CN217996599U - Building construction building materials handling equipment - Google Patents
Building construction building materials handling equipment Download PDFInfo
- Publication number
- CN217996599U CN217996599U CN202222176049.5U CN202222176049U CN217996599U CN 217996599 U CN217996599 U CN 217996599U CN 202222176049 U CN202222176049 U CN 202222176049U CN 217996599 U CN217996599 U CN 217996599U
- Authority
- CN
- China
- Prior art keywords
- lifting rope
- rope
- lifting
- fixedly connected
- building materials
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model provides a construction building materials handling equipment relates to building materials handling technical field, which comprises a mounting bas, be provided with drive assembly on the mount pad, drive assembly has the blowing subassembly through first lifting rope and second lifting rope swing joint, be provided with on the installation piece and be used for carrying out spacing subassembly to first lifting rope, through setting up spacing subassembly, make the spring drive fixed block and I-shaped gyro wheel push down first lifting rope under self spring action for first lifting rope is located I-shaped gyro wheel middle part all the time, thereby plays spacing effect to first lifting rope, and avoid taking place the friction between first lifting rope and the installation piece, play the effect of protection to first lifting rope, prolong the life of first lifting rope, set up the fly leaf through the activity in blowing case one side, can improve the convenience of material loading, through set up the protection bag in blowing case outside, can avoid unexpected the handling in-process of building materials, improve the security that drops in-process.
Description
Technical Field
The utility model relates to a building materials handling technical field particularly, relates to a construction building materials handling equipment.
Background
The building materials are basic materials for building construction, the main building materials comprise wood, stone, reinforcing steel bars and the like, and the building materials are generally required to be hoisted when high-rise buildings are constructed.
But current handling equipment is in the use, and the lifting rope takes place the skew easily, leads to taking place the friction between with the mount, leads to the life of lifting rope shorter, and in addition, the building materials are usually exposed outside when the handling, and the easy unexpected drop in the transportation, and the security is lower, therefore we improve this, provide a construction building materials handling equipment.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a building construction building materials handling equipment can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the technical proposal that:
the utility model provides a construction building materials handling equipment, includes the mount pad, be provided with drive assembly on the mount pad, drive assembly has the blowing subassembly through first lifting rope and second lifting rope swing joint, mount pad one side fixedly connected with support frame, the pulley is installed through the installation piece to support frame one end, be provided with on the installation piece and be used for carrying out spacing subassembly to first lifting rope.
Preferably, the driving assembly comprises a motor and a speed reducer which are fixedly mounted on the mounting seat, a transmission shaft is fixedly sleeved on an output shaft of the motor and an input shaft of the speed reducer respectively, a transmission belt is movably sleeved on the transmission shaft, and a rope collecting disc for collecting the first lifting rope is fixedly connected to the output shaft of the speed reducer.
Preferably, the first lifting rope is movably connected to the pulley, one end, far away from the rope collecting disc, of the first lifting rope is fixedly connected with the second lifting rope, and the lower end of the second lifting rope is fixedly connected with the connecting rod.
Preferably, the discharging assembly comprises a protective bag and a discharging box, the protective bag and the discharging box are connected with the connecting rods through a plurality of first connecting ropes and second connecting ropes respectively, and the discharging box is located inside the protective bag.
As preferred, protective box one side swing joint has the fly leaf, the first stopper of fixedly connected with and second stopper are distinguished at the protective box both ends, the pinhole has been seted up to second stopper inside, the pinhole is inside to run through to be provided with and is used for carrying on spacing spacer pin to the fly leaf, a plurality of draw-in grooves have been seted up on the fly leaf, the one end fixedly connected with that the connecting rod was kept away from to the second connection rope and the couple of draw-in groove lock joint.
Preferably, the inside of the mounting block is rotatably connected with a second roller, mounting grooves are formed in two sides of the mounting block respectively, the limiting component comprises a telescopic rod and a spring, the telescopic rod is fixedly mounted in the mounting grooves, and the spring is sleeved outside the rod body of the telescopic rod.
Preferably, the telescopic rod and the spring are fixedly connected with fixing blocks at the ends far away from the mounting groove, an I-shaped roller is rotatably connected between the fixing blocks, and the middle of the I-shaped roller is abutted to the first lifting rope.
Compared with the prior art, the utility model discloses following beneficial effect has:
(1) Through setting up spacing subassembly, make the spring drive fixed block and I-shaped gyro wheel and push down first lifting rope under self spring action for first lifting rope is located I-shaped gyro wheel middle part all the time, thereby play spacing effect to first lifting rope, avoid first lifting rope to take place the skew and influence the rolling, in addition, through setting up I-shaped gyro wheel and second gyro wheel, can avoid taking place the friction between first lifting rope and the installation piece, play the effect of protection to first lifting rope, prolong the life of first lifting rope.
(2) During the material loading, through rotating the spacer pin and taking it out from the fly leaf is inside, then open the fly leaf, place the building materials at the blowing incasement portion, then close the fly leaf, insert pinhole and fly leaf inside with the spacer pin, fix the fly leaf, then correspond the lock joint with the draw-in groove with the couple, thereby improve the convenience of feeding, through setting up the protecting bag in the protecting box outside, can avoid the building materials accident to drop at the building materials handling in-process, improve the security of handling in-process, in addition, because the protecting bag quality is lighter relatively, can not increase too many burdens for equipment.
Drawings
Fig. 1 is a schematic view of the overall first-view perspective structure of the present invention;
fig. 2 is a schematic view of an overall second-view perspective structure of the present invention;
fig. 3 is a schematic perspective view of a partial structure of the middle discharge assembly of the present invention;
fig. 4 is an enlarged view of the structure at B in fig. 3 according to the present invention;
fig. 5 is an enlarged view of the structure at C in fig. 3 according to the present invention;
fig. 6 is an enlarged view of the structure at a in fig. 2 according to the present invention.
In the figure: 1. a mounting base; 2. a discharging assembly; 201. a protective bag; 202. a first connecting rope; 203. a material placing box; 204. a second connecting rope; 205. a movable plate; 206. a first stopper; 207. a second limiting block; 208. a pin hole; 209. a spacing pin; 210. a card slot; 211. hooking; 3. a drive assembly; 301. a motor; 302. a speed reducer; 303. a rope retracting disc; 304. a drive shaft; 305. a transmission belt; 4. a first lifting rope; 5. a support frame; 6. mounting blocks; 7. a limiting component; 701. an I-shaped roller; 702. a fixed block; 703. a spring; 704. a telescopic rod; 8. a pulley; 9. a second lifting rope; 10. a connecting rod; 11. mounting grooves; 12. a second roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
With specific reference to fig. 1, a building construction building materials handling equipment, includes mount pad 1, be provided with drive assembly 3 on the mount pad 1, drive assembly 3 has blowing subassembly 2 through first lifting rope 4 and 9 swing joint of second lifting rope, 1 one side fixedly connected with support frame 5 of mount pad, 5 one end of support frame installs pulley 8 through installation piece 6, be provided with on the installation piece 6 and be used for carrying out spacing subassembly 7 to first lifting rope 4.
With specific reference to fig. 1 and 2, the driving assembly 3 includes a motor 301 and a speed reducer 302 fixedly mounted on the mounting base 1, a transmission shaft 304 is fixedly sleeved on an output shaft of the motor 301 and an input shaft of the speed reducer 302 respectively, a transmission belt 305 is sleeved on the transmission shaft 304, a rope take-up reel 303 for rolling a first lifting rope 4 is fixedly connected to an output shaft of the speed reducer 302, the first lifting rope 4 is movably connected to a pulley 8, one end of the first lifting rope 4 far away from the rope take-up reel 303 is fixedly connected to a second lifting rope 9, and a connecting rod 10 is fixedly connected to the lower end of the second lifting rope 9.
When specifically setting up, drive reduction gear 302 through starter motor 301 and rotate, the output through reduction gear 302 drives receipts rope dish 303 and rotates to with the slow rolling of first lifting rope 4, first lifting rope 4 drives pulley 8 and rotates, and drives second lifting rope 9 and connecting rod 10 and upwards remove, thereby makes blowing subassembly 2 drive the building materials and rises gradually, can adjust the speed that the building materials rose through setting up reduction gear 302, thereby improves the stationarity of handling.
With specific reference to fig. 1-5, the emptying assembly 2 includes a protective bag 201 and an emptying box 203, the protective bag 201 and the emptying box 203 are connected with the connecting rod 10 through a plurality of first connecting ropes 202 and second connecting ropes 204 respectively, the emptying box 203 is located inside the protective bag 201, a movable plate 205 is movably connected to one side of the protective bag, the two ends of the protective bag are fixedly connected with a first limit block 206 and a second limit block 207 respectively, a pin hole 208 is provided inside the second limit block 207, a limit pin 209 for limiting the movable plate 205 is provided inside the pin hole 208 in a penetrating manner, a plurality of clamping grooves 210 are provided on the movable plate 205, and the second connecting rope 204 is far away from a hook 211 fastened with the clamping groove 210 by one end fixedly connected with the connecting rod 10.
In this embodiment, the two sides of the material placing box 203 are respectively connected with a plurality of second connecting ropes 204, the hook 211 is fixedly connected to one end of the second connecting rope 204 corresponding to one side of the movable plate 205, during material loading, the limiting pin 209 is rotated and is drawn out from the interior of the movable plate 205, then the movable plate 205 is opened, the building materials are placed in the material placing box 203, then the movable plate 205 is closed, the limiting pin 209 is inserted into the pin hole 208 and the interior of the movable plate 205, the movable plate 205 is fixed, then the hook 211 and the clamping groove 210 are correspondingly buckled, so that the material loading convenience is improved, the protective bag 201 is arranged outside the protective bag, the building materials can be prevented from being accidentally dropped in the building material hoisting process, and the safety in the hoisting process is improved.
Specifically referring to fig. 1, 2 and 6, the inside of the mounting block 6 is rotatably connected with a second roller 12, mounting grooves 11 are respectively formed in two sides of the mounting block 6, the limiting component 7 comprises a telescopic rod 704 and a spring 703 which are fixedly mounted in the mounting grooves 11, the spring 703 is sleeved outside the rod body of the telescopic rod 704, one end of the telescopic rod 704 and one end of the spring 703, which are far away from the mounting grooves 11, are fixedly connected with fixing blocks 702, two of the fixing blocks 702 are rotatably connected with an i-shaped roller 701, and the middle of the i-shaped roller 701 is abutted to the first lifting rope 4.
It can be understood that, in the application, in the process of winding or releasing the first lifting rope 4, the second roller 12 and the i-shaped roller 701 rotate correspondingly, and meanwhile, the spring 703 and the telescopic rod 704 extend or shorten correspondingly, the spring 703 drives the fixing block 702 and the i-shaped roller 701 to press the first lifting rope 4 downwards under the action of the own elastic force, so that the first lifting rope 4 is always located in the middle of the i-shaped roller 701, thereby limiting the first lifting rope 4 and avoiding the first lifting rope 4 from being deviated to influence the winding, and in addition, by arranging the i-shaped roller 701 and the second roller 12, the friction between the first lifting rope 4 and the mounting block 6 can be avoided, the first lifting rope 4 is protected, and the service life of the first lifting rope 4 is prolonged.
The working principle of the building construction material lifting equipment is as follows:
when the lifting rope device is used, firstly, the limiting pin 209 is rotated and pulled out of the movable plate 205, then the movable plate 205 is opened, the building materials are placed in the discharging box 203, then the movable plate 205 is closed, the limiting pin 209 is inserted into the pin hole 208 and the movable plate 205 to fix the movable plate 205, then the hook 211 is correspondingly buckled with the clamping groove 210, then the motor 301 is started, the motor 301 drives the reducer 302 to rotate, the rope collecting disc 303 is driven to rotate through the output end of the reducer 302, so that the first lifting rope 4 is slowly wound, the discharging assembly 2 drives the building materials to gradually ascend, the protective bag 201 is arranged outside the discharging box 203, the building materials can be prevented from accidentally falling off in the process of lifting the building materials, the protective effect is achieved, the safety in the lifting process is improved, in the process of gradually winding the first lifting rope 4, the I-shaped roller 701 and the second roller 12 rotate, friction between the first lifting rope 4 and the mounting block 6 can be avoided, the protective effect on the first lifting rope 4 is achieved, the service life of the first lifting rope 4 is prolonged, the elastic force of the spring 703 can be used for ensuring that the first lifting rope 4 smoothly rolls 702 and the first lifting rope 4 can be driven to move, and the first lifting rope 701, and the first lifting rope 4 is prevented from being capable of being lifted, and the first lifting rope works, and the first lifting rope is prevented from being affected by the first lifting rope 701, and the first lifting rope 4, and the first lifting rope 701.
Obviously, the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention, and it is obvious for those skilled in the art to make other variations or changes based on the above description, and all embodiments cannot be exhausted here, and all obvious variations or changes are still in the protection scope of the present invention.
Claims (7)
1. The utility model provides a construction building materials handling equipment, includes mount pad (1), its characterized in that: be provided with drive assembly (3) on mount pad (1), drive assembly (3) have blowing subassembly (2) through first lifting rope (4) and second lifting rope (9) swing joint, mount pad (1) one side fixedly connected with support frame (5), pulley (8) are installed through installation piece (6) to support frame (5) one end, be provided with on installation piece (6) and be used for carrying out spacing subassembly (7) to first lifting rope (4).
2. The building construction lifting equipment as claimed in claim 1, wherein the lifting equipment comprises: drive assembly (3) including motor (301) and reduction gear (302) of fixed mounting on mount pad (1), the fixed cover is equipped with transmission shaft (304) respectively on the output shaft of motor (301) and the input shaft of reduction gear (302), movable sleeve is equipped with drive belt (305) on transmission shaft (304), fixedly connected with is used for carrying out receipts rope dish (303) of rolling to first lifting rope (4) on the output shaft of reduction gear (302).
3. The building construction lifting equipment as claimed in claim 2, wherein: first lifting rope (4) swing joint is on pulley (8), the one end and second lifting rope (9) fixed connection of receiving rope dish (303) are kept away from in first lifting rope (4), second lifting rope (9) lower extreme fixedly connected with connecting rod (10).
4. The building construction lifting equipment as claimed in claim 1, wherein the lifting equipment comprises: the emptying assembly (2) comprises a protective bag (201) and an emptying box (203), the protective bag (201) and the emptying box (203) are connected with a connecting rod (10) through a plurality of first connecting ropes (202) and second connecting ropes (204), and the emptying box (203) is located inside the protective bag (201).
5. The building construction lifting equipment as claimed in claim 4, wherein the lifting equipment comprises: blowing case one side swing joint has fly leaf (205), blowing case both ends are the first stopper of fixedly connected with (206) and second stopper (207) respectively, pinhole (208) have been seted up to second stopper (207) inside, pinhole (208) inside runs through to be provided with and is used for carrying out spacing spacer pin (209) to fly leaf (205), a plurality of draw-in grooves (210) have been seted up on fly leaf (205), the couple (211) of one end fixedly connected with and draw-in groove (210) lock joint of connecting rod (10) are kept away from in second connecting rope (204).
6. The building construction building material lifting equipment as claimed in claim 1, wherein: the mounting block (6) is internally and rotatably connected with a second roller (12), mounting grooves (11) are respectively formed in two sides of the mounting block (6), the limiting component (7) comprises a telescopic rod (704) and a spring (703) which are fixedly mounted in the mounting grooves (11), and the spring (703) is sleeved outside the rod body of the telescopic rod (704).
7. The building construction building material lifting equipment as claimed in claim 6, wherein: the telescopic rod (704) and the spring (703) are fixedly connected with fixing blocks (702) far away from one end of the mounting groove (11), an I-shaped roller (701) is rotatably connected between the two fixing blocks (702), and the middle part of the I-shaped roller (701) is abutted to the first lifting rope (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222176049.5U CN217996599U (en) | 2022-08-16 | 2022-08-16 | Building construction building materials handling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222176049.5U CN217996599U (en) | 2022-08-16 | 2022-08-16 | Building construction building materials handling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217996599U true CN217996599U (en) | 2022-12-09 |
Family
ID=84321217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222176049.5U Active CN217996599U (en) | 2022-08-16 | 2022-08-16 | Building construction building materials handling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217996599U (en) |
-
2022
- 2022-08-16 CN CN202222176049.5U patent/CN217996599U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218088476U (en) | A safe lift for housing construction | |
CN217996599U (en) | Building construction building materials handling equipment | |
CN209799413U (en) | Safe type platform of unloading | |
CN116513994B (en) | Bridge crane electric hoist | |
CN209989003U (en) | Assembled construction steel member hoisting accessory | |
CN216038211U (en) | Anti-swing grab trolley | |
CN113845037A (en) | Electric hoist bridge crane | |
CN211846853U (en) | Safe type deep hole blasting hoist and mount explosive filling device | |
CN221479385U (en) | Material lifting machine for construction | |
CN220432052U (en) | Tower crane attachment, installation and disassembly lifting device | |
CN221587918U (en) | Building construction building materials handling equipment | |
CN211945844U (en) | Hoisting device for construction | |
CN220265109U (en) | Lifting mechanism for security engineering construction | |
CN218478407U (en) | Safety elevator for building construction | |
CN217437630U (en) | Anti-falling protection device of stacker cargo carrying platform | |
CN212917074U (en) | Anti-scattering device for uncoiling of reinforced coil | |
CN221874174U (en) | Tractor counterweight device | |
CN217838152U (en) | Anti-falling lifting device for bridge engineering | |
CN219298823U (en) | High platform of unloading of stability | |
CN115303965B (en) | Flat-top tower crane balance arm assembly without tower top | |
CN220787870U (en) | Lifting device for building materials | |
CN114031005B (en) | Civil engineering is with self-adaptation tower crane hoist and mount system | |
CN217176700U (en) | Safety elevator structure for underground coal mine | |
CN210029860U (en) | Hoisting limit of electric hoist | |
CN212740588U (en) | Buffering stable form material elevator for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |