Prior art keywords
elastic
post
fixedly connected
bridge construction
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221573801.3U
Other languages
Chinese (zh)
Inventor
唐彬
李倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221573801.3U priority Critical patent/CN217925240U/en
Application granted granted Critical
Publication of CN217925240U publication Critical patent/CN217925240U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses an interim protector of bridge construction relates to protector technical field. Including the spacing post of frame, it is connected with the elastic expansion band to rotate between the spacing post of frame, the crooked stand of a plurality of centre gripping of elastic expansion band's fixed surface is connected with, one side fixedly connected with clockwork spring containing box of the spacing post of frame, elastic protection network is accomodate in the inboard winding of clockwork spring containing box. The utility model discloses through the setting of elasticity protection network and elastic stretching area, make the striking personnel contact to have elastic soft protector, avoided the injury that collides with the stereoplasm rail guard and cause, and limit the extension limit of elastic stretching area through the setting of centre gripping crooked stand, prevent that people's impact force is too violent, cross the bridge floor edge and unsettled, play better protective effect; simultaneously with the device back of tearing down, under the drive of elastic stretching area and clockwork spring containing box, the device can tighten up automatically, makes it occupy less volume, the storage of convenient transport.

Description

Temporary protection device for bridge construction
Technical Field
The utility model relates to a protector technical field specifically is interim protector of bridge construction.
Background
The bridge protection device is an isolation device installed on the top end of a bridge subgrade, is used for bridge construction, can isolate a construction site from the outside, can form a closed construction space, avoids non-operating personnel from entering, and reduces the occurrence probability of accidents. And relatively, the protective device can also protect the operating personnel in the protective device, prevent the operating personnel from falling from the bridge and guarantee the safety of the operating personnel.
The utility model discloses a chinese utility model patent that publication number is CN211689903U discloses a interim protector is used in bridge construction, this interim protector is used in bridge construction, annular slab and embedded bar zonulae occludens, the cross-shaped groove can adapt to cup joint different distance embedded bar, the effect of base and embedded bar zonulae occludens still do not damage embedded bar when having played, fix the stand joint in the inner chamber of base, stronger guard action has been played, constructor's life safety has been guaranteed, the knee joint on pin and the stand cup joints fixedly, the pole setting cup joints with the pin, be convenient for installation and dismantlement. Nevertheless when using this utility model, whole interim protector texture is harder, consequently when constructor hit protector, though can not fall, nevertheless still can receive certain injury, is pulling down this interim protector back simultaneously, still can occupy great space, causes inconveniently to transport and storage work. Therefore, a temporary protection device for bridge construction is developed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an interim protector of bridge construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: temporary protection device of bridge construction, including the rail guard main part, the rail guard main part is including the fixed fence of installation, the fixed fence of installation includes two spacing posts of frame, two it is connected with the elastic expansion band to rotate between the spacing post of frame, the crooked stand of a plurality of centre gripping of elastic expansion band's fixed surface is connected with, two one side of the spacing post of frame is fixedly connected with a clockwork spring containing box, one of them elastic protection network is accomodate in the inboard winding of clockwork spring containing box, elastic protection network's one end extends to the inside of another clockwork spring containing box.
Preferably, every the crooked stand of centre gripping includes the stand base, top one side of stand base is rotated and is connected with active crooked post, active crooked post is formed by a plurality of segments initiative post articulated each other, every one side of segment initiative post all is fixed spiro union respectively has a gim peg, every the one end of gim peg all is fixed the spiro union has the driven post of segment.
Preferably, every two driven posts of segment are fixedly connected with an elastic connecting post, the driven posts of segment are combined into a driven bending post through the elastic connecting post, and the bottom end of the driven bending post is rotatably connected with the upright base.
Preferably, the top end fixedly connected with top platform of active bending post and driven bending post, the both sides bottom of top platform is fixedly connected with an elasticity stand separately, all the bottom of elasticity stand all with stand base fixed connection.
Preferably, every the top of top platform and the spacing post of frame all two sets of top grip slipper of fixedly connected with, the inboard centre gripping of two sets of top grip slipper is fixed with a directional crossbeam, has a space between per two directional crossbeams, two the bottom of the spacing post of frame is fixedly connected with fixed platform respectively.
Preferably, one end of each fixing bolt is fixedly connected with a fixing hook, and one end of each fixing hook is hooked with the elastic protective net.
Compared with the prior art, the beneficial effects of the utility model are that:
according to the temporary protection device for bridge construction, through the arrangement of the elastic protection net and the elastic stretching belt, an impacting person can contact the elastic soft protection device, the damage caused by collision with a hard protection fence is avoided, the extension limit of the elastic stretching belt is limited through the arrangement of the clamping bent upright column, the impact force of the person is prevented from being too strong, the person can cross the edge of a bridge floor and be suspended, and a good protection effect is achieved; simultaneously pull down the back with the device, under the drive of elastic stretching area and clockwork spring containing box, the device can tighten up automatically, makes it occupy less volume, the storage of convenient transport.
Drawings
Fig. 1 is an isometric view of the present invention;
fig. 2 is a schematic structural view of the protective guard of the present invention;
fig. 3 is a schematic structural view of the bent upright of the present invention;
fig. 4 is a schematic view of the structure of the fixing rail of the present invention.
In the figure: 1. a guard rail main body; 101. a top end clamping seat; 102. a directional beam; 103. clamping the bent upright post; 131. a top end platform; 132. an elastic upright post; 133. actively bending the column; 134. a fixed hook; 135. a column base; 136. a driven bending post; 137. an elastic connecting column; 138. a fixing bolt; 104. installing a fixed fence; 141. an elastic stretchable band; 142. a frame limit post; 143. a fixed platform; 2. a clockwork spring storage box; 3. an elastic protective net.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
It should be noted that, in the description of the present invention, the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of description and simplification of the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Further, it will be appreciated that the dimensions of the various elements shown in the figures are not drawn to scale, for ease of description, and that the thickness or width of some layers may be exaggerated relative to other layers, for example.
It should be noted that like reference numerals and letters refer to like items in the following figures, and thus, once an item is defined or illustrated in one of the figures, it will not need to be further discussed or illustrated in detail in the description of the figures that follows.
As shown in fig. 1-4, the utility model provides a technical solution:
temporary protection device of bridge construction, including rail guard main part 1, rail guard main part 1 is including the fixed fence 104 of installation, the fixed fence 104 of installation includes two spacing posts 142 of frame, it is connected with elastic expansion band 141 to rotate between two spacing posts 142 of frame, in this embodiment, elastic expansion band 141 can stretch relatively long distance under the exogenic action, and elastic expansion band 141's fixed surface is connected with the crooked stand 103 of a plurality of centre grippings, consequently, when elastic expansion band 141 is stretched, the distance between each crooked stand 103 of centre gripping also can increase, and after the exogenic force disappears, elastic expansion band 141 retracts, make each crooked stand 103 of centre gripping fold, make it only occupy less space when accomodating. One side of each of the two frame limiting columns 142 is fixedly connected with a clockwork spring storage box 2, an elastic protective net 3 is wound and stored inside one of the clockwork spring storage boxes 2, and one end of the elastic protective net 3 extends into the other clockwork spring storage box 2. In this embodiment, two storage rollers are disposed inside the two spring storage boxes 2, two ends of the elastic protection net 3 are wound on the storage rollers, and an elastic steel ring serving as a spring is disposed on the storage rollers and connected to the elastic protection net 3, so that when the whole device is stretched, the elastic protection net 3 is pulled out, the steel ring is tightened, and when external force disappears, the steel ring releases to drive the elastic protection net 3 to retract, and simultaneously the storage rollers rotate to wind the elastic protection net 3 thereon, thereby reducing the length of the external elastic protection net 3 and also reducing the volume of the device when being stored. In this embodiment, when the device is deployed, the length of the elastic expansion band 141 which is pulled apart can be adjusted according to actual conditions, and then the fixed platform 143, the column base 135 and the bridge deck are fixed, and the directional beam 102 is installed. It should be noted that the elastic bands 141 cannot be stretched too much, so that the distance between the two top holders 101 exceeds a positioning beam 102, and too long is likely to cause damage to the elastic bands 141.
Every crooked stand 103 of centre gripping includes stand base 135, and top one side of stand base 135 is rotated and is connected with active crooked post 133, and active crooked post 133 is articulated mutually by a plurality of small segments of initiative post and is formed, and one side of every small segment of initiative post all is fixed spiro union respectively has a gim peg 138, and the one end of every gim peg 138 all is fixed spiro union has the driven post of small segment. An elastic connecting column 137 is fixedly connected between every two small-section driven columns, the small-section driven columns are combined into a driven bending column 136 through the elastic connecting column 137, and the bottom end of the driven bending column 136 is rotatably connected with the upright column base 135. It should be noted that the elastic connecting column 137 has elasticity and flexibility, and thus can be extended as the bending time interval of the driven bending column 136 increases. In this embodiment, the active bending column 133 faces the site of the bridge construction, so if someone bumps into the protection device, the elastic expansion band 141 is driven to stretch, and naturally, the active bending column 133 is also bent, and the active bending column 133 drives the driven bending column 136 to rotate, thereby forming a space for accommodating the collider, so as to dissolve the impact force generated by the collider, and the active bending column 133 and the driven bending column 136 are arranged so that the elastic expansion band 141 is not excessively deformed, so that the collider pops out of the bridge floor, or excessively rebounds, and the collider falls down. The top ends of the driving bending column 133 and the driven bending column 136 are fixedly connected with a top platform 131, the bottom ends of two sides of the top platform 131 are respectively and fixedly connected with an elastic upright column 132, and the bottom ends of all the elastic upright columns 132 are fixedly connected with an upright column base 135. In this embodiment, each of the minor segment driving post and minor segment driven post is provided with a fixed collar on both sides so that the elastic post 132 can pass therethrough, so that the elastic post 132 maintains a bending state consistent with that of the driving bending post 133 and the driven bending post 136, and rebounds after the external force disappears, so that the clamping bending post 103 is returned to the right. The top ends of each top platform 131 and the frame limiting columns 142 are fixedly connected with two groups of top clamping seats 101, the inner sides of the two groups of top clamping seats 101 are fixedly clamped with a directional beam 102, a gap exists between every two directional beams 102, and the bottom ends of the two frame limiting columns 142 are fixedly connected with a fixing platform 143 respectively. In this embodiment, the directional beams 102 are distributed on two sides of the elastic extensible band 141, and the directional beams 102 on two sides have the same length and are distributed in a staggered manner, so that a section of the two opposite directional beams 102 always coincides with each other, thereby forming a nearly-connected total beam, preventing the top end of the elastic extensible band 141 from inclining outwards when the elastic extensible band 141 is stretched, and allowing a person who collides with the elastic extensible band 141 to be thrown out from above. One end of each fixing bolt 138 is fixedly connected with a fixing hook 134, and one end of each fixing hook 134 is hooked with the elastic protection net 3. So that the elastic protection net 3 is tightly clamped on the surface of the curved upright post 103 to provide buffer for the impacter. In this embodiment, the fixing hook 134 is small, smooth in edge, and facing inward, and will not hurt the user.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Interim protector of bridge construction, including rail guard main part (1), its characterized in that: the protective guard main body (1) comprises an installation fixing fence (104), the installation fixing fence (104) comprises two frame limiting columns (142), two elastic telescopic belts (141) are connected between the frame limiting columns (142) in a rotating mode, a plurality of clamping bent stand columns (103) are fixedly connected to the surfaces of the elastic telescopic belts (141), two spring containing boxes (2) are fixedly connected to one sides of the frame limiting columns (142) respectively, one elastic protective net (3) is contained in the inner side of each spring containing box (2) in a winding mode, and one end of each elastic protective net (3) extends to the inside of the other spring containing box (2).
2. The temporary protection device for bridge construction according to claim 1, wherein: every crooked stand of centre gripping (103) includes stand base (135), top one side rotation of stand base (135) is connected with initiative crooked post (133), initiative crooked post (133) are formed by a plurality of small sections initiative posts articulated each other, every one side of small section initiative post all is fixed spiro union respectively has a gim peg (138), every the one end of gim peg (138) all fixes the spiro union and has the driven post of small section.
3. The temporary protection device for bridge construction according to claim 2, wherein: an elastic connecting column (137) is fixedly connected between every two small-section driven columns, the small-section driven columns are combined into a driven bending column (136) through the elastic connecting column (137), and the bottom end of the driven bending column (136) is rotatably connected with the upright column base (135).
4. The temporary protection device for bridge construction according to claim 3, wherein: the top fixedly connected with of initiative crooked post (133) and driven crooked post (136) top platform (131), the both sides bottom of top platform (131) is a fixedly connected with elasticity stand (132) separately, all the bottom of elasticity stand (132) all with stand base (135) fixed connection.
5. The temporary protection device for bridge construction according to claim 4, wherein: every top platform (131) and the top of the spacing post of frame (142) are two sets of top grip slipper (101) of fixedly connected with all, and the inboard centre gripping of two sets of top grip slipper (101) is fixed with a directional crossbeam (102), has a space between per two directional crossbeams (102), two the bottom of the spacing post of frame (142) is fixedly connected with fixed platform (143) respectively.
6. The temporary protection device for bridge construction according to claim 2, wherein: every the one end of gim peg (138) all is fixedly connected with fixed hook (134) respectively, all the one end and the elasticity protection network (3) of fixed hook (134) collude mutually and link to each other.
CN202221573801.3U 2022-06-22 2022-06-22 Temporary protection device for bridge construction Active CN217925240U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221573801.3U CN217925240U (en) 2022-06-22 2022-06-22 Temporary protection device for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221573801.3U CN217925240U (en) 2022-06-22 2022-06-22 Temporary protection device for bridge construction

Publications (1)

Publication Number Publication Date
CN217925240U true CN217925240U (en) 2022-11-29

Family

ID=84182455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221573801.3U Active CN217925240U (en) 2022-06-22 2022-06-22 Temporary protection device for bridge construction

Country Status (1)

Country Link
CN (1) CN217925240U (en)

Similar Documents

Publication Publication Date Title
US5569094A (en) Golf practice net
US8573565B1 (en) Multipurpose seasonal safety support fence
US9339676B2 (en) Trampoline or the like with enclosure
US5989130A (en) Multi-use net
US6223358B1 (en) Convertible pool cover support
CN217925240U (en) Temporary protection device for bridge construction
CN218092434U (en) Municipal works protection rail
US2785897A (en) Protective device for playing fields
JP2020117930A (en) Guard fence
US5816946A (en) Portable safety system for isolating on-deck batter
CN209114970U (en) Power engineering operation safety device
CN217477501U (en) Safety viewing platform for passenger transport passenger post ship
CN211597798U (en) Flat net that safety protection performance is high for construction
CN111705646A (en) Vehicle anticollision rail for bridge building
CN217420741U (en) Rail guard is used in civil engineering bridge construction
CN210421691U (en) Safe high building guardrail of anticollision
US20230330503A1 (en) Shock absorption net for golf practice
CN215136739U (en) Peripheral buffering formula protector that uses of tennis training place
CN114319832B (en) Protection mechanism for building engineering safety
CN218540392U (en) Anti-falling bridge protective fence
CA2220220C (en) Golf practice net
CN218187673U (en) High trampoline guard net of security
CN216392563U (en) Special top-collision-preventing independent fence for male estrus of sika deer
CN220117810U (en) Building construction protection canopy
CN114438932B (en) Municipal administration buffering rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant