with new traction frame according to claim 1, in which: collect box (7) and run through the setting in handling case (3), and collect box (7) lower extreme and be provided with gyro wheel (8), it is provided with hand-screwed bolt (9) to run through on collecting box (7), and hand-screwed bolt (9) one end threaded connection is on handling case (3).
6. A bulldozer with new traction frame according to claim 1, in which: second filter screen (10) run through the setting in handling case (3), and second filter screen (10) set up in first filter screen (4) left side, second filter screen (10) set up in transfer pump (13) top, and second filter screen (10) left side runs through and handles case (3) and be connected with second arm-tie (11), it is provided with second bolt (12) to run through on second arm-tie (11), and second bolt (12) one end threaded connection is on handling case (3).
CN202221119369.0U 2022-05-11 2022-05-11 Bulldozer with brand new traction frame Active CN217998228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221119369.0U CN217998228U (en) 2022-05-11 2022-05-11 Bulldozer with brand new traction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221119369.0U CN217998228U (en) 2022-05-11 2022-05-11 Bulldozer with brand new traction frame

Publications (1)

Publication Number Publication Date
CN217998228U true CN217998228U (en) 2022-12-09

Family

ID=84291639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221119369.0U Active CN217998228U (en) 2022-05-11 2022-05-11 Bulldozer with brand new traction frame

Country Status (1)

Country Link
CN (1) CN217998228U (en)

Similar Documents

Publication Publication Date Title
CN213174066U (en) Water supply and drainage sewage pipes subassembly
CN217998228U (en) Bulldozer with brand new traction frame
CN217613595U (en) Air purification device for coal mining
CN201896328U (en) Crawler belt wind-preventing device for soil shifter
CN205934815U (en) Environment -protection sweeping vehicle
CN206156151U (en) Garbage compressor
CN210448449U (en) Dust removal unloads grey pipe-line filter
CN210049850U (en) Tunnel drilling construction dust device
CN215539437U (en) Raise dust treatment equipment for building engineering construction
CN213380523U (en) Scrap collecting device for steel beam production
CN211412701U (en) Automatic cleaning vibrating screen of broken construction waste screening machine of retrieving
CN208310834U (en) Dedusting and purifying device
CN110695029A (en) Greasy dirt belt cleaning device in vertical storage tank
CN211724825U (en) Plate frame filter press
CN217734141U (en) Milling and excavating machine not easy to cause large-area collapse
CN214288715U (en) Real-time monitoring's green emission reduction falls formula of making an uproar building rubbish crushing and screening device
CN215335182U (en) Natural gas line filter screen structure convenient to quick assembly disassembly
CN215700162U (en) Dust falling device of cutting machine for cast pipe
CN214974594U (en) Construction equipment for earthwork engineering
CN211100631U (en) Greasy dirt belt cleaning device in vertical storage tank
CN220053659U (en) Crawler belt plate pin lug fracture fault detection device of crawler crane
CN211935834U (en) Sewage treatment sieve rate ware
CN214363696U (en) Loader with wet dust removal device
CN219648257U (en) Waste residue collecting mechanism of heat treatment cleaning machine
CN211258704U (en) Water-coal separation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant