CN217961912U - Gas circulation treatment glass steel washing tower - Google Patents

Gas circulation treatment glass steel washing tower Download PDF

Info

Publication number
CN217961912U
CN217961912U CN202222100000.1U CN202222100000U CN217961912U CN 217961912 U CN217961912 U CN 217961912U CN 202222100000 U CN202222100000 U CN 202222100000U CN 217961912 U CN217961912 U CN 217961912U
Authority
CN
China
Prior art keywords
intake pipe
pipe
glass steel
tower body
gas circulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222100000.1U
Other languages
Chinese (zh)
Inventor
艾保勇
陈文武
王庆成
艾玉华
吴世钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Gunai Environmental Protection Equipment Technology Co ltd
Original Assignee
Hebei Gunai Environmental Protection Equipment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Gunai Environmental Protection Equipment Technology Co ltd filed Critical Hebei Gunai Environmental Protection Equipment Technology Co ltd
Priority to CN202222100000.1U priority Critical patent/CN217961912U/en
Application granted granted Critical
Publication of CN217961912U publication Critical patent/CN217961912U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model belongs to the technical field of the scrubbing tower, a gas circulation handles glass steel scrubbing tower is disclosed, including the glass steel tower body, coupling hose is all installed to the bottom of first intake pipe, second intake pipe and third intake pipe, jet-propelled subassembly is all installed to coupling hose's one end, the utility model discloses set up the water tank, spout ball and coupling hose, after the waste gas that contains the granule gets into from the air inlet, can enter into the fourth intake pipe, enter into third intake pipe, second intake pipe and first intake pipe respectively by the fourth intake pipe, enter into jet-propelled ball in the middle of at last along coupling hose, in the jet orifice blowout waste gas of seting up above through spouting the ball to can let waste gas and the water of water tank the inside fully contact, thereby can filter most particulate matters, and the first filter layer of installation also is for filtering the particulate matters once more between the fixed block, the effectual efficiency that improves shower head processing waste gas.

Description

Gas circulation treatment glass steel washing tower
Technical Field
The utility model belongs to the technical field of the scrubbing tower, concretely relates to gas circulation handles glass steel scrubbing tower.
Background
Along with the rapid development of industry, pollution is more and more serious, and the scrubbing tower is a novel gas purification treatment equipment, and it is produced on the basis of original clarifier improvement, now widely used in the aspects such as industrial waste gas purification and dust removal, the purifying effect is better.
Present glass steel scrubbing tower, under the general condition, waste gas all gets into by the bottom, then discharge by the top, after waste gas enters into inside by the bottom of scrubbing tower, can remove dust by inside spray set, and when the particulate matter that enters into the inside waste gas of scrubbing tower was too much, can influence the jet-propelled of spray set injector head, cause the problem of orifice jam, thereby can influence the effect of removing dust, and the water that spray set inside the scrubbing tower jetted out contacts the back with waste gas, directly just outside the discharge tower, unusual waste water resource, not timely cyclic utilization.
Disclosure of Invention
An object of the utility model is to provide a gas circulation handles glass steel scrubbing tower to solve current device when exhaust gas particulate matter is too much, can influence the problem of shower head and the water that the shower head sprays out do not have cyclic utilization's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a gas circulation treatment glass steel washing tower, includes the glass steel tower body, glass steel tower body internally mounted has the water tank, the air inlet is installed to one side of glass steel tower body, the one end of air inlet just is located the inside fourth intake pipe that gets into waste gas of installing of glass steel tower body, first intake pipe, second intake pipe and the third intake pipe of different diameters size are installed respectively to the bottom of fourth intake pipe, coupling hose is all installed to first intake pipe, second intake pipe and third intake pipe's bottom, jet-propelled subassembly is all installed to coupling hose's one end.
Preferably, the outlet pipe is installed to one side of glass steel tower body, the one end of outlet pipe extends to inside the water tank, install rotatable valve on the outlet pipe, but the rose box of filtering waste water is installed to the other end of outlet pipe, the third connecting pipe is installed at the top of rose box, install the booster pump on the third connecting pipe.
Preferably, one end of the third connecting pipe is arranged in the inner cavity of the glass fiber reinforced plastic tower body, and is provided with a first connecting pipe, spray pipes are arranged at two ends of the first connecting pipe, and a plurality of spray heads are arranged on the spray pipes.
Preferably, the shower below just is located all to install the fixed block of two symmetries on the glass steel tower body inner wall, two install first filter layer between the fixed block.
Preferably, the air injection assembly comprises an air injection balloon, and a plurality of air injection holes for air outlet are formed in the air injection balloon.
Preferably, an air outlet pipe is installed on one side of the glass fiber reinforced plastic tower body, a filter plate is installed inside the air outlet pipe, and a second filter layer is arranged on the filter plate.
Compared with the prior art, the utility model, following beneficial effect has:
(1) The utility model discloses the water tank has been set up, spout ball and coupling hose, after the waste gas that contains the granule gets into from the air inlet, can enter into the fourth intake pipe, entering into the third intake pipe respectively by the fourth intake pipe, second intake pipe and first intake pipe, enter into in the middle of the jet-propelled ball along coupling hose at last, the fumarole blowout waste gas of seting up above the ball through spouting, thereby can let the water of waste gas and water tank the inside fully contact, thereby can filter most particulate matter, and the first filter layer of installation also is for filtering the particulate matter once more between the fixed block, the effectual efficiency that the shower head handled waste gas that has improved.
(2) The utility model discloses set up valve, rose box and booster pump, opened the valve of installing on the outlet pipe, let sewage enter into the rose box in the middle of filter, filter and accomplish the back, carry out the pressure boost by the booster pump of installing on the third connecting pipe again, let the water of accomplishing of filtering enter into first connecting pipe the inside, in the middle of the shower is entered into from first connecting pipe at last, by the shower head blowout again, can let waste water cyclic utilization like this to save the water resource.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the air-jetting balloon of the present invention;
FIG. 3 is a schematic structural view of the filter plate of the present invention;
in the figure: 1. a glass fiber reinforced plastic tower body; 2. a first connecting pipe; 3. an air outlet pipe; 4. a filter plate; 5. a shower pipe; 6. a shower head; 7. a first filter layer; 8. a third connecting pipe; 9. a booster pump; 10. a first intake pipe; 11. a filter box; 12. a valve; 13. a water outlet pipe; 14. a water tank; 15. spraying a balloon; 16. a fourth intake pipe; 17. a connecting hose; 18. a third intake pipe; 19. an air inlet; 20. a second intake pipe; 21. a fixed block; 22. a gas injection hole; 23. a second filter layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a gas circulation treatment glass steel scrubbing tower, including glass steel tower body 1, 1 internally mounted of glass steel tower body has water tank 14, air inlet 19 is installed to one side of glass steel tower body 1, the one end of air inlet 19 just is located 1 internally mounted of glass steel tower body and has the fourth intake pipe 16 that gets into waste gas, the first intake pipe 10 of different diameters size is installed respectively to the bottom of fourth intake pipe 16, second intake pipe 20 and third intake pipe 18, first intake pipe 10, connecting hose 17 is all installed to the bottom of second intake pipe 20 and third intake pipe 18, jet-propelled subassembly is all installed to connecting hose 17's one end, after waste gas enters into fourth intake pipe 16 from air inlet 19, can enter into first intake pipe 10 respectively, second intake pipe 20 and third intake pipe 18, in the middle of entering jet-propelled subassembly along connecting hose 17, at last with the water of 14 the inside fully contacts.
Further, outlet pipe 13 is installed to one side of glass steel tower body 1, inside outlet pipe 13's one end extended to water tank 14, install rotatable valve 12 on the outlet pipe 13, but the rose box 11 of filtration waste water is installed to outlet pipe 13's the other end, third connecting pipe 8 is installed at the top of rose box 11, install booster pump 9 on the third connecting pipe 8, open valve 12 back, waste water enters into in the middle of the rose box 11, filter the completion back, carry out the pressure boost by booster pump 9 again, make things convenient for cyclic utilization.
Furthermore, the one end of third connecting pipe 8 just is located 1 inner chamber departments of glass steel tower body and installs first connecting pipe 2, and shower 5 is all installed at the both ends of first connecting pipe 2, all installs a plurality of shower 6 on two shower 5, and the water after the pressure boost completion can enter into in the middle of first connecting pipe 2, in the middle of entering into shower 6 along shower 5, sprays out at last, removes dust.
Specifically, two symmetrical fixing blocks 21 are arranged below the spray pipe 5 and on the inner wall of the glass fiber reinforced plastic tower body 1, a first filter layer 7 is arranged between the two fixing blocks 21, and the first filter layer 7 arranged between the two fixing blocks 21 is used for secondary filtration.
It is worth to say that the air injection assembly comprises an air injection ball 15, a plurality of air outlet air injection holes 22 are formed in the air injection ball 15, and the exhaust air can be fully contacted with the water in the water tank 14 through the air injection holes 22 formed in the air injection ball 15, so that the content of particles is reduced.
Further, outlet duct 3 is installed to one side of glass steel tower body 1, and 3 internally mounted of outlet duct have a filter 4, have seted up second filter layer 23 on the filter 4.
The utility model discloses a theory of operation and use flow: use the utility model discloses the time, after the waste gas that contains the granule gets into from air inlet 19, can enter into fourth intake pipe 16, enter into third intake pipe 18 respectively by fourth intake pipe 16 again, second intake pipe 20 and first intake pipe 10, enter into jet-propelled ball 15 at last along coupling hose 17 when, jet orifice 22 blowout waste gas of seting up on through jet-propelled ball 15, thereby can let waste gas and the water of water tank 14 the inside fully contact, thereby can filter most particulate matter, and the first filter layer 7 of installation also is for filtering the particulate matter once more between the fixed block 21, reopen valve 12 of installing above outlet pipe 13, let sewage enter into filter box 11 in the middle of and filter, filter the completion after, carry out the pressure boost by booster pump 9 of installing above third connecting pipe 8 again, let the water of filtering the completion enter into first connecting pipe 2 the inside, enter into in the middle of shower 5 from first connecting pipe 2 at last, spout by shower head 6.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A gas circulation treatment glass steel washing tower is characterized in that: including glass steel tower body (1), glass steel tower body (1) internally mounted has water tank (14), air inlet (19) are installed to one side of glass steel tower body (1), the one end of air inlet (19) just is located glass steel tower body (1) internally mounted has fourth intake pipe (16) that gets into waste gas, first intake pipe (10), second intake pipe (20) and third intake pipe (18) of different diameters size are installed respectively to the bottom of fourth intake pipe (16), coupling hose (17) are all installed to the bottom of first intake pipe (10), second intake pipe (20) and third intake pipe (18), jet-propelled subassembly is all installed to the one end of coupling hose (17).
2. The gas circulation treatment glass fiber reinforced plastic washing tower of claim 1, wherein: outlet pipe (13) are installed to one side of glass steel tower body (1), the one end of outlet pipe (13) extends to inside water tank (14), install rotatable valve (12) on outlet pipe (13), but filter box (11) of filterable waste water are installed to the other end of outlet pipe (13), third connecting pipe (8) are installed at the top of filter box (11), install booster pump (9) on third connecting pipe (8).
3. The gas circulation treatment glass fiber reinforced plastic washing tower as claimed in claim 2, wherein: the one end of third connecting pipe (8) just is located glass steel tower body (1) inner chamber department and installs first connecting pipe (2), shower (5), two are all installed at the both ends of first connecting pipe (2) all install a plurality of shower heads (6) on shower (5).
4. The gas circulation treatment glass fiber reinforced plastic washing tower as claimed in claim 3, wherein: spray pipe (5) below just is located all to install two fixed blocks (21) of symmetry on glass steel tower body (1) inner wall, two install first filter layer (7) between fixed block (21).
5. The gas circulation treatment glass fiber reinforced plastic washing tower of claim 4, wherein: the air injection assembly comprises an air injection balloon (15), and a plurality of air outlet air injection holes (22) are formed in the air injection balloon (15).
6. The gas circulation treatment glass fiber reinforced plastic washing tower of claim 5, wherein: an air outlet pipe (3) is installed on one side of the glass fiber reinforced plastic tower body (1), a filter (4) is installed inside the air outlet pipe (3), and a second filter layer (23) is arranged on the filter (4).
CN202222100000.1U 2022-08-10 2022-08-10 Gas circulation treatment glass steel washing tower Active CN217961912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222100000.1U CN217961912U (en) 2022-08-10 2022-08-10 Gas circulation treatment glass steel washing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222100000.1U CN217961912U (en) 2022-08-10 2022-08-10 Gas circulation treatment glass steel washing tower

Publications (1)

Publication Number Publication Date
CN217961912U true CN217961912U (en) 2022-12-06

Family

ID=84258246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222100000.1U Active CN217961912U (en) 2022-08-10 2022-08-10 Gas circulation treatment glass steel washing tower

Country Status (1)

Country Link
CN (1) CN217961912U (en)

Similar Documents

Publication Publication Date Title
CN212757801U (en) Gas circulation treatment glass steel washing tower
CN218687810U (en) Energy-efficient scrubbing tower
CN217961912U (en) Gas circulation treatment glass steel washing tower
CN211051150U (en) Poisonous and harmful gaseous pollutants administers deep purification device
CN208161296U (en) A kind of environment-protecting type exhaust air dedusting and purifying device
CN214233430U (en) Energy-saving efficient type purifying column
CN211799972U (en) Wet purifier of boats and ships exhaust-gas emission
CN212548839U (en) Industrial dust and waste gas desulfurization and dust removal equipment
CN211462539U (en) Spray adsorption tower of drying and dewatering system with wind power
CN210473507U (en) Energy-saving environment-friendly acid-base waste gas treatment comprehensive washing tower
CN207628151U (en) A kind of spraying waste gas treatment device
CN213375728U (en) Wet dust collector
CN214415981U (en) Waste gas treatment cyclone tower with multi-stage filtering function
CN221412602U (en) High-efficient scrubbing tower
CN217909667U (en) But UV photodissociation clarifier of exhaust gas pretreatment
CN220003511U (en) Industrial waste gas desulfurization and denitrification tower
CN220788660U (en) Spray cooling tower for dedusting converter flue gas
CN221889474U (en) Water curtain filtering device
CN217568187U (en) Waste gas spray tower equipment for waste gas treatment
CN213686856U (en) Environmental protection equipment exhaust-gas treatment purifier
CN218452020U (en) Tower and trough integrated efficient washing device
CN219502350U (en) Clean stove tail gas clean-up mechanism of heat
CN215138115U (en) Dust collector for desulfurizing tower
CN215085751U (en) Water curtain dust removal mechanism of paint spraying machine
CN215782746U (en) Device for removing odor of tubular membrane chemical cleaning

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant