CN217924804U - Building engineering is with linking wall spare structure - Google Patents

Building engineering is with linking wall spare structure Download PDF

Info

Publication number
CN217924804U
CN217924804U CN202221920021.1U CN202221920021U CN217924804U CN 217924804 U CN217924804 U CN 217924804U CN 202221920021 U CN202221920021 U CN 202221920021U CN 217924804 U CN217924804 U CN 217924804U
Authority
CN
China
Prior art keywords
wall
clamping block
block
fixed sleeve
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221920021.1U
Other languages
Chinese (zh)
Inventor
冯云飞
王好
刘强
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Youzhu Construction Engineering Co ltd
Original Assignee
Sichuan Youzhu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Youzhu Construction Engineering Co ltd filed Critical Sichuan Youzhu Construction Engineering Co ltd
Priority to CN202221920021.1U priority Critical patent/CN217924804U/en
Application granted granted Critical
Publication of CN217924804U publication Critical patent/CN217924804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a building engineering is with linking wall spare structure relates to building engineering subassembly technical field, including the connecting rod and be used for the fixed sleeve that sets up in the wall, the connecting rod is close to the fixed screw rod that is provided with of fixed sleeve's one end, the screw rod screw thread is worn to establish in the fixed sleeve, the connecting rod is kept away from fixed sleeve's one end and is provided with the coupling assembling that is used for connecting the scaffold steel pipe. During construction, the screw rods on the connecting rods are in threaded connection with the fixing sleeves in the wall body, the connecting rods are quickly connected with the wall body, the connecting assemblies on the connecting rods are connected with the wall connecting pieces and the scaffold steel pipes, the installation of the wall connecting pieces can be completed, and the operation is simple and convenient.

Description

Building engineering is with linking wall spare structure
Technical Field
The application relates to the technical field of constructional engineering components, in particular to a wall connecting piece structure for building engineering.
Background
The wall connecting member generally means a member for reinforcing stability of other structures by being connected to a reliable fixing end, and a member for connecting a scaffold body to a building main structure in a construction work, capable of transferring a tensile force and a compressive force. The wall attachment connection realized by the wall connecting piece plays an important role in strengthening the overall stability of the scaffold, improving the stable bearing capacity of the scaffold and avoiding major accidents such as toppling or collapse.
At present, most of the wall connecting pieces of the steel pipe fastener type scaffold still adopt a steel pipe embedded form. Through the pre-buried vertical steel pipe in assigned position before major structure concrete placement as even wall spare, treat that the concrete strength reaches the back, adopt steel pipe and ordinary fastener will be connected even wall spare and limbs pole setting, will cut off even wall spare after the later stage is used and is accomplished to adopt the concrete to fill in.
Aiming at the related technology, the wall connecting piece is cut off after being used, and the embedded part is filled with concrete to ensure the construction quality of the building after the wall connecting piece is cut off, so that the defect of low construction efficiency exists.
SUMMERY OF THE UTILITY MODEL
In order to improve the efficiency of construction, this application provides a building engineering is with linking wall spare structure.
The application provides a pair of building engineering is with linking wall spare structure adopts following technical scheme:
the utility model provides a building engineering is with linking wall spare structure, includes the connecting rod and is used for the fixed sleeve that sets up in the wall, the connecting rod is close to the fixed screw rod that is provided with of fixed sleeve's one end, the screw rod screw thread is worn to establish in the fixed sleeve, the connecting rod is kept away from fixed sleeve's one end and is provided with the coupling assembling that is used for connecting the scaffold steel pipe.
Through adopting above-mentioned technical scheme, during the construction, through the screw rod on the connecting rod and the internal fixed sleeve threaded connection of wall, realize the high-speed joint of connecting rod and wall body, the coupling assembling on the rethread connecting rod will be connected wall spare and scaffold steel pipe, can accomplish the installation of wall spare even, and easy operation is convenient. When the scaffold is dismantled, the screw rod is rotated to make the screw rod break away from the fixed sleeve, make coupling assembling and scaffold steel pipe break away from the connection, fill the fixed sleeve in the wall again, can accomplish the construction, improve the efficiency of construction.
Optionally, the connecting assembly includes a clamping block and a fastener, a circular groove is formed in the top wall of the clamping block in the vertical direction, a square groove is formed in the side wall of the clamping block in the length direction perpendicular to the circular groove, the clamping block includes a first clamping block and a second clamping block, and the fastener is used for connecting the first clamping block and the second clamping block.
Through adopting above-mentioned technical scheme, the setting of circular recess and square groove makes even wall spare can be used to connect circular or square steel pipe, has improved the suitability of even wall spare.
Optionally, the fastener is set as a fastening bolt, the first fixture block is close to the side wall of the fixing sleeve and is provided with a through hole along the length direction of the fixing sleeve, the second fixture block is close to the side wall of the fixing sleeve and is provided with a first threaded hole communicated with the through hole, and the fastening bolt is arranged in the through hole in a penetrating manner and is used for being in threaded connection with the first threaded hole.
Through adopting above-mentioned technical scheme, during the construction, realize the fastening connection to first fixture block and second fixture block through knob fastening bolt, and then make scaffold steel pipe and even wall spare stable connection, easy operation is convenient.
Optionally, a sliding groove is formed in the side wall of the through hole in the length direction perpendicular to the through hole, a sliding sheet is arranged in the sliding groove in the length direction of the through hole in a sliding mode, and the sliding sheet is fixedly sleeved on the fastening bolt.
Through adopting above-mentioned technical scheme, the gleitbretter sets up for prevent that the fastener from droing from the through-hole of first fixture block, fastening bolt is difficult for losing in handling, can directly use labour saving and time saving when connecting first fixture block and second fixture block.
Optionally, the top wall and the side wall of the first fixture block are both provided with a guide block for guiding the second fixture block.
Through adopting above-mentioned technical scheme, the setting of guide block makes the first screw hole of second fixture block and the through-hole quick centering of first fixture block, and the fastener of being convenient for is connected first fixture block and second fixture block, and easy operation is convenient.
Optionally, an iron chain is fixedly connected between the first fixture block and the second fixture block.
Through adopting above-mentioned technical scheme, the setting of iron chain prevents that the second fixture block from dropping from the eminence when the installation, realizes safe construction, prevents losing in handling of second fixture block simultaneously, directly takes during the installation, and then has improved the installation effectiveness of even wall spare.
Optionally, a telescopic rod is arranged in a threaded manner at one end, away from the fixing sleeve, of the connecting rod, a connecting block is fixedly arranged at one end, away from the fixing sleeve, of the telescopic rod, the connecting block is rotatably connected with the first clamping block, and a rotating block is fixedly arranged on the telescopic rod in a fixing manner.
Through adopting above-mentioned technical scheme, to the different interval settings of different buildings and scaffold steel pipe, drive the telescopic link through the turning block and rotate, the telescopic link is extended or is shortened along the length direction of connecting rod, realizes the length change of wall spare even, and the coupling assembling of being convenient for connects scaffold steel pipe, has effectively improved the suitability of wall spare even.
Optionally, one end of the fixing sleeve, which is far away from the connecting rod, is fixedly provided with two fixing hooks, and the two fixing hooks are arranged in a bending manner towards the direction far away from each other.
Through adopting above-mentioned technical scheme, the setting of fixed hook, the area of contact of effectual increase fixed sleeve and wall body, fixed sleeve is difficult for breaking away from in the wall body, has improved the stability of even wall spare.
In summary, the present application includes at least one of the following beneficial technical effects:
1. during construction, the screw rod on the connecting rod is in threaded connection with the fixing sleeve in the wall body, so that the connecting rod is quickly connected with the wall body, the connecting component on the connecting rod is connected with the wall piece and the scaffold steel pipe, and the installation of the wall piece can be completed, and the operation is simple and convenient. When the scaffold is dismantled, the screw rod is rotated to be separated from the fixing sleeve, so that the connecting assembly is separated from the scaffold steel pipe, and then the fixing sleeve in the wall is filled, so that construction can be completed, and the construction efficiency is improved;
2. the arrangement of the round groove and the square groove ensures that the wall connecting piece can be used for connecting round or square steel pipes, thereby improving the applicability of the wall connecting piece;
3. different intervals to different buildings and scaffold steel pipe set up, drive the telescopic link through the turning block and rotate, the telescopic link is extended or is shortened along the length direction of connecting rod, realizes the length change of wall spare even, and the coupling assembling of being convenient for connects scaffold steel pipe, has effectively improved the suitability of even wall spare.
Drawings
FIG. 1 is an overall block diagram of the present application;
FIG. 2 is a cross-sectional view of the present application;
FIG. 3 is an enlarged view of portion A of FIG. 2;
FIG. 4 is an exploded view of the coupling assembly embodying the subject application;
fig. 5 is an exploded view of the present application, which embodies primarily the connection block.
Description of the reference numerals: 1. a wall body; 11. fixing the sleeve; 12. a fixed hook; 2. a connecting rod; 21. a reinforcing plate; 22. a second threaded hole; 3. scaffold steel pipes; 4. a screw; 5. a connecting assembly; 51. a clamping block; 511. a first clamping block; 512. a second fixture block; 52. a fastener; 53. a circular groove; 54. a square groove; 55. a through hole; 56. a first threaded hole; 57. a chute; 58. sliding a sheet; 6. a guide block; 7. an iron chain; 8. a telescopic rod; 81. connecting blocks; 811. a first accommodating groove; 812. a second accommodating groove; 82. rotating the block; 9. a first round block; 10. and a second round block.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses building engineering is with linking wall spare structure.
Referring to fig. 1 and 3, a building engineering is with linking wall with structure, including the connecting piece and be used for the fixed sleeve 11 that sets up in wall body 1, fixed sleeve 11 is pre-buried in wall body 1, and fixed sleeve 11 keeps away from the fixed two stationary hooks 12 that are provided with of one end of connecting rod 2, and two stationary hooks 12 are towards the crooked setting of the direction of keeping away from each other, and stationary hook 12 is used for increasing the area of contact of fixed sleeve 11 and wall body 1, makes fixed sleeve 11 difficult follow wall body 1 and breaks away from. Connecting rod 2 can be dismantled with fixed sleeve 11 and be connected, and connecting rod 2 keeps away from the one end rotation of fixed sleeve 11 and is provided with coupling assembling 5 that is used for connecting scaffold steel pipe 3.
Referring to fig. 2 and 3, a screw rod 4 is fixedly arranged at one end of the connecting rod 2 close to the fixing sleeve 11, the screw rod 4 is in threaded connection with the fixing sleeve 11, and a reinforcing plate 21 is fixedly sleeved at one end of the connecting rod 2 close to the fixing sleeve 11. During construction, the screw rod 4 is rotated to enable the screw rod 4 to be in threaded connection with the fixed sleeve 11 until the reinforcing plate 21 is abutted against the side wall of the wall body 1 close to the side wall of the wall body 1, connection of the connecting rod 2 and the wall body 1 is completed, and the operation is simple and convenient.
Referring to fig. 2 and 4, the connecting assembly 5 includes a fixture block 51 and a fastening member 52, a circular groove 53 is formed in a top wall of the fixture block 51 along a vertical direction, a square groove 54 is formed in a side wall of the fixture block 51 along a direction perpendicular to a length direction of the circular groove 53, the fixture block 51 includes a first fixture block 511 and a second fixture block 512, the fastening member 52 is used for connecting the first fixture block 511 and the second fixture block 512, an iron chain 7 for preventing the second fixture block 512 from being lost is disposed on the side wall of the first fixture block 511, one end of the iron chain 7 is fixedly connected with the side wall of the first fixture block 511, and the other end of the iron chain is fixedly connected with the side wall of the second fixture block 512. The arrangement of the circular groove 53 and the square groove 54 enables the wall connecting piece to be used for connecting circular and square steel pipes, and improves the applicability of the wall connecting piece. The iron chain 7 is arranged for preventing the second clamping block 512 from falling from a high place during installation, construction safety is guaranteed, and installation can be completed only by one person during installation because the first clamping block 511 and the second clamping block 512 are connected through the iron chain 7 to be close to each other, so that time and labor are saved.
Referring to fig. 4, the fastening member 52 is configured as a fastening bolt, four through holes 55 are formed in the side wall of the first latch 511 close to the fixing sleeve 11 along the length direction of the fixing sleeve 11, four first threaded holes 56 for communicating with the through holes 55 are formed in the side wall of the second latch 512 close to the fixing sleeve 11, and the fastening bolt is inserted into the through holes 55 and is in threaded connection with the first threaded holes 56. During construction, the fastening connection of the first latch 511 and the second latch 512 is realized through the fastening piece 52, so that the scaffold steel pipe 3 is stably connected with the wall connecting piece.
Referring to fig. 4, the top wall and the side wall of the first latch 511 are both provided with a guide block 6 for guiding the second latch 512, the two guide blocks 6 are disposed at one end of the two side walls close to each other, each guide block 6 includes a straight section and an inclined section, the straight section is disposed and fixed on the side wall of the first latch 511, the inclined section is fixed at one end of the straight section far away from the first latch 511, the straight section is horizontally disposed along the side wall plane of the first latch 511, and the inclined section is inclined toward the bottom wall far away from the circular groove 53. Due to the arrangement of the guide block 6, the first threaded hole 56 of the second fixture block 512 is quickly aligned with the through hole 55 of the first fixture block 511, so that the fastener 52 can conveniently connect the first fixture block 511 with the second fixture block 512, and the operation is simple and convenient.
Referring to fig. 4, a sliding groove 57 is formed in the side wall of the through hole 55 along a length direction perpendicular to the through hole 55, a sliding piece 58 is slidably disposed in the sliding groove 57 along the length direction of the through hole 55, and the sliding piece 58 is fixedly sleeved on the fastening bolt. The sliding piece 58 is provided to prevent the fastener 52 from falling off from the through hole 55 of the first latch 511, so as to save time for searching for a fastening bolt during installation.
Referring to fig. 2 and 5, the connecting rod 2 is kept away from the lateral wall of fixed sleeve 11 and is seted up second screw hole 22 along the length direction of connecting rod 2, and telescopic link 8 is worn to be equipped with by second screw hole 22 internal thread, and fixed cover is equipped with turning block 82 on the telescopic link 8, and the fixed connecting block 81 that is provided with of one end that connecting rod 2 was kept away from to telescopic link 8. During the construction, drive telescopic link 8 through turning block 82 and rotate, telescopic link 8 extends or shortens along the length direction of connecting rod 2, and telescopic link 8 drives connecting block 81 and removes, and connecting block 81 drives coupling assembling 5 and removes, and coupling assembling 5 is applicable in being connected of different buildings and scaffold, has effectively improved the suitability of even wall spare.
Referring to fig. 5, the first latch 511 is rotatably installed on the connection block 81, and the circular groove 53 or the square groove 54 of the latch 51 is fitted to the scaffold steel pipe 3 by rotating the latch 51. First fixture block 511 is close to and is provided with first circle piece 9 on the lateral wall of connecting rod 2 fixedly, first circle piece 9 is close to the fixed second circle piece 10 that is provided with of one end of connecting rod 2, the diameter of second circle piece 10 is greater than the diameter of first circle piece 9, connecting block 81 has seted up first holding tank 811 along the length direction of telescopic link 8 on keeping away from the lateral wall of telescopic link 8, second holding tank 812 has been seted up along the length direction of telescopic link 8 to the diapire of first holding tank 811, the diameter of first holding tank 811 is less than the diameter of second holding tank 812, first circle piece 9 rotates and sets up in first holding tank 811, second circle piece 10 rotates and sets up in second holding tank 812. The second round block 10 and the second receiving groove 812 prevent the first latch 511 from being separated from the connecting rod 2, thereby improving the stability of the wall connecting member.
The implementation principle of this application embodiment wall spare structure for building engineering is: during the construction, with the screw rod 4 on the connecting rod 2 and the interior fixed sleeve 11 threaded connection of wall body 1, the rethread rotates turning block 82, make the telescopic link 8 remove towards the direction that is close to scaffold steel pipe 3, when the diapire of the circular recess 53 of first fixture block 511 or square groove 54 and scaffold steel pipe 3's lateral wall butt, second fixture block 512 passes through guide block 6 and the quick centering of first guide block 6, rotate fastening bolt, make first fixture block 511 and second fixture block 512 fastening connection, can accomplish the installation of even wall spare, and easy operation is convenient. When the scaffold is dismantled, the screw rod 4 is rotated to enable the screw rod 4 to be separated from the fixing sleeve 11, the fastening bolt is twisted to enable the fixture block 51 to be separated from the scaffold steel pipe 3, then the fixing sleeve 11 in the wall surface 1 is filled, construction can be completed, and construction efficiency is improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a building engineering is with linking wall spare structure, includes connecting rod (2) and is used for fixed sleeve (11) of setting in wall body (1), its characterized in that: the fixed screw rod (4) that is provided with of one end that connecting rod (2) are close to fixed sleeve (11), screw rod (4) screw thread is worn to establish in fixed sleeve (11), the one end that fixed sleeve (11) were kept away from in connecting rod (2) is provided with coupling assembling (5) that are used for connecting scaffold steel pipe (3).
2. The wall connecting piece structure for building construction engineering according to claim 1, characterized in that: the connecting assembly (5) comprises a clamping block (51) and a fastening piece (52), a circular groove (53) is formed in the top wall of the clamping block (51) in the vertical direction, a square groove (54) is formed in the side wall of the clamping block (51) in the length direction perpendicular to the circular groove (53), the clamping block (51) comprises a first clamping block (511) and a second clamping block (512), and the fastening piece (52) is used for connecting the first clamping block (511) and the second clamping block (512).
3. The wall connecting piece structure for building construction engineering according to claim 2, characterized in that: the fastening piece (52) is arranged as a fastening bolt, a through hole (55) is formed in the side wall, close to the fixing sleeve (11), of the first clamping block (511) along the length direction of the fixing sleeve (11), a first threaded hole (56) communicated with the through hole (55) is formed in the side wall, close to the fixing sleeve (11), of the second clamping block (512), and the fastening bolt is arranged in the through hole (55) in a penetrating mode and is used for being in threaded connection with the first threaded hole (56).
4. The wall connecting part structure for the building construction project according to claim 3, characterized in that: the side wall of the through hole (55) is provided with a sliding groove (57), a sliding sheet (58) is arranged in the sliding groove (57) in a sliding mode along the length direction of the through hole (55), and the sliding sheet (58) is fixedly arranged on a fastening bolt.
5. The wall connecting piece structure for building construction engineering according to claim 2, characterized in that: and guide blocks (6) for guiding the second fixture block (512) are arranged on the top wall and the side wall of the first fixture block (511).
6. The wall connecting piece structure for building construction engineering according to claim 2, characterized in that: an iron chain (7) is fixedly connected between the first clamping block (511) and the second clamping block (512).
7. The wall connecting piece structure for building construction engineering according to claim 1, characterized in that: connecting rod (2) are kept away from the one end screw thread of fixed sleeve (11) and are worn to be equipped with telescopic link (8), the fixed connecting block (81) that is provided with of one end that fixed sleeve (11) were kept away from in telescopic link (8), connecting block (81) rotate with first fixture block (511) and are connected, fixed cover is equipped with turning block (82) on telescopic link (8).
8. The wall connecting piece structure for building construction engineering according to claim 1, characterized in that: one end, far away from the connecting rod (2), of the fixing sleeve (11) is fixedly provided with two fixing hooks (12), and the two fixing hooks (12) are arranged in a bending mode towards the direction far away from each other.
CN202221920021.1U 2022-07-23 2022-07-23 Building engineering is with linking wall spare structure Active CN217924804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221920021.1U CN217924804U (en) 2022-07-23 2022-07-23 Building engineering is with linking wall spare structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221920021.1U CN217924804U (en) 2022-07-23 2022-07-23 Building engineering is with linking wall spare structure

Publications (1)

Publication Number Publication Date
CN217924804U true CN217924804U (en) 2022-11-29

Family

ID=84148553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221920021.1U Active CN217924804U (en) 2022-07-23 2022-07-23 Building engineering is with linking wall spare structure

Country Status (1)

Country Link
CN (1) CN217924804U (en)

Similar Documents

Publication Publication Date Title
CN217924804U (en) Building engineering is with linking wall spare structure
CN214740257U (en) Structure is built to interim room convenient to dismantle
CN106284852A (en) A kind of reinforcing bar connector of plane position adjustable
CN210459943U (en) Novel multifunctional wall connecting piece of fastener type scaffold
CN111794375A (en) Steel house assembling and connecting assembly
CN208401474U (en) Combined type temporary cable line overhead device
CN208778027U (en) Tunnel steel arch frame hook type lock foot anchoring stock
CN112227554A (en) Transverse connection structure of prefabricated wall of assembled
CN213999951U (en) Concrete loading device
CN217812293U (en) Outer scaffold is wall spare even
CN220318527U (en) Inserted self-locking prestressed concrete pile
CN220267188U (en) Steel pipe fastener protective sheath
CN216740092U (en) Auxiliary mechanism for horizontal connection and installation of steel structure
CN212897195U (en) Pre-buried threaded sleeve
CN220954217U (en) High-strength high-toughness low-temperature-resistant prestressed anchorage device
CN219316001U (en) Steel structure connecting assembly
CN214362660U (en) Road and bridge crack reinforcing structure
CN215828221U (en) Tower crane attaches wall spare mounting structure
CN216841722U (en) Mining anchor rope capable of quickly installing metal net
CN216477043U (en) Steel structure fireproof door for steel structure building
CN218292486U (en) Main reinforcement connecting sleeve for assembled reinforced concrete structure
CN219794618U (en) Building wall connecting piece
CN219140051U (en) Mounting bracket for rush-repair of ductile cast iron water supply pipe
CN220909173U (en) Supplementary grabbing device of many poles little unit rack operation
CN212405569U (en) Transverse connection structure of prefabricated wall of assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant