CN217922880U - Novel sand base brick structure of permeating water - Google Patents

Novel sand base brick structure of permeating water Download PDF

Info

Publication number
CN217922880U
CN217922880U CN202221582882.3U CN202221582882U CN217922880U CN 217922880 U CN217922880 U CN 217922880U CN 202221582882 U CN202221582882 U CN 202221582882U CN 217922880 U CN217922880 U CN 217922880U
Authority
CN
China
Prior art keywords
layer
sand
brick structure
sand base
coat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221582882.3U
Other languages
Chinese (zh)
Inventor
王义廷
赵明
林建仁
伍根伙
谷昕
李仰根
刘文龙
谢芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Motple New Materials Research Shanghai Co ltd
Original Assignee
Motple New Materials Research Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Motple New Materials Research Shanghai Co ltd filed Critical Motple New Materials Research Shanghai Co ltd
Priority to CN202221582882.3U priority Critical patent/CN217922880U/en
Application granted granted Critical
Publication of CN217922880U publication Critical patent/CN217922880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a novel sand base brick structure of permeating water, comprising a main body, the main part is inside including soil basic unit, soil basic unit's top is provided with thick stone layer, thick stone layer's top is provided with the back up coat, and the top of back up coat is provided with sand base permeable bed, the centre on back up coat top surface is provided with the cross lug, the fixed dead lever that is provided with in bottom of cross lug, just the dead lever runs through in back up coat and thick stone layer, sets up the inside in soil basic unit. The utility model discloses a dead lever for connect more stably between each articulamentum, guarantee the joint strength between every layer, prevent to split open between every layer, simultaneously through the hole of permeating water, increase comfort level and frictional force that the pedestrian trampled, increase the security of walking, increased the infiltration effect through the hole of permeating water, prevent that ponding from attaching to the surface on sand base permeable bed.

Description

Novel sand base brick structure of permeating water
Technical Field
The utility model relates to a sand base brick structure technical field that permeates water specifically is a novel sand base brick structure that permeates water.
Background
Along with the rapid development of social economy, the brick that permeates water has obtained the wide application in municipal works, gardens square, fields such as rainwater filtration collection as city construction "infiltration reduces discharging" an important material, and the brick that permeates water has the effect: effectively relieve the stubborn diseases of waterlogging in rainstorm seasons, improve urban road drainage and the living environment of people, and improve the rainwater infiltration, purification and collection utilization rate.
However, the existing water permeable brick only uses aeolian sand and curing agent as raw materials, and has lower hardness and lower bearing capacity, so that the service life is shorter; therefore, the existing requirements are not met, and a novel sand-based water permeable brick structure is provided for the requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel sand base brick structure of permeating water to the brick of permeating water that proposes in solving above-mentioned background art only is simple use aeolian sand and curing agent as the raw materials, and hardness is lower, and bearing capacity is lower, causes the lower scheduling problem of life.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel sand base brick structure of permeating water, comprises a main body, the inside soil base layer that includes of main part, soil base layer's top is provided with the thick stone layer, the top on thick stone layer is provided with the back up coat, and the top of back up coat is provided with sand base permeable bed, the centre on back up coat top surface is provided with the cross lug, the fixed dead lever that is provided with in bottom of cross lug, just the dead lever runs through in back up coat and thick stone layer, sets up the inside at soil base layer, the both ends surface mounting of dead lever has the connection tooth, the one end of main part is provided with first lug, the opposition end of main part is provided with first concave plate, one side of main part is provided with the second lug, the opposition side of main part is provided with the second concave plate.
Preferably, when the two main bodies are connected with each other at the end face, the first convex block is arranged inside the first concave plate, and when the two main bodies are connected with each other at the end face, the second convex block is arranged inside the second concave plate.
Preferably, four end angles at the top of the reinforcing layer are fixedly provided with fixing columns, four end angles at the bottom of the sand-based water permeable layer are provided with fixing holes, and the fixing columns are installed inside the fixing holes.
Preferably, the middle of the bottom of the sand-based permeable layer is provided with a cross concave block which is matched with the cross convex block, and the surface of the sand-based permeable layer is provided with eight permeable holes.
Preferably, when the main bodies are connected, fine stone seams are arranged among the main bodies.
Preferably, the bottom end of the soil base layer is fixedly provided with a rack.
Preferably, a reinforcing mesh is arranged inside the reinforcing layer.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the fixing rod of the utility model penetrates through the reinforcing layer and the thick stone layer and is arranged inside the soil base layer, so that the connection between each connecting layer is more stable, the connection strength between each layer is ensured, and the crack between each layer is prevented;
2. the utility model discloses a surface of sand base permeable bed is provided with eight permeable holes, has increased comfort level and the frictional force that the pedestrian trampled, and the permeable hole also has skid-proof effect simultaneously, increases the security of walking, has increased the infiltration effect through the permeable hole, prevents that ponding from adhering to the surface of sand base permeable bed;
3. the utility model discloses a set up in the inside of first concave plate through first lug between a plurality of main parts, the second lug sets up in the inside of second concave plate for connect the fastening between a plurality of main parts, and make adjacent whole be in same horizontal plane of passing through, improve adjacent holistic planarization.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall structure of the present invention;
FIG. 3 is a schematic overall structure of the present invention;
fig. 4 is a structural sectional view of the main body of the present invention;
fig. 5 is the structure schematic diagram of the sand-based permeable layer of the utility model.
In the figure: 1. a soil base layer; 2. a thick stone layer; 3. a reinforcement layer; 4. a sand-based permeable layer; 5. a first bump; 6. a second bump; 7. a first concave plate; 8. a second concave plate; 9. water permeable holes; 10. fixing a column; 11. fine stone seams; 12. a rack; 13. a cross-shaped projection; 14. a fixing rod; 15. a connecting tooth; 16. a main body; 17. a fixing hole; 18. a cross concave block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 5, the present invention provides an embodiment: the utility model provides a novel sand base brick structure of permeating water, including main part 16, main part 16 is inside including soil base layer 1, soil base layer 1's top is provided with boulder layer 2, boulder layer 2's top is provided with back up coat 3, back up coat 3's top is provided with sand base permeable bed 4, the centre of 3 top surfaces of back up coat is provided with cross lug 13, the fixed dead lever 14 that is provided with in bottom of cross lug 13, and dead lever 14 runs through in back up coat 3 and boulder layer 3, the setting is in soil base layer 1's inside, the both ends surface mounting of dead lever 14 has connect tooth 15, main part 16's one end is provided with first lug 5, main part 16's opposition end is provided with first notch board 7, one side of main part 16 is provided with second lug 6, main part 16's opposition side is provided with second notch board 8.
Further, when the two bodies 16 are connected to each other at the side surface, the first protrusion 5 is disposed inside the first concave plate 7, and when the two bodies 16 are connected to each other at the side surface, the second protrusion 6 is disposed inside the second concave plate 8.
By adopting the technical scheme, the main bodies 16 are connected and fastened, and the adjacent transparent bodies are positioned on the same horizontal plane, so that the flatness of the adjacent bodies is improved.
Further, fixed being provided with fixed column 10 at four end angles at reinforcing layer 3 top, four end angles of sand base permeable bed 4 bottom are provided with fixed orifices 17, and fixed column 10 installs the inside to fixed orifices 17.
Through adopting above-mentioned technical scheme for install to the inside of fixed orifices 17 through fixed column 10, the back up coat 3 is connected more stably with sand base permeable bed 4.
Further, the centre of sand base permeable layer 4 bottom is provided with cross concave block 18, and mutually supports with cross lug 13, and the surface of sand base permeable layer 4 is provided with eight holes 9 that permeate water.
Through adopting above-mentioned technical scheme for increased comfort level and the frictional force that the pedestrian trampled, the hole 9 of permeating water also has skid-proof effect simultaneously, increases the security of walking, has increased the infiltration effect through the hole 9 of permeating water, prevents that ponding from adhering to the surface on sand base permeable bed 4.
Further, when the plurality of main bodies 16 are connected, the fine stone slits 11 are provided between the plurality of main bodies 16.
By adopting the technical scheme, the body is beautified while being reinforced among the main bodies 16.
Further, a rack 12 is fixedly arranged at the bottom end of the soil foundation layer 1.
Through adopting above-mentioned technical scheme for increase whole frictional force of laying the connection.
Further, a reinforcing mesh is arranged inside the reinforcing layer 3.
Through adopting above-mentioned technical scheme for improve the structural strength of back up coat 3, the condition that further reduces the section brick takes place, thereby avoids behind the section brick pedestrian to trample the condition that produces the rainwater and splash and takes place.
The working principle is as follows: during the use, at first run through in back up coat 3 and thick stone layer 3 through dead lever 14, set up the inside at soil matrix 1, make to connect more stably between each articulamentum, guarantee the joint strength between every layer, prevent to split between every layer, then set up in the inside of first concave plate 7 through first lug 5 between a plurality of main parts 16, second lug 6 sets up in the inside of second concave plate 8, make to connect the fastening between a plurality of main parts 16, and make adjacent penetrating whole be in on the same horizontal plane, improve adjacent holistic planarization, be provided with eight permeable holes 9 through the surface of sand base permeable layer 4 at last, the comfort level and the frictional force of trampling have been increased, permeable holes 9 also have skid-proof effect simultaneously, increase the security of walking, the infiltration effect has been increased through permeable holes 9, prevent ponding attached to the surface of sand base permeable layer 4.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. A novel sand base brick structure that permeates water, includes main part (16), its characterized in that: the soil base layer (1) is arranged in the main body (16), the thick stone layer (2) is arranged above the soil base layer (1), the reinforcing layer (3) is arranged above the thick stone layer (2), the sand base permeable layer (4) is arranged above the reinforcing layer (3), the cross bump (13) is arranged in the middle of the top surface of the reinforcing layer (3), the fixing rod (14) is fixedly arranged at the bottom of the cross bump (13), the fixing rod (14) penetrates through the reinforcing layer (3) and the thick stone layer (2) and is arranged in the soil base layer (1), the connecting teeth (15) are arranged on the surfaces of the two ends of the fixing rod (14), the first bump (5) is arranged at one end of the main body (16), the first concave plate (7) is arranged at the opposite end of the main body (16), the second bump (6) is arranged on one side of the main body (16), and the second concave plate (8) is arranged on the opposite side of the main body (16).
2. The novel sand-based water permeable brick structure according to claim 1, characterized in that: when the two main bodies (16) are connected with each other in an end face, the first protruding block (5) is arranged inside the first concave plate (7), and when the two main bodies (16) are connected with each other in a side face, the second protruding block (6) is arranged inside the second concave plate (8).
3. The novel sand-based water permeable brick structure according to claim 1, characterized in that: four end angles at the top of the reinforcing layer (3) are fixedly provided with fixing columns (10), four end angles at the bottom of the sand-based permeable layer (4) are provided with fixing holes (17), and the fixing columns (10) are installed in the fixing holes (17).
4. The novel sand-based water permeable brick structure according to claim 3, characterized in that: the middle of sand base permeable layer (4) bottom is provided with cross concave block (18), and with cross lug (13) mutually support, the surface of sand base permeable layer (4) bottom is provided with eight holes (9) of permeating water.
5. The novel sand-based water permeable brick structure according to claim 1, characterized in that: when the main bodies (16) are connected, the fine stone seams (11) are arranged among the main bodies (16).
6. The novel sand-based water permeable brick structure according to claim 1, characterized in that: the bottom end of the soil base layer (1) is fixedly provided with a rack (12).
7. The novel sand-based water permeable brick structure according to claim 1, characterized in that: a layer of reinforcing mesh is arranged inside the reinforcing layer (3).
CN202221582882.3U 2022-06-18 2022-06-18 Novel sand base brick structure of permeating water Active CN217922880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221582882.3U CN217922880U (en) 2022-06-18 2022-06-18 Novel sand base brick structure of permeating water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221582882.3U CN217922880U (en) 2022-06-18 2022-06-18 Novel sand base brick structure of permeating water

Publications (1)

Publication Number Publication Date
CN217922880U true CN217922880U (en) 2022-11-29

Family

ID=84183578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221582882.3U Active CN217922880U (en) 2022-06-18 2022-06-18 Novel sand base brick structure of permeating water

Country Status (1)

Country Link
CN (1) CN217922880U (en)

Similar Documents

Publication Publication Date Title
CN210262547U (en) Wide structure is tied up to bituminous paving
CN102220733B (en) Non-linear movable type combined system of ballast and damping fastener
CN207672358U (en) A kind of environment protection pavement
CN217922880U (en) Novel sand base brick structure of permeating water
CN109680582A (en) A kind of permeable garden path structure
CN208685390U (en) Sponge city paved road structure
CN212224453U (en) Water storage and drainage structure for drainage of basement roof
CN203080380U (en) Pavement structure applicable to damp and hot rainy regions
CN207582236U (en) Football Field Turf
CN214783033U (en) Ecological town road in sponge city
CN211227914U (en) Composite reinforcement structure of highway subgrade soft soil layer
CN214401260U (en) Waterborne polyurethane pavement structure
CN214613390U (en) Gap type permeable paving connection fixing plate for sponge city
CN212895759U (en) Subside support type square structure of mating formation of permeating water
KR100798960B1 (en) The water storage reduction space playground structural altificial grass body
CN212865481U (en) Anti-cracking grain noodle for rural areas
CN113882212A (en) Street tree root system tree pool structure and construction process thereof
CN209722627U (en) A kind of draining road structure of town road
CN111501835B (en) Impact-resistant and smashing-resistant rubber bedding for concrete bottom plate of hydraulic drainage building
CN207608922U (en) A kind of architectural engineering retaining wall
CN218322183U (en) Concrete road surface structure that permeates water that bearing capacity is high
CN211898529U (en) Landscape retaining wall capable of being planted
CN210975414U (en) Comprehensive pipe gallery waterproof construction of sponge city ecosystem
CN217678423U (en) Concrete road surface permeates water convenient to rainwater infiltration
CN108951340A (en) A kind of steel fiber reinforced concrete sponge urban ecology guidance tape and preparation method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant