Prior art keywords
rod
main
bolt
main rod
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221002453.4U
Other languages
Chinese (zh)
Inventor
张彤阳
王晓岷
张青峰
周亚东
董其虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University Of Technology Design Institute Group Co ltd
Original Assignee
Hefei University Of Technology Design Institute Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University Of Technology Design Institute Group Co ltd filed Critical Hefei University Of Technology Design Institute Group Co ltd
Priority to CN202221002453.4U priority Critical patent/CN217975489U/en
Application granted granted Critical
Publication of CN217975489U publication Critical patent/CN217975489U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a BIM-based temporary fixing frame for building wall installation, which comprises a main rod, an extension rod, a bottom rod, a stay bar and a plurality of auxiliary rods, wherein the main rod is in a U-shaped rod-shaped structure, the bar-shaped through holes arranged on the front wall and the rear wall are respectively a sliding hole, the bottom end of the main rod is hinged with the left end of the bottom rod, and the top end of the main rod is connected with the extension rod in a sliding manner through a bolt; the bar-shaped through hole arranged on the extension rod is a second sliding hole, the extension rod is arranged in the gap of the main rod, the bottom end of the extension rod is connected with the main rod in a sliding mode through a second bolt, and the top end of the extension rod is provided with a support plate; the right end of the supporting rod is hinged with the right end of the bottom rod, and the left end part of the supporting rod is inserted into the gap of the main rod and is in sliding connection with the main rod through a third bolt; the left end part of each auxiliary rod is inserted into the gap of the main rod and is in sliding connection with the main rod through a fourth bolt, and the right end of each auxiliary rod is provided with a support plate. The utility model discloses convenient the regulation can support at the different positions of wall body.

Description

Building wall installs and uses interim mount based on BIM
Technical Field
The utility model relates to a mount technical field, concretely relates to building wall installs and uses interim mount based on BIM.
Background
The Building Information model (Building Information Modeling) is based on various relevant Information data of a construction engineering project, is established, and simulates real Information of a Building through digital Information. The method has eight characteristics of information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and graphing. When assembling a wall, a temporary fixing frame is generally adopted to support the wall.
The fixing frame in the prior art is generally an inclined strut, one end of the strut is fixed on a wall body, and the other end of the strut is fixed on the ground, so that a stable triangular supporting structure is formed. Accordingly, those skilled in the art have provided a BIM-based temporary fixing frame for building wall installation to solve the above-mentioned problems of the background art.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a BIM-based temporary fixing frame for mounting building walls, which comprises a main rod, an extension rod, a bottom rod, a stay bar and a plurality of auxiliary rods, wherein the main rod is in a U-shaped rod-shaped structure, the bar-shaped through holes arranged on the front wall and the rear wall are slide holes, the bottom end of the main rod is hinged with the left end of the bottom rod, and the top end of the main rod is connected with the extension rod in a sliding manner through a bolt; the strip-shaped through hole arranged on the extension rod is a second sliding hole, the extension rod is arranged in the gap of the main rod, the bottom end of the extension rod is connected with the main rod in a sliding mode through a second bolt, and the top end of the extension rod is provided with a support plate; the right end of the support rod is hinged with the right end of the bottom rod, and the left end part of the support rod is inserted into the gap of the main rod and is connected with the main rod in a sliding manner through a third bolt; the left end part of each auxiliary rod is inserted into the gap of the main rod and is in sliding connection with the main rod through a fourth bolt, and the right end of each auxiliary rod is provided with a support plate.
Preferably: the first bolt penetrates through the top of the main rod and the second sliding hole and then is in threaded connection with a nut.
Preferably: and the second bolt penetrates through the first sliding hole and the bottom of the extension rod and then is in threaded connection with a nut.
Preferably, the following components: and the third bolt penetrates through the first sliding hole and the left end part of the support rod and then is in threaded connection with a nut.
Preferably, the following components: and the fourth bolt penetrates through the first sliding hole and the left end part of the auxiliary rod and then is in threaded connection with a nut.
Preferably, the following components: the support plate structurally comprises a main plate and an auxiliary plate, four inclined holes uniformly formed in the main plate are push holes, and the left side wall of the main plate is hinged to the top end of an extension rod or the top end of an auxiliary rod; the auxiliary board is characterized in that four sliding grooves are uniformly formed in the right side wall of the auxiliary board, a strip-shaped through hole formed in the left side wall of each sliding groove is a third sliding hole, an extension board is arranged in each sliding groove, a moving column is fixed in a central through hole of the inner side end of each extension board, each moving column penetrates through the third sliding hole and then is inserted into a push hole, the auxiliary board is arranged on the right side face of the main board, and the central portion of the auxiliary board is rotatably connected with the central portion of the main board.
Preferably, the following components: two sides of each sliding groove are provided with a raised limiting strip, strip-shaped grooves which are respectively arranged on two sides of each extending plate are limiting grooves, and each limiting strip is respectively connected in one limiting groove in a sliding manner.
Preferably: four arc holes evenly arranged on the main board are positioning holes, four round through holes evenly arranged on the auxiliary board are second fixing holes, and each second fixing hole is aligned with one positioning hole.
Preferably: the through hole arranged at the outer side end part of each extension plate is a first fixing hole.
The utility model discloses a technological effect and advantage:
1. the utility model supports the main rod at different angles by supporting the stay bar between the bottom rod and the main rod; the main rod can be extended through the extension rod to support a higher wall body; the auxiliary rods can be supported at the middle part and the lower part of the wall body, so that the vertical combined wall body is prevented from collapsing after the bottom of the vertical combined wall body is free from support.
2. The utility model discloses set up the extension board, through rotating the subplate for push away the hole and rotate the back for the slide opening, promote to the outside and remove the post, make to remove the post and withdraw from the spout with the extension board, thereby increase the support radius of extension board.
Drawings
Fig. 1 is a front view of a temporary fixing frame for installing a building wall based on BIM provided in an embodiment of the present application;
FIG. 2 is a right side view of a main board of a BIM-based temporary fixing frame for installing a building wall according to an embodiment of the present application;
fig. 3 is a right side view of a sub-panel of a temporary fixing frame for installation of a building wall based on BIM provided by an embodiment of the present application.
In the figure: the main rod 10, a first sliding hole 11, an extension rod 12, a second sliding hole 13, a first bolt 14, a second bolt 15, a bottom rod 16, a support rod 17, a third bolt 18, an auxiliary rod 19, a fourth bolt 20, a main plate 21, a push hole 22, a positioning hole 23, an auxiliary plate 24, a sliding groove 25, a limiting strip 26, an extension plate 27, a moving column 28, a first fixing hole 29, a second fixing hole 30 and a third sliding hole 31.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments. The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.
Example 1
Referring to fig. 1 to 3, in the present embodiment, a temporary fixing frame for installing a building wall based on BIM is provided, including a main rod 10, an extension rod 12, a bottom rod 16, a support rod 17, and a plurality of auxiliary rods 19, where the main rod 10 is in a U-shaped rod-shaped structure, and the bar-shaped through holes respectively formed in the front wall and the rear wall are sliding holes 11, the bottom end of the main rod 10 is hinged to the left end of the bottom rod 16, the top end of the main rod 10 is slidably connected to the extension rod 12 through a first bolt 14, and the main rod 10 is used for supporting an upper wall; the strip-shaped through hole formed in the extension rod 12 is a second sliding hole 13, the extension rod 12 is arranged in a gap of the main rod 10, the bottom end of the extension rod is slidably connected with the main rod 10 through a second bolt 15, the top end of the extension rod 12 is provided with a support plate, and the extension rod 12 increases the length of the main rod 10; the right end of the stay bar 17 is hinged with the right end of the bottom bar 16, the left end of the stay bar 17 is inserted into the gap of the main bar 10 and is slidably connected with the main bar 10 through a third bolt 18, and the stay bar 17 is used for supporting the inclined main bar 10; the left end of each auxiliary rod 19 is inserted into the gap of the main rod 10, is connected with the main rod 10 in a sliding mode through a four-number bolt 20, and is provided with a support plate at the right end, and the auxiliary rods 19 are used for supporting a lower wall.
The first bolt 14 penetrates through the top of the main rod 10 and the second sliding hole 13 and then is in threaded connection with a nut, so that the top of the main rod 10 is in sliding connection with the extension rod 12.
The second bolt 15 is screwed with a nut after penetrating through the first sliding hole 11 and the bottom of the extension rod 12, and the extension rod 12 is fixed with the support rod 10 after the nut is screwed tightly.
The third bolt 18 penetrates through the first sliding hole 11 and the left end part of the stay bar 17 and then is in threaded connection with a nut, and when the nut is screwed in, the stay bar 17 and the main bar 10 are fixed.
The fourth bolt 20 is screwed with a nut after passing through the first slide hole 11 and the left end part of the secondary rod 19, and the secondary rod 19 is fixed with the support rod 10 after the nut is screwed in.
The structure of the support plate comprises a main plate 21 and an auxiliary plate 24, four inclined holes uniformly formed in the main plate 21 are push holes 22, the push holes 22 are used for pushing a moving column 28 to move, and the left side wall of the main plate 21 is hinged to the top end of an extension rod 12 or an auxiliary rod 19; four sliding grooves 25 are uniformly formed in the right side wall of the auxiliary plate 24, a strip-shaped through hole formed in the left side wall of each sliding groove 25 is a third sliding hole 31, an extending plate 27 is arranged in each sliding groove 25, a moving column 28 is fixed in a central through hole in the inner side end of each extending plate 27, each moving column 28 penetrates through the third sliding hole 31 and then is inserted into one pushing hole 22, each extending plate 27 is used for increasing the radius of the auxiliary plate 24, the auxiliary plate 24 is arranged on the right side face of the main plate 21, and the central portion of each auxiliary plate is rotatably connected with the central portion of the main plate 21.
Two sides of each sliding groove 25 are provided with a convex limiting strip 26, two sides of each extending plate 27 are respectively provided with a strip-shaped groove which is a limiting groove, and each limiting strip 26 is respectively connected in one limiting groove in a sliding way, so that the extending plates 27 are connected in the sliding grooves 25 in a sliding way.
Four arc-shaped holes uniformly formed in the main plate 21 are positioning holes 23, four circular through holes uniformly formed in the auxiliary plate 24 are second fixing holes 30, each second fixing hole 30 is aligned with one positioning hole 23, and when the auxiliary plate 24 rotates, 30 second fixing holes move along one positioning hole 23.
The through hole provided at the outer end of each extension plate 27 is a first fixing hole 29, and a screw is screwed into the wall body through the first fixing hole 29, so that the extension plate 27 is fixed to the wall body.
The utility model discloses a theory of operation: when the wall-mounted extension rod is used, the height of the extension rod 12 is adjusted according to the height of a wall, after the extension rod 12 slides to a set position along the main rod 10, the second bolt 15 is screwed tightly, and then the extension rod 12 and the main rod 10 are fixed; then, the bottom rod 16 is supported on the ground, the angle of the main rod 10 is adjusted, meanwhile, the top end of the support rod 17 slides along the main rod 10, and after the angle is adjusted, a nut on the third bolt 18 is screwed tightly, so that the support rod 17 fixedly supports the main rod 10; during installation, a support plate at the top end of the extension rod 12 is fixed on an upper wall body, a plurality of support plates on the auxiliary rods 19 are fixed on the middle and lower wall bodies, and then nuts on each four-number bolt 20 are screwed tightly, so that the auxiliary rods 19 are fixed with the main rod 10; when the support plate is fixed, the support radius can be adjusted: the auxiliary plate 24 is rotated anticlockwise, so that after the push hole 22 rotates clockwise relative to the auxiliary plate 24, the moving column 28 is pushed to slide outwards along the third sliding hole 31, the moving column 28 drives the extension plate 27 to slide outwards, so that the extension plate 27 extends out of the auxiliary plate 24, and the support radius of the auxiliary plate 24 can be increased; when the fixing is performed, the auxiliary plate 24 and the extension plate 27 are attached to the wall surface, and then screws are screwed into the wall body after passing through the positioning holes 23 and the second fixing holes 30, so that the main plate 21 and the auxiliary plate 24 are fixed on the wall body, and screws are screwed into the wall body after passing through the first fixing holes 29, so that the extension plate 27 is fixed on the wall body. The utility model discloses convenient the regulation can support at the different positions of wall body.
It is obvious that the described embodiments are only some of the embodiments of the present invention, and not all of them. Based on the embodiments in the present disclosure, all other embodiments obtained by a person of ordinary skill in the art and related fields without creative efforts shall fall within the protection scope of the present disclosure. The structures, devices, and methods of operation of the present invention, not specifically described and illustrated, are generally practiced by those of ordinary skill in the art without specific recitation or limitation.

Claims (5)

1. The BIM-based temporary fixing frame for mounting the building wall is characterized by comprising a main rod (10), an extension rod (12), a bottom rod (16), a support rod (17) and a plurality of auxiliary rods (19), wherein the main rod (10) is of a U-shaped rod-shaped structure, a first sliding hole (11) is formed in each of strip-shaped through holes formed in the front wall and the rear wall, the bottom end of the main rod (10) is hinged with the left end of the bottom rod (16), and the top end of the main rod (10) is slidably connected with the extension rod (12) through a first bolt (14); the strip-shaped through hole formed in the extension rod (12) is a second sliding hole (13), the extension rod (12) is arranged in a gap of the main rod (10), the bottom end of the extension rod is in sliding connection with the main rod (10) through a second bolt (15), and a support plate is arranged at the top end of the extension rod (12); the right end of the support rod (17) is hinged with the right end of the bottom rod (16), and the left end of the support rod is inserted into the gap of the main rod (10) and is connected with the main rod (10) in a sliding manner through a third bolt (18); the left end part of each auxiliary rod (19) is inserted into the gap of the main rod (10), is in sliding connection with the main rod (10) through a fourth bolt (20), and the right end of each auxiliary rod is provided with a support plate.
2. The BIM-based temporary fixing frame for building wall installation according to claim 1, wherein the first bolt (14) is threaded with a nut after passing through the top of the main rod (10) and the second sliding hole (13).
3. The BIM-based temporary fixing frame for building wall installation according to claim 1, wherein the second bolt (15) passes through the first slide hole (11) and the bottom of the extension rod (12) and then is screwed with a nut.
4. The BIM-based temporary fixing frame for building wall installation according to claim 1, wherein the third bolt (18) passes through the first sliding hole (11) and the left end part of the stay bar (17) and then is screwed with a nut.
5. The BIM-based temporary fixing frame for building wall installation according to claim 1, wherein the fourth bolt (20) is threaded with a nut after passing through the first slide hole (11) and the left end part of the auxiliary rod (19).
CN202221002453.4U 2022-04-28 2022-04-28 Building wall installs and uses interim mount based on BIM Active CN217975489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221002453.4U CN217975489U (en) 2022-04-28 2022-04-28 Building wall installs and uses interim mount based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221002453.4U CN217975489U (en) 2022-04-28 2022-04-28 Building wall installs and uses interim mount based on BIM

Publications (1)

Publication Number Publication Date
CN217975489U true CN217975489U (en) 2022-12-06

Family

ID=84266155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221002453.4U Active CN217975489U (en) 2022-04-28 2022-04-28 Building wall installs and uses interim mount based on BIM

Country Status (1)

Country Link
CN (1) CN217975489U (en)

Similar Documents

Publication Publication Date Title
CN217975489U (en) Building wall installs and uses interim mount based on BIM
CN108797283B (en) Connection adjusting structure of side form plate for road construction
CN209844454U (en) Lateral telescopic cable bridge for tunnel
CN210142798U (en) Lightning arrester for big data center
CN215674426U (en) Seamless splicing and assembling frame for LED electronic screen
CN211524320U (en) Electrical equipment installation is with enclosing fender safely
CN212156347U (en) Civil engineering survey and drawing laying-out device based on BIM
CN214613474U (en) Novel highway engineering template supports device
CN220326018U (en) Semiconductor device shell fixing device
CN214460566U (en) Device for fixing bottom pile in building foundation construction
CN219604182U (en) Pushing support frame convenient to assemble
CN214405493U (en) Wall-mounted display screen bracket
CN213138373U (en) Outdoor assembled easel of painting from life
CN220790863U (en) Assembled isolation greening fence
CN110608058A (en) Portable supporting device for coal mining
CN218244866U (en) Assembled flower nursery
CN215533212U (en) Vertical greening plant landscape wall convenient to detach and move
CN212991765U (en) Power transformation secondary equipment replacing device
CN109057521B (en) Guardrail for building engineering convenient to dismouting
CN219740254U (en) Photovoltaic support convenient to install
CN216355767U (en) Distribution engineering cable bridge device
CN218580837U (en) Assembled steel framework house
CN213212963U (en) Electromechanical tube leads to BIM system wire casing fixing device
CN216412511U (en) Model design building assembly for architecture
CN110206317B (en) Tool for enlarging steel bar spacing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant