CN217927517U - Steel structure pipeline bracket with bradyseism quick detach mechanism - Google Patents

Steel structure pipeline bracket with bradyseism quick detach mechanism Download PDF

Info

Publication number
CN217927517U
CN217927517U CN202221644304.8U CN202221644304U CN217927517U CN 217927517 U CN217927517 U CN 217927517U CN 202221644304 U CN202221644304 U CN 202221644304U CN 217927517 U CN217927517 U CN 217927517U
Authority
CN
China
Prior art keywords
clamp
wall
cardboard
connecting seat
last
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221644304.8U
Other languages
Chinese (zh)
Inventor
郝晓静
黄兵
潘玉竹
孙传凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Yimin Steel Structure Co ltd
Original Assignee
Yantai Yimin Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Yimin Steel Structure Co ltd filed Critical Yantai Yimin Steel Structure Co ltd
Priority to CN202221644304.8U priority Critical patent/CN217927517U/en
Application granted granted Critical
Publication of CN217927517U publication Critical patent/CN217927517U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a steel structure pipeline bracket with bradyseism quick detach mechanism, including last clamp, lower clamp, cardboard, spring and stand, go up the both sides of clamp and all install connecting seat one, the below of going up the clamp is provided with down the clamp, because cardboard itself is made by magnetic material, when two cardboards received the gravitation of external strong magnetic tool, take place to remove in the working chamber is inside, thereby increased the distance between two cardboards, so that putting into of stand, when external strong magnetic effect removes, two cardboards carry out the block to the stand under the effect of elasticity, the connection effect of last clamp and lower clamp has been formed, the practicality of installation parts such as bolt has been reduced, the convenience of connection has been improved, when needs will go up clamp and lower clamp separation, continue to utilize strong magnetic tool to the gravitation of cardboard, increase the distance between two cardboards, so that last clamp can normally break away from with lower clamp, the effect of quick detach has been realized.

Description

Steel structure pipeline bracket with bradyseism quick detach mechanism
Technical Field
The utility model relates to a pipe bracket technical field specifically is a steel construction pipe bracket with bradyseism quick detach mechanism.
Background
The pipeline is a device which is connected by pipes, pipe connectors, valves and the like and used for conveying gas, liquid or fluid with solid particles, can be conveyed by utilizing the pressure or gravity of the fluid, and plays a transmission function, is a common part in production and life, has wide application range, is mainly used for water supply, drainage, long-distance petroleum and natural gas conveying and various industrial devices, needs a pipeline bracket to support the pipeline because the pipeline is influenced by the gravity, avoids the pipeline from falling, often uses more disassembling tools and produces a certain amount of connecting parts such as bolts and the like in the process of installing and disassembling the pipeline bracket, and increases the complexity of work.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction conduit support with bradyseism quick detach mechanism to solve and often use more extracting tool when dismantling conduit support that proposes in the above-mentioned background art, and produce parts such as an amount of bolts and lead to having increased the problem that the work load has reduced the convenience.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel structure pipeline bracket with bradyseism quick detach mechanism, includes clamp, lower clamp, cardboard, spring and stand, go up the both sides of clamp and all install connecting seat one, the below of going up the clamp is provided with down the clamp, connecting seat two is all installed to clamp both sides outer wall down, the lower surface mounting of clamp has the base down, the last surface mounting of connecting seat two has the working chamber, the slide is installed to the lower extreme inner wall of working chamber, the cardboard has been placed, 2 to the upper surface of slide one side outer wall connection that the cardboard is close to the working chamber inner wall has the spring, the lower surface mounting of connecting seat one has the stand, the draw-in groove has evenly been seted up to the outer wall of stand, the lower extreme of stand runs through and inserts to the working chamber inside, the outer wall run-through formula of going up clamp and lower clamp evenly is equipped with the threaded rod, the threaded rod is close to the one end of last clamp and lower clamp inner wall and installs the rubber pad.
Preferably, the longitudinal section of the upper clamp is of a semicircular structure, and 2 connecting seats are symmetrical about the longitudinal center line of the upper clamp.
Adopt above-mentioned technical scheme, utilize the semicircular design of last clamp, can place the pipeline wherein to the surface shape of adaptation pipeline reduces the extrusion to the pipeline outer wall.
Preferably, the upper surface of lower clamp is towards the lower surface of last clamp, the longitudinal section of clamp is semicircular structure, 2 down the connecting seat two is symmetrical about the vertical central line of clamp down.
Adopt above-mentioned technical scheme, utilize the relative design of last clamp and lower clamp, can form the space of placing of pipeline to form the support to the pipeline.
Preferably, 2 the base is symmetrical about the vertical central line of clamp down, the spout has been seted up to the upper surface of slide, 2 the slide is symmetrical about the vertical central line of working chamber.
Adopt above-mentioned technical scheme, the design of slide is used for supporting the slip of cardboard, avoids the cardboard phenomenon of empting to appear.
Preferably, the longitudinal section of the clamping plate is of an L-shaped structure, the clamping plate and the outer wall of the sliding seat form a sliding structure, and the other end of the spring is connected with the inner wall of the working cavity.
Adopt above-mentioned technical scheme, under the effect of spring, utilize elasticity to promote the cardboard and slide on the slide to form the effect of block.
Preferably, the draw-in groove constitutes the block structure with the one end of cardboard, the threaded rod passes through threaded connection with last clamp and lower clamp.
Adopt above-mentioned technical scheme, because the rubber pad is towards the design of pipeline outer wall, can play absorbing effect when the pipeline takes place vibrations.
Compared with the prior art, the beneficial effects of the utility model are that: this steel structure pipeline bracket with bradyseism quick detach mechanism:
1. the clamping plates are made of magnetic materials, when the two clamping plates are attracted by an external strong magnetic tool, the clamping plates move in the working cavity, so that the distance between the two clamping plates is increased, the stand column can be conveniently placed, when the external strong magnetic effect is relieved, the two clamping plates clamp the stand column under the action of elasticity, the connecting effect of an upper clamp and a lower clamp is formed, the practicability of installation parts such as bolts is reduced, the connection convenience is improved, when the upper clamp and the lower clamp need to be separated, the attraction of the strong magnetic tool to the clamping plates is continuously utilized, the distance between the two clamping plates is increased, the upper clamp can be normally separated from the lower clamp, and the quick-release effect is realized;
2. when the pipeline installation was inside at last clamp and lower clamp, because the external diameter of pipeline is different, probably with last clamp and produce certain gap down between the clamp, when the pipeline was at last clamp and when vibrating down between the clamp, thereby the damage that often can cause the pipeline outer wall influences the effect of pipeline transportation, utilize the design of threaded rod this moment, when the threaded rod rotates, promote the rubber pad and be close to the pipeline outer wall, utilize the elastic action of rubber pad, played the effect of buffering to the pipeline outer wall, the integrality of pipeline outer wall has been protected.
Drawings
FIG. 1 is a schematic view of the overall cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the overall front view structure of the present invention;
FIG. 3 is a schematic view of a cross-sectional structure of the connection side of the column and the slot of the present invention;
fig. 4 is a schematic view of the connection overlooking structure of the upper clamp and the connecting seat of the present invention.
In the figure: 1. an upper hoop; 2. a first connecting seat; 3. a lower hoop; 4. a second connecting seat; 5. a base; 6. a working chamber; 7. a slide base; 8. clamping a plate; 9. a spring; 10. a column; 11. a card slot; 12. a threaded rod; 13. and (7) a rubber pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a steel structure pipeline bracket with bradyseism quick detach mechanism, including last clamp 1, connecting seat one 2, lower clamp 3, connecting seat two 4, base 5, working chamber 6, slide 7, cardboard 8, spring 9, stand 10, draw-in groove 11, threaded rod 12 and rubber pad 13, connecting seat one 2 is all installed to the both sides of going up clamp 1, the longitudinal section of going up clamp 1 is semi-circular structure, 2 a connecting seat 2 is symmetrical about the vertical central line of last clamp 1, will be down clamp 3 and place stably with base 5, will go up clamp 1's inner wall clamp 3 down afterwards, as shown in figure 1 and figure 2.
Go up clamp 1's below and be provided with down clamp 3, connecting seat two 4 are all installed to 3 both sides outer walls of lower clamp, and the upper surface of lower clamp 3 is towards the lower surface of last clamp 1, and the longitudinal section of lower clamp 3 is semi-circular structure, and 2 connecting seats two 4 are symmetrical about the vertical central line of clamp 3 down, make connecting seat one 2 towards connecting seat two 4, as shown in fig. 1 and fig. 3.
Lower clamp 3's lower surface mounting has base 5, the last surface mounting of connecting seat two 4 has working chamber 6, slide 7,2 base 5 is installed to the lower extreme inner wall of working chamber 6 and is symmetrical about the vertical central line of clamp 3 down, the spout has been seted up to the upper surface of slide 7,2 slide 7 is symmetrical about the vertical central line of working chamber 6, because two cardboard 8 of working chamber 6 inside all contain magnetic material, through external strong magnetic tool, produce opposite direction's appeal to two cardboard 8, make cardboard 8 slide on slide 7, thereby increase the distance between two cardboard 8, so that stand 10 penetrates between two cardboard 8, as shown in fig. 1 and fig. 3.
The outer wall of one side that cardboard 8,2 cardboard 8 is close to the inner wall of working chamber 6 has spring 9 placed on the upper surface of slide 7, the longitudinal section of cardboard 8 is L type structure, cardboard 8 constitutes sliding construction with slide 7 outer wall, spring 9's the other end and the inner wall connection of working chamber 6, 3 direction removal of clamp down go up clamp 1, make stand 10 get into inside working chamber 6, and make draw-in groove 11 on the stand 10 respectively towards the one end of two cardboard 8, remove the gravitation of external strong magnetic tool to two cardboard 8 this moment, then cardboard 8 moves to draw-in groove 11 direction under the effect of spring 9, and form the block effect with draw-in groove 11, thereby stabilize the position of stand 10 inside working chamber 6, as shown in fig. 1 and 2.
The lower surface mounting of connecting seat 2 has stand 10, draw-in groove 11 has evenly been seted up to the outer wall of stand 10, the lower extreme of stand 10 runs through and inserts to the working chamber 6 inside, the outer wall run-through formula of going up clamp 1 and lower clamp 3 evenly is equipped with threaded rod 12, threaded rod 12 is close to the one end of last clamp 1 and lower clamp 3 inner wall and installs rubber pad 13, draw-in groove 11 constitutes the block structure with the one end of cardboard 8, threaded rod 12 passes through threaded connection with last clamp 1 and lower clamp 3, penetrate the pipeline in the space between last clamp 1 and the lower clamp 3 after last clamp 1 forms the connection effect with lower clamp 3, in order to form the supporting role to the pipeline, threaded rod 12 rotates afterwards, adjust the distance between rubber pad 13 and the pipeline outer wall, make rubber pad 13 and the laminating of pipeline outer wall mutually, utilize the elasticity characteristic of rubber pad 13, when the pipeline takes place vibrations, certain cushioning effect has been played to the pipeline, thereby the integrality of pipeline outer wall has been kept, as shown in fig. 1 and fig. 2.
The working principle is as follows: when the steel structure pipeline support with the bradyseism quick release mechanism is used, firstly, the lower hoop 3 and the base 5 are placed stably, then, the inner wall of the upper hoop 1 faces towards the lower hoop 3, because the two clamping plates 8 in the working cavity 6 both contain magnetic materials, attraction forces in opposite directions are generated on the two clamping plates 8 through the two external strong magnetic tools, the distance between the two clamping plates 8 is increased, the upright post 10 enters the working cavity 6, the attraction forces of the external strong magnetic tools on the two clamping plates 8 are relieved, and then the clamping plates 8 move towards the clamping groove 11 under the action of the spring 9 and form a clamping effect with the clamping groove 11;
after the upper clamp 1 and the lower clamp 3 form a connecting effect, a pipeline penetrates into a space between the upper clamp 1 and the lower clamp 3 to form a supporting effect on the pipeline;
then, the threaded rod 12 is rotated, the distance between the rubber pad 13 and the outer wall of the pipeline is adjusted, so that the rubber pad 13 is attached to the outer wall of the pipeline, and the overall practicability is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a steel construction pipeline bracket with bradyseism quick detach mechanism, includes last clamp (1), lower clamp (3), cardboard (8), spring (9) and stand (10), its characterized in that: go up the both sides of clamp (1) and all install connecting seat (2), the below of going up clamp (1) is provided with down clamp (3), connecting seat two (4) are all installed to clamp (3) both sides outer wall down, the lower surface mounting of clamp (3) has base (5) down, the last surface mounting of connecting seat two (4) has working chamber (6), slide (7) are installed to the lower extreme inner wall of working chamber (6), cardboard (8) have been placed to the upper surface of slide (7), 2 one side outer wall connection that cardboard (8) are close to working chamber (6) inner wall has spring (9), the lower surface mounting of connecting seat (2) has stand (10), draw-in groove (11) have evenly been seted up to the outer wall of stand (10), the lower extreme of stand (10) runs through and inserts to working chamber (6) inside, go up clamp (1) and the outer wall run-through formula of clamp (3) down and evenly be equipped with threaded rod (12), threaded rod (12) are close to the one end of last clamp (1) and lower clamp (3) inner wall and install rubber pad (13).
2. The steel structure pipeline bracket with the shock absorption quick release mechanism as claimed in claim 1, wherein: the longitudinal section of going up clamp (1) is semicircular structure, 2 connecting seat (2) are symmetrical about the vertical central line of last clamp (1).
3. The steel structure pipeline bracket with the shock absorption quick release mechanism as claimed in claim 1, wherein: the upper surface of lower clamp (3) is towards the lower surface of last clamp (1), the longitudinal section of lower clamp (3) is semicircular structure, 2 the longitudinal center line symmetry about lower clamp (3) of connecting seat two (4).
4. The steel structure pipeline bracket with the shock absorption quick release mechanism as claimed in claim 1, wherein: 2 base (5) are symmetrical about the vertical central line of lower clamp (3), the spout has been seted up to the upper surface of slide (7), 2 slide (7) are symmetrical about the vertical central line of working chamber (6).
5. The steel structure pipeline bracket with the shock absorption quick release mechanism as claimed in claim 1, wherein: the longitudinal section of the clamping plate (8) is of an L-shaped structure, the clamping plate (8) and the outer wall of the sliding seat (7) form a sliding structure, and the other end of the spring (9) is connected with the inner wall of the working cavity (6).
6. The steel structure pipeline bracket with the quick release mechanism of bradyseism of claim 1, characterized in that: draw-in groove (11) constitute the block structure with the one end of cardboard (8), threaded rod (12) pass through threaded connection with last clamp (1) and lower clamp (3).
CN202221644304.8U 2022-06-28 2022-06-28 Steel structure pipeline bracket with bradyseism quick detach mechanism Active CN217927517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221644304.8U CN217927517U (en) 2022-06-28 2022-06-28 Steel structure pipeline bracket with bradyseism quick detach mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221644304.8U CN217927517U (en) 2022-06-28 2022-06-28 Steel structure pipeline bracket with bradyseism quick detach mechanism

Publications (1)

Publication Number Publication Date
CN217927517U true CN217927517U (en) 2022-11-29

Family

ID=84184437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221644304.8U Active CN217927517U (en) 2022-06-28 2022-06-28 Steel structure pipeline bracket with bradyseism quick detach mechanism

Country Status (1)

Country Link
CN (1) CN217927517U (en)

Similar Documents

Publication Publication Date Title
CN201615288U (en) Fixed thermal-insulating saddle pipe holder
CN217927517U (en) Steel structure pipeline bracket with bradyseism quick detach mechanism
CN202834418U (en) Pipeline radial shock absorption support
CN210461945U (en) Reinforcing apparatus for water conservancy pipeline laying
CN108397600A (en) A kind of wall damping device of antimony glycol feedstock transportation pipeline
CN213452121U (en) Antidetonation support protection device
CN207621493U (en) A kind of plumbing installation of antidetonation
CN104964098A (en) Two-way buffer pipeline support-hanger
CN210920330U (en) Drainage pipeline installing support
CN210423982U (en) Mounting structure of pipeline support
CN214368534U (en) Pipeline fixing device is used in hydraulic engineering construction
CN210263123U (en) Municipal pipeline support piece
CN213541536U (en) Pipeline supports connecting device for hydraulic engineering
CN112982551B (en) Non-negative pressure water supply equipment with anti-corrosion function
CN211715914U (en) Vacuum pipeline mounting base
CN213299222U (en) Anti-seismic support is with high damping buffer type U type pipe clamp that bears
CN204962042U (en) Novel pipeline removes frame
CN210860100U (en) Gas pipeline installation hanging device
CN211423686U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN214838876U (en) Multi-position supporting structure of urban comprehensive pipe gallery cross section
CN203441446U (en) Pressure cap
CN216715409U (en) Novel water supply and drainage bradyseism pipe clamp
CN213206782U (en) Fixing device for pipeline engineering
CN216666696U (en) Stress-relieving and shock-absorbing pipe clamp
CN220506016U (en) Underground pipe gallery hoisting pipeline support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant