CN217927539U - Municipal administration water supply and drainage pipeline construction equipment - Google Patents

Municipal administration water supply and drainage pipeline construction equipment Download PDF

Info

Publication number
CN217927539U
CN217927539U CN202222180640.8U CN202222180640U CN217927539U CN 217927539 U CN217927539 U CN 217927539U CN 202222180640 U CN202222180640 U CN 202222180640U CN 217927539 U CN217927539 U CN 217927539U
Authority
CN
China
Prior art keywords
hoop board
drainage pipeline
groove
pipeline construction
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222180640.8U
Other languages
Chinese (zh)
Inventor
邱向鑫
姚城熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222180640.8U priority Critical patent/CN217927539U/en
Application granted granted Critical
Publication of CN217927539U publication Critical patent/CN217927539U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model belongs to the technical field of the pipeline construction, especially, municipal administration water supply and drainage pipe construction equipment, be not convenient for adjust to general drainage pipe construction equipment, make it to be difficult to satisfy the problem that different topography is used, the scheme as follows is put forward now, it includes the box, lower hoop board and last hoop board, slidable mounting has the lifter plate in the box, the equal fixed mounting in top four corners of lifter plate has the bracing piece, the top fixed mounting of four bracing pieces has same arc, lower hoop board sets up the top at the arc, and two square grooves have been seted up at the top of arc, slidable mounting has the flange in the square groove, the draw-in groove has all been seted up to the bottom both sides of lower hoop board, two flanges activity joint respectively are in the draw-in groove that corresponds. The utility model discloses a cooperation between lead screw, lifter plate, bracing piece and the arc can realize the altitude mixture control to pipeline hoop board to satisfy different service environment and adjust, satisfy the construction to the pipeline, promoted and used the flexibility.

Description

Municipal administration water supply and drainage pipeline construction equipment
Technical Field
The utility model relates to a pipeline construction technical field especially relates to a municipal administration water supply and drainage pipeline construction equipment.
Background
The drainage pipeline refers to a system consisting of a pipeline collecting and discharging sewage, wastewater and rainwater and auxiliary facilities thereof, and comprises a main pipe, branch pipes and pipelines leading to a treatment plant, wherein the pipelines are built on a street or any other place, and the pipelines are used as drainage pipelines as long as the pipelines play a drainage role.
General drainage pipeline construction equipment is inconvenient to adjust, so that the drainage pipeline construction equipment is difficult to meet different terrains for use; therefore, a municipal water supply and drainage pipeline construction device is provided to solve the problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving general drainage pipe construction equipment and be not convenient for adjust for be difficult to satisfy the shortcoming that different topography was used, and a municipal administration water supply and drainage pipe construction equipment who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a municipal administration water supply and drainage pipeline construction equipment, includes box, lower hoop and last hoop, slidable mounting has the lifter plate in the box, and the equal fixed mounting in top four corners of lifter plate has the bracing piece, and the top fixed mounting of four bracing pieces has same arc, lower hoop sets up at the top of arc, and the top of arc has seted up two square grooves, and slidable mounting has the flange in the square groove, the draw-in groove has all been seted up to the bottom both sides of lower hoop, and two flanges activity joint respectively are in the draw-in groove that corresponds, and go up the hoop setting at the top of hoop under, and the top both sides of lower hoop have all seted up a plurality of screw holes, and the equal threaded mounting in a plurality of screw holes has the bolt, go up the hoop activity and cup joint in the outside of a plurality of bolts, it is connected with the lead screw to rotate on the bottom inner wall of box, the lifter plate screw thread cup joints in the outside of lead screw, and the top fixed mounting of lead screw has the knob.
Preferably, a plurality of constant head tanks have been seted up in the outside of knob, the spout has been seted up at the top of box, and slidable mounting has the slide in the spout, and the right side fixed mounting of slide has the locating lever, and locating lever activity joint is in the constant head tank that corresponds.
Preferably, the left side fixedly connected with pressure spring of slide, the left end fixed connection of pressure spring is on the left side inner wall of spout.
Preferably, the inner walls of the two sides of the sliding groove are fixedly connected with the same transverse rod, and the sliding plate is sleeved on the outer side of the transverse rod in a sliding mode.
Preferably, the fixed cover in the outside of lead screw has connect the spacing collar, and the top inner wall activity butt of spacing collar and box, the equal fixed mounting in bottom half four corners has the support column.
Preferably, the bottom of the convex plate is fixedly connected with a connecting spring and a pull ring, and the bottom ends of the two connecting springs are respectively and fixedly connected to the inner wall of the bottom of the corresponding square groove.
Preferably, vertical holes are formed in four corners of the top of the box body, and the four supporting rods are connected in the corresponding vertical holes in a sliding mode respectively.
In the utility model, a municipal administration water supply and drainage pipeline construction equipment, through promoting the slide left and driving the locating lever and break away from the constant head tank, remove the fixed to the knob, then rotatory knob drives the lead screw and rotates, the lead screw drives the lifter plate through the screw transmission with the lifter plate and carries out the elevating movement, the lifter plate drives the arc wall through four bracing pieces jointly and carries out vertical motion, thereby carry out height control to the lower hoop, make the lower hoop butt under the pipeline, then loosen the slide, make the slide reset and drive the locating lever card and go into in the constant head tank under the elasticity of pressure spring, fix the knob, thus fix the height of lower hoop, then fix the upper hoop above the pipeline through the bolt, realize the concatenation of pipeline fixedly;
in the utility model, the municipal water supply and drainage pipeline construction device drives the two convex plates to be separated from the clamping groove by pulling the two pull rings, and the fixation of the lower hoop plate is released, so that the arc plate and the box body can be conveniently detached from the lower part of the lower hoop plate;
the utility model has the advantages of reasonable design, through the cooperation between lead screw, lifter plate, bracing piece and the arc, can realize the altitude mixture control to pipeline hoop board to satisfy different service environment and adjust, satisfy the construction to the pipeline, promoted and used the flexibility, the reliability is high.
Drawings
FIG. 1 is a schematic perspective view of a municipal water supply and drainage pipeline construction device according to the present invention;
FIG. 2 is a schematic cross-sectional view of a municipal water supply and drainage pipeline construction device provided by the present invention;
FIG. 3 is a partial enlarged view of portion A of FIG. 2;
fig. 4 is a partially enlarged view of a portion B in fig. 2.
In the figure: 1. a box body; 2. a lower hoop plate; 3. an upper hoop plate; 4. an arc-shaped plate; 5. a support bar; 6. a lifting plate; 7. a screw rod; 8. a bolt; 9. a knob; 10. a chute; 11. a slide plate; 12. positioning a rod; 13. a pressure spring; 14. a square groove; 15. a connecting spring; 16. a pull ring; 17. a convex plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a municipal administration water supply and drainage pipeline construction equipment, comprising a box body 1, lower hoop plate 2 and upper hoop plate 3, slidable mounting has lifter plate 6 in box body 1, the equal fixed mounting in top four corners of lifter plate 6 has bracing piece 5, the top fixed mounting of four bracing pieces 5 has same arc 4, lower hoop plate 2 sets up the top at arc 4, and two square grooves 14 have been seted up at arc 4's top, slidable mounting has flange 17 in square groove 14, the draw-in groove has all been seted up to the bottom both sides of lower hoop plate 2, two flange 17 activity joints respectively are in the draw-in groove that corresponds, upper hoop plate 3 sets up the top at hoop plate 2 down, and a plurality of screw holes have all been seted up to the top both sides of lower hoop plate 2, equal threaded mounting has bolt 8 in a plurality of screw holes, upper hoop plate 3 activity cup joints the outside at a plurality of bolts 8, it is connected with lead screw 7 to rotate on the bottom inner wall of box body 1, lifter plate 6 screw thread cup joints the outside at lead screw 7, and the top fixed mounting of lead screw 7 has knob 9.
In this embodiment, a plurality of constant head tanks have been seted up in the outside of knob 9, and spout 10 has been seted up at the top of box 1, and slidable mounting has slide 11 in spout 10, and slide 11's right side fixed mounting has locating lever 12, and locating lever 12 activity joint is fixed a position knob 9 in the constant head tank that corresponds.
In this embodiment, the left side fixedly connected with pressure spring 13 of slide 11, the left end fixed connection of pressure spring 13 resets slide 1 on the left side inner wall of spout 10.
In this embodiment, fixedly connected with is the same horizontal pole on the both sides inner wall of spout 10, and slide 11 slides and cup joints in the outside of horizontal pole, leads slide 11.
In this embodiment, the fixed cover in the outside of lead screw 7 has connect the spacing collar, and the spacing collar carries on spacingly with the top inner wall activity butt of box 1 to lead screw 7, and the equal fixed mounting in box 1 bottom four corners has the support column.
In this embodiment, the bottom of the convex plate 17 is fixedly connected with the connecting springs 15 and the pull ring 16, and the bottom ends of the two connecting springs 15 are respectively and fixedly connected to the inner wall of the bottom of the corresponding square groove 14 to reset the convex plate 17.
In this embodiment, vertical hole has all been seted up in the top four corners of box 1, and four bracing pieces 5 are sliding connection respectively in the vertical hole that corresponds, lead bracing piece 5.
In this embodiment, when using, drive locating lever 12 and break away from the constant head tank through promoting slide 11 left, remove the fixed to knob 9, then rotatory knob 9 drives lead screw 7 and rotates, lead screw 7 drives lifter plate 6 through the screw drive with lifter plate 6 and carries out elevating movement, lifter plate 6 drives arc 4 through four bracing pieces 5 jointly and carries out vertical motion, thereby carry out height control to hoop 2 down, make 2 butt of hoop under in the pipeline, then loosen slide 11, make slide 11 reset and drive locating lever 12 card income constant head tank under the elasticity of pressure spring 13, fix knob 9, thereby highly fixing hoop 2 down, then fix hoop 3 in the pipeline top through bolt 8, realize that the concatenation to the pipeline is fixed, drive two protruding boards 17 and break away from the draw-in groove through pulling two pull rings 16, remove the fixed to hoop 2 down, so that dismantle arc 4 and box 1 from hoop 2 below down.

Claims (7)

1. The utility model provides a municipal administration water supply and drainage pipeline construction equipment, its characterized in that, includes box (1), lower hoop board (2) and last hoop board (3), slidable mounting has lifter plate (6) in box (1), and the equal fixed mounting in top four corners of lifter plate (6) has bracing piece (5), and the top fixed mounting of four bracing pieces (5) has same arc (4), hoop board (2) set up at the top of arc (4) down, and two square grooves (14) have been seted up at the top of arc (4), and slidable mounting has flange (17) in square groove (14), the draw-in groove has all been seted up to the bottom both sides of hoop board (2) down, two flange (17) activity joint respectively in the draw-in groove that corresponds, go up the top of hoop board (3) and set up the top of hoop board (2) down, and the top both sides of hoop board (2) down have all seted up a plurality of screw holes, and all threaded hole installs bolt (8), go up hoop board (3) and be connected with on the outside of cup jointing in a plurality of bolt (8) activity, rotate on the bottom of box (1) the inner wall, the lead screw (7) fixed lead screw (7) are installed in the knob (7) outside of lead screw (7), and knob (7) fixed lead screw (7).
2. The municipal water supply and drainage pipeline construction device according to claim 1, wherein a plurality of positioning grooves are formed in the outer side of the knob (9), a sliding groove (10) is formed in the top of the box body (1), a sliding plate (11) is slidably mounted in the sliding groove (10), a positioning rod (12) is fixedly mounted on the right side of the sliding plate (11), and the positioning rod (12) is movably clamped in the corresponding positioning groove.
3. The municipal water supply and drainage pipeline construction device according to claim 2, wherein a compression spring (13) is fixedly connected to the left side of the sliding plate (11), and the left end of the compression spring (13) is fixedly connected to the inner wall of the left side of the sliding chute (10).
4. The municipal water and drainage pipeline construction device according to claim 3, wherein the inner walls of the two sides of the chute (10) are fixedly connected with a cross bar, and the sliding plate (11) is slidably sleeved on the outer side of the cross bar.
5. The municipal water supply and drainage pipeline construction device according to claim 1, wherein a limiting ring is fixedly sleeved on the outer side of the screw rod (7), the limiting ring is movably abutted against the inner wall of the top of the box body (1), and support columns are fixedly mounted at four corners of the bottom of the box body (1).
6. The municipal water and drainage pipeline construction device according to claim 1, wherein the bottom of the convex plate (17) is fixedly connected with a connecting spring (15) and a pull ring (16), and the bottom ends of the two connecting springs (15) are respectively fixedly connected to the inner wall of the bottom of the corresponding square groove (14).
7. The municipal water supply and drainage pipeline construction device according to claim 1, wherein vertical holes are formed in four corners of the top of the box body (1), and the four support rods (5) are slidably connected in the corresponding vertical holes respectively.
CN202222180640.8U 2022-08-18 2022-08-18 Municipal administration water supply and drainage pipeline construction equipment Active CN217927539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222180640.8U CN217927539U (en) 2022-08-18 2022-08-18 Municipal administration water supply and drainage pipeline construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222180640.8U CN217927539U (en) 2022-08-18 2022-08-18 Municipal administration water supply and drainage pipeline construction equipment

Publications (1)

Publication Number Publication Date
CN217927539U true CN217927539U (en) 2022-11-29

Family

ID=84166200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222180640.8U Active CN217927539U (en) 2022-08-18 2022-08-18 Municipal administration water supply and drainage pipeline construction equipment

Country Status (1)

Country Link
CN (1) CN217927539U (en)

Similar Documents

Publication Publication Date Title
CN217927539U (en) Municipal administration water supply and drainage pipeline construction equipment
CN203062152U (en) Stretchable assembling clamp used for welding flange short pipe
CN208690346U (en) A kind of lithium battery steel shell being easily installed disassembly for electronic mini train
CN101905923B (en) Overwater-installed submersible water impeller
CN201581631U (en) Supporting structure of disc locking type scaffold
CN209560882U (en) A kind of construction management bulletin board
CN216045790U (en) Auxiliary device for pipeline installation and connection
CN214305729U (en) Underground pipeline butt joint device
CN208417487U (en) A kind of novel rotary type reducer structure
CN220870254U (en) Pipeline installation structure
CN219549777U (en) Engineering water supply and drainage pipeline supporting structure
CN220812040U (en) Building site sewage collection device
CN216789590U (en) Drainage pipe of municipal works supports connection structure
CN212156159U (en) Sewage drainage pipe for municipal works
CN2439983Y (en) LPG integral automobile gas-feeding device
CN217843406U (en) Watch-dog installation device suitable for clear boat is portable
CN219954466U (en) Auxiliary installation structure for connecting pipeline with filter
CN219928884U (en) Adjustable pipeline bearing support
CN220335722U (en) Large-span aqueduct construction support structure
CN214502739U (en) Oil can switch mounting bracket for tensile testing machine
CN220247004U (en) Environment-friendly inspection well convenient to assemble and disassemble
CN219450981U (en) Concrete pipe rubber circle installation device
CN217130542U (en) Municipal administration water supply and drainage construction supports positioner
CN215322602U (en) Regulation type railway signal lamp
CN220488488U (en) Water supply and drainage pipeline installation fixer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant