CN217977740U - Water conservancy water and electricity installation engineering pipeline erects structure - Google Patents
Water conservancy water and electricity installation engineering pipeline erects structure Download PDFInfo
- Publication number
- CN217977740U CN217977740U CN202221517177.5U CN202221517177U CN217977740U CN 217977740 U CN217977740 U CN 217977740U CN 202221517177 U CN202221517177 U CN 202221517177U CN 217977740 U CN217977740 U CN 217977740U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- outer frame
- frame body
- positioning mechanism
- water conservancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 31
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 230000005611 electricity Effects 0.000 title claims abstract description 12
- 238000007789 sealing Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 abstract description 4
- 238000005267 amalgamation Methods 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000013013 elastic material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a water conservancy water and electricity installation technical field has proposed a water conservancy water and electricity installation engineering pipeline erects structure, including outer frame body and positioning mechanism, positioning mechanism slides and sets up in the inside of outer frame body, is provided with in the outer frame body to be used for the spacing stop gear to positioning mechanism, and positioning mechanism includes first connecting plate and second connecting plate, and a side that first connecting plate is close to outer frame body and the equal fixedly connected with slider in a side that the second connecting plate is close to outer frame body. Through the cooperation setting between outer frame body, positioning mechanism and the stop gear, through forming an annular structure with first connecting plate and second connecting plate amalgamation to under the effect of adjusting bolt and grip block, can fix the pipeline in annular structure's inside in advance, behind hoisting equipment with the pipeline lifting, under outer frame body and stop gear's effect, can directly carry out spacing and support to annular structure, it is consuming time shorter to operate under the lifting state of pipeline.
Description
Technical Field
The utility model relates to a water conservancy water and electricity installation technical field, it is specific, relate to a water conservancy water and electricity installation engineering pipeline erects structure.
Background
The water conservancy water and electricity installation engineering is just to the planning of north-south water transfer engineering, the building of hydraulic structures such as power station, dam, gate, the design of river course treatment engineering, can use many pipelines at water conservancy water and electricity installation engineering, utilize the pipeline to come water supply or drainage, and the pipeline just need use the mechanism of erectting to fix the pipeline in the installation, at present, traditional pipeline erection structure formula structure as an organic whole, need utilize hoisting equipment to fix the pipeline through the fixed establishment on the structure of erectting after lifting to the structure of erectting, the installation spends time longer after the lifting, very big influence the efficiency of erectting to whole pipeline. Therefore, the water conservancy hydroelectric installation engineering pipeline erection structure is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a water conservancy water and electricity installation engineering pipeline erects structure, it is longer to have solved the installation spent in the correlation technique, very big influence to the efficiency problem of erectting of whole pipeline.
The technical scheme of the utility model as follows: a water conservancy hydroelectric installation engineering pipeline erecting structure comprises an outer frame body and a positioning mechanism, wherein the positioning mechanism is arranged in the outer frame body in a sliding manner, a limiting mechanism used for limiting the positioning mechanism is arranged in the outer frame body, the positioning mechanism comprises a first connecting plate and a second connecting plate, a sliding block is fixedly connected to one side face, close to the outer frame body, of the first connecting plate and one side face, close to the outer frame body, of the second connecting plate, sliding grooves are formed in two sides of the inner wall of the outer frame body, the sliding blocks are connected to the inner portions of the sliding grooves in a sliding manner, one end of the second connecting plate is hinged to one end of the first connecting plate, the other end of the second connecting plate is detachably connected to the other end of the first connecting plate, the positioning mechanism further comprises a screw rod, and connecting blocks are fixedly connected to the first connecting plate and the second connecting plate, the two ends of the screw rod respectively penetrate through the interiors of the two connecting blocks and are in threaded connection with positioning nuts, the interiors of the first connecting plate and the second connecting plate are both in threaded connection with adjusting bolts, one ends of the adjusting bolts, far away from the outer frame body, are rotatably connected with clamping blocks, the inner bottom wall of the outer frame body is provided with limiting grooves, the bottom ends of the two connecting blocks are inserted into the limiting grooves, a sealing plate is arranged above the outer frame body, the bottom surface of the sealing plate is fixedly connected with a filling plate, the two ends of the filling plate are respectively inserted into the interiors of the two sliding grooves, the limiting mechanism comprises a limiting rod, one end of the limiting rod penetrates through the outer surface of the outer frame body and extends into the sliding grooves, the other end of the limiting rod is fixedly connected with a push-pull plate, one end, close to the positioning mechanism, of the limiting rod is positioned above the sliding block, and the limiting mechanism further comprises a moving groove, the inner part of the moving groove is connected with a moving block in a sliding mode, the bottom end of the moving block is fixedly connected with the upper surface of the limiting rod, one side face of the moving block is fixedly connected with a return spring, and one end, far away from the moving block, of the return spring is fixedly connected with the inner wall of the moving groove.
The utility model discloses a theory of operation and beneficial effect do:
the utility model discloses in through outer frame body, cooperation setting between positioning mechanism and the stop gear, through piecing together first connecting plate and second connecting plate and forming an annular structure, and under the effect of adjusting bolt and grip block, can fix the pipeline in annular structure's inside in advance, after hoisting equipment with the pipeline lifting, under outer frame body and stop gear's effect, can directly carry out spacing and support to annular structure, it is consuming time shorter to operate under the lifting state of pipeline, very big promotion the integral erection efficiency of pipeline.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Fig. 1 is a perspective view of the present invention;
FIG. 2 is a cross-sectional view of the front view of the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 2 according to the present invention;
fig. 4 is a perspective view of the sealing cover of the present invention.
In the figure: 1. an outer frame body; 2. a positioning mechanism; 21. a first connecting plate; 22. a second connecting plate; 23. connecting blocks; 24. a screw; 25. positioning a nut; 26. adjusting the bolt; 27. a clamping block; 3. a sealing plate; 4. a limiting mechanism; 41. a moving groove; 42. a moving block; 43. a return spring; 44. a limiting rod; 45. a push-pull plate; 5. a slider; 6. a chute; 7. a infill panel; 8. a limiting groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be obtained by a person skilled in the art without any inventive work, are related to the scope of the present invention.
Example 1
As shown in fig. 1 to 4, the embodiment provides a water conservancy hydroelectric installation engineering pipeline erection structure, including outer frame 1 and positioning mechanism 2, positioning mechanism 2 is slidably disposed in the inside of outer frame 1, be provided with in the outer frame 1 and be used for the spacing stop gear 4 to positioning mechanism 2, positioning mechanism 2 includes first connecting plate 21 and second connecting plate 22, the one end of second connecting plate 22 and the one end of first connecting plate 21 are articulated, the other end of second connecting plate 22 and the other end of first connecting plate 21 can be dismantled and be connected, positioning mechanism 2 still includes screw rod 24, equal fixedly connected with connecting block 23 on first connecting plate 21 and on second connecting plate 22, the both ends of screw rod 24 run through the inside of two connecting blocks 23 respectively and threaded connection has set nut 25, the inside of first connecting plate 21 and the inside of second connecting plate 22 all threaded connection have adjusting bolt 26, the one end that adjusting bolt 26 keeps away from outer frame 1 rotates and is connected with grip block 27, spacing groove 8 has been seted up to the inner bottom wall of outer frame 1, the bottom of two connecting blocks 23 all pegs graft in the inside of spacing groove 8.
In this embodiment, the first connecting plate 21 and the second connecting plate 22 can form an annular structure, the screw 24 is inserted into the two connecting blocks 23, the two positioning nuts 25 are fixed on the screw 24 to fix the joint of the first connecting plate 21 and the second connecting plate 22, the distance between the clamping block 27 and the outer frame 1 can be adjusted by rotating the adjusting bolt 26, the clamping block 27 is made of elastic material, the clamping block 27 can be tightly attached to the outer surface of the pipeline, the pipeline can be fixed in the annular structure in advance, and the purpose of pre-supporting and positioning the pipeline is achieved.
Example 2
As shown in fig. 1 to 4, the present embodiment also proposes, based on the same concept as the above-described embodiment: including outer frame 1 and positioning mechanism 2, positioning mechanism 2 sets up in the inside of outer frame 1 in the slip, be provided with in the outer frame 1 and be used for the spacing stop gear 4 to positioning mechanism 2, positioning mechanism 2 includes first connecting plate 21 and second connecting plate 22, the one end of second connecting plate 22 and the one end of first connecting plate 21 are articulated, the other end of second connecting plate 22 can be dismantled with the other end of first connecting plate 21 and be connected, the equal threaded connection in inside of first connecting plate 21 and second connecting plate 22 has adjusting bolt 26, adjusting bolt 26 is far away from the one end of outer frame 1 and is rotated and be connected with grip block 27, the equal fixedly connected with slider 5 in a side that first connecting plate 21 is close to outer frame 1 and second connecting plate 22 is close to outer frame 1, spout 6 has all been seted up to the both sides of outer frame 1 inner wall, and slider 5 sliding connection is in the inside of spout 6, the top of outer frame 1 is provided with closing plate 3, the bottom surface fixedly connected with filling plate 7 of closing plate 3, the both ends of filling plate 7 peg graft respectively in the inside of two spout 6, stop gear 4 includes limiting rod 44, the one end fixed connection that the other end of the outer frame 1 runs through the outer surface of outer frame 1 and extends to the fixed sliding connection of the movable block 41 and the fixed sliding connection of the movable block 41, the movable block 41 is connected with the return spring 41, the return spring 41 is connected with the return spring 41, the return spring 41 that the return connection of the return spring 41 is close to the side of the movable block 42 and the movable block 42, the movable block 41.
In this embodiment, the sliding block 5 on the annular structure may be inserted into the inside of the sliding groove 6, the push-pull plate 45 drives the limiting rod 44 to move, the limiting rod 44 is drawn out from the inside of the sliding groove 6, the moving block 42 is made to extrude the return spring 43, after the sliding block 5 moves to the inner bottom wall of the sliding groove 6, the push-pull plate 45 may be loosened, the limiting rod 44 is made to move to the inside of the sliding groove 6 under the elastic action of the return spring 43, and the sliding block 5 may be further limited, so as to fix the annular structure, and the opening of the outer frame 1 may be sealed by inserting the filling plate 7 on the sealing plate 3 into the inside of the sliding groove 6.
The working principle is as follows: before the pipeline is erected and installed, firstly, the pipeline is placed in an annular structure formed by a first connecting plate 21 and a second connecting plate 22, the first connecting plate 21 and the second connecting plate 22 can be fixed through a screw rod 24 and a positioning nut 25, then, a clamping block 27 is attached to the outer surface of the pipeline in an attached mode through rotating an adjusting bolt 26, the pipeline can be fixed in the annular structure in advance, and the purpose of supporting and positioning the pipeline in advance is achieved.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a water conservancy water and electricity installation engineering pipeline erection structure, its characterized in that, includes outer frame body (1) and positioning mechanism (2), positioning mechanism (2) slide to set up in the inside of outer frame body (1), be provided with in outer frame body (1) and be used for spacing stop gear (4) to positioning mechanism (2), positioning mechanism (2) are including first connecting plate (21) and second connecting plate (22), the one end of second connecting plate (22) with the one end of first connecting plate (21) is articulated, the other end of second connecting plate (22) with the connection can be dismantled to the other end of first connecting plate (21), the inside of first connecting plate (21) with the equal threaded connection in inside of second connecting plate (22) has adjusting bolt (26), the one end that outer frame body (1) was kept away from in adjusting bolt (26) is rotated and is connected with grip block (27).
2. The water conservancy electricity installation engineering pipeline erection structure of claim 1, characterized in that, a side that first connecting plate (21) is close to outer frame (1) and a side that second connecting plate (22) is close to outer frame (1) all fixedly connected with slider (5), spout (6) have all been seted up to the both sides of outer frame (1) inner wall, and slider (5) sliding connection is in the inside of spout (6).
3. A water conservancy electricity installation engineering pipeline erection structure according to claim 1, characterized in that, positioning mechanism (2) still includes screw rod (24), all fixedly connected with connecting block (23) on first connecting plate (21) and on second connecting plate (22), the both ends of screw rod (24) run through the inside of two connecting blocks (23) respectively and threaded connection has set nut (25).
4. A water conservancy and hydropower installation engineering pipeline erection structure according to claim 3, wherein the inner bottom wall of the outer frame body (1) is provided with a limiting groove (8), and the bottom ends of the two connecting blocks (23) are inserted in the limiting groove (8).
5. The water conservancy hydroelectric installation engineering pipeline erection structure of claim 2, characterized in that a sealing plate (3) is arranged above the outer frame body (1), a filling plate (7) is fixedly connected to the bottom surface of the sealing plate (3), and two ends of the filling plate (7) are respectively inserted into the two sliding grooves (6).
6. A water conservancy hydroelectric installation engineering pipeline erection structure according to claim 2, characterized in that stop gear (4) includes gag lever post (44), the one end of gag lever post (44) runs through the surface of outer frame (1) and extends to the inside of spout (6), the other end fixedly connected with push-and-pull plate (45) of gag lever post (44), the one end that stop gear (44) is close to positioning mechanism (2) is located the top of slider (5).
7. The water conservancy and hydropower installation engineering pipeline erection structure according to claim 6, wherein the limiting mechanism (4) further comprises a moving groove (41), a moving block (42) is slidably connected inside the moving groove (41), the bottom end of the moving block (42) is fixedly connected with the upper surface of a limiting rod (44), a return spring (43) is fixedly connected to one side surface of the moving block (42), and one end, away from the moving block (42), of the return spring (43) is fixedly connected with the inner wall of the moving groove (41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221517177.5U CN217977740U (en) | 2022-06-16 | 2022-06-16 | Water conservancy water and electricity installation engineering pipeline erects structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221517177.5U CN217977740U (en) | 2022-06-16 | 2022-06-16 | Water conservancy water and electricity installation engineering pipeline erects structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217977740U true CN217977740U (en) | 2022-12-06 |
Family
ID=84270936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221517177.5U Active CN217977740U (en) | 2022-06-16 | 2022-06-16 | Water conservancy water and electricity installation engineering pipeline erects structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217977740U (en) |
-
2022
- 2022-06-16 CN CN202221517177.5U patent/CN217977740U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113882322B (en) | Intelligent water stopping method for repairing underwater concrete damaged dry chamber | |
CN113605331A (en) | Modular quick-assembly water retaining cofferdam for flood discharge runner maintenance and application method thereof | |
CN203594000U (en) | Simple water-retaining sluice gate structure | |
CN217977740U (en) | Water conservancy water and electricity installation engineering pipeline erects structure | |
CN203821329U (en) | Flood gate with quick and precise guidance and sealing | |
CN212801447U (en) | Hinge dam is with stagnant water structure of being convenient for maintenance | |
CN215977119U (en) | Damaged dry chamber cabin of concrete under water restores intelligent stagnant water and equips | |
CN111287153A (en) | Automatic water discharge gate for dam | |
CN211080249U (en) | A be convenient for adjust formula supporting construction for construction | |
CN209925741U (en) | Power assisting device on valve handle | |
CN113605308A (en) | Intercepting device for hydraulic engineering and using method thereof | |
CN209178952U (en) | A kind of block-resistant type technical water supply water intaking mouth structure suitable for slding form operation | |
CN210086340U (en) | Dredging device for water conservancy | |
CN216342548U (en) | Siphon type power generation device | |
CN217948967U (en) | Gate slot protector | |
CN204738276U (en) | Irrigation canals and ditches drainage gate | |
CN107938615A (en) | A kind of hydraulic engineering gate of good airproof performance | |
CN216948378U (en) | Detachable water conservancy construction cofferdam of reinforcement type | |
CN217412565U (en) | Drilling equipment for steel parts for civil engineering building | |
CN220117352U (en) | Anti-seepage structure of sluice pump station | |
CN212896224U (en) | Power station tail water overhauls floodgate | |
CN221567396U (en) | Sewage well area water device of plugging into | |
CN212714836U (en) | Novel hydraulic engineering river course gate | |
CN216075192U (en) | Long service life's cofferdam for hydraulic engineering | |
CN113737855B (en) | Utility tunnel for municipal administration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |