CN217943777U - High-efficient preparation facilities of interface mortar - Google Patents

High-efficient preparation facilities of interface mortar Download PDF

Info

Publication number
CN217943777U
CN217943777U CN202221795537.8U CN202221795537U CN217943777U CN 217943777 U CN217943777 U CN 217943777U CN 202221795537 U CN202221795537 U CN 202221795537U CN 217943777 U CN217943777 U CN 217943777U
Authority
CN
China
Prior art keywords
preparation
thick bamboo
base
interface mortar
preparation section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221795537.8U
Other languages
Chinese (zh)
Inventor
任思远
刘军伟
符占标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyang New Tianyi Green Building Materials Co ltd
Original Assignee
Xinyang New Tianyi Green Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyang New Tianyi Green Building Materials Co ltd filed Critical Xinyang New Tianyi Green Building Materials Co ltd
Priority to CN202221795537.8U priority Critical patent/CN217943777U/en
Application granted granted Critical
Publication of CN217943777U publication Critical patent/CN217943777U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The utility model discloses a high-efficient preparation facilities of interface mortar, including base, installation piece and preparation section of thick bamboo, the movable block is installed at the base top, the installation piece is installed to the top symmetry of base, the installation axle is installed to the inboard of installation piece, the movable sleeve is installed in the outside of installation axle, the preparation section of thick bamboo is installed at the top of movable sleeve, the mount is installed at the top of base, and the mount is located one side of preparation section of thick bamboo, the support frame is installed at the top of base, and the support frame is located one side of mount, a preparation section of thick bamboo is installed to the inboard of support frame, the front of a preparation section of thick bamboo is run through and is installed the baffler. The utility model discloses well preparation section of thick bamboo can rotate in the outside of loose axle through the movable sleeve, makes the preparation section of thick bamboo can incline to the certain angle of place ahead to the messenger does not have the interface mortar of complete discharge and can all discharge, and the interface mortar can be discharged from the bin outlet because gravity.

Description

High-efficient preparation facilities of interface mortar
Technical Field
The utility model relates to an interface mortar preparation technical field specifically is a high-efficient preparation facilities of interface mortar.
Background
The interface agent is an adhesive, is generally made of vinyl acetate-ethylene and is usually used on the surface of concrete, because the surface of the concrete is too smooth, the surface of a base layer can be rough, the adhesive force to the base layer can be increased, the plastering layer is prevented from hollowing and crusting by using the product, the interface mortar needs to be prepared by mixing a plurality of materials during preparation, and therefore, a preparation device is needed during preparation
The prior interface mortar high-efficiency preparation device has the following defects:
1. patent document CN215472087U discloses a high-efficiency preparation device for interface mortar, which comprises a stirring barrel, a weight sensor, an S-shaped stirring roller and an inner wall scraper, wherein the top of the stirring barrel is fixedly connected with two support columns, the upper ends of the two support columns are fixedly connected with a support plate, the front part of the upper end of the support plate is fixedly connected with two connecting columns, the surfaces of the two connecting columns are fixedly connected with the weight sensor, and the bottom of the weight sensor is fixedly connected with a display screen; and set up the combination of inner wall scraper blade and S-shaped (mixing) shaft at the agitator inner chamber, be convenient for quick and even stirring material, also can strike off the mortar that remains at the agitator inner wall totally through the inner wall scraper blade when wasing the agitator inner wall simultaneously, the clean agitator inner wall of being convenient for has increased the life of agitator. "compare with the utility model discloses, this preparation facilities is not convenient for carry out the ejection of compact to can cause the puzzlement to the staff.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high-efficient preparation facilities of interface mortar to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: an efficient interface mortar preparation device comprises a base, an installation block and a preparation barrel, wherein a moving block is installed at the top of the base, the installation block is symmetrically installed at the top of the base, an installation shaft is installed on the inner side of the installation block, a movable sleeve is installed on the outer side of the installation shaft, the preparation barrel is installed at the top of the movable sleeve, a fixed frame is installed at the top of the base, and the fixed frame is located on one side of the preparation barrel;
the support frame is installed at the top of base, and the support frame is located one side of mount, a preparation section of thick bamboo is installed to the inboard of support frame, the front of a preparation section of thick bamboo is run through and is installed the baffler.
Preferably, a cushion block is installed at the top of the base.
Preferably, the bottom of the moving block is provided with a sliding block, the sliding block is movably connected with the top of the base, and one side of the moving block is provided with a using rod.
Preferably, the front surface of the preparation cylinder is provided with a discharge outlet in a penetrating way.
Preferably, the top of mount is run through and is installed driving motor, and movable mounting has the puddler on the top inner wall of mount, and the top of puddler is connected with driving motor's output, and the puddler is located the inside of preparation section of thick bamboo.
Preferably, the connecting cylinder is installed at the bottom of the preparation cylinder, the feeding pipe is installed at one end of the connecting cylinder, and one end of the feeding pipe penetrates through the inner side of the fixing frame and is located above the preparation cylinder.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an install the active structure at the top of base, the active structure is including the installation piece, installation axle and movable sleeve, the top at the movable sleeve is installed to the preparation section of thick bamboo, the opposite side of preparation section of thick bamboo passes through the bolt fastening simultaneously at the top of cushion, when carrying out the ejection of compact after the preparation is accomplished, take off the bolt, under staff's help, make the preparation section of thick bamboo rotate in the outside of loose axle through the movable sleeve, make the preparation section of thick bamboo can incline certain angle to the place ahead, thereby make not totally discharged interface mortar can all discharge, interface mortar can be because gravity, discharge from the bin outlet.
2. The utility model discloses an install the support frame at the top of base, the installation of support frame prepares a section of thick bamboo, can store in advance the material that needs were prepared through preparing a section of thick bamboo, makes the device when stirring, can prestore the interface mortar material of next stirring, accomplishes the back when the preparation, takes out the baffler, makes the interface material who prepares directly enter into a preparation section of thick bamboo to it is higher to make efficiency.
Drawings
Fig. 1 is a perspective view of the present invention;
fig. 2 is a schematic structural view of the moving block of the present invention;
FIG. 3 is a schematic view of the structure at the position A of the present invention;
fig. 4 is a schematic view of the structure of the preparation cylinder of the present invention.
In the figure: 1. a base; 101. a cushion block; 2. a moving block; 201. a slider; 202. using a rod; 3. mounting blocks; 301. installing a shaft; 302. a movable sleeve; 4. preparing a cartridge; 401. a discharge outlet; 5. a fixed mount; 501. a drive motor; 502. a stirring rod; 6. a support frame; 601. preparing a cylinder; 602. a barrier plate; 603. a connecting cylinder; 604. and (4) feeding a pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "provided," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: an interface mortar high-efficiency preparation device;
the device comprises a base 1, a moving block 2, an installation block 3, a preparation cylinder 4 and a fixed frame 5, wherein the moving block 2 is installed at the top of the base 1, a cushion block 101 is installed at the top of the base 1, a sliding block 201 is installed at the bottom of the moving block 2, the sliding block 201 is movably connected with the top of the base 1, a use rod 202 is installed at one side of the moving block 2, the installation block 3 is symmetrically installed at the top of the base 1, an installation shaft 301 is installed at the inner side of the installation block 3, a movable sleeve 302 is installed at the outer side of the installation shaft 301, the preparation cylinder 4 is installed at the top of the movable sleeve 302, a discharge hole 401 is installed on the front surface of the preparation cylinder 4 in a penetrating manner, the fixed frame 5 is installed at the top of the base 1, the fixed frame 5 is located at one side of the preparation cylinder 4, a driving motor 501 is installed at the top of the fixed frame 5 in a penetrating manner, a stirring rod 502 is movably installed on the inner wall at the top of the fixed frame 5, and the top end of the stirring rod 502 is connected with the output end of the driving motor 501, and puddler 502 is located the inside of preparation section of thick bamboo 4, base 1 provides the mounted position for the movable block 2 and the mounted block 3 at top, cushion 101 is used for fixing preparation section of thick bamboo 4, movable block 2 is through moving the bottom of the preparation section of thick bamboo 4 of slope, can not need the staff to support, use pole 202 can remove movable block 2, mounted block 3 provides the mounted position for installation axle 301, installation axle 301 is used for installing movable sleeve 302, make preparation section of thick bamboo 4 can move about through movable sleeve 302, preparation section of thick bamboo 4 provides the space for the preparation of interface mortar, bin outlet 401 makes the interface mortar of accomplishing of preparation can discharge, mount 5 provides the mounted position for driving motor 501, driving motor 501 is used for driving puddler 502 to rotate, puddler 502 can stir the preparation to the material in the preparation section of thick bamboo 4.
Referring to fig. 1 and 4, the present invention provides an embodiment of: an interface mortar high-efficiency preparation device;
including support frame 6, support frame 6 is installed at the top of base 1, and support frame 6 is located one side of mount 5, prepare a section of thick bamboo 601 is installed to the inboard of support frame 6, prepare a front of section of thick bamboo 601 and run through and install barrier plate 602, prepare a bottom of 601 and install connecting cylinder 603, inlet pipe 604 is installed to the one end of connecting cylinder 603, and the one end of inlet pipe 604 runs through the inboard of mount 5, and be located the top of preparation section of thick bamboo 4, support frame 6 provides the mounted position for preparing a section of thick bamboo 601, can store the material that needs to prepare in advance through preparing a section of thick bamboo 601, make the device when stirring, can prestore the interface mortar material of stirring next time, after the preparation is accomplished, take out barrier plate 602, make the interface material who prepares directly enter into preparation section of thick bamboo 4 through inlet pipe 604, thereby make efficiency higher.
The working principle is as follows: before using the high-efficient preparation facilities of interface mortar, whether this high-efficient preparation facilities of interface mortar has the problem that influences the use earlier, at first with the high-efficient preparation facilities of interface mortar, place the position that needs use, pour the material that needs carry out the preparation into preparation section of thick bamboo 4, drive puddler 502 through driving motor 501 and rotate the stirring, during the ejection of compact, can incline preparation section of thick bamboo 4, make the interface mortar in preparation section of thick bamboo 4 can all discharge, make the device when stirring, can prestore the interface mortar material of next stirring, be convenient for prepare next time, play the effect of raising the efficiency.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not to be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a high-efficient preparation facilities of interface mortar, includes base (1), installation piece (3) and preparation section of thick bamboo (4), its characterized in that: the movable block (2) is mounted at the top of the base (1), the mounting blocks (3) are symmetrically mounted at the top of the base (1), the mounting shaft (301) is mounted on the inner side of the mounting block (3), the movable sleeve (302) is mounted on the outer side of the mounting shaft (301), the preparation barrel (4) is mounted at the top of the movable sleeve (302), the fixing frame (5) is mounted at the top of the base (1), and the fixing frame (5) is located on one side of the preparation barrel (4);
support frame (6) are installed at the top of base (1), and support frame (6) are located one side of mount (5), a preparation section of thick bamboo (601) is installed to the inboard of support frame (6), the front of a preparation section of thick bamboo (601) is run through and is installed baffler (602).
2. The efficient interface mortar preparation device according to claim 1, wherein: the top of the base (1) is provided with a cushion block (101).
3. The efficient interface mortar preparation device according to claim 1, wherein: the bottom of the moving block (2) is provided with a sliding block (201), the sliding block (201) is movably connected with the top of the base (1), and one side of the moving block (2) is provided with a using rod (202).
4. The efficient interface mortar preparation device according to claim 1, wherein: the front surface of the preparation cylinder (4) is provided with a discharge outlet (401) in a penetrating way.
5. The efficient interface mortar preparation device according to claim 1, wherein: the top of mount (5) is run through and is installed driving motor (501), and movable mounting has puddler (502) on the top inner wall of mount (5), and the top of puddler (502) is connected with driving motor's (501) output, and puddler (502) are located the inside of preparation section of thick bamboo (4).
6. The efficient interface mortar preparation device according to claim 1, wherein: a connecting cylinder (603) is installed at the bottom of the preparation cylinder (601), a feeding pipe (604) is installed at one end of the connecting cylinder (603), and one end of the feeding pipe (604) penetrates through the inner side of the fixing frame (5) and is located above the preparation cylinder (4).
CN202221795537.8U 2022-07-13 2022-07-13 High-efficient preparation facilities of interface mortar Active CN217943777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221795537.8U CN217943777U (en) 2022-07-13 2022-07-13 High-efficient preparation facilities of interface mortar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221795537.8U CN217943777U (en) 2022-07-13 2022-07-13 High-efficient preparation facilities of interface mortar

Publications (1)

Publication Number Publication Date
CN217943777U true CN217943777U (en) 2022-12-02

Family

ID=84219552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221795537.8U Active CN217943777U (en) 2022-07-13 2022-07-13 High-efficient preparation facilities of interface mortar

Country Status (1)

Country Link
CN (1) CN217943777U (en)

Similar Documents

Publication Publication Date Title
CN217943777U (en) High-efficient preparation facilities of interface mortar
CN212193703U (en) Concrete blanking chamber
CN212385715U (en) Water conservancy dykes and dams construction building material feeding device
CN214786069U (en) Waterscape concrete pouring device
CN216239576U (en) Plastering machine for construction engineering construction
CN212642152U (en) Concrete hopper for civil engineering
CN112814337A (en) Wall plastering device for decoration project
CN218509073U (en) Wall body masonry device for building engineering
CN216746333U (en) Concrete feed bin is with reinforced detection device
CN218518931U (en) Stifled device is prevented in heat preservation mortar feeding
CN218024338U (en) Pet ore sand levelling machine
CN217042425U (en) Feeding device of powder mixer
CN215969410U (en) Aggregate mixing arrangement for building engineering
CN220095032U (en) Anti-solidification mixer convenient to clean regularly
CN214462297U (en) A high-efficient trowelling machine for building trade
CN220008299U (en) Concrete mixing stirring equipment
CN214575769U (en) Concrete slab pouring device for hydraulic and hydroelectric engineering
CN217016381U (en) High-efficient homogeneous mixing device of chinese-medicinal material powder
CN217233719U (en) Concrete pump for building construction
CN218373249U (en) Grouting device for road and bridge construction
CN211666195U (en) Building wall plastering device
CN215709008U (en) Be used for villages and small towns construction engineering residue conveyor
CN217372893U (en) Convenient high-efficient discharge apparatus of concrete that removes
CN215825618U (en) Agitating unit of mortar for building engineering
CN210880303U (en) Concrete mixing plant loading attachment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant