CN217924442U - Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile - Google Patents

Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile Download PDF

Info

Publication number
CN217924442U
CN217924442U CN202221212529.6U CN202221212529U CN217924442U CN 217924442 U CN217924442 U CN 217924442U CN 202221212529 U CN202221212529 U CN 202221212529U CN 217924442 U CN217924442 U CN 217924442U
Authority
CN
China
Prior art keywords
nut
wall
prestressed
slow
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221212529.6U
Other languages
Chinese (zh)
Inventor
李聪聪
唐明成
袁龙彬
汤亮
张志芳
王仕名
徐红桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202221212529.6U priority Critical patent/CN217924442U/en
Application granted granted Critical
Publication of CN217924442U publication Critical patent/CN217924442U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a prestressed tendon segmental connection structure of a slow bonding prestressed cast-in-place pile, which comprises a large nut, a small nut, a middle nut and an inserted bar, wherein one end of the large nut is connected with a steel strand, the other end of the large nut is in threaded connection with the middle nut, one end of the small nut is connected with the steel strand, and the other end of the small nut is in threaded connection with the inserted bar; the inner wall of one side of the middle nut is fixedly provided with a blocking wall, the inner wall of the other side of the middle nut is hinged with a bolt, a spring is arranged between the bolt and the inner wall of the middle nut, a raised head is formed at one end of the inserted rod, which deviates from the small nut, and the inserted rod is inserted into the middle nut to clamp the raised head with the blocking wall and the bolt. This application has easy operation, simple to operate, improves the advantage of efficiency of construction with both ends steel strand wires high-speed joint through the mode of pegging graft.

Description

Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile
Technical Field
The utility model relates to a technical field of slow bonding prestressed reinforcement installation especially relates to a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure.
Background
A pile foundation of a public building close to a subway area adopts a slow-bonding prestressed cast-in-place pile, wherein slow-bonding prestressed tendons are bound on the inner side of vertical common steel bars of a pile body, a tensioning fixed end is arranged at the bottom of the pile body, and a tensioning end is arranged at the top of the pile. The slow bonding prestress technology can fully play the tensile property of the high-strength steel bar and the compression resistance of the high-strength concrete, and a certain pressure is artificially applied to the cast-in-place pile before the structural member bears the load. The generated prestress state is used for reducing or offsetting tensile stress caused by external load, namely the deficiency of the tensile strength of the concrete is made up by the higher compressive strength of the concrete, and the aim of preventing the concrete in a tension area from cracking is fulfilled.
The slow-bonding prestressed cast-in-place pile is characterized in that: (1) the section of the pile body is small; (2) the steel consumption is less; (3) the engineering cost is low; (4) compared with the construction period of a common cast-in-place pile, the construction period is consistent, and energy conservation and emission reduction are facilitated.
The length of the slow-bonding prestressed cast-in-place pile is about 40 to 50m, the slow-bonding prestressed tendons are arranged on the inner side of a pile body steel reinforcement cage, the cast-in-place pile steel reinforcement cage is manufactured and installed in a segmented mode, and the problem that a steel strand connector cannot be used for connection in the installation process of the slow-bonding prestressed steel strands is solved, however, the existing steel strand connector is inconvenient to connect and influences the construction progress.
SUMMERY OF THE UTILITY MODEL
The utility model provides a slow bonding prestressing force bored concrete pile prestressing tendons segmentation connection structure has easy operation, simple to operate, improves the advantage of efficiency of construction.
The technical problem to be solved is that: in the slow bonding prestress wire installation, can't avoid using the steel strand wires connector to connect, however current steel strand wires connector is connected inconveniently, influences the construction progress.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to a slow bonding prestressing force bored concrete pile prestressing tendons segmentation connection structure, including big nut, little nut, middle nut and inserted bar, big nut one end is connected with the steel strand wires, and the other end is connected with middle nut threaded connection, little nut one end is connected with the steel strand wires, and the other end is connected with inserted bar threaded connection;
the inner wall of one side of the middle nut is fixedly provided with a blocking wall, the inner wall of the other side of the middle nut is hinged with a bolt, a spring is arranged between the bolt and the inner wall of the middle nut, a raised head is formed at one end of the inserted rod, which is far away from the small nut, and the inserted rod is inserted into the middle nut to enable the raised head to be clamped with the blocking wall and the bolt.
The utility model relates to a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure, it is further, big nut and little nut all are equipped with the blind end with the steel strand wires link, are equipped with the perforation that supplies steel strand wires to pass on the blind end, steel strand wires pass fenestrate one end and are equipped with the enlarged footing.
The utility model relates to a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure, it is further, be equipped with the internal thread on the big nut inner wall, be equipped with complex external screw thread with it on the outer wall of middle nut.
The utility model relates to a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure, it is further, the one end shaping that middle nut is close to big nut has the extension section.
The utility model relates to a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure, it is further, be equipped with the internal thread on the little nut inner wall, be equipped with on the inserted bar outer wall with interior screw-thread fit's external screw thread.
The utility model relates to a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure, it is further, it sets up half week along middle nut circumference to keep off the wall.
The utility model relates to a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure, it is further, the one side that plush copper and inserted bar are connected is formed with the plane that is used for the butt on keeping off the wall.
Compared with the prior art, the utility model, following beneficial effect has:
this application is through setting up big nut and little nut, links to each other both ends steel strand wires with both in advance, and when the butt joint, nut in the middle of the installation on big nut, installation inserted bar on little nut, then insert the inserted bar in the middle nut, in bolt and fender wall can block the bolt card into the nut in the middle, realize the high-speed joint of two steel strand wires, easy operation, simple to operate, improvement efficiency of construction.
The present invention will be further explained with reference to the accompanying drawings.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is the internal structure diagram of the middle nut of the present invention.
Reference numerals are as follows:
1. a large nut; 2. a small screw cap; 3. a middle nut; 4. a rod is inserted; 5. steel strand wires; 6. an extension section; 7. a retaining wall; 8. a bolt; 9. a spring; 10. and (4) a raised head.
Detailed Description
As shown in fig. 1-2, the utility model relates to a slow bonding prestressed cast-in-place pile prestressed reinforcement segmentation connection structure includes big nut 1, little nut 2, middle nut 3 and inserted bar 4, 1 one end of big nut is connected with steel strand wires 5, 3 threaded connection of the other end and middle nut, 2 one end of little nut is connected with another steel strand wires 5, the other end and 4 threaded connection of inserted bar, big nut 1 and little nut 2 all are equipped with the blind end with 5 links of steel strand wires, blind end center department is equipped with the perforation that supplies steel strand wires 5 to pass, steel strand wires 5 pass fenestrate one end and are equipped with the enlarged head, through enlarged head with steel strand wires 5 and 1 fixed connection of big nut.
The inner wall of the large nut 1 is provided with internal threads, the outer wall of the middle nut 3 is provided with external threads matched with the internal threads, and the middle nut 3 is screwed into the large nut 1 during installation. The middle nut 3 is formed with a hemispherical extension section 6 at one end close to the large nut 1, and after the middle nut 3 is screwed into the large nut 1, the extension section 6 is abutted against the expansion head.
Be equipped with the internal thread on the 2 inner walls of little nut, be equipped with on the 4 outer walls of inserted bar with internal thread complex external screw thread, during the installation, with in the little nut 2 of inserted bar 4 screw in.
The inner wall of one side of the middle nut 3 is fixedly provided with a retaining wall 7, the retaining wall 7 is arranged in a half-circle along the circumference of the middle nut 3, the inner wall of the other side of the middle nut is hinged with a bolt 8 through a pin shaft, a spring 9 is arranged between the bolt 8 and the inner wall of the middle nut 3, the spring 9 is used for driving the bolt 8 to be in a horizontal state, a raised head 10 is formed at one end of the inserted link 4, which is far away from the small nut 2, a plane used for abutting against the retaining wall 7 is formed at one side where the raised head 10 is connected with the inserted link 4, the inserted link 4 is inserted into the middle nut 3, so that the raised head 10 is clamped with the retaining wall 7 and the bolt 8, and the steel strands 5 at two ends are connected.
This application is through setting up big nut 1 and little nut 2, link to each other both ends steel strand wires 5 with both in advance, when the butt joint, install middle nut 3 on big nut 1, install inserted bar 4 on little nut 2, then insert in middle nut 3 with inserted bar 4, in bolt 8 and fender wall 7 can block bolt 8 card into middle nut 3, realize the high-speed joint of two steel strand wires 5, easy operation, simple to operate, improvement efficiency of construction.
The above-mentioned embodiments are merely illustrative of the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the spirit of the present invention should fall within the protection scope defined by the claims of the present invention.

Claims (7)

1. The utility model provides a slow bonding prestressed filling pile prestressed reinforcement segmentation connection structure which characterized in that: the novel steel strand wire fixing device comprises a large nut (1), a small nut (2), a middle nut (3) and an insertion rod (4), wherein one end of the large nut (1) is connected with a steel strand wire (5), the other end of the large nut (1) is in threaded connection with the middle nut (3), one end of the small nut (2) is connected with the steel strand wire (5), and the other end of the small nut (2) is in threaded connection with the insertion rod (4);
middle nut (3) one side inner wall sets firmly keeps off wall (7), and articulated on the opposite side inner wall have bolt (8), be equipped with spring (9) between bolt (8) and middle nut (3) inner wall, the one end shaping that inserted bar (4) deviates from little nut (2) has plush copper (10), inserted bar (4) insert in middle nut (3) make plush copper (10) with keep off wall (7) and bolt (8) joint.
2. The prestressed tendon segmental connection structure for the slow-bonding prestressed cast-in-place pile of claim 1, which is characterized in that: big nut (1) and little nut (2) all are equipped with the blind end with steel strand wires (5) link, are equipped with the perforation that supplies steel strand wires (5) to pass on the blind end, steel strand wires (5) pass the perforated one end and are equipped with the enlarged footing.
3. The prestressed tendon segmental connection structure for the slow-bonding prestressed cast-in-place pile of claim 1, which is characterized in that: the inner wall of the large nut (1) is provided with internal threads, and the outer wall of the middle nut (3) is provided with external threads matched with the internal threads.
4. The prestressed tendon segmental connection structure for the slow-bonding prestressed cast-in-place pile of claim 3, wherein: and an extension section (6) is formed at one end of the middle nut (3) close to the large nut (1).
5. The prestressed tendon segmental connection structure for the slow-bonding prestressed cast-in-place pile of claim 1, which is characterized in that: the inner wall of the small nut (2) is provided with an internal thread, and the outer wall of the inserted bar (4) is provided with an external thread matched with the internal thread.
6. The prestressed tendon segmental connection structure for the slow-bonding prestressed cast-in-place pile of claim 1, which is characterized in that: the retaining wall (7) is arranged along the circumference of the middle nut (3) for half a circle.
7. The prestressed tendon segmental connection structure for the slow-bonding prestressed cast-in-place pile of claim 1, which is characterized in that: and a plane for abutting against the blocking wall (7) is formed on one surface of the raised head (10) connected with the inserted rod (4).
CN202221212529.6U 2022-05-20 2022-05-20 Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile Active CN217924442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221212529.6U CN217924442U (en) 2022-05-20 2022-05-20 Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221212529.6U CN217924442U (en) 2022-05-20 2022-05-20 Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile

Publications (1)

Publication Number Publication Date
CN217924442U true CN217924442U (en) 2022-11-29

Family

ID=84178637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221212529.6U Active CN217924442U (en) 2022-05-20 2022-05-20 Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile

Country Status (1)

Country Link
CN (1) CN217924442U (en)

Similar Documents

Publication Publication Date Title
CN201125491Y (en) Prestress rib fixed end anchorage
CN109653531B (en) External prestress steel strand connector and matched tensioning device
CN101074578B (en) Special anchoros for wedged variable-corrugated clamped sheets
CN101210447A (en) Steel strand integral bundle extrusion anchor cable guy cable
CN111155418A (en) Beam falling prevention device and method using fabricated bridge hanging point structure
CN2739290Y (en) Steel strand vertical prestress anchoring system
CN1512018A (en) Prestress combined beam, continuous prestress combined beam structure and producing connection method
CN209760863U (en) External prestress steel strand connector and matched tensioning device
CN217924442U (en) Prestressed reinforcement segmented connection structure of slow-bonding prestressed cast-in-place pile
CN210976342U (en) Steel strand connector
CN202611109U (en) Steel strand connector
CN200943289Y (en) Prestress FRP tendon extrusion type anchorage
CN207761302U (en) One kind can be used in turn anchor pole tension tool
CN207418179U (en) A kind of preceding card punching bridge prestress stretch-draw jack
CN110485631A (en) There is the pretensioned prestressing precast beam of anchor head in a kind of end
CN211714375U (en) Steel bar connecting joint of prefabricated concrete structure
CN210946868U (en) Connector for threaded steel bar and prestressed tendon
CN112523228A (en) Prestressed beam string applied to vertical rod of foundation pit self-locking jack
CN209066282U (en) A kind of prestressing force pull system of steel strand wires
CN212505861U (en) Steel strand anti-slip device
CN210684760U (en) End plate-free prestressed concrete pile connecting structure
CN219427052U (en) Prestressing force mould platform
CN2701981Y (en) High strength wire pre-tensioned prestressing anchor system
CN218643238U (en) Prestressed carbon fiber rib tensioning system
CN108265631A (en) A kind of prestressing force pull system of porous tool anchor and steel strand wires

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant