CN217924088U - Green building assembled steel construction - Google Patents
Green building assembled steel construction Download PDFInfo
- Publication number
- CN217924088U CN217924088U CN202221875863.XU CN202221875863U CN217924088U CN 217924088 U CN217924088 U CN 217924088U CN 202221875863 U CN202221875863 U CN 202221875863U CN 217924088 U CN217924088 U CN 217924088U
- Authority
- CN
- China
- Prior art keywords
- welding
- support column
- sides
- box
- steel construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an assembled steel construction for green building, which comprises a supporting column, the top welding of support column has the installation piece, the both sides of support column all run through and are provided with a supporting beam. The utility model discloses an installation piece, a supporting beam, the mounting panel, the bracing piece, the stopper, the mounting box, first connecting plate, first dovetail groove, the second dovetail groove, a first spring, the connecting rod, spacing arch, the trapezoidal piece, spacing box, the second spring, the cooperation of second connecting plate and triangle stopper is used, current assembled steel construction has been solved when using, only adopt the bolt to carry out fixed mounting to the steel construction usually, need personnel to lift the structure when fixed, just can install the structure, complex operation not only like this, the stability that supports to the steel construction is also relatively poor simultaneously, and the steel construction all has the damage of certain degree when demolising in the later stage, can't carry out used repeatedly's problem.
Description
Technical Field
The utility model relates to a green building technical field specifically is a green building assembled steel construction.
Background
In the whole life cycle, resources are saved, the environment is protected, pollution is reduced, healthy, applicable and efficient use space is provided for people, high-quality buildings harmoniously symbiotic with the nature are realized to the maximum extent, green building evaluation follows the principle of adjusting according to local conditions, and the performances of safety, durability, health, comfort, life convenience, resource saving, environment living suitability, five indexes and the like in the whole life cycle of the buildings are realized by combining the characteristics of climate, environment, resources, economy, culture and the like of regions where the buildings are located.
Along with the reinforcing of people's environmental protection consciousness, it adopts assembled steel construction to carry out the frame to build to have partial building at present, compare in traditional building system, can save a large amount of energy and partial building material, current assembled steel construction is when using, only adopt the bolt to carry out fixed mounting to the steel construction usually, need personnel to lift the structure when fixed, just can install the structure, complex operation not only like this, also relatively poor to the stability of steel construction support, and the steel construction all has the damage of certain degree when demolising in the later stage, can't carry out used repeatedly, not only increased building rubbish, also make the waste of resource easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green assembled steel construction for building, possess and support stably and be convenient for carry out the advantage of dismouting, solved current assembled steel construction when using, only adopt the bolt to carry out fixed mounting to the steel construction usually, need personnel to lift the structure when fixed, could install the structure, complex operation not only so, simultaneously also relatively poor to the stability of steel construction support, and the steel construction all has the damage of certain degree when demolising at the later stage, can't carry out used repeatedly, not only increased building rubbish, also cause the problem of wasting of resources easily.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an assembled steel structure for green building, includes the support column, the top welding of support column has the installation piece, the both sides of support column all run through and are provided with a supporting beam, the mounting panel has all been welded to a supporting beam's both sides, both sides all are provided with stop gear around the support column, the bottom of support column is provided with installation mechanism, the top welding of installation piece has the stopper, the guide way has been seted up to the front side of installation piece.
Preferably, a first trapezoidal groove is formed in the bottom of the supporting beam, a trapezoidal block is movably connected to the inner cavity of the first trapezoidal groove, and a supporting rod is welded to the bottom of the trapezoidal block.
Preferably, installation mechanism includes the mounting box, the top and the support column welding of mounting box, the second dovetail groove has been opened to the front side of mounting box, the rear side welding of second dovetail groove inner chamber has the guide bar, first spring has all been welded to the both sides of mounting box inner chamber, and the welding of one side that two first springs are relative has first connecting plate, and the welding of one side that two first connecting plates are relative has spacing arch, the front side welding of first connecting plate has the arm-tie.
Preferably, stop gear includes spacing box, one side that spacing box is close to the support column welds with the support column, the quantity of spacing box is two, the second spring has all been welded to the upper and lower both sides of spacing box inner chamber, and the second connecting plate has all been welded to one side that two second springs are relative, and the triangle stopper has been welded to one side that two second connecting plates are relative, and the connecting rod has all been welded to one side that two second connecting plates are opposite.
Preferably, one side opposite to each connecting rod runs through to the outer side of the limiting box and is fixedly connected with a pull handle, first through holes are formed in the two sides of the limiting box, and the movable door is installed on one side opposite to the front side and the rear side of the two limiting boxes through bolts.
Preferably, the second through holes are formed in the two sides of the supporting column, and grooves are formed in the two sides of the supporting column.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses an installation piece, a supporting beam, the mounting panel, the bracing piece, the stopper, the mounting box, first connecting plate, first dovetail groove, the second dovetail groove, a first spring, the connecting rod, spacing arch, the trapezoidal piece, spacing box, the second spring, the cooperation of second connecting plate and triangle stopper is used, current assembled steel construction has been solved when using, only adopt the bolt to carry out fixed mounting to the steel construction usually, need personnel to lift the structure when fixed, just can install the structure, complex operation not only like this, the stability that supports to the steel construction is also relatively poor simultaneously, and the steel construction all has the damage of certain degree when demolising in the later stage, can't carry out used repeatedly's problem.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is an exploded perspective view of the support pillar with a local structure of the present invention;
FIG. 3 is an exploded perspective view of the mounting mechanism of the present invention;
fig. 4 is a sectional and exploded perspective view of the structure limiting mechanism of the present invention.
In the figure: the device comprises a supporting column 1, a mounting block 2, a pulling handle 3, a supporting beam 4, a mounting plate 5, a limiting mechanism 6, a mounting mechanism 7, a supporting rod 8, a limiting block 9, a guide groove 10, a mounting box 11, a first connecting plate 12, a first trapezoidal groove 13, a second trapezoidal groove 14, a guide rod 15, a first spring 16, a connecting rod 17, a limiting protrusion 18, a trapezoidal block 19, a limiting box 20, a second spring 21, a second connecting plate 22 and a triangular limiting block 23.
Detailed Description
Please refer to fig. 1-4, an assembly type steel structure for green building includes a support pillar 1, a mounting block 2 welded on the top of the support pillar 1, a support beam 4 penetrating through the two sides of the support pillar 1, a mounting plate 5 welded on the two sides of the support beam 4, a limiting mechanism 6 arranged on the front and rear sides of the support pillar 1, a mounting mechanism 7 arranged on the bottom of the support pillar 1, a limiting block 9 welded on the top of the mounting block 2, and a guide groove 10 arranged on the front side of the mounting block 2.
A first dovetail groove 13 has been seted up to a supporting beam 4's bottom, and the inner chamber swing joint in first dovetail groove 13 has trapezoidal piece 19, and the bottom welding of trapezoidal piece 19 has bracing piece 8.
Two opposite one sides of connecting rod 17 all run through to the outside of spacing box 20 and fixedly connected with draws 3, and first through-hole has all been seted up to the both sides of spacing box 20, and the dodge gate is all installed through the bolt in two opposite one sides around spacing box 20.
Second through holes are formed in the two sides of the supporting column 1, and grooves are formed in the two sides of the supporting column 1.
Through the cooperation of first through-hole and second through-hole, be convenient for mounting panel 5 gets into in the spacing box 20, through setting up the dodge gate, the staff of being convenient for overhauls the part in the spacing box 20, through setting up the arm-tie, the staff of being convenient for stimulates first connecting plate 12, remove spacing arch 18 spacing to stopper 9 with this, through setting up the recess, can support a supporting beam 4 with the cooperation of bracing piece 8, cooperation through guide way 10 and guide bar 15, can lead spacing to installation piece 2, can prevent simultaneously that installation piece 2 from taking place to rock in second dovetail groove 14, with this stability that increases support column 1.
During the use, the user assembles the installation to support column 1 earlier, the user aligns guide bar 15 with guide way 10, subsequently the user inserts installation piece 2 in second dovetail groove 14 through support column 1, when installation piece 2 gets into second dovetail groove 14, installation piece 2 drives stopper 9 and gets into in mounting box 11, stopper 9 gets into behind mounting box 11, first connecting plate 12 drives spacing arch 18 through the resilience force of first spring 16 and inserts in stopper 9, make spacing arch 18 can carry out spacingly to installation piece 2, with this to carry out the assembly installation to support column 1, after the installation, the user passes mounting panel 5 from first through-hole and second through-hole through a supporting beam 4, until mounting panel 5 extends to the inner chamber of spacing box 20, after mounting panel 5 gets into spacing box 20, second connecting plate 22 drives triangle stopper 23 through the resilience force of second spring 21 and moves, until triangle stopper 23 inserts in mounting panel 5, with this to mounting panel 5 spacing, make mounting panel 4 can carry out stable installation, after the installation of support beam 4, the user inserts the bracing piece 19 with the bracing piece in order that this supports supporting beam 8, this supports the back support bar 8 with this installation recess and support the supporting beam 8.
In summary, the following steps: this green assembled steel construction for building, through installation piece 2, a supporting beam 4, mounting panel 5, bracing piece 8, stopper 9, mounting box 11, first connecting plate 12, first dovetail groove 13, second dovetail groove 14, first spring 16, connecting rod 17, spacing arch 18, dovetail block 19, spacing box 20, second spring 21, second connecting plate 22 and triangle stopper 23's cooperation is used, current assembled steel construction has been solved when using, only adopt the bolt to carry out fixed mounting to the steel construction usually, need personnel to lift the structure when fixed, just can install the structure, complex operation not only like this, simultaneously also relatively poor to the stability of steel structural support, and the steel construction all has the damage of certain degree when demolising in the later stage, can't carry out used repeatedly's problem.
Claims (6)
1. The utility model provides a green assembled steel construction for building, includes support column (1), its characterized in that: the welding of the top of support column (1) has installation piece (2), the both sides of support column (1) all run through and are provided with a supporting beam (4), mounting panel (5) have all been welded to the both sides of a supporting beam (4), both sides all are provided with stop gear (6) around support column (1), the bottom of support column (1) is provided with installation mechanism (7), the top welding of installation piece (2) has stopper (9), guide way (10) have been seted up to the front side of installation piece (2).
2. The assembly type steel structure for green and environment-friendly buildings according to claim 1, characterized in that: a first trapezoidal groove (13) has been seted up to the bottom of a supporting beam (4), the inner chamber swing joint in first trapezoidal groove (13) has trapezoidal piece (19), the bottom welding of trapezoidal piece (19) has bracing piece (8).
3. The assembly type steel structure for green and environment-friendly buildings according to claim 1, wherein: installation mechanism (7) include mounting box (11), the top and support column (1) welding of mounting box (11), second dovetail groove (14) have been seted up to the front side of mounting box (11), the rear side welding in second dovetail groove (14) inner chamber has guide bar (15), first spring (16) have all been welded to the both sides in mounting box (11) inner chamber, and the welding of one side relative in two first springs (16) has first connecting plate (12), and the welding of one side relative in two first connecting plate (12) has spacing arch (18), the front side welding of first connecting plate (12) has the arm-tie.
4. The assembly type steel structure for green and environment-friendly buildings according to claim 1, wherein: stop gear (6) are including spacing box (20), one side and support column (1) welding that spacing box (20) are close to support column (1), the quantity of spacing box (20) is two, second spring (21) have all been welded to the upper and lower both sides of spacing box (20) inner chamber, and second connecting plate (22) have all been welded to one side that two second springs (21) are relative, and one side welding that two second connecting plates (22) are relative has triangle stopper (23), and connecting rod (17) have all been welded to one side that two second connecting plates (22) are opposite.
5. The green environmental building fabricated steel structure of claim 4, wherein: one side that two connecting rods (17) are opposite all runs through to the outside of spacing box (20) and fixedly connected with draws handle (3), first through-hole has all been seted up to the both sides of spacing box (20), and the dodge gate is all installed through the bolt in two spacing box (20) front and back opposite one side.
6. The assembly type steel structure for green and environment-friendly buildings according to claim 1, wherein: the two sides of the supporting column (1) are provided with second through holes, and the two sides of the supporting column (1) are provided with grooves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221875863.XU CN217924088U (en) | 2022-07-21 | 2022-07-21 | Green building assembled steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221875863.XU CN217924088U (en) | 2022-07-21 | 2022-07-21 | Green building assembled steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217924088U true CN217924088U (en) | 2022-11-29 |
Family
ID=84191628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221875863.XU Active CN217924088U (en) | 2022-07-21 | 2022-07-21 | Green building assembled steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217924088U (en) |
-
2022
- 2022-07-21 CN CN202221875863.XU patent/CN217924088U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202299044U (en) | Unit stone curtain wall | |
CN217924088U (en) | Green building assembled steel construction | |
CN201436332U (en) | Shearing wall with seamed steel plate connected on middle part by bolt | |
CN108708485B (en) | Mounting structure of precast concrete assembled wallboard | |
CN207314290U (en) | Down-the-hole plane full-water column steel gate leaf structure | |
CN208981567U (en) | A kind of assembly concrete shear wall connecting joint structure | |
CN209620560U (en) | A kind of novel climbing frame hanging seat | |
CN208934394U (en) | One kind can turnover type hydraulic climbing formwork wall-attaching equipment | |
CN211735875U (en) | Bending and shearing double-order damper | |
CN211007826U (en) | Solar hydraulic simple lifting parking equipment | |
CN210190103U (en) | Assembled underground garage channel-shaped plate mould | |
CN210887683U (en) | Assembled wall body frame with large-span entrance to a cave | |
CN208916557U (en) | A kind of modular lift car | |
CN208309811U (en) | A kind of connecting node of the replaceable active beam link of accentric support steel construction | |
CN204282567U (en) | A kind of flexion-proof energy consumption supporting structure | |
CN211473664U (en) | Novel protective fence | |
CN209959068U (en) | Steel construction door convenient to installation | |
CN213144084U (en) | Anti-impact steel structure for building outer wall | |
CN216516200U (en) | Safe formula steel construction node component | |
CN218600092U (en) | Integrated refrigerator lower cross beam structure | |
CN213011453U (en) | L-shaped car frame | |
CN215052254U (en) | Fixing device is strengthened to overhead station bridge | |
CN212897184U (en) | Reinforcement component | |
CN214785173U (en) | Novel connection structure between curtain and wall body | |
CN218623482U (en) | Anti-fatigue structure of steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |