CN217949268U - Prevent blockking up escape canal structure - Google Patents

Prevent blockking up escape canal structure Download PDF

Info

Publication number
CN217949268U
CN217949268U CN202221833134.8U CN202221833134U CN217949268U CN 217949268 U CN217949268 U CN 217949268U CN 202221833134 U CN202221833134 U CN 202221833134U CN 217949268 U CN217949268 U CN 217949268U
Authority
CN
China
Prior art keywords
fixedly connected
escape canal
wall
ditch
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221833134.8U
Other languages
Chinese (zh)
Inventor
薛振辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221833134.8U priority Critical patent/CN217949268U/en
Application granted granted Critical
Publication of CN217949268U publication Critical patent/CN217949268U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a prevent blockking up escape canal structure, including the escape canal body, all opened the dashpot on the front ditch wall upper portion of escape canal body and the back ditch wall, two fixedly connected with a plurality of buffer gear, a plurality of has all alternated in the lower cell wall middle part of dashpot a plurality of cover plate, a plurality of has all been placed between buffer gear's the upper end a plurality of wash port, a plurality of the fixed frame of common fixedly connected with between the front ditch wall middle part of escape canal body and the back ditch wall middle part, the fixed connection that alternates at the lower ditch wall middle part of escape canal body fixedly connected with clearance mechanism, the joint has collection mechanism in the clearance mechanism, the fixed frame of common fixedly connected with between the front ditch wall middle part of escape canal body and the back ditch wall middle part, and the lower ditch wall fixed connection of fixed frame and escape canal body, common fixedly connected with blocks the net between the front frame wall of fixed frame and the back frame wall. A prevent blockking up escape canal structure, the escape canal prevents blockking up effectually, can collect rubbish, can prolong the life of trench cover board.

Description

Prevent blockking up escape canal structure
Technical Field
The utility model relates to a escape canal technical field, in particular to prevent blockking up escape canal structure.
Background
The drainage ditch is a drainage ditch which leads water collected at low-lying positions near a side ditch, a cut-off ditch and a roadbed, a crop field and a house to a roadbed, a crop field and a house field, the depth and the spacing of the field drainage ditches are determined according to the drainage system engineering layout and the engineering standard, the flow, the water level, the section size and the engineering quantity of drainage ditches and buildings at all levels are analyzed and calculated, and the drainage ditch has the following defects in the use process of the existing drainage ditch: 1. when the existing drainage ditch is used, the ditch cover plate of the drainage ditch is easy to be damaged by treading, the service life of the ditch cover plate is influenced, and the practicability of the drainage ditch is also reduced; 2. present escape canal when using, the rubbish that contains in the sewage of being not convenient for clears up the collection, leads to the end of escape canal to take place to block up easily, has influenced the drainage efficiency of escape canal, so, we release one kind and prevent blockking up the escape canal structure.
SUMMERY OF THE UTILITY MODEL
A primary object of the utility model is to provide a prevent blockking up escape canal structure, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a prevent blockking up escape canal structure, includes the escape canal body, all opened the dashpot on the front groove wall upper portion of escape canal body and the back ditch wall, two the lower cell wall middle part of dashpot all alternates fixedly connected with a plurality of buffer gear, a plurality of cover plate, a plurality of has all been placed between buffer gear's the upper end middle part of cover plate has all opened a plurality of wash port, fixedly connected with clearance mechanism alternates in the lower ditch wall middle part of escape canal body, the joint has the collection mechanism in the clearance mechanism, fixed frame of common fixedly connected with between the front groove wall middle part of escape canal body and the back ditch wall middle part, and the lower extreme of fixed frame and the lower ditch wall fixed connection of escape canal body, net is blocked to common fixedly connected with between the front frame wall of fixed frame and the back frame wall.
Preferably, buffer gear includes the baffle-box, the three spring of lower box wall middle part fixedly connected with of baffle-box, it is three common fixedly connected with limiting plate between the upper end of spring, the upper end left part and the equal fixedly connected with buffer beam in upper end right part of limiting plate, two the last tank wall and the common fixedly connected with buffer board of baffle-box are all run through to the upper end of buffer beam, the lower extreme of baffle-box alternates fixed connection with the lower cell wall of dashpot.
Preferably, clearance mechanism includes the fixed plate, open at the upper end middle part of fixed plate has the opening, two electric putter of the lower extreme right part fixedly connected with of fixed plate, and two electric putter's output all run through the lower extreme of fixed plate and common fixedly connected with clearance board, and the right-hand member fixedly connected with of clearance board clearance brush, the lower extreme of fixed plate alternates fixed connection with the lower ditch wall in escape canal body.
Preferably, collect the mechanism including collecting the frame, the upper end right part fixedly connected with guide plate of collecting the frame, the upper end left part fixedly connected with of collecting the frame is carried the rope, it has a plurality of drainage hole to open at the lower frame wall middle part of collecting the frame, the surface upper portion and the opening joint of collecting the frame.
Preferably, the thickness of the fixed plate is consistent with that of the lower ditch wall of the drainage ditch body, and the right end face of the cleaning brush is in contact with the left end face of the blocking net.
Preferably, the upper end surface of the guide plate is arranged in a leftward inclined manner, and the diameter length of the plurality of water filtering holes is consistent with that of the meshes of the blocking net.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. in the utility model, by arranging the buffer mechanism, when the trench cover plate is trampled, the buffer plate pushes the limiting plate to move downwards, and then the buffer plate can play a role in buffering the trench cover plate through the elasticity of the spring, so that the impact force on the trench cover plate during trampling can be reduced, the bearing capacity of the trench cover plate is improved, the service life of the trench cover plate is effectively prolonged, and the practicability of the drainage ditch is improved;
2. the utility model discloses in, through setting up clearance mechanism and collection mechanism, the shrink through electric putter drives the clearance board and moves down, when making clearance brush clearance block the net, still will block during rubbish pushes the collection frame, can clear up the collection to the rubbish that contains in the sewage, avoids rubbish to take place to block up at the end in escape canal, has ensured the drainage efficiency in escape canal.
Drawings
FIG. 1 is a schematic view of the overall structure of an anti-clogging drainage ditch structure of the present invention;
fig. 2 is a schematic view of the overall structure of the buffering mechanism of the anti-clogging drainage ditch structure of the present invention;
FIG. 3 is a schematic view of the overall structure of the cleaning mechanism of the anti-clogging drainage ditch structure of the present invention;
fig. 4 is the utility model relates to a prevent blockking up collection mechanism overall structure schematic diagram of escape canal structure.
In the figure: 1. a drainage ditch body; 2. a buffer tank; 3. a buffer mechanism; 4. a trench cover plate; 5. a drain hole; 6. a cleaning mechanism; 7. a collection mechanism; 8. a fixing frame; 9. a barrier net; 31. a buffer tank; 32. a spring; 33. a limiting plate; 34. a buffer rod; 35. a buffer plate; 61. a fixing plate; 62. a port; 63. an electric push rod; 64. cleaning the plate; 65. cleaning a brush; 71. a collection frame; 72. a baffle; 73. lifting a rope; 74. and (5) filtering the water.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
Referring to fig. 1-4, the present invention provides a technical solution:
the utility model provides a prevent blockking up escape canal structure, including escape canal body 1, buffer slot 2 has all been opened on the preceding ditch wall upper portion of escape canal body 1 and the back ditch wall, the lower cell wall middle part of two buffer slot 2 all alternates fixedly connected with a plurality of buffer gear 3, a plurality of cover plate 4 has all been placed between the upper end of a plurality of buffer gear 3, a plurality of wash port 5 has all been opened at the upper end middle part of a plurality of cover plate 4, fixedly connected with clearance mechanism 6 alternates in the lower ditch wall middle part of escape canal body 1, the joint has collection mechanism 7 in the clearance mechanism 6, fixed frame 8 of common fixedly connected with between the preceding ditch wall middle part of escape canal body 1 and the back ditch wall middle part, and the lower ditch wall fixed connection of fixed frame 8 and escape canal body 1, common fixedly connected with blocks net 9 between the preceding frame wall of fixed frame 8 and the back frame wall.
In this embodiment, the buffering mechanism 3 includes a buffering box 31, three springs 32 are fixedly connected to the middle of the lower box wall of the buffering box 31, a limiting plate 33 is fixedly connected between the upper ends of the three springs 32, buffering rods 34 are fixedly connected to the left and right of the upper end of the limiting plate 33, the upper ends of the two buffering rods 34 penetrate through the upper box wall of the buffering box 31 and are fixedly connected to a buffering plate 35, and the lower end of the buffering box 31 is fixedly connected to the lower box wall of the buffering groove 2 in a penetrating manner; the front end surfaces of the front buffer plates 35 and the rear end surfaces of the rear buffer plates 35 are respectively in contact with the front groove wall of the front buffer groove 2 and the rear groove wall of the rear buffer groove 2, and the buffer plates 35 can be limited.
In this embodiment, the cleaning mechanism 6 includes a fixed plate 61, a through hole 62 is formed in the middle of the upper end of the fixed plate 61, two electric push rods 63 are fixedly connected to the right portion of the lower end of the fixed plate 61, the output ends of the two electric push rods 63 penetrate through the lower end of the fixed plate 61 and are fixedly connected to a cleaning plate 64 together, a cleaning brush 65 is fixedly connected to the right end of the cleaning plate 64, and the lower end of the fixed plate 61 is fixedly connected to the lower trench wall of the drainage trench body 1 in an inserting manner; the thickness of fixed plate 61 is unanimous with the thickness of the lower ditch wall of escape canal body 1, and it has the fixed mouth of fixed plate 61 size to open on the lower ditch wall of escape canal body 1 to be favorable to collecting placing of frame 71, the right-hand member face of cleaning brush 65 and the left end face contact of arresting net 9, the cleaning brush 65 of being convenient for is cleared up the wire side of arresting net 9, avoids arresting net 9 to be blockked up by rubbish.
In this embodiment, the collecting mechanism 7 includes a collecting frame 71, a guide plate 72 is fixedly connected to the right portion of the upper end of the collecting frame 71, a lifting rope 73 is fixedly connected to the left portion of the upper end of the collecting frame 71, a plurality of water filtering holes 74 are formed in the middle of the lower frame wall of the collecting frame 71, and the upper portion of the outer surface of the collecting frame 71 is clamped with the through hole 62; the upper end surface of the guide plate 72 is arranged in a leftward inclined manner, so that the garbage on the guide plate 72 moves leftwards to the collection frame 71, the garbage is convenient to collect, and the diameter length of the water filtering holes 74 is consistent with that of the meshes of the blocking net 9, so that the water in the garbage is discharged through the water filtering holes 74.
It should be noted that, the utility model relates to a prevent blockking up escape canal structure, in the use, can shelter from the top of escape canal body 1 through trench cover 4, when trench cover 4 received trample, buffer board 35 atress promoted buffer beam 34 downwards, limiting plate 33 downwardly moving makes spring 32 shrink, at this moment elasticity through spring 32, can cushion the shock attenuation to the trampling force that trench cover 4 received, can effectively alleviate the impact force to trench cover 4 when trampling, thereby the bearing capacity of trench cover 4 has been promoted, the life of trench cover 4 has been prolonged, the security has been improved, can arrange sewage into escape canal body 1 through a plurality of wash port 5, then can play the filtering action to sewage through arresting net 9, can arrest the rubbish in the sewage left side at arresting net 9, at this moment, through the shrink of two electric putter 63, can make rubbish clearance board 64 drive clearance brush 65 move downwards, can be when clearing arresting net 9, still will arrest the left side of arresting net 9, at last collection rubbish collection frame that can push and can take place the collection of rubbish and carry out the terminal collection rope 71 that the collection of rubbish, the collection rope that can take place the final collection of escape canal, the collection rope 71, the collection rope that can take place, the last collection rope that takes place to the rubbish collection of rubbish, the escape canal, the rubbish collection rope that takes place in the escape canal, the rubbish that can avoid blocking net 9.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a prevent blockking up escape canal structure, includes escape canal body (1), its characterized in that: all opened on the front groove wall upper portion of escape canal body (1) and the back ditch wall buffer slot (2), two fixedly connected with a plurality of buffer gear (3), a plurality of have all been alternated in the middle part of the lower cell wall of buffer slot (2) a plurality of cover plate (4), a plurality of have all been placed between the upper end of buffer gear (3) in the middle part of the upper end of cover plate (4) a plurality of wash port (5) have all been opened, fixedly connected with clearance mechanism (6) have been alternated in the middle part of the lower ditch wall of escape canal body (1), the joint has collection mechanism (7) in clearance mechanism (6), fixed frame (8) of common fixedly connected with between the front groove wall middle part of escape canal body (1) and the back ditch wall middle part, and the lower ditch wall fixed connection of the lower extreme of fixed frame (8) and escape canal body (1), common fixedly connected with hinders blocking net (9) between the front groove wall of fixed frame (8) and the back frame wall.
2. The anti-clogging drainage ditch structure according to claim 1, wherein: buffer gear (3) are including baffle-box (31), the three spring of lower boxwall middle part fixedly connected with (32) of baffle-box (31), it is three common fixedly connected with limiting plate (33) between the upper end of spring (32), the upper end left part and the equal fixedly connected with buffer beam (34) in upper end right part of limiting plate (33), two the last tank wall and common fixedly connected with buffer board (35) of baffle-box (31) all run through in the upper end of buffer beam (34), the lower extreme of baffle-box (31) and the lower wall fixed connection that alternates of buffer slot (2).
3. The anti-clogging drainage ditch structure according to claim 1, wherein: clearance mechanism (6) are including fixed plate (61), open at the upper end middle part of fixed plate (61) has opening (62), two electric putter (63) of the lower extreme right part fixedly connected with of fixed plate (61), and the output of two electric putter (63) all runs through the lower extreme of fixed plate (61) and common fixedly connected with cleaning plate (64), and the right-hand member fixedly connected with cleaning brush (65) of cleaning plate (64), the lower extreme of fixed plate (61) and the lower ditch wall interlude fixed connection of escape canal body (1).
4. The anti-clogging drainage ditch structure according to claim 1, wherein: collect mechanism (7) including collecting frame (71), the upper end right part fixedly connected with guide plate (72) of collecting frame (71), rope (73) are carried to the upper end left part fixedly connected with of collecting frame (71), open at the lower frame wall middle part of collecting frame (71) has a plurality of drainage hole (74), the surface upper portion and opening (62) joint of collecting frame (71).
5. The anti-clogging drainage ditch structure according to claim 3, wherein: the thickness of the fixing plate (61) is consistent with that of the lower ditch wall of the drainage ditch body (1), and the right end face of the cleaning brush (65) is in contact with the left end face of the blocking net (9).
6. The anti-clogging drainage ditch structure according to claim 4, wherein: the upper end surface of the guide plate (72) is arranged in a leftward inclined mode, and the diameter length of the water filtering holes (74) is consistent with the diameter length of meshes of the blocking net (9).
CN202221833134.8U 2022-07-14 2022-07-14 Prevent blockking up escape canal structure Active CN217949268U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221833134.8U CN217949268U (en) 2022-07-14 2022-07-14 Prevent blockking up escape canal structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221833134.8U CN217949268U (en) 2022-07-14 2022-07-14 Prevent blockking up escape canal structure

Publications (1)

Publication Number Publication Date
CN217949268U true CN217949268U (en) 2022-12-02

Family

ID=84223223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221833134.8U Active CN217949268U (en) 2022-07-14 2022-07-14 Prevent blockking up escape canal structure

Country Status (1)

Country Link
CN (1) CN217949268U (en)

Similar Documents

Publication Publication Date Title
CN217949268U (en) Prevent blockking up escape canal structure
CN211873273U (en) Municipal administration road drainage structures
CN210002333U (en) river channel gabion structure wall type ecological bank protection
CN214783049U (en) Energy-saving drainage structure for road bed
CN210263298U (en) Underground garage drainage structure
CN218204822U (en) Novel drainage ditch
CN216379874U (en) Town road drainage structures
CN215406125U (en) Ground side slope protective structure
CN214363364U (en) River trash blocking device
CN216405348U (en) River course cleaning device for hydraulic engineering
CN216839672U (en) Wisdom is rainwater collection device for water utilities management
CN214460930U (en) Environment-friendly sponge city's rainwater circulation system
CN213555711U (en) Environment-friendly landscape rainwater collection device
CN213296581U (en) Town road drainage structures
CN211395586U (en) Chute for hydraulic engineering
CN216379865U (en) Road and bridge drainage ditch with good drainage effect
CN217150452U (en) Spoil area drainage system
CN220666255U (en) Roadbed edge protection device for highway construction
CN219508706U (en) Rainwater diversion and collection system
CN214914096U (en) Filtering device used in drainage ditch
CN213572292U (en) A drainage device for town road
CN221218376U (en) Quick drainage collection device of town road rainwater
CN218622474U (en) Highway maintenance drainage device
CN214363626U (en) Automatic prevent urban waterlogging and use well lid
CN218204159U (en) Vertical type barricade of water conservancy river course

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant