Novel profiled steel sheet wall window structure
Technical Field
The utility model relates to a building door and window technical field specifically is a novel profiled sheet wall window structure.
Background
The window is characterized in that the window structurally refers to a hole built in a wall or a roof and used for enabling light or air to enter a room, the window of a modern window is composed of a window frame, glass, a movable component hinge, a handle, a pulley and the like, the window frame is used for supporting a main structure of a window body and can be made of wood, metal, ceramic or plastic materials, a transparent part is attached to the window frame and can be made of paper, cloth, silk or glass materials, and the movable component mainly takes metal materials as a main part.
After profiled sheet building construction is accomplished, can need installation window structure on the wall, so that external sunshine can shine to the building in, the circulation of air is also convenient for carry on simultaneously, current window structure is when using, adopt the foamer to fix it on the wall usually, if need change the window structure, dismantle the back with the window structure, still need consume certain manpower and clear up the foamer, and when clearing up the dust on the window, generally need the staff in the outside to clear up it, because of partial window is in the eminence, make and need the staff to carry out high altitude construction, probably there is the accident when the operation and take place, cause harm to staff's life safety easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel profiled sheet wall window structure, possess and be convenient for install the window structure and be convenient for carry out the advantage of clearing up the dust on the window, solved current window structure when using, adopt the foaming agent to fix it on the wall usually, if need change the window structure, after dismantling the window structure, still need consume certain manpower and clear up the foaming agent, and when clearing up the dust on the window, generally need the staff to clear up it in the outside, because of partial window is in the eminence, make and need the staff to carry out high altitude construction, probably have the unexpected problem of taking place when the operation.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a novel die mould steel sheet wall window structure, includes the wall body, the inner chamber movable mounting of wall body has the window frame, movable window is installed through the pivot to the inner chamber of window frame, the both sides of window frame all are provided with fixed establishment, movable window's rear side is provided with clean mechanism, the water hole has been seted up down to the bottom of window frame inner chamber.
Preferably, fixed establishment is including the installation piece, one side and window frame fixed connection that the installation piece is close to the window frame, the equal fixedly connected with installing frame in the positive both sides of wall body, spacing commentaries on classics board is installed through the bearing to the inner chamber of installing frame, the constant head tank has been seted up at the top of installation piece, the equal fixedly connected with guide frame in one side that two installing frames are opposite, the top of guide frame is run through and is provided with the connecting rod, the bottom of connecting rod is run through to the bottom and the fixedly connected with handle of guide frame, the equal fixedly connected with locating lever in one side that two connecting rods are relative.
Preferably, the front side of installation piece is opened and is equipped with the slide opening, the through-hole has been seted up at the top of installing frame, the inner wall of guide frame and the junction on connecting rod surface are sliding connection.
Preferably, clean mechanism includes the carriage, the quantity of carriage is two, the front side and the movable window fixed connection of carriage, the horizontal welding of inner chamber of carriage has the slide bar, the surperficial movable sleeve of slide bar is equipped with the slider, and the activity of one side that two sliders are relative is provided with clean brush board, the rear side of slider is seted up and is equipped with the dovetail groove, trapezoidal piece has all been welded to the upper and lower both sides of clean brush board, and the bottom welding of the slider of bottom has the connection handle.
Preferably, the connection part of the inner wall of the sliding block and the inner wall of the sliding rod is in sliding connection, and the rear side of the cleaning brush plate is welded with a pulling plate.
Preferably, the bottom of the two sides of the back of the wall body are respectively welded with a supporting plate, and the top of each supporting plate is movably connected with the window frame.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses an installation piece, the installing frame, spacing commentaries on classics board, the constant head tank, the guide frame, the connecting rod, the locating lever, the carriage, the slide bar, the slider, clean brush board, connect the handle, lower water hole, trapezoidal piece, the dovetail groove, handle and slide opening cooperation are used, current window structure has been solved when using, adopt the foamer to fix it on the wall usually, if need change the window structure, dismantle the window structure after, still need consume certain manpower and clear up the foamer, and when clearing up the dust on the window, generally need the staff in the outside to clear up it, because of partial window is in the eminence, make and need the staff to carry out high altitude construction, probably there is the unexpected problem of taking place during the operation.
Drawings
Fig. 1 is a front perspective view of the structure of the present invention;
FIG. 2 is a rear perspective view of the structure of the present invention;
FIG. 3 is an exploded perspective view of the fixing mechanism of the present invention;
FIG. 4 is an exploded perspective view of the cleaning mechanism of the present invention;
fig. 5 is an exploded perspective view of the cleaning mechanism of the present invention.
In the figure: 1 wall body, 2 window frames, 3 movable windows, 4 fixing mechanisms, 5 cleaning mechanisms, 6 mounting blocks, 7 mounting frames, 8 limiting rotating plates, 9 positioning grooves, 10 guide frames, 11 connecting rods, 12 positioning rods, 13 supporting frames, 14 sliding rods, 15 sliding blocks, 16 cleaning brush plates, 17 connecting handles, 18 drainage holes, 19 trapezoidal blocks, 20 trapezoidal grooves, 21 handles and 22 sliding holes.
Detailed Description
Referring to fig. 1 to 5, a novel profiled steel sheet wall window structure includes a wall 1, a window frame 2 is movably mounted in an inner cavity of the wall 1, a movable window 3 is mounted in the inner cavity of the window frame 2 through a rotating shaft, fixing mechanisms 4 are disposed on two sides of the window frame 2, a cleaning mechanism 5 is disposed on a rear side of the movable window 3, and a drain hole 18 is disposed at a bottom of the inner cavity of the window frame 2.
Fixing mechanism 4 is including installation piece 6, one side and window frame 2 fixed connection that installation piece 6 is close to window frame 2, the equal fixedly connected with installing frame 7 in the positive both sides of wall body 1, spacing commentaries on classics board 8 is installed through the bearing to the inner chamber of installing frame 7, constant head tank 9 has been seted up at the top of installation piece 6, the equal fixedly connected with guide frame 10 in one side that two installing frames 7 are opposite, the top of guide frame 10 is run through and is provided with connecting rod 11, the bottom of connecting rod 11 is run through to the bottom and the fixedly connected with handle 21 of guide frame 10, the equal fixedly connected with locating lever 12 in one side that two connecting rods 11 are relative.
The front side of the mounting block 6 is provided with a sliding hole 22, the top of the mounting frame 7 is provided with a through hole, and the connection part of the inner wall of the guide frame 10 and the surface of the connecting rod 11 is in sliding connection.
The cleaning mechanism 5 comprises two supporting frames 13, the number of the supporting frames 13 is two, the front side of each supporting frame 13 is fixedly connected with the movable window 3, a sliding rod 14 is transversely welded in an inner cavity of each supporting frame 13, a sliding block 15 is movably sleeved on the surface of each sliding rod 14, a cleaning brush plate 16 is movably arranged on one side, opposite to the two sliding blocks 15, of each sliding block 15, a trapezoidal groove 20 is formed in the rear side of each sliding block 15, trapezoidal blocks 19 are welded on the upper side and the lower side of each cleaning brush plate 16, and a connecting handle 17 is welded at the bottom end of each sliding block 15 at the bottom.
The connection part of the inner wall of the sliding block 15 and the inner wall of the sliding rod 14 is in sliding connection, and the rear side of the cleaning brush plate 16 is welded with a pulling plate.
The bottom of the two sides of the back of the wall body 1 are welded with supporting plates, and the tops of the supporting plates are movably connected with the window frame 2.
Through the cooperation of trapezoidal piece 19 and dovetail groove 20, be convenient for the staff changes cleaning brush 16, through setting up slide opening 22, can cooperate with spacing commentaries on classics board 8 and carry on spacingly to installation piece 6, through setting up guide frame 10, can lead to spacingly to connecting rod 11, in order to prevent that connecting rod 11 from taking place to rock when removing, and lead to in locating lever 12 can't get into constant head tank 9, through setting up the backup pad, can support window frame 2, with this stability that increases window frame 2, through setting up the arm-tie, be convenient for the staff will clean brush 16 and pull out in the slider 15.
During the use, the staff installs window frame 2 earlier, then the staff aligns spacing commentaries on classics board 8 and slide opening 22, the staff drives installation piece 6 through window frame 2 afterwards and removes, make installation piece 6 can insert in installing frame 7, spacing commentaries on classics board 8 passes slide opening 22 and extends to the front side of installation piece 6 simultaneously, after installation piece 6 gets into installing frame 7 completely, the staff rotates spacing commentaries on classics board 8, make spacing commentaries on classics board 8 can stagger with slide opening 22, so that make spacing commentaries on classics board 8 can carry out spacingly to installation piece 6, the staff drives connecting rod 11 through handle 21 and stimulates downwards, connecting rod 11 drives locating lever 12 and removes downwards when removing, until locating lever 12 passes through the through-hole and extends to the inner chamber of constant head tank 9, with this to spacing commentaries on classics board 8 cooperation to install piece 6 spacing, after installing window frame 2, the staff installs movable window 3 to window frame 2 in through the pivot, after long-time use, the outside of movable window 3 is cleared up easily, if need, the dust clearance window 3, the staff can open the movable window, the ladder board goes on a side and removes to the outside and makes the ladder board that the dust goes on a round trip to brush and removes, the ladder window and removes and makes the ladder board 16 that the window that the staff moves after the removal, the ladder moves, the ladder window removes after the cleaning strip that the dust removes, the cleaning window removes, the ladder moves after the ladder window removes, the staff moves, 16 moves after the ladder moves.
In summary, the following steps: this novel profiled sheet wall window structure, through installation piece 6, installing frame 7, spacing commentaries on classics board 8, constant head tank 9, guide frame 10, connecting rod 11, locating lever 12, carriage 13, slide bar 14, slider 15, clean brush board 16, connect 17, launching hole 18, trapezoidal piece 19, trapezoidal groove 20, handle 21 and slide opening 22 cooperation are used, current window structure when using has been solved, adopt the foamer to fix it on the wall usually, if need change the window structure, dismantle the window structure after, still need consume certain manpower and clear up the foamer, and when clearing up the dust on the window, generally need the staff to clear up it in the outside, because of partial window is in the eminence, make and need the staff to carry out high altitude construction, probably have unexpected problem when the operation.